LIGO-Number |
Title |
Author(s) |
Topic(s) |
Last Updated |
F1300014-v1 |
LIGO Memorandum Template |
Dennis Coyne |
Policies
|
17 Sep 2024 |
M1500263-v1 |
Guidelines for Advanced LIGO Detector Upgrade Development Review |
Dennis Coyne |
Requirements
Conceptual Design
Fabrication
System Engineering
Policies
Preliminary Design
Final Design
Upgrades
|
05 Oct 2016 |
E960050-v13 |
LIGO Vacuum Compatible Materials List |
Dennis Coyne |
Fabrication
Vacuum
Final Design
|
11 Sep 2024 |
E1000193-x0 |
LIGO UHV Qualification Test Results |
Dennis Coyne |
System Engineering
Vacuum
|
11 Sep 2024 |
F080013-x0 |
Fabricated Equipment Request Form |
Phil Lindquist |
Procurements
|
04 Mar 2009 |
D1003141-v3 |
Rack and Cable Tray Layout, LVEA, L1 |
Dennis Coyne et al. |
Observatory Facilities
System Engineering
|
30 Aug 2024 |
D1002704-v7 |
Rack and Cable Tray Layout_LVEA_H1 |
Dennis Coyne et al. |
Observatory Facilities
System Engineering
|
28 Aug 2024 |
E1200625-v4 |
local coordinates of support tube ends |
Dennis Coyne |
Auxiliary Optics
System Engineering
|
26 Aug 2024 |
E1400310-v2 |
aLIGO Availability Estimate |
Dennis Coyne |
Operations
System Engineering
|
02 May 2024 |
E1500229-v14 |
Third IFO Component Request Log |
Dennis Coyne |
Operations
System Engineering
LIGO-India
|
10 Feb 2017 |
M1400339-v1 |
Vacuum Review Board (VRB) Charter |
Dennis Coyne |
System Engineering
Vacuum
Technical Review Board
|
23 Oct 2014 |
E1200479-v1 |
aLIGO, SYS, (System), (Systems) |
Dennis Coyne |
Detector
System Engineering
|
07 Jul 2024 |
E0900023-v14 |
PROCESS FOR MANUFACTURING CANTILEVER SPRING BLADES FOR AdvLIGO |
Douglas Cook et al. |
Basic R&D
System Engineering
|
27 Oct 2021 |
T080003-v1 |
Thermal Noise Increase due to a Gold Coated Barrel |
Dennis Coyne et al. |
Document Migration
|
20 May 2024 |
E1800082-x0 |
Vacuum System |
Dennis Coyne et al. |
Vacuum
|
15 May 2024 |
E1300959-x0 |
aLIGO, Configuration Control |
Dennis Coyne |
System Engineering
Final Design
|
08 May 2024 |
E1500147-v1 |
aLIGO, Waiver Log |
Dennis Coyne |
System Engineering
|
03 May 2024 |
F1500003-v3 |
Third IFO Component Request Form and Procedure |
Dennis Coyne et al. |
Operations
System Engineering
|
24 Apr 2024 |
F0900037-v2 |
LIGO Operations Change Request Form |
Dennis Coyne |
Operations Business
|
23 Jan 2013 |
M960076-v5 |
LIGO Quality Assurance Plan |
Jeffrey Lewis et al. |
Quality Assurance
|
26 Mar 2024 |
M080375-v26 |
LIGO - Virgo - KAGRA (LVK) Abbreviations and Acronyms List |
David Shoemaker et al. |
Reports
|
24 Mar 2024 |
E1300949-x0 |
aLIGO, Optical Layouts |
Dennis Coyne |
System Engineering
Final Design
|
21 Mar 2024 |
F0900007-v1 |
Document Change Notice (DCN) template. |
Dennis Coyne |
System Engineering
|
15 Mar 2024 |
E030350-v5 |
Configuration Control & Drawing Requirements |
Calum Torrie et al. |
System Engineering
|
06 Mar 2024 |
E1300946-x0 |
aLIGO, System Layouts |
Dennis Coyne |
System Engineering
Final Design
|
07 Feb 2024 |
D1100291-v6 |
aLIGO IAS LHO Monuments |
Douglas Cook et al. |
Auxiliary Optics
Installation
|
30 Oct 2013 |
M060092-v25 |
LIGO Laboratory Organization Chart |
David Reitze et al. |
Management
|
30 Jan 2024 |
E1300945-x0 |
aLIGO, System Requirements |
Dennis Coyne |
Requirements
System Engineering
|
20 Oct 2023 |
E1300962-x0 |
aLIGO, System Performance Estimate |
Dennis Coyne |
Modelling
System Engineering
|
20 Oct 2023 |
E0900364-v10 |
Metal components intended for use in the Adv LIGO Vacuum System |
Dennis Coyne et al. |
System Engineering
|
02 Dec 2020 |
F0900008-x0 |
LIGO Technical Note Template |
Dennis Coyne |
System Engineering
|
11 Feb 2009 |
D1000227-v10 |
CUSTOM CABLE V25M |
Benjamin Abbott et al. |
Seismic Isolation
Fabrication
|
23 Jul 2012 |
E960022-v25 |
LIGO Clean and Bake Methods and Procedures |
Betsy Weaver et al. |
Fabrication
Vacuum
Cleaning
|
03 May 2023 |
E1201035-v25 |
aLIGO Chamber Entry & Exit Procedures |
Calum Torrie et al. |
Safety
System Engineering
|
27 Mar 2023 |
T2000002-v2 |
A+ Filter Cavity Tube, Expansion Joints and Tube Supports: Conceptual Design and Requirements. |
Dennis Coyne |
Requirements
A+
Conceptual Design
System Engineering
Vacuum
|
15 Mar 2023 |
E1200392-v9 |
Initial Alignment Procedure - LBSC2 As Built |
Jason Oberling et al. |
Installation
|
10 Mar 2014 |
L070131-x0 |
Unacceptability of 7075 Aluminum Alloy in the LIGO UHV? |
Dennis Coyne |
Document Migration
|
12 Nov 2022 |
G1602132-v1 |
CAD Camera Views from ETM for scatter evaluation |
Eduardo Sanchez et al. |
Auxiliary Optics
System Engineering
|
12 Apr 2017 |
M040004-x0 |
Record of Decision/Agreement (RODA) |
Dennis Coyne et al. |
Document Migration
|
31 Aug 2022 |
T2000431-v4 |
Filter Cavity Tube (FCT) Support Loads |
Dennis Coyne et al. |
A+
Vacuum
|
28 Jul 2022 |
E1000369-x0 |
aLIGO Testing and Commissioning Documentation |
Dennis Coyne |
System Test
System Engineering
Subsystem Test
|
24 Jun 2022 |
E0900480-v6 |
FTIR Testing to Qualify Parts for LIGO UHV Service |
Dennis Coyne |
Fabrication
Vacuum
|
10 Jun 2022 |
F1000003-v5 |
Advanced LIGO FTIR Sample Record |
Dennis Coyne |
Vacuum
|
09 Jun 2022 |
Q2100038-v1 |
Waiver: Sputtered Contamination on the A+ ITM05 Barrel |
Dennis Coyne |
System Engineering
|
24 Mar 2022 |
E1800084-x0 |
Vacuum Equipment (VE), CDRL Documents |
Dennis Coyne |
Vacuum
|
08 Dec 2021 |
T1300511-v2 |
Particulate Contamination Requirements |
Dennis Coyne |
System Engineering
|
20 Oct 2021 |
T1400652-v1 |
DRAFT Technical Proposal for Decommissioning the LHO Mid-Station Cryopumps |
Dennis Coyne |
Vacuum
Proposals
Technical Review Board
|
27 Sep 2021 |
D1200869-v13 |
aLIGO IAS LLO Monuments |
Dennis Coyne |
Auxiliary Optics
|
13 Jul 2021 |
L2100073-v2 |
Appointment of Jameson Rollins as LIGO Laboratory Low-Latency Data Stream Group Leader |
Dennis Coyne et al. |
System Engineering
Appointment
|
02 Jul 2021 |
T2100277-v1 |
Monte Carlo Analysis of Filter Cavity Tube (FCT) Alignment Strategies |
Dennis Coyne |
System Engineering
|
29 Jun 2021 |
D961094-v2 |
Horizontal Access Module Assembly (HAM), LIGO Vacuum Equipment |
Dennis Coyne |
Vacuum
Document Migration
|
29 Jun 2021 |
E0900398-v5 |
Advanced LIGO residual gas estimate |
Michael Zucker et al. |
Vacuum
|
02 Jun 2021 |
F0900005-v1 |
Review Report Template |
Dennis Coyne |
Reviews
|
05 May 2021 |
E980268-x0 |
HAM Seismic Installation Procedure, Rev. 03 |
Dennis Coyne et al. |
Document Migration
|
23 Apr 2021 |
E010613-v2 |
Generic Requirements & Standards for Detector Subsystems |
Dennis Coyne |
Fabrication
System Engineering
Final Design
|
24 Feb 2021 |
E1300653-v1 |
Material Qualification RGA Test Results: Epo-Tek 353ND epoxy |
Dennis Coyne |
System Engineering
Vacuum
|
22 Feb 2021 |
E1200861-v1 |
Material Qualification RGA Test Results: Epoxy Pax EP-1730-1 potting compound |
Dennis Coyne |
Vacuum
|
22 Feb 2021 |
G050427-x0 |
Coupled Dynamics of Payload Structures on the Seismically Isolated Optics Table |
Dennis Coyne |
Document Migration
|
12 Feb 2021 |
L960370-v1 |
Calculation/Design Check of the Alternative BT Guided Support Design |
Dennis Coyne |
Vacuum
Document Migration
|
29 Sep 2020 |
T1900628-v1 |
Beam Tube Support Loads |
Dennis Coyne |
Vacuum
Final Design
|
29 Sep 2020 |
G030226-v1 |
Evaluation of EPI Approaches |
Dennis Coyne |
Seismic Isolation
Reviews
|
24 Sep 2020 |
G030229-v1 |
EPI Plan & Schedule |
Dennis Coyne |
Seismic Isolation
Reviews
|
24 Sep 2020 |
E1900095-v1 |
LTREX Project |
Dennis Coyne |
Vacuum
|
24 Sep 2020 |
T030074-v1 |
External Pre-Isolation (EPI) Evaluation |
Dennis Coyne |
Seismic Isolation
Reviews
|
23 Sep 2020 |
D970348-v1 |
BSC Shell Weldment |
Dennis Coyne |
Fabrication
Vacuum
|
16 Sep 2020 |
D970412-v1 |
BSC Overall Assembly, LIGO Vacuum Equipment |
Dennis Coyne |
Fabrication
Vacuum
|
16 Sep 2020 |
D970383-v1 |
Equipment Arrangement Plan, Area 600, Corner Station, Louisiana, LIGO Vacuum Equipment |
Dennis Coyne |
Document Migration
|
16 Sep 2020 |
D970384-v1 |
Equipment Arrangement, Right End Station, Area 800, Louisiana, LIGO Vacuum Equipment |
Dennis Coyne |
Document Migration
|
16 Sep 2020 |
D961169-v1 |
LIGO Vacuum Equipment Issued for As Built - Equipment Arrangement, Right End Station, Area 500, Washington Site |
Dennis Coyne |
Document Migration
|
16 Sep 2020 |
D961171-v1 |
Equipment Arrangement, Left End Station, Washington, LIGO Vacuum Equipment, Rev. 05 - AS BUILT |
Dennis Coyne |
Document Migration
|
16 Sep 2020 |
D961100-v1 |
60" BSC Cover, Type I, Beam Splitter Chamber |
Dennis Coyne |
Vacuum
Document Migration
|
16 Sep 2020 |
D961145-v1 |
BSC End Cover, Type A11, Beam Splitter Chamber |
Dennis Coyne |
Vacuum
Document Migration
|
16 Sep 2020 |
E2000429-v2 |
Specification: Filter Cavity Tube Supports |
Dennis Coyne et al. |
Requirements
System Engineering
Vacuum
Final Design
|
10 Sep 2020 |
G2000952-v1 |
Control Challenges for the Laser Interferometer Gravitational-wave Observatory (LIGO) |
Dennis Coyne |
Detector
System Engineering
Sensing and Control
|
03 Sep 2020 |
E1000453-v1 |
Optical Contamination Test Results EP30-2 Bonded Quartz Glass Disks |
Dennis Coyne et al. |
Fabrication
|
02 Sep 2020 |
D950130-x0 |
Beam Tube Termination Slabs Relative to Buildings |
Dennis Coyne |
Document Migration
|
24 Aug 2020 |
T2000280-v2 |
Ground Vibration Induced Motion of the Filter Cavity Tube (FCT) Baffles |
Dennis Coyne |
System Engineering
Vacuum
|
23 Jul 2020 |
M000154-x0 |
Technical Evaluation of Alternative Design Concepts for the LIGO-II Seismic Isolation System |
Rich Abbott et al. |
Document Migration
|
16 Jul 2020 |
E1300796-x0 |
aLIGO, FMP, Vacuum Equipment (VE) |
Dennis Coyne |
Vacuum
|
29 May 2020 |
E2000124-v1 |
Material Qualification RGA Test Results: Low-Reflection, Matte Black Aluminum Foil |
Dennis Coyne |
System Engineering
Vacuum
|
17 Apr 2020 |
E080177-v2 |
RGA Test Qualification of components for the LIGO UHV |
Dennis Coyne |
Fabrication
System Engineering
Vacuum
|
15 Apr 2020 |
E1300797-x0 |
VE, GNB Gate Valves |
Dennis Coyne |
Vacuum
|
31 Mar 2020 |
E0900479-v3 |
Instructions for taking Low Volatility Residue (LVR) Wipe Samples |
Dennis Coyne |
Fabrication
Vacuum
|
28 Feb 2020 |
E1800020-v1 |
Optical Contamination Test resuits: EPO-TEK 302-3M adhesive |
Dennis Coyne et al. |
Fabrication
System Engineering
Vacuum
|
27 Feb 2020 |
E1800043-x0 |
Material Qualification RGA Test Results: EPO-TEK 302-3M adhesive |
Dennis Coyne |
Fabrication
System Engineering
Vacuum
|
27 Feb 2020 |
L2000060-v1 |
VRB response to L1100162: acceptable to not vacuum bake the CP and ERM to ESD flex connector bond |
Dennis Coyne |
Vacuum
|
11 Feb 2020 |
D1101001-v3 |
aLIGO, high quality, 6" Viewport Flange |
Dennis Coyne |
Auxiliary Optics
Vacuum
|
26 Sep 2011 |
E1300001-v11 |
Long Term Storage Plan for the Components of the Third Advanced LIGO Interferometer |
Carol Wilkinson et al. |
System Engineering
LIGO-India
|
18 Jun 2016 |
E1800085-v2 |
CDRL for BT design and qualification |
Dennis Coyne |
Vacuum
|
21 Oct 2019 |
P1900316-v1 |
Cosmic Explorer: The U.S. Contribution to Gravitational-Wave Astronomy beyond LIGO |
David Reitze et al. |
Detector
Activity
Basic R&D
|
11 Oct 2019 |
L1900320-v2 |
LIGO A+ Big BeamSplitter Suspension (BBSS) Preliminary Design Review (PDR) Charge |
Dennis Coyne |
Suspensions
Reviews
Preliminary Design
|
27 Sep 2019 |
E0900048-v9 |
Welding Specification for Weldments used within the Advanced LIGO Vacuum System |
Dennis Coyne et al. |
System Engineering
Final Design
|
21 Aug 2019 |
D1101006-v1 |
aLIGO, high quality, non-wedged, 6" Viewport, Optic |
Dennis Coyne |
Auxiliary Optics
Vacuum
|
09 Jun 2011 |
E1000374-v1 |
RGA Test Results: A-OSEM heads with wound coil (quantity = 404) |
Dennis Coyne et al. |
System Engineering
Vacuum
|
16 Jul 2019 |
T030246-x0 |
LIGO Optical Contamination Tests of the PEEK Unwound Spools |
Lee Cardenas et al. |
Document Migration
|
16 Jul 2019 |
T1900410-v1 |
Desired results of the Cosmic Explorer engineering study |
Rana Adhikari et al. |
Conceptual Design
Observatory Facilities
Vacuum
|
09 Jul 2019 |
M1500244-v7 |
LIGO Laboratory Open Source Software License Policy |
Randy Trudeau |
Policies
|
09 May 2019 |
T080233-x0 |
Beam Splitter Optical Surface Deformation Due to Gravity |
Dennis Coyne et al. |
Document Migration
|
18 Apr 2019 |
D1900102-v1 |
LTREX Beam Tube segment without flanges |
Dennis Coyne |
Vacuum
|
01 Apr 2019 |
E1800210-v1 |
Optical Contamination Test resuits: Euclid Compact Interferometer |
Robert Taylor et al. |
Basic R&D
|
19 Feb 2019 |
T970212-v1 |
Mirror Thermoelastic Deflection in the LIGO Optical Surface Absorption Measurement System |
Dennis Coyne |
Document Migration
|
17 Jan 2019 |
E1800261-v1 |
Technical Information supporting Bidders Walk Through, LHO Wind Fence |
Stephen Appert et al. |
Seismic Isolation
Conceptual Design
Proposals
|
14 Nov 2018 |
E1200686-v2 |
aLIGO HAM-ISI, "Common Documentation" (List of all DCC trees, wikis, and general documentation) |
Fabrice Matichard et al. |
Seismic Isolation
|
22 Oct 2018 |
E1800083-x0 |
Beam Tube (BT), CDRL Documents |
Dennis Coyne |
Vacuum
|
16 Oct 2018 |
G1801900-v5 |
Alignment of the LIGO Detector: International Workshop on Accelerator Alignment 2018 at FNAL |
Calum Torrie et al. |
Operations
System Engineering
|
08 Oct 2018 |
E1800216-v1 |
Procedure to test water and air outgassing contribution from components |
Calum Torrie et al. |
Operations
System Engineering
|
29 Aug 2018 |
E1300795-x0 |
aLIGO, FMP |
Dennis Coyne |
Vacuum
|
28 Aug 2018 |
P1400177-v6 |
Advanced LIGO |
Peter Fritschel et al. |
Final Design
|
17 Jul 2018 |
T1800253-v1 |
LCP-4 (cryo-trap) Internal Photos (Livingston) |
Scott McCormick et al. |
Operations
Quality Assurance
System Engineering
Vacuum
|
09 Jul 2018 |
T1800133-v4 |
Instrument Science White Paper 2018 |
Brian Lantz et al. |
Detector
Basic R&D
|
26 Jun 2018 |
L1800095-v1 |
TRB Report on the Stray Light Control Shroud for the Output Faraday Isolator (OFI) |
Dennis Coyne et al. |
Auxiliary Optics
Reports
Reviews
System Engineering
Upgrades
|
12 Jun 2018 |
E1101226-v3 |
Proof Test Levels for Advanced LIGO Viewports |
Dennis Coyne |
System Engineering
Vacuum
|
08 Jun 2018 |
E1700332-v1 |
Material Qualification RGA Test Results: Kester 6337 (Sn63Pb37) Solder |
Dennis Coyne |
Vacuum
|
08 Jun 2018 |
M1500262-v3 |
Procurement Workflow for Detector Improvements (DI) |
Dennis Coyne et al. |
Procurements
System Engineering
Policies
Operations Business
Technical Review Board
|
07 Jun 2018 |
M1500313-v2 |
Process Flow for Engineering Operations of the LIGO Detector Systems |
Dennis Coyne et al. |
Operations
Detector
Requirements
System Test
Integration
Conceptual Design
Commissioning
Fabrication
System Engineering
Policies
Final Design
Subsystem Test
Installation
|
07 Jun 2018 |
C951751-v1 |
Civil Construction: Preliminary Design Report, DRAFT - Volume II-2, Construction Specifications (CDRL 11 and 13, DRD 05) |
Dennis Coyne |
Observatory Facilities
Preliminary Design
|
04 May 2018 |
T1400713-v3 |
Test Mass Discharge System (TMDS): Design Document |
Eduardo Sanchez et al. |
System Engineering
Vacuum
Final Design
|
25 Apr 2018 |
E1500146-x0 |
aLIGO, SEI, Operation Guides/Manuals/Tutorials |
Dennis Coyne |
Seismic Isolation
|
24 Apr 2018 |
E1800088-v1 |
CDRL for VE design, fabrication, installation and test |
Dennis Coyne |
Vacuum
|
27 Mar 2018 |
E1800087-v1 |
CDRL for VE design competition |
Dennis Coyne |
Vacuum
|
27 Mar 2018 |
E1800086-v1 |
CDRL for BT fabrication and installation |
Dennis Coyne |
Vacuum
|
27 Mar 2018 |
E1800081-v1 |
CBI Qualification Test Cleaning Report (Task Orders #94-1, #94-2, and #95-1) - sanitized version |
Dennis Coyne |
Vacuum
|
27 Mar 2018 |
T1800103-v1 |
Vertex to end station chamber positioning requirement |
Dennis Coyne |
System Engineering
|
16 Mar 2018 |
E1800042-x0 |
Material Qualification RGA Test Results: NuFern Single-Mode, Optical Fiber 1060 - OCT-P |
Dennis Coyne |
System Engineering
Sensing and Control
Vacuum
|
22 Feb 2018 |
D020214-x0 |
Hydraulic External Pre-Isolation (HEPI): Piping and Instrumentation Diagram |
Dennis Coyne |
Document Migration
|
11 Apr 2003 |
D1300047-v1 |
Long Term Storage (LTS) Layout in the H2 Electronics Building, Washington - Plan View |
Dennis Coyne |
System Engineering
|
25 Jan 2018 |
D1300035-v1 |
LTS VPW LAYOUT, WASHINGTON - PLAN VIEW |
Dennis Coyne |
Observatory Facilities
|
25 Jan 2018 |
E1700397-x0 |
SEI Bellows |
Dennis Coyne |
Seismic Isolation
Vacuum
|
27 Nov 2017 |
T1700231-v3 |
LSC Instrument Science White Paper 2017-2018 |
David McClelland et al. |
Core Optics
Basic R&D
|
24 Oct 2017 |
G1500673-v1 |
System Identification Overview & Session Goals (GWADW 2015) |
Dennis Coyne |
System Engineering
|
21 Sep 2017 |
E1700333-v1 |
Optical Contamination Cavity Test Results: Kester 6337 (Sn63Pb37) Solder |
Dennis Coyne |
Vacuum
|
21 Sep 2017 |
G1701594-v1 |
Brief LIGO Controls Overview |
Dennis Coyne |
Detector
State Control and Monitoring
Sensing and Control
|
26 Aug 2017 |
E1300954-v1 |
aLIGO, Contamination Control (CC) |
Dennis Coyne |
System Engineering
Vacuum
Final Design
|
14 Jul 2017 |
E1000088-v1 |
Qualifying Parts for LIGO UHV Service |
Dennis Coyne |
System Engineering
Vacuum
|
14 Jul 2017 |
G1700601-v1 |
Engineering behind the Laser Interferometer Gravitational-wave Observatory (LIGO) |
Dennis Coyne |
Detector
System Engineering
|
08 Jun 2017 |
C951653-v1 |
LIGO Technical Foundation Analyses: Executive Summary and Discussions |
Dennis Coyne |
Observatory Facilities
Final Design
|
01 Jun 2017 |
T040001-v1 |
Vacuum Hydrocarbon Outgassing Requirements |
Dennis Coyne |
System Engineering
Vacuum
Document Migration
|
13 Apr 2017 |
E1300128-v3 |
aLIGO Interferometer Optics Positions and Orientations for Initial Alignment |
Dennis Coyne |
System Engineering
|
09 Feb 2017 |
G1700563-v1 |
CSWG Workshop at the March 2017 LVC meeting |
Dennis Coyne |
State Control and Monitoring
System Engineering
Sensing and Control
|
17 Mar 2017 |
D1600385-v1 |
L1 ITMy OptLev Beams at Viewport after CPy Pitch Correction |
Dennis Coyne |
System Engineering
|
09 Feb 2017 |
L1600055-v1 |
VRB Request: approve waiver on qualifying a high QE photodiode |
Dennis Coyne |
System Engineering
Vacuum
|
13 Jan 2017 |
E1600262-v4 |
aLIGO OMC: Spare OMC production plan |
Koji Arai et al. |
Assembly
Sensing and Control
|
09 Dec 2016 |
E1200481-x0 |
aLIGO, AOS |
Dennis Coyne et al. |
Auxiliary Optics
|
25 Oct 2016 |
E1400371-v5 |
aLIGO System Acceptance Document/Data Package |
Dennis Coyne |
System Engineering
|
10 Oct 2016 |
E1500057-v1 |
aLIGO System Block Diagrams |
Dennis Coyne |
System Engineering
|
06 Oct 2016 |
E1600299-v1 |
Third IFO component request: Request for second, 3rd IFO PMC for LLO |
Dennis Coyne |
System Engineering
Laser Systems
|
04 Oct 2016 |
D0902216-v8 |
Advanced LIGO L1 Optical Layout, ZEMAX |
Michael Smith et al. |
System Engineering
Final Design
|
28 Sep 2016 |
D1101115-v2 |
aLIGO, high quality, 6in Viewport Clamp, wedged |
Dennis Coyne |
Auxiliary Optics
Vacuum
|
08 Jul 2011 |
D961142-v1 |
60" HAM Cover, Type A-4, HAM Chamber |
Dennis Coyne |
Vacuum
Document Migration
|
27 Jul 2016 |
D970427-v1 |
84" HAM Cover, Horizontal Access Module (HAM), LIGO Vacuum Equipment |
Dennis Coyne |
Vacuum
Document Migration
|
27 Jul 2016 |
D1600164-v1 |
Gate Valve Designations, Locations, Orientations and Quantities (LHO and LLO) |
Dennis Coyne |
Vacuum
|
20 Jul 2016 |
G1601461-v3 |
LIGO Voyager: a 3G interferometer in a 1G facility |
Rana Adhikari et al. |
Upgrades
|
07 Jul 2016 |
E1600180-v1 |
Waiver for vacuum bake and RGA scan of a bonded repair of a beam dump on the L1 OMC Breadboard Assy, ASSY-D1201439-3 |
Dennis Coyne |
System Engineering
Vacuum
|
08 Jun 2016 |
E1600086-v1 |
Material Qualification RGA Test Results: High Quantum Efficiency InGaAs Photodiode |
Dennis Coyne et al. |
System Engineering
Sensing and Control
Vacuum
|
12 May 2016 |
T1600100-x0 |
Damage Thresholds and Infrared Sensor Trigger Levels for the TCS ZnSe Windows |
Dennis Coyne |
Auxiliary Optics
Vacuum
|
08 Apr 2016 |
L1600062-v1 |
Review Committee Report on the Non-Magnetic Blade-spring Damper (NMBD) |
Dennis Coyne et al. |
Suspensions
System Engineering
|
08 Apr 2016 |
T1600098-v1 |
Estimated Temperature Dependence of the Non-Magnetic, Blade-spring Damper (NMBD) for the Quad UIM |
Dennis Coyne |
Suspensions
|
06 Apr 2016 |
T1600097-v1 |
Viton-B Complex Modulus |
Dennis Coyne |
Seismic Isolation
Suspensions
|
06 Apr 2016 |
E021114-x0 |
RFI Mitigation Review Board Report |
Rich Abbott et al. |
Document Migration
|
12 Feb 2016 |
L1500103-v1 |
Technical Review Board (TRB) report: Should We Insulate the Beamtube? |
Dennis Coyne et al. |
System Engineering
Vacuum
Technical Review Board
|
15 Dec 2015 |
M050303-v5 |
Advanced LIGO Project Execution Plan |
David Shoemaker et al. |
Management
Project Controls
|
25 Nov 2015 |
T950087-v1 |
Cryopump Infrared Shielding Considerations |
Dennis Coyne |
Document Migration
|
07 Nov 2015 |
E1300645-x0 |
aLIGO, System Reliability & Availability |
Dennis Coyne |
Operations
System Engineering
|
12 Oct 2015 |
E1500028-v1 |
Helium Bomb Testing Procedure |
Dennis Coyne et al. |
Vacuum
|
28 Aug 2015 |
L1300162-v1 |
TRB charge: Design Review of the On-line Data Characterization (ODC) System |
Dennis Coyne |
Reviews
System Engineering
Detector Characterization
|
14 Aug 2015 |
E1500248-v1 |
Helium Leak Test Procedure for the TMDS Ionizer Assembly |
Nichole Washington et al. |
Vacuum
|
23 Jul 2015 |
L1500094-v1 |
Final Design Review (FDR) charge: End Reaction Mass (ERM) with a central hole |
Dennis Coyne |
Suspensions
System Engineering
|
09 Jun 2015 |
G1300115-v34 |
aLIGO Fabrication Acceptance Review Tracking |
Dennis Coyne et al. |
Detector
Reviews
Subsystem Test
|
03 Jun 2015 |
G1500698-v1 |
Summary of Controls Sessions (GWADW 2015) |
Dennis Coyne et al. |
System Engineering
|
01 Jun 2015 |
G1500663-v1 |
GWADW Controls Sessions Introduction |
Dennis Coyne et al. |
System Engineering
|
01 Jun 2015 |
G1500454-v1 |
Controls Workshop at the GWADW 2015 |
Dennis Coyne et al. |
Detector
Public Talk / Colloquium
|
01 Jun 2015 |
T080194-v1 |
Dynamic Vibration Absorber |
Dennis Coyne |
Basic R&D
System Engineering
|
28 May 2015 |
E1300961-x0 |
aLIGO, Simulation |
Dennis Coyne |
Modelling
System Engineering
|
12 May 2015 |
E1201096-v5 |
Contamination Sample Handling - How to receive, use, send, buy and store samples. |
Calum Torrie et al. |
System Engineering
|
06 May 2015 |
M1500035-v3 |
Advanced LIGO Project Closeout Acceptance |
David Shoemaker et al. |
Detector
Reports
|
06 May 2015 |
L1500019-v1 |
LHO Installation Acceptance Review Report |
Michael Landry et al. |
Reviews
|
06 May 2015 |
L1400006-x0 |
Fabrication Acceptance Review Documents and Status |
David Shoemaker et al. |
Detector
Reviews
|
06 May 2015 |
T1500056-v5 |
Sketches showing views of the ETM/RM gap from chamber ports |
Dennis Coyne |
System Engineering
|
30 Apr 2015 |
T1500009-v1 |
Test Mass Discharging System (TMDS) Structural Support Design |
Dennis Coyne |
System Engineering
Vacuum
|
29 Apr 2015 |
E990303-v1 |
Seismic Isolation Subsystem Design Requirements Document |
Dennis Coyne et al. |
Seismic Isolation
Requirements
Modelling
Conceptual Design
|
31 Mar 2015 |
T1000230-v7 |
Initial Alignment Subsystem (IAS), Final Design Document |
Scott Shankle et al. |
Reviews
Final Design
|
26 Mar 2015 |
T020033-x0 |
Initial LIGO Seismic Isolation Upgrade Design Requirements Document |
Dennis Coyne et al. |
Document Migration
|
25 Mar 2015 |
E1300769-v4 |
Core Optics Fabrication Acceptance Documentation |
GariLynn Billingsley et al. |
Core Optics
|
12 Mar 2015 |
E1500123-v2 |
Fabrication Acceptance Review Status of Input Optics EOM Testing, Modeling and Discussion of need for Waivers from Systems |
Christopher Guido et al. |
Input Optics
Reviews
|
11 Mar 2015 |
Q1500014-v1 |
Waiver for SmCo magnet/Al jacket assembly |
Dennis Coyne |
Suspensions
System Engineering
Vacuum
|
11 Mar 2015 |
Q1500004-v1 |
Waiver: to roughen surface of HLTS pen mass in situ |
Calum Torrie |
Quality Assurance
Suspensions
System Engineering
Vacuum
|
11 Mar 2015 |
M070383-v1 |
cleaning waiver for ELI L1, 2" REO beamsplitter in HAM4 |
Dennis Coyne |
Quality Assurance
System Engineering
Sensing and Control
Vacuum
|
11 Mar 2015 |
L1100162-v1 |
VRB question: acceptable to not vacuum bake the CP and ERM to ESD flex connector bond? |
Dennis Coyne et al. |
Core Optics
Suspensions
Vacuum
|
11 Mar 2015 |
L0900066-v1 |
VRB Waiver Request: Small quantity of small commercial Viton O-Rings |
Dennis Coyne |
Seismic Isolation
Fabrication
System Engineering
|
11 Mar 2015 |
L070089-v1 |
Request for advice/waivers on some Input Optics elements |
Dennis Coyne |
Quality Assurance
Input Optics
|
11 Mar 2015 |
E1400330-v1 |
Waiver for another RGA scan of the OMC Breadboard Assy, ASSY-D1201439-3 |
Dennis Coyne |
System Engineering
Sensing and Control
Vacuum
|
11 Mar 2015 |
E1201079-v1 |
Machining Fluid Waiver Granted for SRI |
Dennis Coyne |
System Engineering
Sensing and Control
|
11 Mar 2015 |
E1000610-v1 |
Waiver for the use of Ecocool AP-71 machining fluid for the sealing flange of the SEI storage containers. |
Dennis Coyne |
Seismic Isolation
System Engineering
Vacuum
|
11 Mar 2015 |
E1100734-x0 |
Advanced LIGO Initial Alignment Procedures |
Douglas Cook et al. |
Installation
|
10 Mar 2015 |
T000053-v1 |
aLIGO Universal Suspension Subsystem Design Requirements |
Dennis Coyne |
Conceptual Design
Suspensions
|
08 Mar 2015 |
E1300947-x0 |
aLIGO, System Design |
Dennis Coyne |
System Engineering
Final Design
|
02 Mar 2015 |
E1500154-x0 |
DCN: Remove laser diode power monitoring from Optical Lever system |
Dennis Coyne |
Auxiliary Optics
|
27 Feb 2015 |
E1500155-v1 |
ECR: Remove Laser Diode Power Monitors from the Optical Lever System Design |
Dennis Coyne |
Auxiliary Optics
|
27 Feb 2015 |
M1300468-v10 |
Acceptance Process for the Advanced LIGO Project |
Dennis Coyne et al. |
Policies
Project Controls
|
23 Feb 2015 |
M070102-v2 |
M070102 Advanced LIGO Change Control Procedure |
Carol Wilkinson et al. |
Project Controls
Change Control
|
22 Feb 2015 |
E1300956-x0 |
aLIGO, Records of Decisions & Agreements (RODAs) |
Dennis Coyne |
System Engineering
Final Design
|
21 Feb 2015 |
T010075-v3 |
Advanced LIGO Systems Design |
Peter Fritschel et al. |
System Engineering
|
17 Feb 2015 |
T950079-x0 |
iLIGO System Block Diagrams |
Dennis Coyne |
Document Migration
|
10 Feb 2015 |
E1500048-v1 |
Procedures, Safe-Guards and Cautions for Safe and Proper Use, and Diagnosis, of LIGO Equipment |
Dennis Coyne |
System Engineering
|
04 Feb 2015 |
E1500042-v1 |
ECR: Add black glass panels to the OMC Suspension Assembly to mitigate stray light noise |
Dennis Coyne |
Auxiliary Optics
|
30 Jan 2015 |
G1200110-v3 |
BSC Cable Trays … again: Evaluation of an LLO Proposal for an Alternative Design |
Dennis Coyne |
System Engineering
Installation
|
14 Jan 2015 |
D1100430-v2 |
BSC CABLE TRAY ASSEMBLY |
Neil Custard et al. |
Assembly
Fabrication
|
14 Jan 2015 |
D1001797-v2 |
aLIGO Installation, LHO Y-End Station, Cartridge & Cleanroom, Layout |
Dennis Coyne |
Installation
|
14 Jan 2015 |
G1001024-v1 |
Cable Tray Route/Constraint Considerations |
Dennis Coyne |
System Engineering
Installation
|
14 Jan 2015 |
D1003142-x0 |
Rack and Cable Tray Layouts |
Dennis Coyne |
Observatory Facilities
System Engineering
|
14 Jan 2015 |
E1400152-v20 |
aLIGO LLO Installation Acceptance "Punch List" |
Dennis Coyne |
Detector
Reviews
Installation
|
23 Dec 2014 |
E1400472-v3 |
Test Mass In Situ Cleaning Procedure |
GariLynn Billingsley et al. |
Core Optics
System Engineering
|
15 Dec 2014 |
T070076-x0 |
OBSOLETE |
Dennis Coyne |
Document Migration
|
08 Dec 2014 |
G1401337-v1 |
Test Mass Discharging System (TMDS) Design Review Presentation |
Rich Abbott et al. |
System Engineering
Vacuum
Final Design
|
20 Nov 2014 |
E1400154-x0 |
aLIGO LHO Installation Acceptance |
Dennis Coyne |
Detector
Reviews
System Engineering
Installation
|
17 Nov 2014 |
E1200099-v4 |
aLIGO Chamber (Top Level) Installation Procedure: LHAM6 |
Eric James et al. |
Installation
|
12 Nov 2014 |
E1400399-v1 |
ECR: Retrofitted ESD Cable Connections |
Dennis Coyne |
Suspensions
System Engineering
Change Control
|
11 Oct 2014 |
E1300948-x0 |
aLIGO, System Description |
Dennis Coyne |
System Engineering
Final Design
|
25 Sep 2014 |
G1400396-v5 |
Plenary Lecture for SPIE Laser Damage 2014 |
Calum Torrie et al. |
System Engineering
|
18 Sep 2014 |
M1000211-v3 |
Subsystem-Level and System-Level Testing Requirements |
Dennis Coyne et al. |
System Engineering
Policies
|
10 Sep 2014 |
T0900368-v2 |
Allowable Bake Temperature for UHV Processing of Copper Alloys |
Dennis Coyne |
Fabrication
System Engineering
Vacuum
|
19 Aug 2014 |
T0900438-v2 |
LIGO Vacuum Qualification of First Contact™ |
Dennis Coyne |
Vacuum
|
19 Aug 2014 |
E040023-x0 |
Linear Voice Coil Actuator Design Requirements Advanced LIGO Seismic Isolation System |
Dennis Coyne et al. |
Document Migration
|
31 Jul 2014 |
C010406-v1 |
Advanced LIGO, SEI, HAM-ISI Prototype, Final Design Document |
Dennis Coyne et al. |
Seismic Isolation
Final Design
|
31 Jul 2014 |
D1001662-v2 |
H1 & L1 Output Septum Plate Port Locations |
Dennis Coyne |
Input Optics
System Engineering
Sensing and Control
Vacuum
|
16 Jul 2014 |
D1001661-v2 |
H1 & L1 Input Septum Plate Port Locations |
Dennis Coyne |
Input Optics
System Engineering
Sensing and Control
Vacuum
|
16 Jul 2014 |
D960799-x0 |
LVEA Integration Layout (Derived from LIGO-D960129-01-E) |
Dennis Coyne |
Document Migration
|
14 Jul 2014 |
T1400341-v2 |
Maximum B-OSEM Current |
Dennis Coyne et al. |
Suspensions
Vacuum
Subsystem Test
|
09 Jul 2014 |
D960073-x0 |
Chamber and Rack Designations |
Dennis Coyne et al. |
Document Migration
|
09 Jul 2014 |
E1400216-v1 |
aLIGO Installation Acceptance Document for L1 DAQ |
Brian O'Reilly et al. |
Installation
|
21 Jun 2014 |
E1400184-v1 |
aLIGO Installation Acceptance Document for LHAM2 |
Dennis Coyne |
Installation
|
21 Jun 2014 |
E1400185-v6 |
aLIGO Installation Acceptance Document for LBSC4 (X) |
Dennis Coyne et al. |
Installation
|
21 Jun 2014 |
E1400181-v2 |
aLIGO Installation Acceptance Document for LBSC3 (X) |
Dennis Coyne et al. |
Installation
|
21 Jun 2014 |
E1400179-v3 |
aLIGO Installation Acceptance Document for LBSC1 (Y) |
Dennis Coyne et al. |
Installation
|
21 Jun 2014 |
E1400300-x0 |
Changes Resulting from Input Mode Cleaner Testing |
Dennis Coyne |
Integration
Commissioning
|
19 Jun 2014 |
E1300788-v1 |
ECR: add baffle to PR3 Suspensions to prevent wire heating |
Dennis Coyne |
System Test
Auxiliary Optics
Suspensions
Change Control
|
19 Jun 2014 |
E1300960-x0 |
aLIGO, Noise Budgets |
Dennis Coyne |
System Engineering
Final Design
|
19 Jun 2014 |
E1400258-v3 |
Contamination Control Mitigation Processes and the resulting Cleanliness Levels |
Calum Torrie et al. |
Operations
Core Optics
System Engineering
Installation
|
19 Jun 2014 |
E1400013-x0 |
aLIGO, Supervisory Control |
Dennis Coyne |
Detector
System Engineering
|
18 Jun 2014 |
E1100690-v10 |
Initial Alignment Procedure - WBSC8 As Built |
Jason Oberling et al. |
Installation
|
11 Jun 2014 |
E1400153-x0 |
aLIGO LLO Installation Acceptance |
Dennis Coyne |
Detector
Reviews
System Engineering
Installation
|
10 Jun 2014 |
E1101071-v5 |
Initial Alignment Procedure - WBSC6 As Built |
Douglas Cook et al. |
Auxiliary Optics
Installation
|
05 Jun 2014 |
E1300951-x0 |
aLIGO, General Contamination Control Documentation |
Dennis Coyne |
System Engineering
Vacuum
Final Design
|
03 Jun 2014 |
E1200795-v6 |
Initial Alignment Procedure - WBSC2 As Built |
Jason Oberling et al. |
Installation
|
02 Jun 2014 |
E1200956-v7 |
Initial Alignment Procedure - LBSC4 As Built |
Jason Oberling et al. |
Auxiliary Optics
Installation
|
02 Jun 2014 |
D950021-v1 |
LIGO Arm Layouts |
Dennis Coyne |
Document Migration
|
30 May 2014 |
E1100784-v8 |
Initial Alignment Procedure - LHAM4 and LHAM5 As Built |
Ken Mason et al. |
Installation
|
23 May 2014 |
E1100783-v9 |
Initial Alignment Procedure - LHAM2 and LHAM3 As Built |
Douglas Cook et al. |
Installation
|
22 May 2014 |
G060224-x0 |
Installation (INS): Requirements and Design Breakout Presentation - NSF Review of Advanced LIGO Project |
Dennis Coyne |
Document Migration
|
20 May 2014 |
G060218-x0 |
Facility Modifications & Preparation (FMP): Requirements and Design Breakout Presentation - NSF Review of Advanced LIGO Project |
Dennis Coyne et al. |
Document Migration
|
20 May 2014 |
E1000298-v1 |
Material Qualification RGA Test Results: Semitron ESD 480 PEEK |
Dennis Coyne et al. |
Fabrication
|
19 May 2014 |
E1300953-x0 |
aLIGO, Particulate Contamination |
Dennis Coyne |
System Engineering
Vacuum
Final Design
|
06 May 2014 |
E1200393-v6 |
Initial Alignment Procedure - LBSC3 As Built |
Jason Oberling et al. |
Installation
|
05 May 2014 |
E1400221-v1 |
aLIGO Installation Acceptance Document for L1 PSL |
Dennis Coyne |
Installation
|
30 Apr 2014 |
E1200562-v4 |
aLIGO Tree and Chamber Level DCC Drawing Numbers |
Calum Torrie et al. |
System Engineering
|
21 Apr 2014 |
E1000386-v1 |
Material Qualification RGA Test Results: MasterBond EP30-2 epoxy |
Dennis Coyne et al. |
System Engineering
Vacuum
|
08 Apr 2014 |
D950145-x0 |
CDS Power Locations in the LVEA |
Rolf Bork et al. |
Document Migration
|
03 Apr 2014 |
D950144-x0 |
VE Electrical Power Locations - LVEA |
Dennis Coyne |
Document Migration
|
03 Apr 2014 |
E980062-x0 |
Document Change Notice (DCN) |
Dennis Coyne |
Document Migration
|
20 Mar 2014 |
E970064-x0 |
Changes to the LIGO Seismic Isolation System: Fabrication Process Specification (LIGO-E970063-01-D, dated 11 August 1997) |
Dennis Coyne et al. |
Document Migration
|
20 Mar 2014 |
G980150-x0 |
NSF Cost Schedule/Management Review, March 31 - April 2, 1998 - Detector Installation Plan |
Dennis Coyne |
Document Migration
|
18 Mar 2014 |
G970299-x0 |
Advanced Control Techniques |
Dennis Coyne |
Document Migration
|
18 Mar 2014 |
E1300952-x0 |
aLIGO, Hydrocarbon Contamination |
Dennis Coyne |
System Engineering
Vacuum
Final Design
|
14 Mar 2014 |
G960239-x0 |
Detector Subsystem Requirements Review Presentation Viewgraphs |
Dennis Coyne et al. |
Document Migration
|
14 Mar 2014 |
G960201-x0 |
Physics Environmental Monitor Presentation |
Dennis Coyne |
Document Migration
|
13 Mar 2014 |
F1300019-v2 |
aLIGO Installation Acceptance Document Template |
Dennis Coyne |
Reports
Reviews
System Engineering
Policies
Installation
|
11 Mar 2014 |
E1400111-x0 |
DCN - change in ground STS seismometer names and locations |
Dennis Coyne |
Seismic Isolation
System Engineering
|
05 Mar 2014 |
E1400073-v3 |
Directive regarding preparation of aLIGO Third Interferometer Viewports |
Dennis Coyne |
Safety
Auxiliary Optics
System Engineering
Vacuum
|
20 Feb 2014 |
T040232-x0 |
Beamsplitter First Elastic Mode Frequency versus Dimensions (Advanced LIGO) |
Dennis Coyne |
Document Migration
|
12 Feb 2014 |
T070189-v3 |
Design Specifications for the OMC Suspension |
Norna Robertson et al. |
Requirements
Suspensions
|
07 Feb 2014 |
E1400012-v1 |
Pumpdown and Ultimate Pressures (PSI document V049-1-078, rev 0) |
Dennis Coyne |
Vacuum
|
09 Jan 2014 |
E1300950-x0 |
aLIGO, Coordinate Systems |
Dennis Coyne |
System Engineering
Final Design
|
12 Dec 2013 |
E1200844-v2 |
aLIGO SUS Acceptance Criteria and Deliverables |
Jeffrey Kissel et al. |
System Test
Suspensions
|
11 Dec 2013 |
T0900367-v1 |
Ambient Magnetic Field Coupling to Quadruple Suspension Stainless Steel Parts |
Norna Robertson et al. |
Suspensions
Final Design
|
11 Dec 2013 |
G1300808-v1 |
Operations Sparing Plan Approach |
Dennis Coyne |
Operations
System Engineering
|
11 Dec 2013 |
D1300973-v1 |
Kapton Washer-Style Shim |
Dennis Coyne et al. |
Assembly
Auxiliary Optics
Vacuum
Subsystem Test
|
01 Nov 2013 |
F1300020-v1 |
aLIGO System Acceptance Document Template |
Dennis Coyne |
Reports
Reviews
System Engineering
Policies
|
17 Oct 2013 |
E1200329-v3 |
aLIGO Chamber (Top Level) Installation Procedure: LBSC2 |
Dennis Coyne et al. |
Installation
|
08 Oct 2013 |
D1001519-v8 |
Cable Assy, Lower Ring Heater Segment |
Mindy Jacobson et al. |
Assembly
Auxiliary Optics
Fabrication
Vacuum
Final Design
Cleaning
|
19 Jun 2013 |
|
|
|
None
|
|
G960051-x0 |
LIGO - Presentation at IEEE 1996 Aerospace Applications Conference |
Dennis Coyne |
Document Migration
|
09 May 2013 |
G950065-x0 |
Interfaces |
Dennis Coyne |
Document Migration
|
03 May 2013 |
T080307-v6 |
Initial Alignment System (IAS) Design Requirements Document (DRD) |
Michael Smith et al. |
Auxiliary Optics
Final Design
|
03 May 2013 |
E1200797-v9 |
aLIGO IAS Alignment Solutions |
Dennis Coyne |
Auxiliary Optics
System Engineering
Installation
|
24 Apr 2013 |
E1101072-x0 |
Initial Alignment Procedure -LHAM6 |
Douglas Cook et al. |
Installation
|
23 Apr 2013 |
E1100782-x0 |
Initial Alignment Procedure -LHAM1 |
Douglas Cook et al. |
Installation
|
23 Apr 2013 |
E1200024-v1 |
aLIGO Installation Procedure: WBSC6 |
Dennis Coyne |
Installation
|
26 Jan 2012 |
E1200798-v2 |
aLIGO IAS WBSC2 Alignment Solutions |
Dennis Coyne |
Auxiliary Optics
System Engineering
Installation
|
27 Mar 2013 |
D1200911-v1 |
aLIGO TCS High Quality Non-Wedged 6 in Viewport Assembly, AR800-1080 |
Mindy Jacobson et al. |
Assembly
Auxiliary Optics
Fabrication
System Engineering
Vacuum
Installation
|
26 Mar 2013 |
M1100282-v2 |
Acceptance Deliverables and Criteria for Advanced LIGO |
Dennis Coyne et al. |
System Engineering
|
14 Mar 2013 |
M1200366-v2 |
Guidance and format for writing an “Operation Manual” (aka “User’s Manual” or “Operator’s Manual”) |
Dennis Coyne |
System Engineering
Policies
|
14 Mar 2013 |
T010076-v2 |
Advanced LIGO Optical Layout Overview |
Dennis Coyne |
System Engineering
Preliminary Design
|
28 Feb 2013 |
D0902345-v8 |
Advanced LIGO H2 Optical Layout, ZEMAX |
Michael Smith et al. |
System Engineering
Final Design
|
28 Feb 2013 |
L1100046-v1 |
VRB request: no baking for optics? |
Dennis Coyne |
Core Optics
Auxiliary Optics
Input Optics
System Engineering
Sensing and Control
Vacuum
|
20 Feb 2013 |
E1200802-v4 |
aLIGO IAS L1 PRC Alignment Solutions |
Dennis Coyne |
Auxiliary Optics
Installation
|
19 Feb 2013 |
E1200025-v5 |
aLIGO Chamber (Top Level) Installation Procedure: LHAM3 |
Eric James et al. |
Installation
|
19 Feb 2013 |
E1200556-v10 |
aLIGO IAS LBSC2 Alignment Solutions |
Dennis Coyne |
Auxiliary Optics
System Engineering
Installation
|
12 Feb 2013 |
T1000558-v2 |
Output Faraday Isolator (OFI) Table Deflection and Modal Analysis |
Dennis Coyne et al. |
Auxiliary Optics
|
24 Jan 2013 |
T1000542-v4 |
Stress analysis of the monolithic flexures for the Arm Cavity Baffle (ACB), ITM Elliptical Baffle and the Cryo-pump/Manifold Baffle |
Dennis Coyne |
Auxiliary Optics
|
17 Jan 2013 |
D0901920-v13 |
Advanced LIGO H1 Optical Layout, ZEMAX |
Michael Smith et al. |
System Engineering
Final Design
|
11 Dec 2012 |
D1200905-x0 |
Alignment Monument Layout, LLO Corner Station, BSC Mechanical Test Stands |
Dennis Coyne |
Auxiliary Optics
|
11 Oct 2012 |
D1100024-v3 |
Rack & Cable Tray Layout, Y-End, H1 & H2 |
Dennis Coyne |
System Engineering
|
06 Sep 2012 |
D1101596-v2 |
Alignment Monument Layout, LHO Corner Station, BSC Mechanical Test Stands |
Douglas Cook et al. |
Auxiliary Optics
|
04 Sep 2012 |
D1101092-v3 |
aLIGO Septum Viewport Assembly, wedged |
Dennis Coyne |
Auxiliary Optics
Vacuum
|
30 Aug 2012 |
D1100999-v4 |
aLIGO, high quality, non-wedged, 6" Viewport Assembly |
Dennis Coyne |
Auxiliary Optics
Vacuum
|
22 Aug 2012 |
M1200276-v1 |
RODA: Increase of Schnupp Asymmetry from 5 cm to 8 cm |
Peter Fritschel et al. |
System Engineering
Final Design
|
06 Aug 2012 |
T1200354-v1 |
water and air outgassing rates for Advanced LIGO Cabling |
Dennis Coyne |
Vacuum
|
31 Jul 2012 |
D961115-v4 |
BSC Floor Assembly & Details, Beam Splitter Chamber (BSC), LIGO Vacuum Equipment |
Dennis Coyne |
Fabrication
Vacuum
Final Design
Document Migration
|
31 Jul 2012 |
E1100478-v5 |
DCN: Initial Release of aLIGO High Quality Viewport Assemblies (wedged and non-wedged) |
Dennis Coyne |
Auxiliary Optics
Vacuum
|
26 Jun 2012 |
E980057-x0 |
Document Change Notice (DCN) - SEI HAM First Article Test Layout, Rev. A |
Dennis Coyne |
Document Migration
|
19 Jun 2012 |
E960140-x0 |
Acceleration Load Spec |
Dennis Coyne |
Document Migration
|
14 Jun 2012 |
E960128-x0 |
LIGO Detector Subsystem Review Report - Preliminary Design Review, Control and Data System (CDS): Control and Monitoring (CM) |
Kent Blackburn et al. |
Document Migration
|
14 Jun 2012 |
E960126-x0 |
LIGO Detector Subsystem Review Report - Design Requirements Review, Physics Environment Monitoring (PEM) |
Rolf Bork et al. |
Document Migration
|
14 Jun 2012 |
E960051-x0 |
LIGO Vacuum Equipment Subsystem Review Report - Design Requirements Review, Vacuum Control and Monitoring System (VCMS) |
Bill Althouse et al. |
Document Migration
|
14 Jun 2012 |
E960036-x0 |
LIGO EMI Control Plan and Procedures |
System Engineering et al. |
Document Migration
|
14 Jun 2012 |
E950092-x0 |
Interface Control Document (ICD): Beam Tube (BT) - Vacuum Equipment (VE) |
Dennis Coyne et al. |
Document Migration
|
12 Jun 2012 |
E950091-x0 |
Interface Control Document (ICD): LIGO System & Detector (Det) - Vacuum Equipment (VE) |
Dennis Coyne |
Document Migration
|
12 Jun 2012 |
E950090-x0 |
Interface Control Document ICD): LIGO System & Detector (DET) - Civil Construction (CC) |
Dennis Coyne |
Document Migration
|
12 Jun 2012 |
E950089-x0 |
Interface Control Document (ICD): Beam Tube (BT) - Civil Construction (CC), Final Draft |
Dennis Coyne et al. |
Document Migration
|
12 Jun 2012 |
E950088-x0 |
Interface Control Document (ICD): Vacuum Equipment (VE) - Civil Construction (CC) |
Dennis Coyne et al. |
Document Migration
|
12 Jun 2012 |
C940056-v1 |
Geotechnical Investigation of the LIGO Site, Livingston, Louisiana |
Dennis Coyne |
System Engineering
|
19 Apr 2012 |
E0900082-v1 |
Interface Control Document (ICD): Seismic Isolation (SEI) – Systems (SYS) |
Dennis Coyne |
Seismic Isolation
System Engineering
Final Design
|
01 Apr 2012 |
E050176-v1 |
Interface Control Document (ICD): Suspension, UK Scope (SUS/UK) – Interferometer Sensing & Control (ISC) |
Dennis Coyne |
Suspensions
Sensing and Control
Final Design
|
01 Apr 2012 |
E050169-v1 |
Interface Control Document (ICD): Suspension, UK Scope (SUS/UK) – Auxiliary Optics Support (AOS) |
Dennis Coyne |
Auxiliary Optics
Suspensions
Final Design
|
01 Apr 2012 |
E050168-v1 |
Interface Control Document (ICD): Suspension, UK Scope (SUS/UK) – Core Optics Components (COC) |
Dennis Coyne |
Core Optics
Suspensions
Final Design
|
01 Apr 2012 |
E050160-v1 |
Interface Control Document (ICD): Suspension, UK Scope (SUS/UK) – Suspension, US Scope (SUS/US) |
Dennis Coyne |
Suspensions
Final Design
|
01 Apr 2012 |
E050159-v1 |
Interface Control Document (ICD): Seismic Isolation (SEI) – Suspension, UK Scope (SUS/UK) |
Dennis Coyne |
Seismic Isolation
Suspensions
Final Design
|
01 Apr 2012 |
E030647-v1 |
Advanced LIGO Detector System Interface Control Document (ICD) |
Dennis Coyne |
Seismic Isolation
Core Optics
Auxiliary Optics
Data Acquisition System
Suspensions
Input Optics
Observatory Facilities
System Engineering
Sensing and Control
Vacuum
Laser Systems
Final Design
Data and Computing
|
01 Apr 2012 |
D000335-v2 |
Small Optic Guide Rod Gluing Fixture Assembly |
Dennis Coyne |
Suspensions
Final Design
|
01 Apr 2012 |
D1101718-v2 |
aLIGO Septum Viewport Blank |
Dennis Coyne |
Auxiliary Optics
Vacuum
|
19 Mar 2012 |
D1101535-v3 |
aLIGO Septum Viewport Assy, non-wedged |
Dennis Coyne |
Vacuum
|
19 Mar 2012 |
D1101117-v3 |
aLIGO, Septum Viewport Flange |
Dennis Coyne |
Auxiliary Optics
Vacuum
|
19 Mar 2012 |
D1101002-v3 |
aLIGO, high quality, 6" Viewport Clamp |
Dennis Coyne |
Auxiliary Optics
Vacuum
|
19 Mar 2012 |
D1101000-v3 |
aLIGO, high quality, .75 deg wedged, 6" Viewport Assembly |
Dennis Coyne |
Auxiliary Optics
Vacuum
|
19 Mar 2012 |
M050220-v2 |
Guidelines for Advanced LIGO Detector Construction Activities |
Dennis Coyne et al. |
System Engineering
|
08 Feb 2012 |
T1100346-v2 |
Design of the Elastomeric Sealed, High Quality, Viewports |
Dennis Coyne |
Auxiliary Optics
Vacuum
|
10 Sep 2011 |
E1100817-x0 |
DCN: Initial Release of Septum Viewport Blank (aLIGO) |
Dennis Coyne |
Auxiliary Optics
Vacuum
|
29 Aug 2011 |
C1105429-v3 |
SOW: Pilot Test, Vacuum Component Bakeout and Residual Gas Assay |
Richard Bagley et al. |
Procurements
Integration
Fabrication
Vacuum
Cleaning
|
17 Aug 2011 |
D1101554-v1 |
obsolete |
Dennis Coyne |
Auxiliary Optics
Final Design
|
03 Aug 2011 |
E1000192-v1 |
Optical Contamination Cavity Test Results: Q3000 QUAD IR PHOTO DIODES |
Liyuan Zhang et al. |
Fabrication
|
26 Jul 2011 |
T1100379-v1 |
Comments on Modal Analysis of the PCal Pylon |
Dennis Coyne |
Auxiliary Optics
|
18 Jul 2011 |
E1100624-v1 |
Specification: Pulse-Purge Vacuum Baking for Polymers |
Dennis Coyne |
Vacuum
|
15 Jul 2011 |
D1101005-v1 |
aLIGO, high quality, .75 deg wedged, 6" Viewport, Optic |
Dennis Coyne |
Auxiliary Optics
Vacuum
|
11 Jul 2011 |
E1100521-x0 |
DCN: Initial Release of aLIGO High Quality Viewport Windows (wedged and non-wedged) |
Dennis Coyne |
Auxiliary Optics
Vacuum
|
09 Jun 2011 |
D1101091-v1 |
OBSOLETE |
Dennis Coyne |
Auxiliary Optics
Vacuum
|
09 Jun 2011 |
T010103-v1 |
aLIGO Suspension System Conceptual Design |
Russell Jones et al. |
Conceptual Design
Suspensions
|
09 Jun 2011 |
G1100464-v3 |
Plenary 2 aLIGO Technical Status part 2 (NSF Review Apr-2011) |
Dennis Coyne |
Reviews
System Engineering
NSF
|
05 May 2011 |
E1000678-v2 |
Optical Lever Heights above the Floor |
Dennis Coyne |
Auxiliary Optics
System Engineering
Final Design
Installation
|
04 May 2011 |
T1000689-v1 |
Stress and Deflection Analysis of the TMS Large Motion Restraint Design |
Dennis Coyne |
Auxiliary Optics
|
04 May 2011 |
T1100246-v1 |
iLIGO L1, H1 and H2 Interferometer Resonances |
Dennis Coyne |
Seismic Isolation
Core Optics
Auxiliary Optics
Commissioning
Suspensions
Input Optics
System Engineering
|
04 May 2011 |
E1100385-v2 |
Cable Lengths, End Station, H1 & H2 |
Dennis Coyne |
Observatory Facilities
System Engineering
|
21 Apr 2011 |
E1000382-v8 |
Material Qualification Queue |
Dennis Coyne |
System Engineering
Vacuum
|
11 Apr 2011 |
E1100023-v1 |
Material Qualification RGA Test Results: EG&G YAG-444A Photodiode |
Dennis Coyne |
Sensing and Control
Vacuum
|
04 Apr 2011 |
E970130-v4 |
Material, Process, Handling and Shipping Specification for Fluorel Parts |
Dennis Coyne |
Fabrication
System Engineering
Vacuum
|
29 Mar 2011 |
E1100144-v1 |
Electropolished Aluminum -- outgassing test |
Dennis Coyne et al. |
System Engineering
Vacuum
|
27 Feb 2011 |
D1002650-v1 |
IAS Layout for H2 FMx, ITMx |
Douglas Cook et al. |
Auxiliary Optics
|
21 Jan 2011 |
D1002651-v1 |
IAS Layout for H2 FMy, ITMy |
Douglas Cook et al. |
Auxiliary Optics
|
21 Jan 2011 |
D1002643-v1 |
IAS Layout for H1 ITMx |
Douglas Cook et al. |
Auxiliary Optics
|
21 Jan 2011 |
D1002653-v1 |
IAS Layout for H2 ETMy |
Douglas Cook et al. |
Auxiliary Optics
|
21 Jan 2011 |
E1000760-v2 |
Cable Lengths, Corner Station, H1 & H2 |
Dennis Coyne |
Observatory Facilities
System Engineering
|
12 Jan 2011 |
D1003343-v1 |
H1, L1 PRC Septum Plate Port Location |
Dennis Coyne |
System Engineering
Vacuum
|
07 Jan 2011 |
D1003344-v1 |
H2 PRC Septum Plate Port Location |
Dennis Coyne |
System Engineering
Vacuum
|
07 Jan 2011 |
D961165-v1 |
LIGO Vacuum Equipment Reissued to LIGO for Information - Equipment Arrangement Plan, Corner Station, Washington Site |
Dennis Coyne |
Document Migration
|
24 Nov 2010 |
D1002647-v1 |
IAS Layout for H1 ETMy |
Douglas Cook et al. |
Auxiliary Optics
|
08 Nov 2010 |
D970385-v1 |
Equipment Arrangement, Left End Station - Area 700, Louisiana, LIGO Vacuum Equipment |
Dennis Coyne |
Document Migration
|
04 Nov 2010 |
D1002652-x0 |
IAS Layout for H2 ETMx |
Douglas Cook et al. |
Auxiliary Optics
|
29 Oct 2010 |
D1002649-x0 |
IAS Layout for H1 SR3, SR2, SRM |
Douglas Cook et al. |
Auxiliary Optics
|
29 Oct 2010 |
D1002648-x0 |
IAS Layout for H1 PR3, PR2, PRM |
Douglas Cook et al. |
Auxiliary Optics
|
29 Oct 2010 |
D1002646-x0 |
IAS Layout for H1 ETMx |
Douglas Cook et al. |
Auxiliary Optics
|
11 Oct 2010 |
D1002645-x0 |
IAS Layout for H1 BS |
Douglas Cook et al. |
Auxiliary Optics
|
11 Oct 2010 |
D1002644-x0 |
IAS Layout for H1 ITMy |
Douglas Cook et al. |
Auxiliary Optics
|
11 Oct 2010 |
T1000564-v1 |
Allowable Bake Temperature for UHV Processing of Aluminum Alloys |
Dennis Coyne |
System Engineering
Vacuum
|
28 Sep 2010 |
E1000479-v1 |
Optical Contamination Test Results MasterBond EP30-2 samples on glass slides |
Liyuan Zhang et al. |
Suspensions
System Engineering
Vacuum
|
26 Sep 2010 |
E1000376-v1 |
RGA Test Results: A-OSEM Circuit Board Sub-Assembly (223 units) |
Dennis Coyne et al. |
Incoming Inspection
Suspensions
System Engineering
Vacuum
|
01 Sep 2010 |
E1000375-v1 |
RGA Test Results: A-OSEM Assemblies (quantity = first 7 production units; ICS bake 324) |
Dennis Coyne et al. |
Suspensions
System Engineering
Vacuum
|
31 Aug 2010 |
E1000196-v1 |
Optical Contamination Cavity Test Results: New Focus Picomotor 830X-UHV |
Liyuan Zhang et al. |
System Engineering
Sensing and Control
Vacuum
|
25 Aug 2010 |
D0900946-v4 |
D0900946 Adapter A-16, 44 1/4" I.D. x 60 1/2" I.D., LIGO Vacuum Equipment |
Dennis Coyne et al. |
System Engineering
Vacuum
Final Design
|
23 Aug 2010 |
C961213-v1 |
Technical Direction Memorandum 15 to CBI: DI Water Specification |
Dennis Coyne |
Fabrication
Vacuum
|
23 Jul 2010 |
D972710-v1 |
HAM1 & HAM7 Optics Table |
Dennis Coyne |
Seismic Isolation
|
23 Jul 2010 |
T970191-v1 |
Test Mass Transmissibility |
Dennis Coyne |
Core Optics
Modelling
|
16 Jul 2010 |
T050071-v1 |
Advanced LIGO Quad Suspension Installation Fixtures Design Review |
Dennis Coyne |
System Engineering
|
12 Jul 2010 |
D0900947-v4 |
Adapter A-17, 44 5/8" I.D. x 72 1/4" I.D., LIGO Vacuum Equipment |
Dennis Coyne et al. |
System Engineering
Vacuum
Final Design
|
06 Jul 2010 |
D030715-v1 |
Relevant Dimensions for Quad and SEI Installation at LASTI |
Dennis Coyne |
Installation
|
25 Jun 2010 |
E1000221-v1 |
Material Qualification RGA Test Results: Ferro Corporation RM108 Frit |
Dennis Coyne et al. |
Auxiliary Optics
Vacuum
|
17 Jun 2010 |
E1000198-v1 |
Optical Contamination Cavity Test Results: Optek OP232 Emitter and Centronics BPX65 |
Liyuan Zhang et al. |
Suspensions
System Engineering
Vacuum
|
04 Jun 2010 |
E1000199-v1 |
Material Qualification RGA Test Results: Optek OP232 Emitter and Centronics BPX65 |
Dennis Coyne et al. |
Suspensions
System Engineering
Vacuum
|
04 Jun 2010 |
E1000194-v1 |
Optical Contamination Cavity Test Results: Nichrome Wire wrapped on a fused silica rod (heated) |
Dennis Coyne |
System Engineering
Vacuum
|
02 Jun 2010 |
E1000179-v1 |
Optical Contamination Cavity Test Results: Semitron ESd 480 PEEK from Boedeker Plastics |
Liyuan Zhang et al. |
Suspensions
Vacuum
|
02 Jun 2010 |
E1000170-v1 |
Optical Contamination Cavity Test Results: Vishay IR-LED TSTS7100 |
Liyuan Zhang et al. |
Suspensions
Vacuum
|
02 Jun 2010 |
C1000398-v3 |
Statement of Work - Fabrication of Custom In-Vacuum Cables V25M |
Alan Wilkins et al. |
Seismic Isolation
Procurements
|
19 May 2010 |
D0900948-v3 |
Adapter A-18, 60 1/2" I.D. x 72 1/4" I.D., LIGO Vacuum Equipment |
Dennis Coyne et al. |
System Engineering
Vacuum
Final Design
|
18 May 2010 |
T1000006-v6 |
Notes on Making Electrical Connections to Metalized Crystals & Test Outline for ESD Samples |
Margot Hennig et al. |
Suspensions
|
23 Mar 2010 |
M080041-v1 |
Thickness of PR3 and SR3 and wedge information |
Norna Robertson |
Suspensions
Final Design
|
26 Feb 2010 |
E970063-v1 |
LIGO Seismic Isolation System (SEI): Fabrication Process Specification |
Dennis Coyne |
Seismic Isolation
Fabrication
Vacuum
|
12 Feb 2010 |
E048225-v2 |
Process Specification for AdLIGO Seismic Isolation System In-Vacuum Mechanical Elements Fabrication |
Dennis Coyne |
Seismic Isolation
Fabrication
Final Design
|
30 Jan 2010 |
D0900928-v2 |
D0900928 Vacuum Equipment Layout, Right End Station, LHO, Adv. LIGO |
John Worden et al. |
Integration
System Engineering
Vacuum
|
11 Jan 2010 |
F0900006-v2 |
LIGO Specification Template |
Dennis Coyne |
System Engineering
|
08 Jan 2010 |
D0900954-v1 |
Flat Faced Flange, 45.19" I.D. x 80" O.D., LIGO VE |
Dennis Coyne et al. |
Vacuum
Final Design
|
09 Dec 2009 |
D0900953-v1 |
Grooved and Slotted Flange, 44.25" I.D., LIGO VE |
Dennis Coyne et al. |
Vacuum
Final Design
|
07 Dec 2009 |
D0900963-v1 |
Flat Faced Flange, 44 5/8" ID, LIGO VE |
Dennis Coyne et al. |
Vacuum
Final Design
|
07 Dec 2009 |
D0900961-v1 |
Flat Faced Flange, 45.19" ID x 68.25" OD, LIGO VE |
Dennis Coyne et al. |
Vacuum
Final Design
|
07 Dec 2009 |
E950062-v1 |
Cleaning of Beam Tube Can Modules |
Dennis Coyne |
Fabrication
Vacuum
|
27 Oct 2009 |
P080006-x0 |
The Seismic Attenuation System (SAS) for the Advanced LIGO gravitational wave interferometric detectors |
David Ottaway et al. |
Public relations
Document Migration
|
21 Oct 2009 |
P070132-x0 |
Recent results of a seismically isolated optical table prototype designed for advanced LIGO |
David Ottaway et al. |
Public relations
Document Migration
|
19 Oct 2009 |
P070127-x0 |
Observation of three-mode parametric interactions in long optical cavities |
Jesper Munch et al. |
Public relations
Document Migration
|
19 Oct 2009 |
E960159-v1 |
Specification for Viton Vacuum Bakeout, LIGO Vacuum Equipment - Hanford and Livingston |
Dennis Coyne |
Fabrication
Vacuum
|
17 Jul 2009 |
C962778-v1 |
Report of Materials Analysis: Analysis of Three Liquid Samples for Nonvolatile Residue Content. Analysis of Nonvolatile Portion of "Mirachem from Scrubber" for Comparison to the Residues |
Dennis Coyne |
Fabrication
Vacuum
|
09 Jul 2009 |
E960046-v1 |
Specification for Cleaning Procedure for LIGO Vacuum Equipment (PSI) |
Dennis Coyne |
Fabrication
Vacuum
|
09 Jul 2009 |
D0900971-x0 |
Cylindrical Shell, 60.50" ID |
Dennis Coyne |
Vacuum
Final Design
|
12 May 2009 |
D0900974-x0 |
Support Plate, 6 x 12 x 1.375, LIGO VE |
Dennis Coyne |
Vacuum
Final Design
|
12 May 2009 |
D0900973-x0 |
Support Tubing, 4 x 2 x 0.1875, LIGO VE |
Dennis Coyne |
Vacuum
Final Design
|
12 May 2009 |
D0900972-x0 |
Support Assembly, Adapter A-18, LIGO VE |
Dennis Coyne |
Vacuum
Final Design
|
12 May 2009 |
D0900970-x0 |
Cylindrical Shell, 72.25 ID |
Dennis Coyne |
Vacuum
Final Design
|
12 May 2009 |
D0900968-x0 |
Flange, Flat Faced, 50 1/2" ID x 68 1/4" OD, LIGO VE |
Dennis Coyne |
Vacuum
Final Design
|
12 May 2009 |
D0900967-x0 |
Ring, Angle, 4" x 4" x 1/4", LIGO VE |
Dennis Coyne |
Vacuum
Final Design
|
12 May 2009 |
D0900966-x0 |
Flange, Grooved, 72 1/4 ID x 80 OD, LIGO VE |
Dennis Coyne |
Vacuum
Final Design
|
12 May 2009 |
D0900965-x0 |
Flange, Reducing, 61.06 ID x 72.12 OD x 1 Thk, LIGO VE |
Dennis Coyne |
Vacuum
Final Design
|
12 May 2009 |
D0900964-x0 |
Lifting Lug |
Dennis Coyne |
Vacuum
Final Design
|
12 May 2009 |
D0900962-x0 |
Cylindrical Shell for Adapter A-16, 44 5/8" ID, LIGO VE |
Dennis Coyne |
Vacuum
Final Design
|
12 May 2009 |
E0900132-x0 |
DCN for initial release of Core Optic Coating Specifications for Adv. LIGO |
Dennis Coyne |
Core Optics
Fabrication
Change Control
Final Design
|
12 May 2009 |
D0900952-x0 |
tie-rod bracket for vacuum equipment spools and adapters |
Dennis Coyne |
Vacuum
Final Design
|
12 May 2009 |
D950148-v2 |
LVEA and VEA Foundations Relative to the Beam Tube Center Line |
Dennis Coyne |
Integration
System Engineering
Vacuum
Installation
|
10 May 2009 |
L0900059-v1 |
Notes on the optomechanical layout meeting, 31-Mar-2009 |
Dennis Coyne |
System Engineering
Final Design
|
01 Apr 2009 |
T0900120-v2 |
Dynamics of the Damper Suspension for the ETM Transmission Telescope/Monitor |
Dennis Coyne |
Auxiliary Optics
Conceptual Design
|
30 Mar 2009 |
L0900058-v1 |
Request for waiver on glass shot blasted parts (BS/FM stay brackets) |
Dennis Coyne |
Suspensions
Final Design
|
29 Mar 2009 |
M0900087-v1 |
All in vacuum cabling will be shielded |
Dennis Coyne |
System Engineering
Final Design
|
29 Mar 2009 |
M080034-v1 |
Magnet Swap Review for Enhanced LIGO |
Norna Robertson |
Suspensions
Reviews
Upgrades
|
13 Mar 2009 |
E040136-v1 |
Seismic Isolation System (SEI) Payload Mass Properties |
Dennis Coyne |
Seismic Isolation
System Engineering
Final Design
|
13 Mar 2009 |
L0900002-v1 |
VRB request: all SmCo magnets UHV compatible? |
Dennis Coyne |
Requirements
System Engineering
|
06 Mar 2009 |
E010180-v1 |
LIGO Electronics Traveler Form |
Rolf Bork |
Policies
|
04 Mar 2009 |
L0810022-v1 |
epoxy resin for Violin Mode (VM) dampers |
Dennis Coyne |
Letters
Suspensions
Final Design
|
16 Dec 2008 |
G080541-x0 |
Mechanical Mode Damping for Parametric Instability Control - LSC/Virgo Collaboration Meeting, September 22-25, 2008, Amsterdam |
Dennis Coyne et al. |
Document Migration
|
01 Oct 2008 |
T080168-x0 |
Concepts for the Gold Barrel Sleeve For both the ETM and TCP Optics |
Amanda Brummitt et al. |
Document Migration
|
30 Jul 2008 |
G080391-x0 |
Technical Status of Advanced LIGO - PAC 24 Meeting @ LIGO Hanford Observatory, June 24-25, 2008 |
Dennis Coyne et al. |
Document Migration
|
27 Jun 2008 |
T080152-x0 |
Questions preliminary design review of silica masses for advanced LIGO |
Mark Barton et al. |
Document Migration
|
20 Jun 2008 |
T080146-x0 |
Specification and Drawing Review Notes for Input Optics Long Lead Procurement Readiness Review |
GariLynn Billingsley et al. |
Document Migration
|
11 Jun 2008 |
D020359-x0 |
LASTI, HEPI, HEPI Actuation Plate, Plug and Small Pin Valve |
Dennis Coyne et al. |
Document Migration
|
30 May 2008 |
E080182-x0 |
Document Change Notice (DCN) - RGA Test Qualification for the BSC Suspension Structures |
Dennis Coyne |
Document Migration
|
05 May 2008 |
T080106-x0 |
Limits to high vapor pressure elements in alloys for LIGO UHV components |
Dennis Coyne |
Document Migration
|
05 May 2008 |
T080087-x0 |
Report from the LASTI Technical Advisory Committee |
Rich Abbott et al. |
Document Migration
|
21 Apr 2008 |
G040034-x0 |
Hydraulic External Pre-Isolator (HEPI) Overall Installation Plan/Schedule |
Dennis Coyne |
Document Migration
|
15 Apr 2008 |
T080071-x0 |
Outgassing from Aluminum Weld Samples |
Dennis Coyne et al. |
Document Migration
|
31 Mar 2008 |
T060113-x0 |
Welding and cleaning specification for SUS ETM structures |
Mark Barton et al. |
Document Migration
|
14 Mar 2008 |
T060135-x0 |
Design development of the SUS ETM structures |
Mark Barton et al. |
Document Migration
|
14 Mar 2008 |
T020210-x0 |
System Dynamics Model of the External Pre-Isolator (EPI) for the Horizontal Access Module (HAM) |
Dennis Coyne |
Document Migration
|
10 Mar 2008 |
T080053-x0 |
Comments and Questions and Responses on the BOSEM FDR and FRR, and Responses |
Betsy Weaver et al. |
Document Migration
|
06 Mar 2008 |
G070904-x0 |
The HAM-SAS Seismic Isolation System for the Advanced LIGO Interferometers |
Benjamin Abbott et al. |
Document Migration
|
05 Mar 2008 |
T070175-x0 |
Test Mass Optical Surface Deformation due to Gravity when on a V-block metrology mount |
Dennis Coyne |
Document Migration
|
26 Nov 2007 |
T070248-x0 |
Advanced LIGO Input Optics Preliminary Design Review Report |
Dennis Coyne et al. |
Document Migration
|
06 Nov 2007 |
T070153-x0 |
Indirect Length Coupling for the Beamsplitter with Horizontal Wedge |
Dennis Coyne et al. |
Document Migration
|
06 Nov 2007 |
G070695-x0 |
Optical bench Seismic Isolation System (SAS) Prototyped for the HAM chambers of the Advanced LIGO Interferometers - LSC/Virgo Collaborations Meeting, October 22-25 2007, Hannover Germany |
Benjamin Abbott et al. |
Document Migration
|
29 Oct 2007 |
G070628-x0 |
The SAS primary Seismic Attenuation System for Advanced LIGO’s Optical Benches |
Benjamin Abbott et al. |
Document Migration
|
21 Sep 2007 |
T060087-x0 |
Finite Element Analysis of Advanced LIGO SUS ETM Structures using ANSYS Classic beam models |
Mark Barton et al. |
Document Migration
|
07 Aug 2007 |
T060088-x0 |
Finite Element Analysis of Advanced LIGO SUS ETM structures using ANSYS workbench |
Mark Barton et al. |
Document Migration
|
07 Aug 2007 |
G070372-x0 |
Advanced LIGO Subsystem Descriptions - NSF Review of Advanced LIGO |
Dennis Coyne et al. |
Document Migration
|
06 Jul 2007 |
D070165-x0 |
FM-ITM SUSPENSION ENVELOPE |
Dennis Coyne |
Document Migration
|
22 Jun 2007 |
T070121-x0 |
Effect of Attachment Compliance on the Bending Frequencies of Optics Table Payload Structures |
Dennis Coyne |
Document Migration
|
04 Jun 2007 |
T070087-x0 |
Second Report to the HAM-SAS Evaluation Committee |
Dennis Coyne et al. |
Document Migration
|
25 May 2007 |
T070079-x0 |
Report to the HAM-SAS Evaluation Committee |
Dennis Coyne et al. |
Document Migration
|
05 Apr 2007 |
E070066-x0 |
Process Traveler - Accuglass Kapton & PEEK cables & PEEK cable ties |
Dennis Coyne |
Document Migration
|
22 Mar 2007 |
T070031-x0 |
Revised LASTI Plan Summer 2007-2009 |
Rich Abbott et al. |
Document Migration
|
21 Feb 2007 |
T060257-x0 |
Conceptual Design of a Double Pendulum for the Output Mode Cleaner |
Dennis Coyne et al. |
Document Migration
|
10 Jan 2007 |
T060243-x0 |
A Simple Thermal Analysis of the Quad Controls System and Comparison to LASTI Test Results |
Dennis Coyne |
Document Migration
|
25 Oct 2006 |
G060421-x0 |
Advanced LIGO Status - LSC Meeting, August 14-17th, 2006 @ Louisiana State University |
Dennis Coyne |
Document Migration
|
25 Oct 2006 |
T060218-x0 |
Report of the LASTI Technical Advisory Committee |
Rich Abbott et al. |
Document Migration
|
25 Oct 2006 |
E030180-x0 |
Design Requirements for the In-Vacuum Mechanical Elements of the Advanced LIGO Seismic Isolation System for the HAM Chamber |
Dennis Coyne et al. |
Document Migration
|
25 Oct 2006 |
T060206-x0 |
Possible Alternatives to the Current LIGO Drawing Revision Control/Sequence Scheme |
Dennis Coyne |
Document Migration
|
24 Aug 2006 |
G060419-x0 |
HAM SAS Passive Seismic Attenuation System Fabrication, Assembly, Installation - LSC Meeting, August 14-17th, 2006 @ Louisiana State University |
Benjamin Abbott et al. |
Document Migration
|
23 Aug 2006 |
G060226-x0 |
Advanced LIGO Subsystems - NSF Review of Advanced LIGO Project |
Dennis Coyne et al. |
Document Migration
|
08 Aug 2006 |
T050261-x0 |
Quadruple Suspension Dynamics Model with Finite Elements |
Dennis Coyne |
Document Migration
|
07 Jul 2006 |
T060066-x0 |
HAM-SAS Spring Box Simulations |
Valerio Boschi et al. |
Document Migration
|
27 Jun 2006 |
G060219-x0 |
Facility Modifications and Preparation (FMP) |
Dennis Coyne et al. |
Document Migration
|
19 May 2006 |
T040032-x0 |
Polyimide Hydrocarbon Outgas Rate and Temperature Limits for the Isolation System Actuator |
Dennis Coyne |
Document Migration
|
26 Apr 2006 |
T060069-x0 |
Report of the LASTI Technical Advisory Committee |
Rich Abbott et al. |
Document Migration
|
20 Apr 2006 |
G060098-x0 |
Advanced LIGO Optical & Mechanical Layout Status - LSC Meeting, March 19-22, 2006, Hanford WA |
Dennis Coyne |
Document Migration
|
14 Apr 2006 |
G060128-x0 |
HAM Passive Seismic Attenuation System (SAS) System Performance, Fabrication, Assembly , Installation - LSC Meeting, March 19-22, 2006, Hanford WA |
Valerio Boschi et al. |
Document Migration
|
14 Apr 2006 |
T050237-x0 |
Advanced LIGO Preliminary Frequency Analysis of the Quadruple Pendulum Controls Prototype (second) Structure |
Mark Barton et al. |
Document Migration
|
13 Apr 2006 |
T030137-x0 |
ETM Controls Prototype: Mass Estimate of an ETM Suspension Layout |
Caroline Cantley et al. |
Document Migration
|
13 Apr 2006 |
G060025-x0 |
HAM-SAS CCB information |
Dennis Coyne et al. |
Document Migration
|
16 Mar 2006 |
T060059-x0 |
Finite Element Analysis of Advanced LIGO SUS ETM Structures |
Mark Barton et al. |
Document Migration
|
16 Mar 2006 |
T060038-x0 |
Acoustic Coupling Through Cabling for the HAM-SAS System |
Dennis Coyne |
Document Migration
|
22 Feb 2006 |
G050557-x0 |
UHV Cleanliness Requirements: Cleaning/Baking & Contamination Control (HAM-SAS Bidder`s Conference) |
Dennis Coyne |
Document Migration
|
10 Feb 2006 |
T060021-x0 |
Response to Findings from the HAM-SAS LASTI Experiment/Prototype Review |
Dennis Coyne et al. |
Document Migration
|
30 Jan 2006 |
T060020-x0 |
HAM-SAS System Dynamics Model |
Dennis Coyne |
Document Migration
|
24 Jan 2006 |
T060002-x0 |
SAS installation and tuning procedure |
Dennis Coyne et al. |
Document Migration
|
20 Jan 2006 |
T050171-x0 |
Selection of Aluminum Alloys for Use on Advanced LIGO UK Parts |
Dennis Coyne et al. |
Document Migration
|
02 Dec 2005 |
T050184-x0 |
Test Mass Optical Surface Deformation Due to Gravity |
Dennis Coyne |
Document Migration
|
29 Sep 2005 |
T050173-x0 |
Notes on adding an o-ring to the outer barrel of the TNI test mass |
Dennis Coyne |
Document Migration
|
15 Sep 2005 |
T050077-x0 |
Separation of chains in quad suspensions |
Caroline Cantley et al. |
Document Migration
|
15 Sep 2005 |
D050266-x0 |
ETM & ITM SUS Structure Envelope (Adv. LIGO) |
Dennis Coyne |
Document Migration
|
08 Sep 2005 |
T020070-x0 |
Thermal Noise Calculation with Inhomogeneous Loss using the Finite Element Method: Application to Test Mass Optics with Coating Loss, Attachments and Composite Assemblies |
Dennis Coyne |
Document Migration
|
26 Aug 2005 |
T050125-x0 |
Transforming Finite Element Eigensolutions to State Space Modal Models |
Dennis Coyne |
Document Migration
|
27 Jul 2005 |
G970303-x0 |
Automatic System Indentification and Adaptive Control for LIGO Interferometers |
Dennis Coyne |
Document Migration
|
27 Jul 2005 |
T050014-x0 |
Coupled Dynamics Analysis of the Seismic Isolation System (SEI) Stage-2 Structure and the Quadruple Suspension (SUS) Structure |
Dennis Coyne |
Document Migration
|
11 Jul 2005 |
G050316-x0 |
Update on Aspects of the Suspension Design for Advanced LIGO |
Helena Armandula et al. |
Document Migration
|
28 Jun 2005 |
T050098-x0 |
Optics Table Hole Size and Spacing based on Suspension Attachment Frequencies (Advanced LIGO) |
Dennis Coyne |
Document Migration
|
14 Jun 2005 |
T040033-x0 |
Seismic Isolation System (SEI) In-Vacuum Thermal Analysis |
Dennis Coyne |
Document Migration
|
14 Jun 2005 |
G050245-x0 |
Advanced LIGO SUS Installation into BSC Chambers: Mechanical Fixtures |
Dennis Coyne |
Document Migration
|
09 Jun 2005 |
E050105-x0 |
Process Traveler - UHV Approval Test: AML Stepper Motor |
Dennis Coyne |
Document Migration
|
31 May 2005 |
E050129-x0 |
Process Traveler - Emitter and Photodiode for Adv. LIGO OSEM`s |
Dennis Coyne |
Document Migration
|
31 May 2005 |
T050078-x0 |
Suspension Blade Spring Internal Modes (Advanced LIGO) |
Dennis Coyne |
Document Migration
|
18 May 2005 |
G050255-x0 |
Advanced LIGO Update - PAC Meeting, May 18-19, 2005 |
Dennis Coyne |
Document Migration
|
18 May 2005 |
T050057-x0 |
Beamsplitter Coating Strain Induced Radius of Curvature (Advanced LIGO) |
Dennis Coyne |
Document Migration
|
12 Apr 2005 |
G050187-x0 |
ADVANCED LIGO SUS ETM STRUCTURAL DESIGN SUMMARY - LSC Meeting, March 20-23, 2005, Livingston LA |
Caroline Cantley et al. |
Document Migration
|
07 Apr 2005 |
E050050-x0 |
Process Traveler: Electrical feedthroughs for LASTI BSC |
Dennis Coyne |
Document Migration
|
07 Apr 2005 |
G050211-x0 |
Maraging Steel -- SEI perspective for round-table discussions - LSC Meeting, March 20-23, 2005, Livingston LA |
Dennis Coyne |
Document Migration
|
28 Mar 2005 |
G050121-x0 |
Advanced LIGO Update - LSC Meeting, March 20-23, 2005, Livingston LA |
Dennis Coyne |
Document Migration
|
25 Mar 2005 |
G020241-x0 |
Composite Test Mass |
Dennis Coyne |
Document Migration
|
22 Mar 2005 |
T050010-x0 |
Monolithic Suspension Workshop (Glasgow Jan 2005): Minutes & Actions |
Helena Armandula et al. |
Document Migration
|
15 Feb 2005 |
D050058-x0 |
Electrical Feedthrough, Conflat Flange, 12 inch |
Dennis Coyne |
Document Migration
|
08 Feb 2005 |
D050059-x0 |
Electrical Feedthrough, Conflat Flange, 16.5 inch |
Dennis Coyne |
Document Migration
|
08 Feb 2005 |
T050005-x0 |
Quad Interface Issues |
Dennis Coyne |
Document Migration
|
02 Feb 2005 |
G040459-x0 |
Advanced LIGO Assembly & Installation Plan |
Dennis Coyne |
Document Migration
|
05 Nov 2004 |
E021000-x0 |
SPECIFICATION - Earthquake and Safety Stop Design Requirements |
Mark Barton et al. |
Document Migration
|
09 Aug 2004 |
E010142-x0 |
Document Change Notice (DCN) |
Dennis Coyne |
Document Migration
|
31 Jul 2004 |
E010141-x0 |
Installation Specification - Special Procedure: Optical Alignment Adjustment in the Vertex Region of the Hanford 4km Interferometer |
Dennis Coyne |
Document Migration
|
31 Jul 2004 |
E030179-x0 |
Design Requirements for the In-Vacuum Mechanical Elements of the Advanced LIGO Seismic Isolation System for the BSC Chamber |
Dennis Coyne et al. |
Document Migration
|
16 Jul 2004 |
G040257-x0 |
LIGO Commissioning Update |
Dennis Coyne |
Document Migration
|
08 Jun 2004 |
T040078-x0 |
Notes on As-Built Pin Valving for the HEPI Actuator |
Dennis Coyne |
Document Migration
|
04 May 2004 |
E030570-x0 |
Document Change Notice (DCN) - LIGO Vacuum Compatible Materials List |
Dennis Coyne |
Document Migration
|
07 Apr 2004 |
G040134-x0 |
Advanced LIGO Optical Layout Status - LSC Meeting, March 15 - 18th, Livingston, LA |
Dennis Coyne |
Document Migration
|
18 Mar 2004 |
T030044-x0 |
Frequency Analysis of the Quadruple Pendulum Structure |
Dennis Coyne |
Document Migration
|
26 Feb 2004 |
T040007-x0 |
Optical Coupling of Vertical Displacement to Cavity Length |
Dennis Coyne |
Document Migration
|
22 Jan 2004 |
T030228-x0 |
Loss Due to Anisotropic Characteristics of Sapphire |
Dan Busby et al. |
Document Migration
|
22 Dec 2003 |
G030656-x0 |
Management of the Advanced LIGO Seismic Isolation System Development |
Dennis Coyne et al. |
Document Migration
|
20 Nov 2003 |
T030023-x0 |
LIGO Optical Contamination Tests of Hydraulic Fluids |
Lee Cardenas et al. |
Document Migration
|
03 Nov 2003 |
G030538-x0 |
Quiet Hydraulics Board: Purpose, Scope, Charter and Plans |
Dennis Coyne |
Document Migration
|
22 Oct 2003 |
G030429-x0 |
Adv LIGO and retrofit seismic isolation research update - LSC Meeting, August 18th - 21st, Hannover, Germany |
Rich Abbott et al. |
Document Migration
|
14 Oct 2003 |
G030536-x0 |
Advanced LIGO: Detector Organization, Responsibilities, Authority and Decision Tree: SUS and COC |
Dennis Coyne et al. |
Document Migration
|
14 Oct 2003 |
G030270-x0 |
Advanced LIGO: Mechanical Systems, Systems Tests and Installations |
Dennis Coyne |
Document Migration
|
07 Oct 2003 |
G030399-x0 |
Advanced LIGO - LSC Meeting, August 18th - 21st, Hannover, Germany |
Dennis Coyne |
Document Migration
|
22 Aug 2003 |
G030414-x0 |
Hydraulic External Pre-Isolation, Progress on the Seismic Retrofit - LSC Meeting, August 18th - 21st, Hannover, Germany |
Rich Abbott et al. |
Document Migration
|
20 Aug 2003 |
E030398-x0 |
Document Change Notice (DCN) - Reflection/Transmission Scanner (RTS) Drawings |
Dennis Coyne |
Document Migration
|
19 Aug 2003 |
G030409-x0 |
Comments on System Requirements of Advanced LIGO SUS Alignment |
Dennis Coyne |
Document Migration
|
15 Aug 2003 |
T030131-x0 |
Summary of Preliminary Dynamic Measurements Conducted on the Advanced LIGO Seismic Isolation System, Technology Demonstrator |
Dennis Coyne et al. |
Document Migration
|
11 Aug 2003 |
G030236-x0 |
Mass Limits and Balancing: Advanced LIGO, Seismic Isolation System (SEI), Rev. 02 |
Dennis Coyne |
Document Migration
|
30 Jul 2003 |
E970037-x0 |
Component Specification - Small Optics Suspension (SOS) Assembly Specification, Rev. F |
Janeen Romie et al. |
Document Migration
|
23 Jun 2003 |
G030237-x0 |
Finite Element Modeling Requirements: Advanced LIGO, Seismic Isolation System (SEI) |
Dennis Coyne |
Document Migration
|
09 May 2003 |
T030086-x0 |
Natural Vibration Modes of ITM number 11 |
Dennis Coyne |
Document Migration
|
24 Apr 2003 |
G030206-x0 |
Hydraulic Actuators for Advanced LIGO and LIGO I - Aspen Conference 2003 |
Rich Abbott et al. |
Document Migration
|
17 Apr 2003 |
G030116-x0 |
External Pre-Isolation Progress on the Seismic Retrofit - LSC Meeting, March 17th - 20th, Livingston, LA |
Rich Abbott et al. |
Document Migration
|
27 Mar 2003 |
G030047-x0 |
Predicting Thermal Noise in Initial LIGO Interferometers - LSC Meeting, March 17th - 20th, Livingston, LA |
Rana Adhikari et al. |
Document Migration
|
20 Mar 2003 |
G020470-x0 |
Remarks at the PPARC Review of the UK Contribution to an Advanced LIGO |
Dennis Coyne |
Document Migration
|
03 Dec 2002 |
G020480-x0 |
Pre-Isolation - NSF Annual Review |
Dennis Coyne |
Document Migration
|
22 Oct 2002 |
G020457-x0 |
Advanced LIGO Seismic Isolation R&D |
Dennis Coyne |
Document Migration
|
09 Oct 2002 |
T020098-x0 |
Pier Stiffness and Modes |
Dennis Coyne |
Document Migration
|
30 Jul 2002 |
T020086-x0 |
Laser Beam Block Steady-State Temperatures |
Dennis Coyne |
Document Migration
|
10 Jul 2002 |
G020171-x0 |
LIGO and Industry |
Dennis Coyne |
Document Migration
|
30 May 2002 |
G020147-x0 |
Initial LIGO Seismic Isolation System Upgrade |
Dennis Coyne |
Document Migration
|
30 May 2002 |
G020230-x0 |
Staged Approach to Advanced LIGO Implementation |
Dennis Coyne et al. |
Document Migration
|
07 May 2002 |
T020050-x0 |
Initial LIGO Seismic Isolation Upgrade: Conceptual Design Document |
Dennis Coyne |
Document Migration
|
19 Apr 2002 |
T020040-x0 |
External seismic pre-isolation retrofit design |
Rana Adhikari et al. |
Document Migration
|
19 Apr 2002 |
G020169-x0 |
Conceptual Design Review: Initial LIGO Seismic Isolation System Upgrade |
Dennis Coyne |
Document Migration
|
18 Apr 2002 |
G020113-x0 |
Current Work on Hydraulics for LIGO I - LSC Meeting, March 20 - 23, Livingston LA |
Rich Abbott et al. |
Document Migration
|
08 Apr 2002 |
T020045-x0 |
Vibrational Modes of the HAM Seismic Isolation System |
Dennis Coyne |
Document Migration
|
01 Apr 2002 |
T020034-x0 |
Low-frequency Cutoff for Advanced LIGO |
Dennis Coyne et al. |
Document Migration
|
01 Apr 2002 |
T020046-x0 |
Vibrational Modes of the BSC Seismic Isolation System |
Dennis Coyne |
Document Migration
|
01 Apr 2002 |
E010094-x0 |
Installation Specification - Re-alignment of the LLO 4K Interferometer Vertex Region |
Dennis Coyne et al. |
Document Migration
|
06 Feb 2002 |
T000147-x0 |
LIGO-II Proposal Input for the SEI Subsystem |
Fred Asiri et al. |
Document Migration
|
18 Jan 2002 |
G010407-x0 |
Update on R&D for Advanced LIGO, PAC 11 Meeting |
Dennis Coyne et al. |
Document Migration
|
04 Dec 2001 |
D010068-x0 |
Type B, Mechanical Q R&D Substrate |
Janeen Romie et al. |
Document Migration
|
19 Nov 2001 |
D010067-x0 |
Type A, Mechanical Q R&D Substrate |
Janeen Romie et al. |
Document Migration
|
19 Nov 2001 |
E010001-x0 |
Installation Specification - LHO Detector, Y-End Station, In-Chamber < > Installation |
Betsy Weaver et al. |
Document Migration
|
25 Jul 2001 |
T010081-x0 |
Minutes: Advanced LIGO Systems Meeting (7/13/2001) |
Dennis Coyne |
Document Migration
|
17 Jul 2001 |
E010119-x0 |
Installation Specification - Re-alignment of the Livingston Observatory, Y-Arm, End Test Mass |
Dennis Coyne |
Document Migration
|
28 Jun 2001 |
G010208-x0 |
Earthquake Risk & Recovery: Lessons from the 2/28/01 Olympia, WA Quake |
Dennis Coyne |
Document Migration
|
28 Jun 2001 |
E010120-x0 |
Document Change Notice (DCN) |
Dennis Coyne |
Document Migration
|
28 Jun 2001 |
E010121-x0 |
Process Traveler - Pam Bracket, Aluminum |
Dennis Coyne |
Document Migration
|
28 Jun 2001 |
G010237-x0 |
R & D for Advanced LIGO 2002-2006 |
Dennis Coyne et al. |
Document Migration
|
28 Jun 2001 |
G010209-x0 |
Science and Engineering Runs: Plans and Schedule - NSF Review April 30 - May 2, 2001 Pasadena, CA |
Dennis Coyne |
Document Migration
|
05 Jun 2001 |
G010019-x0 |
Advanced Interferometer Sensing & Control (ISC) |
Dennis Coyne |
Document Migration
|
11 Apr 2001 |
E010067-x0 |
Document Change Notice (DCN) |
Dennis Coyne |
Document Migration
|
04 Apr 2001 |
E010066-x0 |
Installation Specification: Re-alignment of the 2 km Interferometer, Y-Arm, End Test Mass |
Dennis Coyne |
Document Migration
|
04 Apr 2001 |
E010060-x0 |
Document Change Notice (DCN) |
Dennis Coyne |
Document Migration
|
29 Mar 2001 |
E010058-x0 |
Document Change Notice (DCN) |
Dennis Coyne |
Document Migration
|
29 Mar 2001 |
E010057-x0 |
Installation Specification: Re-Alignment of the 2 km Interferometer Vertex Region |
Dennis Coyne |
Document Migration
|
29 Mar 2001 |
G010082-x0 |
Planning for Advanced LIGO - LSC Meeting March 14 -17 2001 Livingston, LA |
Dennis Coyne et al. |
Document Migration
|
26 Mar 2001 |
T010027-x0 |
Preliminary Layout of LIGO-2 Power & Signal Recycling Cavities |
Dennis Coyne |
Document Migration
|
12 Mar 2001 |
G010005-x0 |
R&D for Advanced LIGO 2002-2006: NSF Review of LIGO Operations Proposal for FY2002-2006, Hanford, Washington |
Dennis Coyne et al. |
Document Migration
|
08 Mar 2001 |
G000344-x0 |
R&D for Advanced LIGO 2002-2006 - PAC9 Presentation, 13 December 2000 |
Dennis Coyne et al. |
Document Migration
|
23 Jan 2001 |
T000087-x0 |
Available Height above the HAM Optics Table |
Dennis Coyne |
Document Migration
|
09 Jan 2001 |
E000053-x0 |
Specification: LIGO Cavity Lengths and Core Optic Positions, Rev. 02 |
Dennis Coyne |
Document Migration
|
18 Sep 2000 |
T000091-x0 |
Minutes: Advanced LIGO Systems Meeting (9/1/00) |
Dennis Coyne |
Document Migration
|
07 Sep 2000 |
E990097-x0 |
Process Traveler |
Dennis Coyne |
Document Migration
|
08 Aug 2000 |
E000028-x0 |
Core Optics Tilt Angles |
Dennis Coyne et al. |
Document Migration
|
08 Aug 2000 |
D000216-x0 |
Optics Table Elevations (Livingston LVEA) |
Dennis Coyne |
Document Migration
|
13 Jul 2000 |
G000151-x0 |
Prototype Testing, Generalities |
Dennis Coyne |
Document Migration
|
30 May 2000 |
G000122-x0 |
Suspension Materials Research for LIGO II |
Helena Armandula et al. |
Document Migration
|
11 May 2000 |
G000110-x0 |
Detector Installation and Commissioning Status |
Dennis Coyne |
Document Migration
|
04 May 2000 |
D000071-x0 |
COS Viewport, Reducer Flange 10.0" OD to 6.0" (Varian) |
Dennis Coyne |
Document Migration
|
24 Feb 2000 |
E000103-x0 |
Installation Specification: LBSC4 Installation (Livingston X-End Station BSC), Rev. A |
Dennis Coyne |
Document Migration
|
24 Feb 2000 |
E000104-x0 |
Document Change Notice (DCN): Release of E000103, LBSC4 Installation Procedure |
Dennis Coyne |
Document Migration
|
24 Feb 2000 |
G000004-x0 |
LIGO-I Detector, Installation & Commissioning |
Dennis Coyne et al. |
Document Migration
|
15 Feb 2000 |
G990131-x0 |
Presentations at the Glasgow LSC Meeting on Suspension/Isolation Interfaces, 16-17 December 1999 |
Alessandro Bertolini et al. |
Document Migration
|
04 Jan 2000 |
G990124-x0 |
PAC #7, LIGO-I Installation |
Dennis Coyne |
Document Migration
|
02 Dec 1999 |
G990115-x0 |
Installation and Commissioning Approach for LIGO2 |
Dennis Coyne |
Document Migration
|
03 Nov 1999 |
E990304-x0 |
Evaluation Criteria for the LIGO-II Seismic Isolation Subsystem |
Dennis Coyne et al. |
Document Migration
|
10 Sep 1999 |
E990202-x0 |
Process Traveler |
Dennis Coyne |
Document Migration
|
07 Sep 1999 |
E990233-x0 |
Process Traveler |
Dennis Coyne |
Document Migration
|
07 Sep 1999 |
E990214-x0 |
Process Traveler: LIOG Ioslation Stack Flourel Shim |
Dennis Coyne |
Document Migration
|
27 May 1999 |
E990208-x0 |
Process Traveler: HAM Isolation Stack Leg Assembly Pins & Screws |
Dennis Coyne |
Document Migration
|
27 May 1999 |
E990203-x0 |
Process Traveler |
Dennis Coyne |
Document Migration
|
10 May 1999 |
E990122-x0 |
Process Traveler |
Dennis Coyne |
Document Migration
|
27 Apr 1999 |
G990029-x0 |
Detector Construction & Installation, Overview and Status - NSF Presentation, 27-29 April 1999, Livingston Observatory |
Dennis Coyne |
Document Migration
|
26 Apr 1999 |
E990006-x0 |
Process Traveler |
Dennis Coyne |
Document Migration
|
12 Apr 1999 |
E990005-x0 |
Process Traveler |
Dennis Coyne |
Document Migration
|
12 Apr 1999 |
E990013-x0 |
Process Traveler |
Dennis Coyne |
Document Migration
|
05 Apr 1999 |
E990012-x0 |
Process Traveler |
Dennis Coyne |
Document Migration
|
31 Mar 1999 |
E990123-x0 |
Process Traveler |
Dennis Coyne |
Document Migration
|
31 Mar 1999 |
E990124-x0 |
Process Traveler |
Dennis Coyne |
Document Migration
|
31 Mar 1999 |
E990125-x0 |
Process Traveler |
Dennis Coyne |
Document Migration
|
31 Mar 1999 |
E990010-x0 |
Process Traveler |
Dennis Coyne |
Document Migration
|
31 Mar 1999 |
D990091-x0 |
Electrical Feedthrough Locations |
Dennis Coyne |
Document Migration
|
26 Mar 1999 |
E990146-x0 |
Document Change Notice (DCN) |
Dennis Coyne et al. |
Document Migration
|
26 Mar 1999 |
E990002-x0 |
Process Traveler |
Dennis Coyne |
Document Migration
|
25 Jan 1999 |
E980363-x0 |
Process Traveler |
Dennis Coyne |
Document Migration
|
25 Jan 1999 |
E990003-x0 |
Process Traveler |
Dennis Coyne |
Document Migration
|
25 Jan 1999 |
E990001-x0 |
Process Traveler |
Dennis Coyne |
Document Migration
|
25 Jan 1999 |
E980353-x0 |
Vacuum Bake Waiver Request for Polished Optics |
Dennis Coyne |
Document Migration
|
28 Dec 1998 |
T950083-x0 |
Vacuum Equipment (VE) Power Requirements in the LVEA |
Dennis Coyne |
Document Migration
|
13 Nov 1998 |
E980299-x0 |
Process Traveler: ISC Viewports |
Dennis Coyne |
Document Migration
|
10 Nov 1998 |
E980296-x0 |
Process Traveler: LIGO Isolation System Coil Spring Seat (Left-Handed) |
Dennis Coyne |
Document Migration
|
10 Nov 1998 |
E980297-x0 |
Process Traveler: Vent Valves (2-3/4" CF) |
Dennis Coyne |
Document Migration
|
10 Nov 1998 |
E980294-x0 |
Process Traveler: Miscellaneous IO Aluminum Parts |
Dennis Coyne |
Document Migration
|
10 Nov 1998 |
E980298-x0 |
Process Traveler: LIGO Isolation System Coil Spring Seat (Right Handed) |
Dennis Coyne |
Document Migration
|
10 Nov 1998 |
E980295-x0 |
Process Traveler: Miscellaneous IO Stainless Steel Parts |
Dennis Coyne |
Document Migration
|
10 Nov 1998 |
E980283-x0 |
Process Traveler: BSC Locating Pins |
Dennis Coyne |
Document Migration
|
29 Oct 1998 |
E980223-x0 |
Process Traveler: Coil Spring Seat |
Dennis Coyne |
Document Migration
|
26 Oct 1998 |
E980166-x0 |
Process Traveler: Coil Spring Seats |
Dennis Coyne |
Document Migration
|
26 Oct 1998 |
E980185-x0 |
Process Traveler: LOS Aluminum and Quartz Parts |
Dennis Coyne |
Document Migration
|
26 Oct 1998 |
E980225-x0 |
Process Traveler: Magnet |
Dennis Coyne |
Document Migration
|
26 Oct 1998 |
E980164-x0 |
Process Traveler: 2.75" Tee |
Dennis Coyne |
Document Migration
|
26 Oct 1998 |
E980181-x0 |
Process Traveler: LIOG Isolation System Coil Spring Seat |
Dennis Coyne |
Document Migration
|
26 Oct 1998 |
E980184-x0 |
Process Traveler: LOS Stainless Steel Parts |
Dennis Coyne |
Document Migration
|
26 Oct 1998 |
E980222-x0 |
Process Traveler; Coil Spring Seat |
Dennis Coyne |
Document Migration
|
26 Oct 1998 |
E980226-x0 |
Process Traveler: Coil Spring Seat |
Dennis Coyne |
Document Migration
|
26 Oct 1998 |
E980165-x0 |
Process Traveler: Vent Valve |
Dennis Coyne |
Document Migration
|
26 Oct 1998 |
E980180-x0 |
Process Traveler: Viewport, 10: OD Del-Seal Flange (VP800) |
Dennis Coyne |
Document Migration
|
26 Oct 1998 |
E980169-x0 |
Process Traveler: Viewports, 10" OD Del-Seal, Uncoated |
Dennis Coyne |
Document Migration
|
26 Oct 1998 |
E980160-x0 |
Process Traveler: Sensor/Actuator PAM Bracket |
Dennis Coyne |
Document Migration
|
23 Oct 1998 |
E980156-x0 |
Process Traveler: Custom Adapter Nipple (12" to three 4.5" CF converter; D980246-A) |
Dennis Coyne |
Document Migration
|
23 Oct 1998 |
E980157-x0 |
Process Traveler: Dual 25 Pin `D` Connector CF Flange |
Dennis Coyne |
Document Migration
|
23 Oct 1998 |
E980121-x0 |
Process Traveler |
Dennis Coyne |
Document Migration
|
23 Oct 1998 |
E980155-x0 |
Process Traveler: 4.50" CF Flange, Blank |
Dennis Coyne |
Document Migration
|
23 Oct 1998 |
E980154-x0 |
Process Traveler: Isolation System Coil Spring Seat (D972219-A) |
Dennis Coyne |
Document Migration
|
23 Oct 1998 |
G980119-x0 |
Detector Installation - NSF Review Presentation |
Dennis Coyne |
Document Migration
|
21 Oct 1998 |
E980274-x0 |
Process Traveler |
Dennis Coyne |
Document Migration
|
20 Oct 1998 |
E980183-x0 |
Process Traveler |
Dennis Coyne |
Document Migration
|
20 Oct 1998 |
T980085-x0 |
Waiver Request: Silver Plated SOS Fasteners |
Dennis Coyne |
Document Migration
|
23 Sep 1998 |
E980159-x0 |
Process Traveler: Cable for Sensor/Actuator Head Assembly |
Dennis Coyne |
Document Migration
|
14 Sep 1998 |
E980182-x0 |
Process Traveler: Viewport, 10" OD Del-Seal Flange (VP800), 5-3/8" zero-profile 2056 Glass Viewport with 635 nm AR Coating |
Dennis Coyne |
Document Migration
|
14 Sep 1998 |
E980167-x0 |
Process Traveler: Faraday Isolator, 12 mm Aperture, Model 1845-12 |
Dennis Coyne |
Document Migration
|
14 Sep 1998 |
E980158-x0 |
Process Traveler: LOS/SOS Sensor/Actuator Head Assemblies |
Dennis Coyne |
Document Migration
|
14 Sep 1998 |
E980168-x0 |
Process Traveler: Magnet |
Dennis Coyne |
Document Migration
|
14 Sep 1998 |
E980109-x0 |
Document Change Notice (DCN) |
Dennis Coyne et al. |
Document Migration
|
18 Jun 1998 |
T980029-x0 |
Effect of Beamsplitter Vibration Resonance Excitation on the Optically Sensed Cavity Length, Rev. 01 |
Dennis Coyne |
Document Migration
|
14 May 1998 |
G980070-x0 |
Plans for Detector Physical Integration and Installation |
Dennis Coyne |
Document Migration
|
27 Apr 1998 |
D980180-x0 |
SEI HAM First Article Test Layout, LVEA (Hanford), Rev. B |
Dennis Coyne |
Document Migration
|
09 Mar 1998 |
T970168-x0 |
Viton Spring Seat Vacuum Bake Qualification |
Dennis Coyne |
Document Migration
|
10 Nov 1997 |
D950029-x0 |
General Details and Fixed Support Details |
Dennis Coyne et al. |
Document Migration
|
27 Aug 1997 |
T970142-x0 |
Action Item Response Report: First Article Fabrication Readiness Review for the Seismic Isolation System (SEI) |
Dennis Coyne |
Document Migration
|
22 Jul 1997 |
E960098-x0 |
LIGO Detector Subsystem Review Report: Preliminary Design Review (PDR), Suspension System (SUS) |
Alex Abramovici et al. |
Document Migration
|
16 Jul 1997 |
D961304-x0 |
Optical Layout, 40m Recycling |
Dennis Coyne et al. |
Document Migration
|
09 Jul 1997 |
T960051-x0 |
Integrated Layout Drawings: Usage & Maintenance |
Craig Conley et al. |
Document Migration
|
26 Jun 1997 |
T970091-x0 |
Determination of the Wedge Angles for the Core Optics Components |
Dennis Coyne |
Document Migration
|
28 Apr 1997 |
T970077-x0 |
Gravitational Deflection of LIGO Optics in a 9-Point Hindle Mount |
Dennis Coyne |
Document Migration
|
28 Apr 1997 |
D970002-x0 |
Recycling Cavity Dimensional Range |
Dennis Coyne |
Document Migration
|
03 Mar 1997 |
D970003-x0 |
Recycling Cavity Layout |
Dennis Coyne |
Document Migration
|
03 Mar 1997 |
T970068-x0 |
Recycling Cavity and Mode Cleaner Cavity Baseline Dimensions |
Dennis Coyne |
Document Migration
|
03 Mar 1997 |
T960187-x0 |
Effect of Microseismic Noise on a LIGO Interferometer |
Dennis Coyne et al. |
Document Migration
|
18 Feb 1997 |
T960036-x0 |
Comments on PSI`s Proposed Electrical Conduit Stub-Up Plan for the LVEA and VEAs |
Dennis Coyne |
Document Migration
|
24 May 1996 |
E960026-x0 |
LIGO Detector Subsystem Review Report - Design Requirements Review CDS Control and Monitoring |
Bill Althouse et al. |
Document Migration
|
17 May 1996 |
T950066-x0 |
Response to Multiple Action Items in Parsons` Requirements Definition Worksheet |
Dennis Coyne et al. |
Document Migration
|
09 Feb 1996 |
T950084-x0 |
Control Data System (CDS) Power Requirements in the LVEA |
Dennis Coyne |
Document Migration
|
24 Jan 1996 |
E950106-x0 |
LIGO Requirements and Options for Facilities Monitoring and Control Systems (FMCS) |
Dennis Coyne et al. |
Document Migration
|
26 Dec 1995 |
D950139-x0 |
BTE Service Access and Beam Tube Pump Port Locations |
Dennis Coyne |
Document Migration
|
29 Nov 1995 |
T950086-x0 |
Proposed Drawing Template and Release, Approval and Revision Procedure |
Dennis Coyne |
Document Migration
|
16 Nov 1995 |
T950078-x0 |
Recommendation for Guidance/Direction on Support Requirements for NG:yag Laser |
Dennis Coyne |
Document Migration
|
20 Sep 1995 |