LIGO-Number |
Title |
Author(s) |
Topic(s) |
Last Updated |
D0902838-v5 |
Advanced LIGO Optical Layout |
Peter Fritschel et al. |
Detector
System Engineering
|
03 Jan 2017 |
E1400180-x0 |
aLIGO, ISC, Electronics Racks |
Peter Fritschel |
Sensing and Control
|
28 Aug 2024 |
E1400177-x0 |
aLIGO, ISC, Fast Shutter |
Peter Fritschel |
Sensing and Control
|
12 Aug 2024 |
M060323-v17 |
LIGO Laboratory Charter |
Hannah Hansen et al. |
Operations
Policies
Organizational Relations
NSF
Operations Business
Management
|
05 Aug 2024 |
E1700123-v1 |
ECR: Decommission HAM-ISI (HAM table) Optical Levers (Oplev) |
Peter Fritschel |
Seismic Isolation
System Engineering
|
31 Jul 2024 |
T1100472-v36 |
ADC and DAC Channel Usage for ISC |
Daniel Sigg et al. |
Sensing and Control
|
24 Jul 2024 |
T2200287-v3 |
Report of the LSC Post-O5 Study Group |
Peter Fritschel et al. |
Reports
Upgrades
A#
|
07 May 2024 |
D1500016-v6 |
ETM Low Voltage Low Noise Electro-Static Driver Main Board |
Rich Abbott et al. |
Sensing and Control
|
17 Nov 2023 |
T2300137-v2 |
Report from the Heavy Suspension Workshop @ MIT |
Brian Lantz et al. |
Suspensions
A#
|
19 Oct 2023 |
T080192-v1 |
Displacement Noise in Advanced LIGO Triple Suspensions |
Matthew Evans et al. |
Modelling
Conceptual Design
Suspensions
|
03 Oct 2023 |
E1200199-x0 |
aLIGO, ISC, Photodetectors and Sensors |
Daniel Sigg et al. |
Sensing and Control
|
21 Sep 2023 |
D1700361-v3 |
Layout of SLC Baffles with new 2017 SLiC Baffles |
Eduardo Sanchez et al. |
Integration
System Engineering
|
22 Jun 2023 |
E1200159-v1 |
aLIGO, SQZ, SQZT0 |
Daniel Sigg et al. |
Squeezer
|
23 Apr 2023 |
G2300838-v1 |
Update on LIGO Instruments (for OpenLVKEM, April 2023) |
Peter Fritschel |
Detector
|
13 Apr 2023 |
T2300041-v1 |
A♯ Strain Sensitivity |
Kevin Kuns et al. |
Conceptual Design
Upgrades
|
27 Jan 2023 |
G2202195-v1 |
Update on LIGO Instruments (for OpenLVKEM, Dec 2022) |
Peter Fritschel |
Reports
|
15 Dec 2022 |
E1200201-x0 |
aLIGO, ISC, Electronics, Analog |
Rich Abbott et al. |
Sensing and Control
|
06 Dec 2022 |
T2200384-v2 |
The LSC Instrument Science White Paper (2022-2023 edition) |
Peter Fritschel et al. |
Basic R&D
|
04 Dec 2022 |
E1200156-x0 |
aLIGO, ISC, Electronics |
Daniel Sigg et al. |
Sensing and Control
|
11 Nov 2022 |
G2200853-v2 |
Core Optics and Point Absorber Mitigation |
GariLynn Billingsley et al. |
Core Optics
Reviews
|
03 Nov 2022 |
T960120-x0 |
Misalignment-Beam Jitter Coupling in LIGO |
Peter Fritschel |
Document Migration
|
15 Sep 2022 |
D1500295-v4 |
OPO Suspension (OPOS, VOPO, VIP) Overall Assembly Drawing |
Fabrice Matichard et al. |
Basic R&D
Squeezer
|
12 Sep 2022 |
M2100169-v2 |
Panel Report LIGO A+ and Virgo AdV+ coating selection for O5 |
Sheila Rowan et al. |
Core Optics
A+
Basic R&D
Upgrades
Technical Review Board
Memorandum
|
04 Aug 2022 |
T990089-v1 |
Characterization and comparison of a potential new (SUS) local sensor |
Peter Fritschel et al. |
Sensing and Control
Basic R&D
|
30 Jun 2022 |
E1200198-x0 |
aLIGO, ISC, Opto-Mechanical Layouts |
Daniel Sigg et al. |
Sensing and Control
|
16 May 2022 |
G2200736-v1 |
Update on the LIGO, Virgo, and KAGRA detector upgrades for O4 |
Anamaria Effler et al. |
Meeting
|
28 Apr 2022 |
E1500359-v1 |
aLIGO, SQZ |
Lisa Barsotti et al. |
Squeezer
|
17 Mar 2022 |
E1200157-x0 |
aLIGO, ISC, Real-Time Systems |
Daniel Sigg et al. |
Sensing and Control
|
08 Feb 2022 |
E1200174-x0 |
aLIGO, ISC, Electronics, Wiring & Cabling Design |
Daniel Sigg et al. |
Sensing and Control
|
19 Jan 2022 |
T2100298-v2 |
Instrument Science White Paper 2021 |
Peter Fritschel et al. |
Basic R&D
|
14 Oct 2021 |
E1200166-x0 |
aLIGO, ISC, TransMon |
Daniel Sigg et al. |
Sensing and Control
|
25 Mar 2021 |
T990013-x0 |
Diagnostics Test Software |
Daniel Sigg et al. |
Sensing and Control
Data Acquisition System
Document Migration
Data and Computing
|
30 Nov 2010 |
E1500362-v11 |
aLIGO, SQZ, Electronics Block Diagram |
Lisa Barsotti et al. |
Final Design
Squeezer
|
06 Feb 2017 |
D1900281-v9 |
Overview of Frequency-Dependent Squeezing layout for O4: HAM7, HAM8, SQZT0, SQZT7, SQZT8 |
Lee McCuller et al. |
Preliminary Design
A+
Squeezer
|
03 Nov 2020 |
E1500358-v2 |
aLIGO, SQZ, Preliminary Design Documents |
Lisa Barsotti et al. |
Preliminary Design
Squeezer
|
03 Nov 2020 |
G030460-v1 |
DC Readout for Advanced LIGO |
Peter Fritschel |
Sensing and Control
|
24 Sep 2020 |
T2000407-v3 |
Instrument Science White Paper 2020 |
Peter Fritschel et al. |
Detector
Integration
Basic R&D
Upgrades
|
31 Aug 2020 |
G1501317-v8 |
How we know GW150914 was NOT an injection |
Matthew Evans |
Data quality / vetoes
|
10 Aug 2020 |
T1500514-v3 |
LIGO Instrument Report in connection with GW150914 |
Peter Fritschel |
Detector
|
07 Aug 2020 |
T1900279-v2 |
Filter Cavity Optics Substrates |
Lee McCuller et al. |
Core Optics
A+
|
03 Aug 2020 |
T0900582-v7 |
Gas Damping Monte Carlo |
Matthew Evans et al. |
Core Optics
Detector
Vacuum
Suspensions
|
25 Jul 2020 |
M000154-x0 |
Technical Evaluation of Alternative Design Concepts for the LIGO-II Seismic Isolation System |
Rich Abbott et al. |
Document Migration
|
16 Jul 2020 |
E1200170-x0 |
aLIGO, ISC, ISC |
Daniel Sigg et al. |
Sensing and Control
|
13 Jul 2020 |
G1902305-v5 |
Point absorbers in aLIGO coating |
Slawomir Gras et al. |
Core Optics
|
16 Jun 2020 |
E1900177-v2 |
High-reliability Ultra-fast Mechanical Shutter |
Rich Abbott et al. |
Sensing and Control
Basic R&D
|
13 May 2020 |
E2000017-v1 |
A+ Output Mode Cleaner Coating Specifications |
Ken Strain et al. |
Core Optics
A+
|
17 Jan 2020 |
T1900416-v1 |
Filter Cavity Preliminary ISC design |
Lee McCuller et al. |
Preliminary Design
A+
Squeezer
|
09 Jan 2020 |
E1100267-v1 |
6 inch Vacuum Viewport Window |
Peter Fritschel |
Vacuum
Auxiliary Optics
|
25 Mar 2011 |
E1400099-x0 |
aLIGO LSC RF Photodetector |
Peter Fritschel et al. |
Sensing and Control
|
30 Oct 2019 |
P1900316-v1 |
Cosmic Explorer: The U.S. Contribution to Gravitational-Wave Astronomy beyond LIGO |
David Reitze et al. |
Detector
Activity
Basic R&D
|
11 Oct 2019 |
G952003-x0 |
Barry Controls STACIS Isolators: Their performance at MIT and Considerations forTheir Use in LIGO |
Gabriela Gonzalez et al. |
Seismic Isolation
Document Migration
|
18 Sep 2019 |
T1900410-v1 |
Desired results of the Cosmic Explorer engineering study |
Rana Adhikari et al. |
Vacuum
Conceptual Design
Observatory Facilities
|
09 Jul 2019 |
E1900147-v1 |
MIRROR BLANK SPECIFICATION, A+ FILTER CAVITY INPUT MIRROR |
GariLynn Billingsley et al. |
A+
Auxiliary Optics
|
07 Jun 2019 |
E1900146-v1 |
MIRROR BLANK SPECIFICATION, A+ FILTER CAVITY END MIRROR |
GariLynn Billingsley et al. |
A+
Auxiliary Optics
|
07 Jun 2019 |
T070061-v1 |
AOS: Stray Light Control (SLC) Design Requirements |
Michael Smith et al. |
Document Migration
|
03 Jan 2011 |
E1200161-x0 |
aLIGO, ISC, ISCTEY |
Daniel Sigg et al. |
Sensing and Control
|
05 Dec 2018 |
E1200160-x0 |
aLIGO, ISC, ISCTEX |
Daniel Sigg et al. |
Sensing and Control
|
05 Dec 2018 |
T0900144-v7 |
Adv. LIGO Arm Length Stabilization Design |
Sam Waldman et al. |
Sensing and Control
Final Design
|
08 Nov 2018 |
T1400768-v3 |
Science Frame Sample Rates for PEM channels |
Peter Fritschel |
System Engineering
|
19 Oct 2018 |
T1800042-v5 |
The A+ design curve |
Lisa Barsotti et al. |
A+
Conceptual Design
|
11 Oct 2018 |
D1400301-v15 |
ETM and ITM ESD Low Voltage Driver Block Diagrams |
Rich Abbott et al. |
Sensing and Control
|
04 Oct 2018 |
D1100909-v5 |
Input Optics Electronics Layout |
Peter Fritschel et al. |
Data Acquisition System
Final Design
Input Optics
|
30 Apr 2012 |
T1600302-v2 |
aLIGO sensitivity projections for O2 |
Valery Frolov et al. |
Commissioning
|
17 Sep 2018 |
D1500297-v8 |
SQZ in-air optics table |
Lisa Barsotti et al. |
Basic R&D
Squeezer
|
30 Aug 2018 |
E1400110-x0 |
ISC RF Photodetector Design Documentation |
Peter Fritschel et al. |
Sensing and Control
|
08 Aug 2018 |
E1800071-x0 |
Top Level Grouping of AMD documentation, prepared for TRB review 2017-18 |
Sebastien Biscans et al. |
Operations
System Engineering
|
27 Jul 2018 |
P1400177-v6 |
Advanced LIGO |
Peter Fritschel et al. |
Final Design
|
17 Jul 2018 |
P080071-x0 |
Thermo-optic noise in coated mirrors for high-precision optical measurements |
Matthew Evans et al. |
Document Migration
Public relations
|
02 Jul 2018 |
T1800044-v5 |
Updated Advanced LIGO sensitivity design curve |
Lisa Barsotti et al. |
Detector
Modelling
|
12 Jun 2018 |
P1700260-v13 |
Improving astrophysical parameter estimation via offline noise subtraction for Advanced LIGO |
Jenne Driggers et al. |
Detector
Cleaning
|
25 May 2018 |
P1500260-v15 |
The Sensitivity of the Advanced LIGO Detectors at the Beginning of Gravitational Wave Astronomy |
Denis Martynov et al. |
Commissioning
|
10 Feb 2018 |
D1600319-v2 |
AS Port Fast Shutter Protection Block Diagram |
Peter Fritschel |
Sensing and Control
|
31 Jan 2018 |
G1800030-v1 |
LIGO: The Instruments that Launched Gravitational-wave Astronomy |
Peter Fritschel |
Requirements
|
23 Jan 2018 |
D1600493-v1 |
Layout of Stray Light Control Baffles |
Peter Fritschel |
System Engineering
|
05 Dec 2017 |
E1500012-v2 |
ECR: Move IO input beam PZT-mount from periscope to PSL/IO table surface |
Peter Fritschel et al. |
Input Optics
|
17 Jul 2017 |
P1500147-v1 |
What's next for LIGO? Report from the 1st Dawn Workshop 7-8 May 2015, Silver Spring, MD |
Stefan Ballmer et al. |
Meeting
|
27 Jun 2017 |
E1200168-x0 |
aLIGO, ISC, TransMonEY |
Daniel Sigg et al. |
Sensing and Control
|
07 Jun 2017 |
E1200167-x0 |
aLIGO, ISC, TransMonEX |
Daniel Sigg et al. |
Sensing and Control
|
07 Jun 2017 |
E1500361-x0 |
aLIGO, SQZ, VOPO |
Lisa Barsotti et al. |
Preliminary Design
Squeezer
|
17 Apr 2017 |
T1000310-v2 |
Passive Isolation Stack for HAM1 (HAM7) in Advanced LIGO |
Peter Fritschel |
Sensing and Control
Seismic Isolation
|
28 Mar 2017 |
E1400219-x0 |
LHO ISC Electronics Racks |
Peter Fritschel |
Sensing and Control
|
02 Mar 2017 |
P1600285-v21 |
Validating gravitational-wave detections: The Advanced LIGO hardware injection system |
Christopher Biwer et al. |
Detector
|
20 Feb 2017 |
E1600262-v4 |
aLIGO OMC: Spare OMC production plan |
Koji Arai et al. |
Assembly
Sensing and Control
|
09 Dec 2016 |
E1500015-x0 |
ETM and ITM Low Voltage Electro-Static Driver Documentation |
Peter Fritschel |
Sensing and Control
Suspensions
|
03 Oct 2016 |
T1600059-v2 |
New RCG 3.0 DAQ Decimation (Downsampling) Filters |
Peter Fritschel |
Data Acquisition System
|
09 Aug 2016 |
T1400719-v1 |
A Note on the DAQ Decimation (Downsampling) Filters (Prior to RCG 3.0) |
Peter Fritschel |
Data Acquisition System
|
09 Aug 2016 |
T1500075-v1 |
A Note on the RCG Decimation (IOP Upsampling / Downsampling) Filters (Prior to RCG 3.0) |
Peter Fritschel |
Data Acquisition System
|
09 Aug 2016 |
T1600066-v1 |
New RCG 3.0 Decimation (IOP Upsampling / Downsampling) Filter for 16 kHz models |
Peter Fritschel |
Data Acquisition System
|
09 Aug 2016 |
G1600769-v5 |
Projected sensitivities towards aLIGO+ |
Lisa Barsotti et al. |
Upgrades
|
07 Jul 2016 |
T1300503-v4 |
Redesign of quad UIM coil driver and magnet size to reduce magnetic coupling |
Norna Robertson et al. |
Final Design
Suspensions
|
14 Jun 2016 |
T1200479-v2 |
(UK) Electrostatic Driver (HV ESD) Range and Noise |
Peter Fritschel |
Sensing and Control
Modelling
Suspensions
System Engineering
|
08 Jun 2016 |
P150914-v14 |
Observation of Gravitational Waves from a Binary Black Hole Merger |
LIGO Scientific Collaboration et al. |
GW Bursts
Compact Binaries
|
04 Apr 2016 |
E1600102-x0 |
PI damping, Reference material |
Peter Fritschel |
Sensing and Control
|
31 Mar 2016 |
E1600100-x0 |
Parametric Instability Active Damping |
Peter Fritschel |
Sensing and Control
|
31 Mar 2016 |
E1600101-x0 |
PI damping, Electronics |
Peter Fritschel |
Sensing and Control
|
31 Mar 2016 |
G1600209-v1 |
P150914 Figure 3 |
LIGO Scientific Collaboration et al. |
Detector
Education, Outreach
|
25 Feb 2016 |
L1500103-v1 |
Technical Review Board (TRB) report: Should We Insulate the Beamtube? |
Dennis Coyne et al. |
Vacuum
Technical Review Board
System Engineering
|
15 Dec 2015 |
T070089-v1 |
Wide angle scatter from LIGO arm cavities |
Michael Zucker et al. |
Basic R&D
Auxiliary Optics
System Engineering
|
19 Oct 2015 |
T1500484-v2 |
Maximum ETM displacement for Hardware Injections, pre-O1 |
Peter Fritschel |
Modelling
System Engineering
|
18 Sep 2015 |
E0900113-v3 |
Compensation Plate Electro Static Drive gold coating specification |
GariLynn Billingsley |
Core Optics
Final Design
|
02 Sep 2015 |
E0900112-v3 |
Compensation Plate Barrel gold coating specification |
GariLynn Billingsley |
Core Optics
Final Design
|
02 Sep 2015 |
E1500349-v1 |
ECR: Changes to science frame channels for H1 and L1 |
Peter Fritschel |
Data Acquisition System
|
14 Aug 2015 |
E1500343-v1 |
ECR: Add sensor channel from EOM driver to science frames |
Peter Fritschel |
Sensing and Control
Input Optics
|
13 Aug 2015 |
T060075-v1 |
HAM Seismic Isolation Requirements |
Peter Fritschel |
Seismic Isolation
Requirements
Modelling
Suspensions
|
02 Aug 2015 |
D1500172-v1 |
PI Band Pass Filter |
Carl Adams et al. |
Fabrication
|
31 Jul 2015 |
T1500343-v1 |
Concept for a bounce & roll mode damper for the quad suspensions |
Peter Fritschel |
Basic R&D
Suspensions
|
02 Jul 2015 |
M1500035-v3 |
Advanced LIGO Project Closeout Acceptance |
David Shoemaker et al. |
Detector
Reports
|
06 May 2015 |
T1400335-v2 |
Ultra-fast Optical Shutter Design |
Peter Fritschel et al. |
Sensing and Control
|
29 Apr 2015 |
T1100490-v1 |
Forward scatter comparison CP06 and CP03 |
GariLynn Billingsley et al. |
Core Optics
Subsystem Test
|
31 Mar 2015 |
E990303-v1 |
Seismic Isolation Subsystem Design Requirements Document |
Dennis Coyne et al. |
Seismic Isolation
Requirements
Modelling
Conceptual Design
|
31 Mar 2015 |
G010017-x0 |
LIGO II Seismic Isolation Subsystem (SEI) Design Requirements Review |
Peter Fritschel et al. |
Document Migration
|
27 Mar 2015 |
T020033-x0 |
Initial LIGO Seismic Isolation Upgrade Design Requirements Document |
Dennis Coyne et al. |
Document Migration
|
25 Mar 2015 |
E1500156-v2 |
Arm Length Stabilisation Acceptance Documentation |
Bram Slagmolen et al. |
Sensing and Control
Installation
|
25 Mar 2015 |
E1500008-v2 |
ISC Output Mode Cleaner: Acceptance Documentation |
Koji Arai et al. |
Sensing and Control
|
17 Mar 2015 |
T1100291-v2 |
aLIGO ISC Whitening Chassis Test Procedure |
Rich Abbott et al. |
Sensing and Control
System Test
|
16 Mar 2015 |
E1500178-x0 |
ISC Slow Controls: Acceptance Documentation |
Peter Fritschel |
Sensing and Control
Reviews
|
14 Mar 2015 |
E1500172-x0 |
Summary of COC fabrication acceptance review |
Peter Fritschel |
Core Optics
Reviews
|
12 Mar 2015 |
T1300354-v3 |
Scattered light noise due to the ETM coating ripple |
Peter Fritschel et al. |
Modelling
System Engineering
|
11 Mar 2015 |
Q1500012-v1 |
Waiver: unapproved source and no material certs for some small Viton o-rings |
Peter Fritschel |
Sensing and Control
Vacuum
Quality Assurance
System Engineering
|
11 Mar 2015 |
L1200291-v5 |
TRB Report: Recommendation related to the discrepancy between single version of the quad ITM suspensions and the optical layout which calls for a left and right handed versions |
Calum Torrie et al. |
Installation
System Engineering
|
11 Mar 2015 |
E1101087-v3 |
aLIGO OMC Mounting Prisms |
Sam Waldman et al. |
Sensing and Control
Requirements
|
08 Mar 2015 |
T000053-v1 |
aLIGO Universal Suspension Subsystem Design Requirements |
Dennis Coyne |
Conceptual Design
Suspensions
|
08 Mar 2015 |
E1300794-v1 |
ECR: New naming scheme for OMC channels |
Peter Fritschel |
Sensing and Control
Change Control
|
08 Mar 2015 |
P1400105-v5 |
Achieving Resonance in the Advanced LIGO Gravitational-Wave Interferometer |
Alexa N Staley et al. |
Sensing and Control
Integration
Basic R&D
|
05 Mar 2015 |
E1200169-x0 |
aLIGO, ISC, ALS |
Daniel Sigg et al. |
Sensing and Control
|
04 Mar 2015 |
L1500028-v1 |
Documentation of Two Hour Lock Milestone for H1 |
Peter Fritschel et al. |
Integration
|
02 Mar 2015 |
T1000276-v5 |
Output Mode Cleaner (OMC) Design |
Koji Arai et al. |
Sensing and Control
Final Design
|
02 Mar 2015 |
E1500050-v1 |
ISC Fast Shutters: Acceptance Documentation |
Peter Fritschel et al. |
Sensing and Control
|
26 Feb 2015 |
T010075-v3 |
Advanced LIGO Systems Design |
Peter Fritschel et al. |
System Engineering
|
17 Feb 2015 |
T980068-x0 |
Length Sensing & Control Subsystem Final Design |
Detector Isc Grp et al. |
Sensing and Control
Final Design
|
14 Feb 2015 |
E1400479-v1 |
ISC In-Vacuum Optics Tables: Acceptance Documentation |
Peter Fritschel |
Sensing and Control
Reviews
|
12 Feb 2015 |
E1200165-x0 |
aLIGO, ISC, HAM3 |
Daniel Sigg et al. |
Sensing and Control
|
11 Feb 2015 |
E1200163-x0 |
aLIGO, ISC, HAM1 |
Daniel Sigg et al. |
Sensing and Control
|
11 Feb 2015 |
P1400234-v3 |
In-situ Characterization of the Thermal State of Resonant Optical Interferometers via Tracking of their Higher Order Mode Resonances |
Chris Mueller et al. |
Sensing and Control
Commissioning
|
09 Feb 2015 |
M070025-x0 |
Record of Decision/Agreement (RODA) - Decision to adopt Hartmann sensors over WLISMI sensors for Advanced LIGO TCS |
Peter Fritschel et al. |
Document Migration
|
23 Jan 2015 |
T1500016-v2 |
Design overview for the new test mass electro-static driver |
Peter Fritschel et al. |
Sensing and Control
Requirements
Suspensions
|
23 Jan 2015 |
E1400395-v1 |
ISC Optics Tables (ISCT): Acceptance Documentation |
Peter Fritschel |
Sensing and Control
Reviews
|
22 Jan 2015 |
E1400391-x0 |
aLIGO, ISC, Fast Shutter Controls |
Rich Abbott et al. |
Sensing and Control
|
21 Jan 2015 |
E1500003-v1 |
ISC Electronics Racks and Cabling: Acceptance Documentation |
Peter Fritschel et al. |
Sensing and Control
Reviews
|
21 Jan 2015 |
E1200173-x0 |
aLIGO, ISC, Electronics, Physical Layout |
Daniel Sigg et al. |
Sensing and Control
|
21 Jan 2015 |
T1500001-v2 |
Noise requirement for the test mass electro-static driver |
Peter Fritschel |
Sensing and Control
Requirements
Suspensions
|
20 Jan 2015 |
T0900265-v1 |
Requirements and Interfaces for the ETM Transmission Monitor Suspension and Telescope |
Sam Waldman et al. |
Sensing and Control
Detector
Auxiliary Optics
|
19 Jan 2015 |
T1400727-v1 |
Installation procedure for ISC components in HAM1 |
Peter Fritschel |
Sensing and Control
Installation
|
22 Dec 2014 |
E1200164-x0 |
aLIGO, ISC, HAM6 |
Daniel Sigg et al. |
Sensing and Control
|
19 Dec 2014 |
E1300878-v4 |
ISC HAM Tip-Tilt Suspension Acceptance Documentation |
Bram Slagmolen et al. |
Sensing and Control
Installation
|
15 Dec 2014 |
P000008-x0 |
Readout and Control of a Power-Recycled Interferometric Gravitational Wave Antenna |
Rolf Bork et al. |
Document Migration
|
09 Dec 2014 |
E1200162-x0 |
aLIGO, ISC, ISCT End |
Daniel Sigg et al. |
Sensing and Control
|
04 Dec 2014 |
E1400081-v1 |
ISC RF System, Acceptance Documentation |
Peter Fritschel et al. |
Sensing and Control
Reviews
|
04 Dec 2014 |
E1300827-v2 |
ISC RF Demodulators and Phase Frequency Discriminators, Acceptance |
Rich Abbott et al. |
Sensing and Control
|
04 Dec 2014 |
E1200158-x0 |
aLIGO, ISC, ISCT1 |
Daniel Sigg et al. |
Sensing and Control
|
03 Dec 2014 |
E1200171-x0 |
aLIGO, ISC, ASC |
Daniel Sigg et al. |
Sensing and Control
|
01 Dec 2014 |
E1300862-x0 |
aLIGO, ISC, Tip-Tilt Mirror Mounts |
Peter Fritschel et al. |
Sensing and Control
|
27 Nov 2014 |
G1400938-v1 |
Mechanical Loss of Vacuum Compatible Epoxies for Tuned Mass Dampers |
Gregg Harry et al. |
Basic R&D
|
19 Nov 2014 |
G1400397-v2 |
Advanced LIGO Integration: timeline scenario for 2014 |
Peter Fritschel |
Integration
|
12 Nov 2014 |
D1400372-v1 |
Simple diagram of ALS optical layout |
Adam Mullavey et al. |
Sensing and Control
|
04 Nov 2014 |
E1200155-x0 |
aLIGO, ISC, Optical & Opto-Mechanical Components and Assemblies |
Daniel Sigg et al. |
Sensing and Control
|
06 Oct 2014 |
D1200690-v5 |
Laser PD Calibrator Head |
Rich Abbott et al. |
Sensing and Control
Subsystem Test
|
18 Sep 2014 |
E1400194-v1 |
ISC Common Mode Servo & Common Mode Summing Node: Acceptance Documentation |
Peter Fritschel et al. |
Sensing and Control
|
11 Sep 2014 |
G1401078-v1 |
Advanced LIGO Commissioning Overview |
Peter Fritschel |
Commissioning
|
27 Aug 2014 |
T050036-v4 |
Pre-Stabilized Laser Design Requirements |
Richard Savage et al. |
Requirements
Laser Systems
|
20 Aug 2014 |
E1400145-v1 |
ISC Custom Photodetectors: Acceptance Documentation |
Peter Fritschel et al. |
Sensing and Control
Reviews
|
19 Aug 2014 |
P1100090-v5 |
Tip-Tilt Mirror Suspension: Beam Steering for the Advanced LIGO Sensing and Control Signals |
Bram Slagmolen et al. |
Sensing and Control
Basic R&D
|
11 Aug 2014 |
T1100402-v3 |
ISC RF Photodetector Design: LSC & WFS |
Rich Abbott et al. |
Sensing and Control
Final Design
|
07 Aug 2014 |
D1002416-v5 |
Common Mode Servo Block Diagram |
Peter Fritschel |
Sensing and Control
|
05 Aug 2014 |
E1300854-v3 |
ISC Custom Optics, Acceptance |
Lisa Barsotti et al. |
Sensing and Control
|
05 Aug 2014 |
E1400011-v2 |
ISC Beam Diverters: Acceptance Documentation |
Peter Fritschel |
Sensing and Control
|
05 Aug 2014 |
E1300973-v2 |
ISC Signal Conditioning Electronics, Acceptance |
Peter Fritschel et al. |
Sensing and Control
|
05 Aug 2014 |
L1400119-v1 |
Documentation of Two Hour Lock Milestone for L1 |
Peter Fritschel et al. |
Integration
|
30 Jul 2014 |
G1400730-v1 |
Some notes on the electro-static drives |
Peter Fritschel |
Sensing and Control
Suspensions
|
01 Jul 2014 |
E1300803-x0 |
Changes Resulting from the L1 DRMI Testing |
Peter Fritschel et al. |
Integration
Commissioning
|
20 Jun 2014 |
E1300628-x0 |
aLIGO, Integration Testing, Input Mode Cleaner Test |
Daniel Sigg et al. |
Integration
|
19 Jun 2014 |
E1300419-v1 |
ECR: Add half-wave plate to REFL beam path in HAM1 |
Peter Fritschel |
Sensing and Control
Change Control
|
19 Jun 2014 |
E1300676-v1 |
ECR - Extraction of PSL beam in HAM1 through central viewport |
Lisa Barsotti et al. |
Sensing and Control
Installation
|
19 Jun 2014 |
T1400011-v1 |
Integration Testing: Systems meeting discussion, 15 Jan 2014 |
Peter Fritschel |
Integration
Commissioning
|
18 Jun 2014 |
T1300174-v2 |
Commissioning Advanced LIGO’s HIFO-Y |
Daniel Sigg et al. |
Integration
Commissioning
System Engineering
|
18 Jun 2014 |
L1300176-v1 |
Executive Summary of the LHO HIFO-Y Test |
Daniel Sigg et al. |
Integration
|
18 Jun 2014 |
T1100201-v4 |
Commissioning the Advanced LIGO L1 Input Mode Cleaner |
Peter Fritschel et al. |
Integration
Input Optics
|
18 Jun 2014 |
T1400368-v1 |
Advanced LIGO Operations Commissioning Plan |
Peter Fritschel et al. |
Commissioning
|
11 Jun 2014 |
D0902796-v4 |
Quad IQ Demodulator Chassis |
Rich Abbott et al. |
Fabrication
|
30 May 2014 |
T1400053-v2 |
Integration testing report for the L1 DRMI |
Peter Fritschel et al. |
Integration
|
19 May 2014 |
T010007-v5 |
Cavity Optics Suspension Subsystem Design Requirements |
Mark Barton et al. |
Requirements
Suspensions
|
17 May 2014 |
T1400317-v1 |
Arm Length Stabilization (ALS) Vertex Detection System |
Peter Fritschel |
Sensing and Control
|
05 May 2014 |
T1000264-v7 |
List of ISC Photodetectors in Advanced LIGO |
Peter Fritschel et al. |
Sensing and Control
|
01 Apr 2014 |
E1200425-x0 |
aLIGO, ISC, Electronics, Whitening/VGA Module |
Peter Fritschel |
Sensing and Control
|
18 Mar 2014 |
T1400223-v1 |
UIM Coil Driver modifications for larger range |
Peter Fritschel |
Sensing and Control
Suspensions
|
18 Mar 2014 |
G960270-x0 |
PNI Status and Plans - Science & Integration Meeting, 12-13 December 1996 |
Peter Fritschel |
Document Migration
|
14 Mar 2014 |
G960183-x0 |
Alignment Sensing/Control Design Requirements Review |
Peter Fritschel et al. |
Document Migration
|
13 Mar 2014 |
G960105-x0 |
Interferometry for Gravity Wave Detection |
Peter Fritschel |
Document Migration
|
13 Mar 2014 |
T1400196-v1 |
ISC RFPD Resonant Circuit Optimizer Code |
Rich Abbott et al. |
Sensing and Control
Final Design
|
10 Mar 2014 |
E1200539-x0 |
aLIGO, ISC, In-Vacuum QPD |
Koji Arai et al. |
Sensing and Control
|
04 Mar 2014 |
E1400103-x0 |
aLIGO ASC RF Photodetector (WFS) |
Peter Fritschel et al. |
Sensing and Control
|
04 Mar 2014 |
T070189-v3 |
Design Specifications for the OMC Suspension |
Norna Robertson et al. |
Requirements
Suspensions
|
07 Feb 2014 |
T1200307-v4 |
Early aLIGO Configurations: example scenarios toward design sensitivity |
Lisa Barsotti et al. |
Commissioning
|
15 Jan 2014 |
E1200835-x0 |
aLIGO, ISC, In-Vacuum Beam Diverter |
Peter Fritschel |
Sensing and Control
|
08 Jan 2014 |
T070236-v1 |
Interferometer Sensing and Control Design Requirements |
Peter Fritschel |
Sensing and Control
|
13 Dec 2013 |
T1200437-v3 |
Advanced LIGO Interferometer Integration |
Peter Fritschel et al. |
Integration
Commissioning
|
11 Dec 2013 |
T0900423-v4 |
ISC Quadrant Photodetector Design |
Rich Abbott et al. |
Sensing and Control
Basic R&D
|
09 Dec 2013 |
D1200105-v2 |
Breadboard OMC aLIGO |
Sam Barnum et al. |
Sensing and Control
Conceptual Design
|
22 Nov 2013 |
E1300819-v2 |
ISC HAM6 Fast Shutter Hardware Chain |
Rich Abbott et al. |
Sensing and Control
Conceptual Design
|
30 Oct 2013 |
G1300952-v1 |
aLIGO Output Mode Cleaner: Design, Fabrication, and Installation |
Rich Abbott et al. |
Sensing and Control
Final Design
Fabrication
Installation
|
20 Sep 2013 |
E1300711-x0 |
aLIGO, ISC, Opto-Mechanics: In-vacuum bases |
Peter Fritschel |
Sensing and Control
|
10 Sep 2013 |
L1200261-v2 |
Executive Summary of the One Arm Test |
Daniel Sigg et al. |
Integration
|
16 Aug 2013 |
E1200196-x0 |
aLIGO, ISC, Block Diagrams |
Daniel Sigg et al. |
Sensing and Control
|
08 Aug 2013 |
G1300524-v1 |
The Arm Length Stabilisation System for Advanced LIGO Lock Acquisition |
Adam Mullavey et al. |
Sensing and Control
Commissioning
|
09 Jul 2013 |
E1300516-x0 |
DCN for ALS End Station Periscopes |
Bram Slagmolen et al. |
Sensing and Control
Fabrication
|
01 Jul 2013 |
T1300558-v1 |
L1 DRMI Measurements: a checklist |
Peter Fritschel et al. |
System Test
Commissioning
|
18 Jun 2013 |
D1002803-v5 |
End Station ISC Electronics Layout |
Peter Fritschel |
Sensing and Control
|
30 Apr 2012 |
G960044-x0 |
Phase Noise Interferometer: Motivation & Objectives - Presentation at NSF Review of the MIT Component of the LIGO Project, 20-22 March 1996 |
Peter Fritschel |
Document Migration
|
08 May 2013 |
C1107192-v8 |
Statement of Work for aLIGO OMC Optics |
Sam Waldman et al. |
Sensing and Control
Fabrication
|
03 May 2013 |
E1101086-v6 |
OMC Optical Prisms |
Sam Waldman et al. |
Sensing and Control
Requirements
|
03 May 2013 |
G950051-x0 |
Barry Controls Isolators: Are they Useful for LIGO? |
Peter Fritschel |
Document Migration
|
02 May 2013 |
G940035-x0 |
MIT Technical Program - NSF Cost Review Presentation |
Peter Fritschel |
Document Migration
|
26 Apr 2013 |
G930062-x0 |
Interferometer Topology Decision: Summary and Viewgraph Presentations |
Peter Fritschel et al. |
Document Migration
|
18 Apr 2013 |
D1100170-v4 |
Vertex ISC Electronics Layout |
Peter Fritschel et al. |
Sensing and Control
|
11 Apr 2013 |
T1100080-v3 |
Commissioning Advanced LIGO's First Arm Cavity |
Daniel Sigg et al. |
Integration
Commissioning
System Engineering
|
17 Mar 2013 |
E1200836-v1 |
aLIGO Optical Lever Longitudinal-to-Angle Coupling Coefficients |
Peter Fritschel et al. |
Auxiliary Optics
|
20 Feb 2013 |
L1300018-v2 |
Summary of the L1 Input Mode Cleaner Testing |
Peter Fritschel et al. |
Integration
|
16 Feb 2013 |
D1000653-v4 |
TOP LEVEL ISC Equipment Block Diagram |
Rich Abbott et al. |
Sensing and Control
Conceptual Design
|
31 Jan 2013 |
G1201295-v2 |
Magnetic coupling to test mass suspensions. |
Peter Fritschel |
Integration
Suspensions
Subsystem Test
|
02 Jan 2013 |
D1200662-v2 |
Gain factors for ISC RF detectors and signal conditioning chain |
Peter Fritschel |
Sensing and Control
|
08 Nov 2012 |
D1200749-v3 |
AL Mass Replacement for ECD Magnet Assembly |
Sam Barnum et al. |
Sensing and Control
Final Design
|
12 Oct 2012 |
C1204586-v2 |
Statement of Work: Fabrication of Hermetically Sealed Electronics Enclosures |
Peter Fritschel et al. |
Procurements
|
19 Sep 2012 |
T050271-x0 |
Considerations regarding magnet strengths for the Advanced LIGO test mass quadruple suspensions |
Peter Fritschel |
Preliminary Design
Suspensions
|
11 Sep 2012 |
M1200276-v1 |
RODA: Increase of Schnupp Asymmetry from 5 cm to 8 cm |
Peter Fritschel et al. |
Final Design
System Engineering
|
06 Aug 2012 |
T1200351-v1 |
Correction to the inspiral range calculation in GWINC |
Peter Fritschel et al. |
GW source predictions
Modelling
Compact Binaries
|
16 Jul 2012 |
E1200683-v2 |
End Station Rack Naming Convention |
Rich Abbott et al. |
Final Design
System Engineering
|
12 Jul 2012 |
E950087-x0 |
LIGO Detector Subsystem Review Report Design Requirements Review ASC |
Bill Althouse et al. |
Document Migration
|
12 Jun 2012 |
E950085-x0 |
Design Requirements Review - Suspension |
Bill Althouse et al. |
Document Migration
|
12 Jun 2012 |
G1200588-v1 |
aLIGO Integration status for 23 May 2012 meeting |
Peter Fritschel |
Integration
|
23 May 2012 |
E1200172-x0 |
aLIGO, ISC, IMC |
Daniel Sigg et al. |
Sensing and Control
|
29 Apr 2012 |
D1200658-x0 |
Flexible Tube Mount, 10in, ISC Table, aLIGO |
Sam Barnum et al. |
Auxiliary Optics
Final Design
|
27 Apr 2012 |
T1000298-v2 |
Advanced LIGO Length Sensing and Control Final Design |
Guido Mueller et al. |
Sensing and Control
Final Design
|
09 Apr 2012 |
E1200122-x0 |
aLIGO, ISC |
Rich Abbott et al. |
Sensing and Control
|
21 Mar 2012 |
E1200195-x0 |
aLIGO, ISC, System Overview |
Daniel Sigg et al. |
Sensing and Control
|
09 Feb 2012 |
E1101095-v4 |
Advanced LIGO Output Mode Cleaner Coating Specifications |
Sam Waldman et al. |
Sensing and Control
Conceptual Design
|
31 Jan 2012 |
T1100062-v6 |
aLIGO I&Q Demodulator Test Procedure |
Rich Abbott et al. |
Sensing and Control
Subsystem Test
|
09 Jan 2012 |
E1101088-v4 |
aLIGO OMC Curved Optics Specification |
Sam Waldman et al. |
Sensing and Control
Requirements
|
06 Dec 2011 |
T1100448-x0 |
Input Optics Power Control |
Rich Abbott et al. |
Final Design
Input Optics
|
22 Aug 2011 |
T010103-v1 |
aLIGO Suspension System Conceptual Design |
Russell Jones et al. |
Conceptual Design
Suspensions
|
09 Jun 2011 |
G1100462-v2 |
ISC Technical Status - NSF 2011 |
Peter Fritschel |
Sensing and Control
Reviews
|
05 May 2011 |
G1100505-v2 |
Plenary 3 Advanced LIGO Technical Description, Part I, April 2011 NSF Review |
Peter Fritschel |
Reviews
|
05 May 2011 |
G1100445-v3 |
Plenary 5 Integration Planning - NSF 2011 |
Valery Frolov et al. |
Sensing and Control
|
05 May 2011 |
C1102245-v4 |
Statement of Work for 6 inch Vacuum Viewport Windows |
Peter Fritschel |
Procurements
Auxiliary Optics
|
08 Apr 2011 |
E1000246-v6 |
6.0 inch Vacuum Viewport Specification |
Michael Smith et al. |
Final Design
|
21 Mar 2011 |
T1000175-v2 |
Thinner Compensation Plates for reduced Squeeze film damping |
Matthew Evans et al. |
Sensing and Control
Core Optics
Change Control
Vacuum
Suspensions
Technical Review Board
System Engineering
|
14 Dec 2010 |
C1001195-v5 |
Statement of Work - Quad I&Q RF Demodulator |
Rich Abbott et al. |
Fabrication
|
22 Sep 2010 |
T1000251-v1 |
Report of the Committee to Compare the Scientific Cases for AHLV and HHLV |
B Sathyaprakash et al. |
Modelling
Collaboration
Reports
Astrophysics / Multi-messenger
|
02 Jun 2010 |
E0900111-v1 |
Test Mass Barrel gold coating specification - obsolete |
Peter Fritschel |
Core Optics
Auxiliary Optics
Final Design
System Engineering
|
26 May 2010 |
P070082-v4 |
LIGO: The Laser Interferometer Gravitational-Wave Observatory |
Peter Fritschel |
Detector
|
21 Mar 2010 |
T060156-v1 |
Enhanced LIGO |
Sam Waldman et al. |
Sensing and Control
|
18 Nov 2009 |
P070044-x0 |
Effects of mode degeneracy in the LIGO Livingston Observatory recycling cavity |
Brian O'Reilly et al. |
Document Migration
Public relations
|
14 Oct 2009 |
T070247-v1 |
AdvLIGO Interferometer Sensing and Control Conceptual Design |
Peter Fritschel |
Sensing and Control
Conceptual Design
|
14 Sep 2009 |
T080208-v1 |
Stable Recycling Cavities for Advanced LIGO |
Guido Mueller et al. |
Activity
|
01 Jun 2009 |
M080371-v1 |
RODA: Arm Length Stabilization system to use end-station injection of a 532 nm beam, and PDH cavity sensing. |
Peter Fritschel |
System Engineering
|
16 Mar 2009 |
M0900025-v1 |
RODA: Decision to reduce the beam size on the ITMs to 5.3 cm |
Peter Fritschel |
Activity
System Engineering
|
16 Feb 2009 |
G080541-x0 |
Mechanical Mode Damping for Parametric Instability Control - LSC/Virgo Collaboration Meeting, September 22-25, 2008, Amsterdam |
Dennis Coyne et al. |
Document Migration
|
01 Oct 2008 |
G080551-x0 |
Adv. LIGO Arm Length Stabilisation - LSC/Virgo Collaboration Meeting, September 22-25, 2008, Amsterdam |
Rana Adhikari et al. |
Document Migration
|
01 Oct 2008 |
G080391-x0 |
Technical Status of Advanced LIGO - PAC 24 Meeting @ LIGO Hanford Observatory, June 24-25, 2008 |
Dennis Coyne et al. |
Document Migration
|
27 Jun 2008 |
T080146-x0 |
Specification and Drawing Review Notes for Input Optics Long Lead Procurement Readiness Review |
GariLynn Billingsley et al. |
Document Migration
|
11 Jun 2008 |
G080255-x0 |
ISC Requirements and Conceptual Design Review Presentation |
Peter Fritschel |
Document Migration
|
21 Apr 2008 |
T080053-x0 |
Comments and Questions and Responses on the BOSEM FDR and FRR, and Responses |
Betsy Weaver et al. |
Document Migration
|
06 Mar 2008 |
T040199-x0 |
Dimensions for Advanced LIGO Fused Silica Test Masses |
Peter Fritschel |
Document Migration
|
05 Feb 2008 |
T070303-x0 |
Arm Cavity Finesse for Advanced LIGO |
Rana Adhikari et al. |
Document Migration
|
21 Dec 2007 |
T070248-x0 |
Advanced LIGO Input Optics Preliminary Design Review Report |
Dennis Coyne et al. |
Document Migration
|
06 Nov 2007 |
T010067-x0 |
Noise from Fizeau effect |
Peter Fritschel et al. |
Document Migration
|
24 Oct 2007 |
G070254-x0 |
The Big Bang Observer: High Laser Power for Gravitational-wave Astrophysics |
William Folkner et al. |
Document Migration
|
23 Oct 2007 |
T070207-x0 |
OMC Structure Frequencies –Results and Interpretation |
Peter Fritschel et al. |
Document Migration
|
17 Sep 2007 |
G070166-x0 |
OMC Design Considerations - LIGO/VIRGO Scientific Collaborations Meeting, Hilton Capitol Center, Baton Rouge LA, March 19-22, 2007 |
Rich Abbott et al. |
Document Migration
|
11 Jul 2007 |
G070372-x0 |
Advanced LIGO Subsystem Descriptions - NSF Review of Advanced LIGO |
Dennis Coyne et al. |
Document Migration
|
06 Jul 2007 |
G070401-x0 |
Ground Based Gravitational Wave Interferometers |
Peter Fritschel |
Document Migration
|
15 Jun 2007 |
G070217-x0 |
Advanced LIGO ISC Overview - LIGO/VIRGO Scientific Collaborations Meeting, Hilton Capitol Center, Baton Rouge LA, March 19-22, 2007 |
Peter Fritschel |
Document Migration
|
02 Apr 2007 |
G070216-x0 |
Stochastic Analysis Group Overview - LIGO/VIRGO Scientific Collaborations Meeting, Hilton Capitol Center, Baton Rouge LA, March 19-22, 2007 |
Peter Fritschel |
Document Migration
|
02 Apr 2007 |
G070191-x0 |
Modulation Scheme for Advanced LIGO - LIGO/VIRGO Scientific Collaborations Meeting, Hilton Capitol Center, Baton Rouge LA, March 19-22, 2007 |
Rana Adhikari et al. |
Document Migration
|
27 Mar 2007 |
T060272-x0 |
Length Sensing and Control for AdLIGO |
Rana Adhikari et al. |
Document Migration
|
23 Feb 2007 |
T060257-x0 |
Conceptual Design of a Double Pendulum for the Output Mode Cleaner |
Dennis Coyne et al. |
Document Migration
|
10 Jan 2007 |
G050566-x0 |
LIGO Commissioning and Run Plans, 2005 NSF Review |
Peter Fritschel |
Document Migration
|
21 Dec 2006 |
G060481-x0 |
Length Sensing and Control of AdLIGO - LSC Meeting, August 14-17th, 2006 @ Louisiana State University |
Rana Adhikari et al. |
Document Migration
|
18 Aug 2006 |
G060226-x0 |
Advanced LIGO Subsystems - NSF Review of Advanced LIGO Project |
Dennis Coyne et al. |
Document Migration
|
08 Aug 2006 |
G010379-x0 |
Advance LIGO Suspensions Subsystem Design Requirements Review |
Peter Fritschel et al. |
Document Migration
|
23 Jun 2006 |
T010175-x0 |
Spatial Dependence of Force in Initial LIGO OSEMs |
O D'arcy et al. |
Document Migration
|
02 Jun 2006 |
T050252-x0 |
Enhancements to the LIGO S5 Detectors |
Rana Adhikari et al. |
Document Migration
|
02 Feb 2006 |
T050168-x0 |
40m DC readout review, report and recommendations |
Peter Fritschel et al. |
Document Migration
|
08 Sep 2005 |
G050371-x0 |
Commissioning Report - LSC Meeting, August 14th - 17th, Hanford WA |
Peter Fritschel |
Document Migration
|
17 Aug 2005 |
G050254-x0 |
S5 Run Performance Goals - PAC 18 Meeting, May 18-19th, 2005 |
Peter Fritschel et al. |
Document Migration
|
19 May 2005 |
G050259-x0 |
Initial LIGO Improvements & Advanced LIGO - PAC 18 Meeting, May 18-19th, 2005 |
Peter Fritschel |
Document Migration
|
18 May 2005 |
G050109-x0 |
Initial LIGO Upgrades - LSC Meeting, March 20-23, 2005, Livingston LA |
Peter Fritschel |
Document Migration
|
28 Mar 2005 |
T050040-x0 |
Fields in the Recycling Cavity at LIGO Livingston Observatory |
Erika D'ambrosio et al. |
Document Migration
|
10 Mar 2005 |
T040172-x0 |
LOS Output Electronics Modifications |
Rana Adhikari et al. |
Document Migration
|
15 Sep 2004 |
T040008-x0 |
Optical loss due to suspension mounting flats (Advanced LIGO) |
Peter Fritschel |
Document Migration
|
09 Aug 2004 |
G040143-x0 |
S2/S3 Calibration - LSC Meeting, March 15 - 18th, Livingston, LA |
Rana Adhikari et al. |
Document Migration
|
18 Mar 2004 |
G040066-x0 |
LIGO Commissioning Update - LSC Meeting, March 15 - 18th, Livingston, LA |
Peter Fritschel |
Document Migration
|
18 Mar 2004 |
T010097-x0 |
Auxiliary Suspended Optics Displacement Noise Requirements |
Peter Fritschel |
Document Migration
|
21 Jan 2004 |
T030290-x0 |
Description of the Angular Sensing and Control (ASC) System in H1 During the Third LIGO Science Run (S3) |
Stefan Ballmer et al. |
Document Migration
|
05 Jan 2004 |
T030250-x0 |
Combining the LIGO H1-H2, H1-L1 and H2-L1 Stochastic Background Measurements Optimally During Triple Coincident Operations |
Sukanta Bose et al. |
Document Migration
|
11 Dec 2003 |
G030555-x0 |
Vibration Reduction in ISC Periscope - LSC Meeting, November 10th - 13th, Hanford WA |
Peter Fritschel et al. |
Document Migration
|
18 Nov 2003 |
G030640-x0 |
Acoustic Mitigation Status for S3 - LSC Meeting, November 10th - 13th, Hanford WA |
Douglas Cook et al. |
Document Migration
|
14 Nov 2003 |
G030605-x0 |
Calibration: S2 update, S3 preliminaries - LSC Meeting, November 10th - 13th, Hanford WA |
Rana Adhikari et al. |
Document Migration
|
14 Nov 2003 |
G030608-x0 |
The Angular Control System at LHO: Current Status - LSC Meeting, November 10th - 13th, Hanford WA |
Stefan Ballmer et al. |
Document Migration
|
14 Nov 2003 |
T030004-x0 |
Shot noise and optical gain of the H1 interferometer |
Peter Fritschel |
Document Migration
|
10 Nov 2003 |
T030094-x0 |
LOS Coil Driver & Universal Dewhitening Filter Revisions |
Peter Fritschel |
Document Migration
|
06 Nov 2003 |
G030426-x0 |
S2 Calibration |
Rana Adhikari et al. |
Document Migration
|
14 Oct 2003 |
G030429-x0 |
Adv LIGO and retrofit seismic isolation research update - LSC Meeting, August 18th - 21st, Hannover, Germany |
Rich Abbott et al. |
Document Migration
|
14 Oct 2003 |
G030527-x0 |
Tasks After S3 - Commissioning Meeting |
Peter Fritschel et al. |
Document Migration
|
14 Oct 2003 |
G030268-x0 |
Advanced LIGO Systems Design & Interferometer Sensing & Optics |
Peter Fritschel |
Document Migration
|
18 Sep 2003 |
G030433-x0 |
LIGO Commissioning Report - LSC Meeting, August 18th - 21st, Hannover, Germany |
Peter Fritschel |
Document Migration
|
15 Sep 2003 |
G030414-x0 |
Hydraulic External Pre-Isolation, Progress on the Seismic Retrofit - LSC Meeting, August 18th - 21st, Hannover, Germany |
Rich Abbott et al. |
Document Migration
|
20 Aug 2003 |
T030097-x0 |
Calibration of the LIGO detectors for the First LIGO Scientific Run |
Rana Adhikari et al. |
Document Migration
|
28 May 2003 |
G030241-x0 |
LSC Changes in Preparation of High Power Operations |
Matthew Evans et al. |
Document Migration
|
07 May 2003 |
G030068-x0 |
LIGO Commissioning Update - LSC Meeting, March 17th - 20th, Livingston, LA |
Peter Fritschel et al. |
Document Migration
|
31 Mar 2003 |
G030116-x0 |
External Pre-Isolation Progress on the Seismic Retrofit - LSC Meeting, March 17th - 20th, Livingston, LA |
Rich Abbott et al. |
Document Migration
|
27 Mar 2003 |
G030010-x0 |
Tasks after S2 |
Peter Fritschel et al. |
Document Migration
|
10 Mar 2003 |
T020166-x0 |
Detecting a Stochastic Background of Gravitational Radiation - Background Information |
Bruce Allen et al. |
Document Migration
|
29 Jan 2003 |
G020482-x0 |
Commissioning - NSF Annual Review |
Peter Fritschel |
Document Migration
|
22 Oct 2002 |
T900044-x0 |
Status of the Fixed-Mass Interferometer Coupled Cavity Experiment |
Peter Fritschel et al. |
Document Migration
|
22 Oct 2002 |
T940079-x0 |
Phase Noise Interferometer Design Review |
Peter Fritschel |
Document Migration
|
10 Oct 2002 |
G020455-x0 |
Interferometer Sensing and Control (ISC) |
Peter Fritschel |
Document Migration
|
09 Oct 2002 |
G020345-x0 |
Second Generation LIGO Interferometers, SPIE Astronomical Instruments Conference |
Peter Fritschel |
Document Migration
|
07 Oct 2002 |
G020330-x0 |
Advanced LIGO Sensing - LSC Meeting, August 19th - 22nd, Hanford WA |
Peter Fritschel et al. |
Document Migration
|
23 Aug 2002 |
G020376-x0 |
Stochastic Upper Limit Group E7 Report - LSC Meeting, August 19th - 22nd, Hanford WA |
Bruce Allen et al. |
Document Migration
|
21 Aug 2002 |
T020115-x0 |
Stochastic Sources Upper Limit Group E7 Report |
Bruce Allen et al. |
Document Migration
|
19 Aug 2002 |
G020272-x0 |
Advanced LIGO Systems & ISC - PAC 12 Meeting, MIT |
Peter Fritschel |
Document Migration
|
17 Jul 2002 |
G020287-x0 |
LIGO Commissioning - PAC 12 Meeting Presentation |
Peter Fritschel et al. |
Document Migration
|
17 Jul 2002 |
G020268-x0 |
Commissioning, Part II - PAC 12 Meeting |
Peter Fritschel |
Document Migration
|
03 Jul 2002 |
G020230-x0 |
Staged Approach to Advanced LIGO Implementation |
Dennis Coyne et al. |
Document Migration
|
07 May 2002 |
T010140-x0 |
Digital Suspension Filter Design |
Peter Fritschel |
Document Migration
|
18 Apr 2002 |
G020144-x0 |
Low-frequency Cutoff in Advanced LIGO - LSC Meeting, March 20 - 23, Livingston LA |
Peter Fritschel |
Document Migration
|
08 Apr 2002 |
T020034-x0 |
Low-frequency Cutoff for Advanced LIGO |
Dennis Coyne et al. |
Document Migration
|
01 Apr 2002 |
G010396-x0 |
Intersite Environmental Correlations: E3 and E4 Investigations, Part 2: Bursts |
Nelson Christensen et al. |
Document Migration
|
13 Nov 2001 |
T010017-x0 |
Proposal to Set an Upper Limit on Stochastic Sources Using LIGO Engineering Data |
Bruce Allen et al. |
Document Migration
|
27 Aug 2001 |
G010286-x0 |
E3/E4 PEM Correlations, Part 1 - LSC Meeting August 13 - 16, Hanford WA |
Nelson Christensen et al. |
Document Migration
|
22 Aug 2001 |
G010302-x0 |
Advanced LIGO Systems Design and Requirements - LSC Meeting August 13 - 16, Hanford WA |
Peter Fritschel |
Document Migration
|
15 Aug 2001 |
G010242-x0 |
Advanced LIGO Systems Requirements Review |
Peter Fritschel |
Document Migration
|
17 Jul 2001 |
G010201-x0 |
The Second Generation LIGO Interferometers |
Peter Fritschel |
Document Migration
|
05 Jun 2001 |
G010200-x0 |
Pursuing Gravitational Wave Astrophysics with LIGO - University of Maryland Seminar, April 27, 2001 |
Peter Fritschel |
Document Migration
|
16 May 2001 |
T000072-x0 |
Proposal for Remote Control of Laser Power into 2km LHO Mode Cleaner |
Peter Fritschel et al. |
Document Migration
|
04 May 2001 |
G010086-x0 |
Global Control Issues for Advanced LIGO Quad Suspensions - LSC Meeting March 14 -17 2001 Livingston, LA |
Peter Fritschel |
Document Migration
|
21 Mar 2001 |
G010085-x0 |
Advanced LIGO Prestabilized Laser Requirements - LSC Meeting March 14 -17 2001 Livingston, LA |
Peter Fritschel |
Document Migration
|
21 Mar 2001 |
T970150-x0 |
LIGO Detector Subsystem Review Report: Design Requirements Review - Core Optics Support Subsystem |
Mike Fine et al. |
Document Migration
|
12 Mar 2001 |
G000428-x0 |
GW Readout Techniques - LIGO II System Requirements Meeting, MIT, May 18-19 2000 |
Peter Fritschel |
Document Migration
|
05 Mar 2001 |
T010022-x0 |
Minutes of the Core Optics Subgroup, 02-15-01 |
Helena Armandula et al. |
Document Migration
|
28 Feb 2001 |
G000316-x0 |
LIGO II: The Second Generation Interferometers |
Peter Fritschel |
Document Migration
|
03 Nov 2000 |
G000225-x0 |
Sensing and Control for LIGO II - LSC Meeting at Hanford, August 15-17, 2000 |
Peter Fritschel et al. |
Document Migration
|
15 Sep 2000 |
T000074-x0 |
DAC Output Signal Conditioning: Dewhitening and Anti-Imaging Filter Design |
Peter Fritschel et al. |
Document Migration
|
27 Jul 2000 |
T000062-x0 |
LIGO II System Requirements Meeting Summary |
Peter Fritschel et al. |
Document Migration
|
02 Jun 2000 |
G000112-x0 |
LHO 2km Cavity Commissioning: Servo Characterization and Performance |
Peter Fritschel |
Document Migration
|
11 May 2000 |
G000028-x0 |
Characterization of the LHO 2km Cavities |
Peter Fritschel |
Document Migration
|
09 May 2000 |
G000006-x0 |
LHO Mode Cleaner Commissioning Status - Director`s Review |
Peter Fritschel |
Document Migration
|
02 Mar 2000 |
T990125-x0 |
Mode Cleaner Installation & Test Plan |
Peter Fritschel |
Document Migration
|
11 Feb 2000 |
T990085-x0 |
Local Damping in the SOS & LOS Suspensions |
Peter Fritschel |
Document Migration
|
03 Nov 1999 |
G990053-x0 |
LIGO II: Requirements and Configurations, PAC6 Meeting Presentation, 20-21 May 1999 |
Peter Fritschel |
Document Migration
|
29 Jun 1999 |
G990036-x0 |
Global Diagnostics System Final Design Review |
Rolf Bork et al. |
Document Migration
|
12 May 1999 |
T980020-x0 |
GDS Reflective Memory Organization, Rev. A |
David Barker et al. |
Document Migration
|
26 Apr 1999 |
G980111-x0 |
Length Sensing/Control Final Design Review (FDR) |
Edward Daw et al. |
Document Migration
|
11 Sep 1998 |
G980109-x0 |
ASC Wavefront Sensing Final Design Review |
Peter Fritschel et al. |
Document Migration
|
11 Sep 1998 |
T970218-x0 |
Mode Cleaner Length/Frequency Control Design, Rev. 02 |
Peter Fritschel et al. |
Document Migration
|
19 May 1998 |
G980071-x0 |
ASC Initial Alignment Subsystem (IAS) Final Design Review (FDR) |
Peter Fritschel et al. |
Document Migration
|
04 May 1998 |
T970145-x0 |
Performance of VCO/AOM Frequency Shifter |
Peter Fritschel et al. |
Document Migration
|
21 Apr 1998 |
G970247-x0 |
The LIGO Project: Progress & Plans |
Peter Fritschel |
Document Migration
|
25 Mar 1998 |
T980004-x0 |
LIGO Channel Count |
Peter Fritschel et al. |
Document Migration
|
23 Mar 1998 |
T970228-x0 |
Performance of VCP/AOM Frequency Shifter |
Peter Fritschel et al. |
Document Migration
|
30 Jan 1998 |
G970192-x0 |
Length Sensing and Control (LSC) Subsystem Preliminary Design Review (PDR) |
Peter Fritschel et al. |
Document Migration
|
31 Jul 1997 |
T970122-x0 |
Length Sensing and Control (LSC) Subsystem Preliminary Design |
Peter Fritschel et al. |
Document Migration
|
22 Jul 1997 |
T960058-x0 |
Length Sensing & Control (LSC) Design Requirements |
Peter Fritschel et al. |
Document Migration
|
22 Jul 1997 |
T900017-x0 |
A Prototype Michelson Interferometer with Fabry-Perot Cavities |
Peter Fritschel et al. |
Document Migration
|
17 Jul 1997 |
T900009-x0 |
The Rigid Inline-Modulated Interferometer at MIT: A Summary of Results |
Peter Fritschel et al. |
Document Migration
|
02 Jul 1997 |
T900010-x0 |
Beam Imaging Diagnostic Systems |
Michael Burka et al. |
Document Migration
|
02 Jul 1997 |
T940066-x0 |
Optical Distortion in Gsanger Pockels Cells |
Peter Fritschel et al. |
Document Migration
|
28 Apr 1997 |
T970060-x0 |
Alignment Sensing/Control (ASC) Preliminary Design |
Peter Fritschel et al. |
Document Migration
|
24 Feb 1997 |
T952007-x0 |
Alignment Sensing/Control (ASC) Design Requirements Document |
Peter Fritschel et al. |
Document Migration
|
24 Feb 1997 |
T960174-x0 |
Summary of the Eddy Current Damping Experiment |
Peter Fritschel et al. |
Document Migration
|
31 Oct 1996 |
T960134-x0 |
Alignment Sensing/Control Conceptual Design. |
Peter Fritschel et al. |
Document Migration
|
26 Aug 1996 |
T960139-x0 |
Shot Noise Sensitivity of the Length Control Error Signals |
Peter Fritschel |
Document Migration
|
13 Aug 1996 |
T960122-x0 |
Proposed Initial Detector MC and RC Baseline Lengths |
Peter Fritschel et al. |
Document Migration
|
25 Jul 1996 |
E960027-x0 |
Report on the Design Requirements Review Core Optics Components |
Jordan Camp et al. |
Document Migration
|
12 Jun 1996 |
T960027-x0 |
Length Sensing and Control Subsystem Conceptual Design Description |
Jordan Camp et al. |
Document Migration
|
20 May 1996 |
T950108-x0 |
Conceptual Lay-Out for a 10 W Single Frequency, Prestabilized Nd:YAG Laser |
Alex Abramovici et al. |
Document Migration
|
20 Oct 1995 |
T950046-x0 |
Performance of the Barry Controls, Inc. STACIS Active Isolation System |
Peter Fritschel et al. |
Document Migration
|
24 Jul 1995 |