LIGO Document L1400119-v1
- The L1 interferometer first achieved full locking on May 27, 2014 (LLO alog 12762). There have now been several lock stretches lasting more than 2 hours. L1 has thus reached the Advanced LIGO Project integration milestone of achieving a 2+ hour lock, with a functional strain readout. This memo serves to document this milestone.
DCC Version 3.4.3, contact
Document Database Administrators