LIGO-Number |
Title |
Author(s) |
Topic(s) |
Last Updated |
E0900347-v9 |
ETM Telescope Primary Parabolic Mirror, ADLIGO |
Michael Smith et al. |
Final Design
Auxiliary Optics
|
08 Feb 2012 |
P060007-x0 |
Measurement of Optical Response of a Detuned Resonant Sideband Extraction Interferometer |
Benjamin Abbott et al. |
Document Migration
|
11 Nov 2021 |
E1300345-x0 |
Repository for ACB Baffle Supporting Analyses/models |
Michael Smith |
Modelling
Auxiliary Optics
|
29 Apr 2020 |
E1000116-v2 |
Output Faraday Rotator Component Specification |
Michael Smith |
Final Design
Auxiliary Optics
|
23 May 2019 |
T070061-v1 |
AOS: Stray Light Control (SLC) Design Requirements |
Michael Smith et al. |
Document Migration
|
03 Jan 2011 |
T1100445-v2 |
AOS SLC: Signal Recycling Cavity Baffles Final Design |
Michael Smith et al. |
Final Design
Auxiliary Optics
|
13 Oct 2011 |
E1300298-x0 |
SLC & VP Installation procedures |
Michael Smith |
Installation
|
21 Mar 2018 |
T060083-v1 |
Auxiliary Optics Support System Conceptual Design Document, Vol. 1: Thermal Compensation System |
Phil Willems |
Conceptual Design
Reviews
Auxiliary Optics
|
25 Jan 2018 |
E1300428-x0 |
Repository for Output Faraday Isolator Test Results |
Michael Smith |
Subsystem Test
Auxiliary Optics
|
25 Dec 2017 |
E1300577-v7 |
SLC ITM/ ETM Manifold Cryopump Baffle Assembly and Installation Document |
Michael Smith et al. |
Assembly
Installation
Auxiliary Optics
|
10 May 2017 |
T1000746-v1 |
Viewports Subsystem Final Design Document |
Michael Smith et al. |
Final Design
Auxiliary Optics
|
13 Mar 2011 |
T1300353-v1 |
TMS: Telescope Testing Facility Alignment Procedure |
Virginio Sannibale et al. |
Subsystem Test
Auxiliary Optics
|
04 Apr 2017 |
E1300341-x0 |
Repository for OFI supporting analyses/models |
Michael Smith |
Modelling
Auxiliary Optics
|
07 Feb 2017 |
T1200313-v3 |
BS Elliptical Baffle Final Design |
Michael Smith et al. |
Final Design
Auxiliary Optics
|
15 Dec 2016 |
T1000747-v4 |
Arm Cavity Baffle Final Design (SLC) |
Michael Smith et al. |
Final Design
Auxiliary Optics
|
14 Dec 2016 |
T1100165-v2 |
AOS SLC Manifold/Cryopump and Mode Cleaner Tube Baffles FDR |
Lisa Austin et al. |
Final Design
Auxiliary Optics
|
14 Dec 2016 |
E1300319-x0 |
Arm Cavity Baffle (ACB) supporting analyses/models |
Michael Smith |
Final Design
Auxiliary Optics
|
14 Dec 2016 |
E1100718-v8 |
Mode Cleaner Tube Baffle Assembly and Installation Procedure |
Lisa Austin et al. |
Assembly
Installation
Auxiliary Optics
|
06 Dec 2016 |
D0902216-v8 |
Advanced LIGO L1 Optical Layout, ZEMAX |
Michael Smith et al. |
Final Design
System Engineering
|
28 Sep 2016 |
T1000181-v1 |
AOS: Stray Light Control (SLC)-- Output Faraday Isolator Final Design |
Michael Smith et al. |
Final Design
Auxiliary Optics
|
09 Sep 2016 |
E1300427-x0 |
Repository for ITM Elliptical Baffle Test Results |
Michael Smith |
Subsystem Test
Auxiliary Optics
|
08 Mar 2016 |
E1300175-v1 |
Gaussian beam Sizes in Signal Recycling Cavity |
Michael Smith |
Auxiliary Optics
|
27 Oct 2015 |
T000092-v4 |
Auxiliary Optics Support System Design Requirements Document, Vol. 1: Thermal Compensation System |
Michael Smith et al. |
Requirements
Reviews
Auxiliary Optics
|
22 Sep 2015 |
E1300390-v3 |
Align/Install Output Faraday Isolator LHO Test |
Michael Smith |
Subsystem Test
Auxiliary Optics
|
29 Jul 2015 |
T1100292-v6 |
(obsolete) Viewport Source List |
Michael Smith |
Final Design
|
14 Apr 2015 |
L1200291-v5 |
TRB Report: Recommendation related to the discrepancy between single version of the quad ITM suspensions and the optical layout which calls for a left and right handed versions |
Calum Torrie et al. |
Installation
System Engineering
|
11 Mar 2015 |
T080063-x0 |
BRDF and Reflectivity Properties of Black Glass Beam Dumps and Baffles |
Michael Smith |
Document Migration
|
04 Feb 2015 |
E1300447-v1 |
TEST-VP LHO |
Michael Smith |
Subsystem Test
Auxiliary Optics
|
02 Feb 2015 |
T1000311-v7 |
aLIGO TransMonSUS Assembly & Installation Hazards Analysis |
Ken Mailand et al. |
Final Design
Safety
Auxiliary Optics
|
21 Jan 2015 |
D0900446-v12 |
Advanced LIGO Transmon Zemax |
Sam Waldman et al. |
Sensing and Control
Final Design
Auxiliary Optics
|
19 Jan 2015 |
E1300438-x0 |
Repository for Viewport Test Results |
Michael Smith |
Subsystem Test
Auxiliary Optics
|
22 Nov 2014 |
E1300338-x0 |
Repository for Signal Recycling Cavity Baffles Test Results |
Michael Smith |
Subsystem Test
Auxiliary Optics
|
22 Nov 2014 |
E1300426-x0 |
Repository for BS Elliptical Baffle Test Results |
Michael Smith |
Subsystem Test
Auxiliary Optics
|
20 Nov 2014 |
E1300346-v2 |
Repository for ACB Baffle Test Results |
Michael Smith |
Subsystem Test
Auxiliary Optics
|
20 Nov 2014 |
E1201012-v8 |
TransMonSUS Assembly & Installation Procedure |
Ken Mailand et al. |
Sensing and Control
Final Design
Auxiliary Optics
|
22 Oct 2014 |
E1300212-v2 |
SLC Acceptance Documentation |
Michael Smith |
Auxiliary Optics
|
30 Sep 2014 |
T070125-x0 |
Advanced LIGO Photon Calibrator Design Requirements Document |
Michael Smith et al. |
Document Migration
|
23 Jun 2014 |
E1300389-v3 |
Align/Install Output Faraday Isolator LLO Test |
Michael Smith |
Subsystem Test
Auxiliary Optics
|
16 Jun 2014 |
E980326-x0 |
Document Change Notice |
Michael Smith |
Document Migration
|
16 May 2014 |
E980325-x0 |
Document Change Notice |
Michael Smith |
Document Migration
|
16 May 2014 |
E980324-x0 |
Document Change Notice |
Michael Smith |
Document Migration
|
16 May 2014 |
E980323-x0 |
Document Change Notice |
Michael Smith |
Document Migration
|
16 May 2014 |
E1300376-v1 |
Install ACB LLO BSC5 Test |
Michael Smith |
Subsystem Test
Auxiliary Optics
|
10 Apr 2014 |
E1300375-v1 |
Install ACB LLO BSC4 Test |
Michael Smith |
Subsystem Test
Auxiliary Optics
|
08 Apr 2014 |
E1100491-v6 |
SLC Mode Cleaner Tube Baffle Install Hazard Analysis |
Michael Smith et al. |
Safety
Auxiliary Optics
|
20 Feb 2014 |
E1000890-v8 |
SLC Arm Cavity Baffle Install Hazard Analysis |
Michael Smith et al. |
Final Design
Installation
Safety
Auxiliary Optics
|
20 Feb 2014 |
E1100984-v8 |
SLC Signal Recycling Cavity Baffle Install Hazard Analysis |
Michael Smith et al. |
Safety
Auxiliary Optics
|
20 Feb 2014 |
E1300283-v3 |
OFI Assembly & Installation Hazard Analysis |
Michael Smith |
Installation
Safety
Auxiliary Optics
|
18 Feb 2014 |
E1200659-v2 |
AOS SLC BS Elliptical Baffle Install Hazard Analysis |
Michael Smith et al. |
Final Design
Safety
Auxiliary Optics
|
15 Feb 2014 |
E1300351-x0 |
Repository for OFI Design Drawings, Interfaces, etc. |
Michael Smith |
Final Design
Auxiliary Optics
|
13 Dec 2013 |
E1100607-v5 |
SLC ITM Manifold/Cryopump Baffle Assembly and Installation Document (OBSOLETE) |
Michael Smith et al. |
Assembly
Installation
Auxiliary Optics
|
09 Dec 2013 |
E1300333-x0 |
Repository for Viewport Installation Procedure Documents |
Michael Smith |
Installation
|
20 Nov 2013 |
E1300043-v3 |
OFI Balance Weights and Locations |
Michael Smith |
Assembly
Fabrication
Auxiliary Optics
|
11 Oct 2013 |
E1100867-v17 |
Advanced LIGO AOS ITM Arm Cavity Baffle Assembly Procedure |
Stephany Foley et al. |
Assembly
Auxiliary Optics
|
24 Sep 2013 |
E1300302-v9 |
SLC/VP Acceptance Check List |
Michael Smith |
Reviews
|
18 Sep 2013 |
E1300336-x0 |
Repository for Signal Recycling Cavity Baffle Supporting Analyses/models |
Michael Smith |
Modelling
Auxiliary Optics
|
18 Sep 2013 |
E1300342-x0 |
Repository for Manifold/Cryopump & Mode Cleaner Baffles Supporting Analyses/models |
Michael Smith |
Modelling
|
18 Sep 2013 |
E1300343-x0 |
Repository for ITM Elliptical Baffle Supporting Analyses/models |
Michael Smith |
Modelling
Auxiliary Optics
|
18 Sep 2013 |
E1300344-x0 |
Repository for BS Elliptical Baffle Supporting Analyses/models |
Michael Smith |
Modelling
|
18 Sep 2013 |
T1300831-v1 |
SR2 Scraper Baffle sketch |
Michael Smith |
Conceptual Design
Auxiliary Optics
|
18 Sep 2013 |
T1300830-v1 |
MC tube baffle beam clearance |
Michael Smith |
Modelling
Auxiliary Optics
|
18 Sep 2013 |
T1300829-v1 |
ACB ETM wide angle scatter power summary |
Michael Smith |
Modelling
Auxiliary Optics
|
18 Sep 2013 |
T1300825-v1 |
ACB shelf length |
Michael Smith |
Installation
Auxiliary Optics
|
18 Sep 2013 |
T1300828-v1 |
ALS-photodetector on ACB |
Michael Smith |
Modelling
Auxiliary Optics
|
17 Sep 2013 |
T1300827-v1 |
ACB shift with target |
Michael Smith |
Modelling
Auxiliary Optics
|
17 Sep 2013 |
T1300826-v1 |
Work Sheet_ thin PD wall |
Michael Smith |
Fabrication
Auxiliary Optics
|
17 Sep 2013 |
T1300824-v1 |
wide angle scatter_ETMX_H1_power |
Michael Smith |
Modelling
Auxiliary Optics
|
17 Sep 2013 |
T1300823-v1 |
wide angle scatter_ITMX_H1_power |
Michael Smith |
Modelling
Auxiliary Optics
|
17 Sep 2013 |
T1300821-v1 |
BS elliptical baffle-3 Model |
Michael Smith |
Modelling
Auxiliary Optics
|
17 Sep 2013 |
T1300816-v1 |
ITM Elllip Baf scatter overlap integral |
Michael Smith |
Modelling
Auxiliary Optics
|
17 Sep 2013 |
T1300820-x0 |
Riley_mrs_10-31-07 - BRDF SURF doc |
Michael Smith |
Education, Outreach
Auxiliary Optics
|
17 Sep 2013 |
T1300819-v1 |
Dan Riley BRDF measurement - final1 |
Michael Smith |
Modelling
Auxiliary Optics
|
17 Sep 2013 |
T1300818-v1 |
Riley-Smith BRDF measurement - final1_mrs |
Michael Smith |
Modelling
Auxiliary Optics
|
17 Sep 2013 |
T1300817-v1 |
aLIGO TCS CO2P BSC2 BAFFLE ASSEMBLY_Three Concepts |
Michael Smith |
Modelling
Auxiliary Optics
|
17 Sep 2013 |
T1300815-v1 |
Fastener list Manifold-cryo baf |
Michael Smith |
Fabrication
Auxiliary Optics
|
17 Sep 2013 |
T1300814-v1 |
CPBS.Proto.Transmissibility.Total.Z.01 |
Michael Smith |
Subsystem Test
Auxiliary Optics
|
17 Sep 2013 |
T1300813-v1 |
CPBS.Proto.Transmissibility.Total.Y.01-02 |
Michael Smith |
Subsystem Test
Auxiliary Optics
|
17 Sep 2013 |
T1300812-v1 |
Manifold-cryo-baf_Blades_Weight_Req |
Michael Smith |
Incoming Inspection
Auxiliary Optics
|
17 Sep 2013 |
T1300811-v1 |
Manifold-Cryo_baffle scatter ETM-annulus |
Michael Smith |
Modelling
Auxiliary Optics
|
17 Sep 2013 |
T1300810-v1 |
MC Tube Baffle Scatter |
Michael Smith |
Modelling
Auxiliary Optics
|
17 Sep 2013 |
T1300809-v1 |
MC Tube Baf Circularity Measurements |
Michael Smith |
Installation
Auxiliary Optics
|
17 Sep 2013 |
T1300808-v1 |
SR2 AR Baf_Hartmann Scraper Baf_revised sketch |
Michael Smith |
Modelling
Auxiliary Optics
|
17 Sep 2013 |
T1300807-v1 |
HAM-BD heights |
Michael Smith |
Modelling
Auxiliary Optics
|
17 Sep 2013 |
T1300806-v1 |
SR Cavity Baf scatter overlap_integral |
Michael Smith |
Modelling
Auxiliary Optics
|
17 Sep 2013 |
T1300805-v1 |
Scattering from SRM AR Baf1_overlap integral |
Michael Smith |
Modelling
Auxiliary Optics
|
17 Sep 2013 |
T1300804-v1 |
SR Cavity Size Summary |
Michael Smith |
Modelling
Auxiliary Optics
|
17 Sep 2013 |
T1300803-v1 |
Signal recycling cavity beam parameters |
Michael Smith |
Modelling
Auxiliary Optics
|
17 Sep 2013 |
T1300801-v1 |
SRM AR BAF SPACER HEIGHT |
Michael Smith |
Modelling
Auxiliary Optics
|
16 Sep 2013 |
T1300800-v1 |
HAM SCRAPER BAF SPACER HEIGHT |
Michael Smith |
Modelling
Auxiliary Optics
|
16 Sep 2013 |
T1300799-v1 |
SR3 HR BAFFLE CHARACTERISTICS |
Michael Smith |
Final Design
Auxiliary Optics
|
16 Sep 2013 |
T1300798-v1 |
beam size at SR2 baffle |
Michael Smith |
Modelling
Auxiliary Optics
|
16 Sep 2013 |
T1300795-v1 |
Squeezer BS deviation angle |
Michael Smith |
Final Design
Auxiliary Optics
|
16 Sep 2013 |
T1300794-v1 |
OFI blade matching light table |
Michael Smith |
Final Design
Auxiliary Optics
|
16 Sep 2013 |
T1300793-v1 |
OFI SPACER HEIGHT |
Michael Smith |
Final Design
Auxiliary Optics
|
16 Sep 2013 |
T1300791-v1 |
OFI glint |
Michael Smith |
Final Design
Auxiliary Optics
|
16 Sep 2013 |
T1300790-v1 |
_iLIGO_OFI data |
Michael Smith |
Subsystem Test
Auxiliary Optics
|
16 Sep 2013 |
T1300789-v1 |
OFI Wedge Prism Reflectance Data |
Michael Smith |
Incoming Inspection
Auxiliary Optics
|
16 Sep 2013 |
T1300788-v1 |
Cryo-Pump Baffle porcelainized steel chipping |
Michael Smith |
Fabrication
Auxiliary Optics
|
16 Sep 2013 |
T1300787-v1 |
Cryo-baf B-K measurement |
Michael Smith |
Installation
Auxiliary Optics
|
16 Sep 2013 |
T1300699-v1 |
ACB scatter various materials |
Michael Smith |
Upgrades
Auxiliary Optics
|
16 Sep 2013 |
T1300700-v1 |
ACB DLC coating on SS |
Michael Smith |
Upgrades
Auxiliary Optics
|
16 Sep 2013 |
T1300731-v1 |
Low-scatter Coating for SS Baffles |
Michael Smith |
Upgrades
Auxiliary Optics
|
13 Sep 2013 |
T1300772-v1 |
CASI BRDF Data, #2 porcelain steel 57 deg inc |
Michael Smith |
Upgrades
Auxiliary Optics
|
13 Sep 2013 |
T1300771-v1 |
Rai Weiss_porcelainized-steel_backscatter_4 |
Michael Smith |
Upgrades
Auxiliary Optics
|
13 Sep 2013 |
T1300770-v1 |
CASI BRDF Data, #4 oxidized steel 3 deg inc |
Michael Smith |
Upgrades
Auxiliary Optics
|
13 Sep 2013 |
T1300762-v1 |
CASI BRDF Data, #4 oxidized steel 57 deg inc |
Michael Smith |
Upgrades
Auxiliary Optics
|
13 Sep 2013 |
T1300764-v1 |
CASI BRDF Data, DLC 57 deg inc |
Michael Smith |
Upgrades
Auxiliary Optics
|
13 Sep 2013 |
T1300767-v1 |
CASI BRDF Data, DLC 15 deg inc |
Michael Smith |
Upgrades
Auxiliary Optics
|
13 Sep 2013 |
T1300768-v1 |
CASI BRDF Data, DLC 5 deg inc |
Michael Smith |
Upgrades
Auxiliary Optics
|
13 Sep 2013 |
T1300765-v1 |
BRDF Multi-AR SS 30 deg inc |
Michael Smith |
Upgrades
Auxiliary Optics
|
13 Sep 2013 |
T1300766-v1 |
BRDF Multi-AR SS 10 deg inc |
Michael Smith |
Upgrades
Auxiliary Optics
|
13 Sep 2013 |
E1300424-v1 |
Thickness Inspection D0902817–v4 Blade Manifold/Cryo Baf |
Michael Smith |
Incoming Inspection
Auxiliary Optics
|
13 Sep 2013 |
T1200425-v1 |
Wide Angle Scatter from ETM HR |
Michael Smith |
Final Design
Auxiliary Optics
|
13 Sep 2013 |
T1100056-v2 |
Arm Cavity Baffle Edge Scatter |
Michael Smith |
Final Design
Auxiliary Optics
|
13 Sep 2013 |
T1300340-x0 |
AOS SLC Signal Recycling Cavity Baffles Assembly and Installation |
Lisa Austin et al. |
Assembly
Installation
Auxiliary Optics
|
13 Sep 2013 |
T1300719-v1 |
BRDF Multi-AR SS 57 deg inc |
Michael Smith |
Upgrades
Auxiliary Optics
|
27 Aug 2013 |
T1300718-v1 |
BRDF Multi-AR SS 15 deg inc |
Michael Smith |
Upgrades
Auxiliary Optics
|
27 Aug 2013 |
T1300717-v1 |
BRDF Multi-AR SS 3 deg inc |
Michael Smith |
Upgrades
Auxiliary Optics
|
27 Aug 2013 |
T1300716-v1 |
ACB Multi-AR coating on SS |
Michael Smith |
Upgrades
Auxiliary Optics
|
27 Aug 2013 |
E1201074-v6 |
Output Faraday Isolator Assembly and Alignment Procedure |
Michael Smith |
Assembly
Auxiliary Optics
|
26 Aug 2013 |
T1300713-v1 |
OFI Balance Weights for heavy table D0900015-v5 |
Michael Smith |
Upgrades
Auxiliary Optics
|
26 Aug 2013 |
D1300023-v3 |
Table Balance Weight Centered: 1.0#,0.5#, 0.25# |
Michael Smith et al. |
Fabrication
Auxiliary Optics
|
26 Aug 2013 |
D1300098-v2 |
Transport Shim Down |
Michael Smith |
Installation
|
21 Aug 2013 |
T1300695-v1 |
BS Elliptical Baffle--Black Glass Design Scattering Analysis |
Michael Smith |
Upgrades
Auxiliary Optics
|
15 Aug 2013 |
T1300692-v1 |
BS Elliptical Baffle Scatter_Black Glass Design |
Michael Smith |
Upgrades
|
15 Aug 2013 |
T1300591-v2 |
ITM Elliptical Baffle--Black Glass Hybrid Design Scattering Analysis |
Michael Smith |
Upgrades
Auxiliary Optics
|
15 Aug 2013 |
T1300691-v1 |
ACB upgrade SS with black glass |
Michael Smith |
Upgrades
Auxiliary Optics
|
15 Aug 2013 |
T1300689-v2 |
ITM Elliptical Baffle Scatter_Black Glass Hybrid |
Michael Smith |
Upgrades
Auxiliary Optics
|
15 Aug 2013 |
T1100446-v4 |
ITM Elliptical Baffle FD |
Michael Smith et al. |
Final Design
Auxiliary Optics
|
14 Aug 2013 |
T1000194-v3 |
OBSOLETE: OFI Assembly & Installation Hazard Analysis |
Michael Smith |
Final Design
Safety
Auxiliary Optics
|
14 Aug 2013 |
T1300407-v2 |
BS Elliptical baffle scatter |
Michael Smith |
Final Design
Auxiliary Optics
|
14 Aug 2013 |
T1300685-v1 |
ITM Elliptical Baffle Scattered Light Interference Effects |
Michael Smith |
Upgrades
Auxiliary Optics
|
14 Aug 2013 |
T1300324-v2 |
ITM Elliptical Baffle Scatter |
Michael Smith |
Final Design
Auxiliary Optics
|
14 Aug 2013 |
E1300409-v3 |
Install Manifold/Cryo Baf LHO ETM X Test |
Michael Smith et al. |
Subsystem Test
Auxiliary Optics
|
02 Aug 2013 |
E1300388-v2 |
Install Manifold/Cryo Baf LLO ETM Y Test |
Michael Smith |
Subsystem Test
Auxiliary Optics
|
02 Aug 2013 |
T1300657-v1 |
Analysis of DLC and Semiconductor AR Coatings for Stainless Steel Baffles |
Michael Smith |
Upgrades
Auxiliary Optics
|
30 Jul 2013 |
T1300589-x0 |
ACB--Black Glass Hybrid Baffle Design Scattering Analysis |
Michael Smith |
Upgrades
Auxiliary Optics
|
27 Jun 2013 |
E1300420-v2 |
Manifold/cryo baffle Blade Balance Weight |
Michael Smith et al. |
Final Design
Auxiliary Optics
|
21 Jun 2013 |
D1300588-v1 |
ACB 1Hole with Black Glass |
Michael Smith |
Upgrades
Auxiliary Optics
|
21 Jun 2013 |
T1300218-v1 |
Creep of SLC Maraging Steel Suspension Blades |
Michael Smith |
Modelling
Installation
Auxiliary Optics
|
19 Jun 2013 |
T1300414-v2 |
Output Faraday Isolator Blade Creep |
Michael Smith |
Modelling
Auxiliary Optics
|
19 Jun 2013 |
E1100842-v8 |
Specification for Oxidation of Polished Mirror (Super #8) Stainless Steel for aLIGO Baffles and Beam Dumps |
Heidy Kelman et al. |
Fabrication
Auxiliary Optics
|
17 Jun 2013 |
T1300539-v2 |
BS wide-angle Scatter Displacement Noise Summary |
Michael Smith |
Modelling
Auxiliary Optics
|
14 Jun 2013 |
E1300437-x0 |
Repository for Signal Recycling Cavity Baffles Test Results |
Michael Smith |
Subsystem Test
Auxiliary Optics
|
13 Jun 2013 |
T1300538-v1 |
BS_wide-angle_scatter_ZEMAX |
Michael Smith |
Modelling
Auxiliary Optics
|
13 Jun 2013 |
E1300357-x0 |
Repository for Viewport SW Vault Files |
Michael Smith |
Final Design
Auxiliary Optics
|
31 May 2013 |
E1300494-v1 |
OFI Hammer Test LLO HAM5 |
Michael Smith et al. |
Subsystem Test
Auxiliary Optics
|
28 May 2013 |
E1100481-v1 |
Mode Cleaner Tube Baffle & Manifold/Cryopump Baffle Fabrication, Installation, and Test Plan |
Michael Smith |
Final Design
Auxiliary Optics
|
24 May 2013 |
E1300056-v4 |
Output Faraday Isolator Installation and Final Alignment Procedure |
Michael Smith |
Installation
Auxiliary Optics
|
24 May 2013 |
T1300416-v2 |
OFI Beam Height |
Michael Smith |
Final Design
Auxiliary Optics
|
24 May 2013 |
T1300411-v1 |
Manifold/Cryopump Baffle blade spring D902817-v4 |
Michael Smith |
Final Design
Auxiliary Optics
|
17 May 2013 |
E1300440-v1 |
TMS Telescope ZEMAX D0900446-v12_ADLIGO-transmon_5-14-13 |
Michael Smith |
Final Design
Auxiliary Optics
|
17 May 2013 |
D1300476-v1 |
aLigo TMS Telescope Ray Trace 5-15-13 |
Ken Mailand et al. |
Final Design
Auxiliary Optics
|
17 May 2013 |
E1300213-x0 |
aLIGO SLC Testing Documents |
Michael Smith |
Auxiliary Optics
|
15 May 2013 |
E1300371-x0 |
Install BS Elliptical Baffle LHO BSC2 X&YTest |
Michael Smith |
Subsystem Test
Auxiliary Optics
|
15 May 2013 |
E1300405-v1 |
Install ITM Elliptical Baffle LHO BSC2 X&Y Test |
Michael Smith |
Subsystem Test
Auxiliary Optics
|
15 May 2013 |
E1300381-v1 |
Install ITM Elliptical Baffle LLO BSC2 X&Y Test |
Michael Smith |
Subsystem Test
Auxiliary Optics
|
15 May 2013 |
E1300368-v1 |
Install BS Elliptical Baffle LLO BSC2 X&Y Test |
Michael Smith |
Incoming Inspection
Auxiliary Optics
|
15 May 2013 |
E1300392-v1 |
Install Signal Recycling Cavity Baffles LLO HAM5 Test |
Michael Smith |
Subsystem Test
Auxiliary Optics
|
15 May 2013 |
E1300394-v1 |
Install Signal Recycling Cavity Baffles LHO HAM5 Test |
Michael Smith |
Subsystem Test
Auxiliary Optics
|
15 May 2013 |
E1300393-v1 |
Install Signal Recycling Cavity Baffles LHO HAM4 Test |
Michael Smith |
Subsystem Test
Auxiliary Optics
|
15 May 2013 |
E1300441-v1 |
Install Signal Recycling Cavity Baffles LLO HAM4 Test |
Michael Smith |
Subsystem Test
Auxiliary Optics
|
15 May 2013 |
E1300295-x0 |
SLC & VP Materials and fabrication specification |
Michael Smith |
Fabrication
Auxiliary Optics
|
14 May 2013 |
E1300300-x0 |
SLC & VP Safety |
Michael Smith |
Safety
Auxiliary Optics
|
14 May 2013 |
T1300475-v1 |
OFI scattering |
Michael Smith |
Modelling
Auxiliary Optics
|
14 May 2013 |
E1300410-v1 |
Install Manifold/Cryo Baf LHO ETM Y Test |
Michael Smith |
Subsystem Test
Auxiliary Optics
|
14 May 2013 |
E1300408-v1 |
Install Manifold/Cryo Baf LHO ITM Y Test |
Michael Smith |
Subsystem Test
Auxiliary Optics
|
14 May 2013 |
E1300407-v1 |
Install Manifold/Cryo Baf LHO ITM X Test |
Michael Smith |
Subsystem Test
Auxiliary Optics
|
14 May 2013 |
E1300387-v1 |
Install Manifold/Cryo Baf LLO ETM X Test |
Michael Smith |
Subsystem Test
Auxiliary Optics
|
14 May 2013 |
E1300386-v1 |
Install Manifold/Cryo Baf LLO ITM Y Test |
Michael Smith |
Subsystem Test
Auxiliary Optics
|
14 May 2013 |
E1300385-v1 |
Install Manifold/Cryo Baf LLO ITM X Test |
Michael Smith |
Subsystem Test
Auxiliary Optics
|
14 May 2013 |
T1300474-v1 |
H1 SIGNAL RECYCLING CAVITY beam size_3-11-13 |
Michael Smith |
Final Design
Auxiliary Optics
|
14 May 2013 |
E1300391-x0 |
Install Signal Recycling Cavity Baffles LLO HAM4 Test |
Michael Smith |
Subsystem Test
Auxiliary Optics
|
07 May 2013 |
E1300382-x0 |
Install ITM Elliptical Baffle LLO BSC2 Y Test |
Michael Smith |
Subsystem Test
Auxiliary Optics
|
07 May 2013 |
E1300380-x0 |
Install ACB LHO BSC510 Test |
Michael Smith |
Subsystem Test
Auxiliary Optics
|
07 May 2013 |
E1300379-x0 |
Install ACB LHO BSC9 Test |
Michael Smith |
Subsystem Test
Auxiliary Optics
|
07 May 2013 |
E1300378-x0 |
Install ACB LHO BSC3 Test |
Michael Smith |
Subsystem Test
Auxiliary Optics
|
07 May 2013 |
E1300377-x0 |
Install ACB LHO BSC1 Test |
Michael Smith |
Subsystem Test
Auxiliary Optics
|
07 May 2013 |
E1300374-x0 |
Install ACB LLO BSC3 Test |
Michael Smith |
Subsystem Test
Auxiliary Optics
|
07 May 2013 |
E1300373-x0 |
Install ACB LLO BSC1 Test |
Michael Smith |
Subsystem Test
Auxiliary Optics
|
07 May 2013 |
E1300372-x0 |
Install BS Elliptical Baffle LHO BSC2 Y Test |
Michael Smith |
Subsystem Test
Auxiliary Optics
|
07 May 2013 |
T080307-v6 |
Initial Alignment System (IAS) Design Requirements Document (DRD) |
Michael Smith et al. |
Final Design
Auxiliary Optics
|
03 May 2013 |
E1300356-x0 |
Repository for Signal Recycling Cavity Baffles SW Vault Files |
Michael Smith |
Final Design
Auxiliary Optics
|
02 May 2013 |
E1300350-x0 |
Repository for Signal Recycling Cavity Baffles Design Drawings, Interfaces, etc. |
Michael Smith |
Final Design
Auxiliary Optics
|
02 May 2013 |
E1300352-x0 |
Repository for Manifold/Cryopump & Mode Cleaner Tube Baffle Design Drawings, Interfaces, etc. |
Michael Smith |
Final Design
Auxiliary Optics
|
02 May 2013 |
E1300354-x0 |
Repository for ITM Elliptical Baffle Design Drawings, Interfaces, etc. |
Michael Smith |
Final Design
Auxiliary Optics
|
02 May 2013 |
E1300348-x0 |
Repository for ACB Baffle Design Drawings, Interfaces, etc. |
Michael Smith |
Final Design
Auxiliary Optics
|
02 May 2013 |
E1300353-x0 |
Repository for ITM Elliptical Baffle Design Drawings, Interfaces, etc. |
Michael Smith |
Final Design
|
02 May 2013 |
E1300349-x0 |
Repository for Viewport Design Drawings, Interfaces, etc. |
Michael Smith |
Final Design
Auxiliary Optics
|
02 May 2013 |
E1300296-x0 |
SLC & VP Parts and spares inventoried |
Michael Smith |
Installation
|
02 May 2013 |
E1300294-x0 |
SLC & VP Design overview and detailed design documentation |
Michael Smith |
Final Design
Auxiliary Optics
|
02 May 2013 |
E1300270-x0 |
aLIGO AOS SLC/VP Acceptance Directory |
Michael Smith |
Reviews
Auxiliary Optics
|
02 May 2013 |
E1300071-v1 |
ITM Elliptical Baffle Balance Weights |
Michael Smith |
Assembly
Installation
|
02 May 2013 |
E1300337-x0 |
Repository for Signal Recycling Cavity Baffles BOM Docs |
Michael Smith |
Fabrication
Auxiliary Optics
|
02 May 2013 |
E1300347-x0 |
Repository for Signal Recycling Cavity Baffle Final Design Report |
Michael Smith |
Final Design
Auxiliary Optics
|
02 May 2013 |
E1300340-x0 |
Repository for OFI Specification Documents |
Michael Smith |
Fabrication
Auxiliary Optics
|
02 May 2013 |
E1300334-x0 |
Repository for Viewport Specification Documents |
Michael Smith |
Fabrication
Auxiliary Optics
|
01 May 2013 |
E1300339-x0 |
Signal Recycling Cavity Final Design Docs |
Michael Smith |
Final Design
Auxiliary Optics
|
01 May 2013 |
E1300335-x0 |
Repository for Viewport BOM Docs |
Michael Smith |
Detector
Fabrication
Auxiliary Optics
|
01 May 2013 |
E1300328-x0 |
Repository for Viewport Assembly Procedure Documents |
Michael Smith |
Assembly
|
01 May 2013 |
E1000099-v1 |
SLC and Viewports Installation Plan |
Michael Smith |
Installation
|
01 May 2013 |
E1101001-v1 |
Signal Recycling Cavity Baffles Production Plan |
Michael Smith et al. |
Final Design
Auxiliary Optics
|
29 Apr 2013 |
E1101023-v1 |
Signal Recycling Cavity Baffles Fabrication and Installation Test Plan |
Michael Smith et al. |
Final Design
Auxiliary Optics
|
29 Apr 2013 |
T0900269-v2 |
AOS: Stray Light Control (SLC) Preliminary Design |
Mohana Mageswaran et al. |
Preliminary Design
Auxiliary Optics
|
29 Apr 2013 |
T1300426-v1 |
SR3 and SR2 Baffles Hole Edge Scatter |
Michael Smith |
Final Design
Auxiliary Optics
|
25 Apr 2013 |
T1300423-v1 |
HAM Scraper Baffle Height |
Michael Smith |
Final Design
Auxiliary Optics
|
25 Apr 2013 |
T1300417-v1 |
Extinction Ratio of Output Faraday Isolator vs Input Angle |
Michael Smith |
Final Design
Auxiliary Optics
|
25 Apr 2013 |
T1300415-v1 |
Output Faraday Isolator Upper Blade D0900541-v4 |
Michael Smith |
Final Design
Auxiliary Optics
|
25 Apr 2013 |
T1300412-v1 |
Manifold-Cryopump Baffle Scatter |
Michael Smith |
Final Design
Auxiliary Optics
|
25 Apr 2013 |
T1300401-v1 |
wide angle scatter_BS_L1_power |
Michael Smith |
Modelling
Auxiliary Optics
|
25 Apr 2013 |
T1300404-v1 |
ACB scatter |
Michael Smith |
Final Design
Auxiliary Optics
|
25 Apr 2013 |
T1300424-v1 |
Scattering Parameters Hartmann Beams |
Michael Smith |
Final Design
Auxiliary Optics
|
25 Apr 2013 |
T1300422-v1 |
H1 Hartmann ITM Probe Scatter |
Michael Smith |
Final Design
Auxiliary Optics
|
25 Apr 2013 |
T1300421-v1 |
Ghost Beam Scatter in Signal Recycling Cavity |
Michael Smith |
Final Design
Auxiliary Optics
|
25 Apr 2013 |
T1300418-v1 |
TFP Polarizer Wedge Deviation OFI |
Michael Smith |
Final Design
Auxiliary Optics
|
24 Apr 2013 |
T1300413-v1 |
ETM Manifold/cryopump Baffle Mis-alignment IFO Beam Power Loss |
Michael Smith |
Final Design
Auxiliary Optics
|
24 Apr 2013 |
T1300408-v1 |
BS Elliptical Baffle Design |
Michael Smith |
Final Design
Auxiliary Optics
|
24 Apr 2013 |
T1300406-v1 |
Wide Angle Scatter from ITM |
Michael Smith |
Final Design
Auxiliary Optics
|
24 Apr 2013 |
T1300405-v1 |
ACB edge scatter, porcelain vs oxidized SS |
Michael Smith |
Final Design
Auxiliary Optics
|
24 Apr 2013 |
T1300403-v1 |
ETM_wide-angle_scatter_AC_ZEMAX |
Michael Smith |
Final Design
Auxiliary Optics
|
24 Apr 2013 |
T1300402-v1 |
ITM Ellip Baf_blade_D1002753-v5 |
Michael Smith |
Final Design
Auxiliary Optics
|
23 Apr 2013 |
E1300303-v1 |
ITM Ellip Baf Responses to committe |
Michael Smith |
Final Design
Auxiliary Optics
|
23 Apr 2013 |
T1300400-v1 |
arm-cavity-bafffle_blade_D1002608-V4_1-17-13 |
Michael Smith |
Final Design
Auxiliary Optics
|
23 Apr 2013 |
E1200677-v5 |
Advanced LIGO AOS ITM Elliptical Baffle Assembly Procedure |
Lisa Austin et al. |
Assembly
Auxiliary Optics
|
23 Apr 2013 |
E1300293-x0 |
SLC & VP Requirements documentation |
Michael Smith |
Requirements
Auxiliary Optics
|
23 Apr 2013 |
T1300351-v1 |
BRDF measurement_10-15-2007- final1 |
Michael Smith |
Subsystem Test
Auxiliary Optics
|
23 Apr 2013 |
T1300350-v1 |
BRDF summary_porcelain vs polish SS |
Michael Smith |
Subsystem Test
Auxiliary Optics
|
23 Apr 2013 |
T1300348-v1 |
Box oven BRDF_3-29-12 |
Michael Smith |
Subsystem Test
Auxiliary Optics
|
23 Apr 2013 |
T1300349-v1 |
Box oven BRDF summary_3-29-12 |
Michael Smith |
Subsystem Test
Auxiliary Optics
|
23 Apr 2013 |
T080064-v1 |
Controlling Light Scatter in Advanced LIGO |
Dan Riley et al. |
Document Migration
|
23 Apr 2013 |
T1300342-v2 |
OFI Optical Test Results, LLO |
Christopher Guido et al. |
Subsystem Test
Auxiliary Optics
|
23 Apr 2013 |
E1300297-x0 |
SLC & VP Assembly procedures |
Michael Smith |
Assembly
Auxiliary Optics
|
23 Apr 2013 |
E1300299-x0 |
SLC & VP Test documents |
Michael Smith |
System Test
Auxiliary Optics
|
22 Apr 2013 |
E1101018-v5 |
AOS SLC ITM Elliptical Baffle Assembly & Install Hazard Analysis |
Michael Smith |
Final Design
Procurements
Input Optics
Safety
|
17 Apr 2013 |
E1300211-x0 |
aLIGO SLC ACCEPTANCE |
Michael Smith |
Auxiliary Optics
|
25 Mar 2013 |
E070124-v3 |
Septum Window Coating Specification |
Lisa Austin et al. |
Fabrication
Auxiliary Optics
|
18 Mar 2013 |
D0902345-v8 |
Advanced LIGO H2 Optical Layout, ZEMAX |
Michael Smith et al. |
Final Design
System Engineering
|
28 Feb 2013 |
E1101022-v1 |
AOS SLC ITM Elliptical Baffle Test Plan |
Michael Smith |
Final Design
Auxiliary Optics
|
19 Feb 2013 |
D1300016-v3 |
Table Balance Weight Offset 3#, 1#, 0.5#, 0.25# |
Michael Smith et al. |
Fabrication
Auxiliary Optics
|
15 Feb 2013 |
E1101021-v4 |
AOS SLC ITM Elliptical Baffle Installation Procedure |
Michael Smith et al. |
Installation
Auxiliary Optics
|
14 Feb 2013 |
E1300070-v2 |
ACB Balance Weights |
Michael Smith |
Assembly
Installation
Auxiliary Optics
|
18 Jan 2013 |
T1300043-v1 |
Arm Cavity Baffle Shift with Alignment Target |
Michael Smith |
Installation
Auxiliary Optics
|
18 Jan 2013 |
T1000192-v3 |
Output Faraday Isolator Test Plan |
Michael Smith |
Final Design
Auxiliary Optics
|
15 Jan 2013 |
D0901920-v13 |
Advanced LIGO H1 Optical Layout, ZEMAX |
Michael Smith et al. |
Final Design
System Engineering
|
11 Dec 2012 |
E1201011-x0 |
TransMonSUS Assembly & Installation Procedure |
Ken Mailand et al. |
Sensing and Control
Final Design
Auxiliary Optics
|
12 Nov 2012 |
L1200282-v5 |
ALS Beams @ HAM1 |
Michael Smith |
Sensing and Control
Final Design
|
26 Oct 2012 |
T1200452-v3 |
CP & RM Alignment Tolerance Re Scattered Light |
Michael Smith |
Core Optics
Suspensions
Installation
Auxiliary Optics
|
25 Sep 2012 |
E1200660-v3 |
AOS SLC BS Elliptical Baffle Installation Procedure |
Michael Smith et al. |
Final Design
Auxiliary Optics
|
02 Aug 2012 |
E1200662-v2 |
AOS SLC BS Elliptical Baffle Production Plan |
Michael Smith et al. |
Final Design
Auxiliary Optics
|
30 Jul 2012 |
E1200661-v1 |
AOS SLC BS Elliptical Baffle Fabrication, Installation, and Test Plan |
Michael Smith |
Final Design
Auxiliary Optics
|
03 Jul 2012 |
E000358-x0 |
Document Change Notice (DCN) |
Michael Smith |
Document Migration
|
28 Jun 2012 |
E000357-x0 |
Document Change Notice (DCN) |
Michael Smith |
Document Migration
|
28 Jun 2012 |
E000328-x0 |
Document Change Notice (DCN) |
Michael Smith |
Document Migration
|
28 Jun 2012 |
E990324-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
28 Jun 2012 |
E990311-x0 |
Process Traveler, Rev. 01 |
Michael Smith |
Document Migration
|
28 Jun 2012 |
E990310-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
28 Jun 2012 |
E990309-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
28 Jun 2012 |
E990308-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
28 Jun 2012 |
E990279-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
28 Jun 2012 |
E990237-x0 |
Document Change Notice (DCN) |
Michael Smith |
Document Migration
|
28 Jun 2012 |
E990159-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
28 Jun 2012 |
E990119-x0 |
Document Change Notice (DCN) |
Michael Smith |
Document Migration
|
28 Jun 2012 |
E1101147-v3 |
OBSOLETE: H1_recycling-cavity-length-0.076wedge |
Michael Smith |
Final Design
System Engineering
|
31 May 2012 |
E1101146-v3 |
OBSOLETE: L1_recycling-cavity-length-0.076wedge |
Michael Smith |
Final Design
System Engineering
|
31 May 2012 |
E1101148-v3 |
OBSOLETE: H2_recycling-cavity-length-0.076wedge |
Michael Smith |
Final Design
System Engineering
|
31 May 2012 |
E1100688-v1 |
OBSOLETE: aLIGO PRM and SRM TIlt Angles |
Michael Smith |
Modelling
System Engineering
|
31 May 2012 |
T1200257-v1 |
BS Wide Angle Scatter from HAM3 HAM4 Offset Spool Flanges_Mathcad |
Michael Smith |
Auxiliary Optics
|
23 May 2012 |
T1200256-v1 |
HAM3, HAM4 Offset Spool Flange Scattering |
Michael Smith |
Auxiliary Optics
|
23 May 2012 |
E1200321-v3 |
Protected Silver High Reflectance Coating |
Michael Smith |
Auxiliary Optics
|
15 May 2012 |
E0900349-v12 |
ETM Telescope Secondary Parabolic Mirror, ADLIGO |
Michael Smith et al. |
Final Design
Auxiliary Optics
|
15 May 2012 |
T080210-v1 |
AOS: Stray Light Control (SLC) Conceptual Design, Stable Recycling Cavity |
Michael Smith |
Document Migration
|
07 May 2012 |
T1200188-v1 |
ETM Transmission Monitor Telescope Performance |
Michael Smith |
Conceptual Design
Auxiliary Optics
|
26 Apr 2012 |
T1200175-v1 |
bLCGT TM Wide Angle Baffle, Manifold Baffle, and Beam Tube Baffle Conceptual Design |
Michael Smith |
Conceptual Design
Auxiliary Optics
|
18 Apr 2012 |
T1200176-v1 |
bLCGT Recycling Cavity Baffles Conceptual Design |
Michael Smith |
Conceptual Design
Auxiliary Optics
|
18 Apr 2012 |
E1200391-v1 |
bLCGT Cavity Lengths |
Michael Smith |
Conceptual Design
Auxiliary Optics
|
18 Apr 2012 |
G1200154-v8 |
AOS SLC Stray Light Control and Viewports |
Lisa Austin et al. |
NSF
Auxiliary Optics
|
09 Apr 2012 |
E1101002-v1 |
AOS SLC ITM Elliptical Baffle Production Plan |
Michael Smith |
Final Design
Auxiliary Optics
|
26 Mar 2012 |
T0900304-v2 |
Advanced LIGO Thermal Compensation System Preliminary Design |
Michael Smith et al. |
Preliminary Design
Auxiliary Optics
|
19 Mar 2012 |
E1200098-v2 |
1.0 inch OFI Wedge Prism Specification |
Michael Smith |
Auxiliary Optics
|
11 Mar 2012 |
D1102016-v1 |
aLIGO AOS HAM FLAT BEAM DUMP ASSY |
Michael Smith |
Final Design
Auxiliary Optics
|
15 Feb 2012 |
E1101200-v1 |
6in VP Type 1 Run Numbers-Serial Numbers |
Michael Smith |
Incoming Inspection
|
15 Dec 2011 |
E1101199-v1 |
6in VP Type 1 AR data |
Michael Smith |
Incoming Inspection
|
15 Dec 2011 |
L1100262-v1 |
Comments and Questions re: T1100517 HWS Final Design Review_MRS |
Michael Smith |
Final Design
Auxiliary Optics
|
29 Nov 2011 |
M1100272-x0 |
RODA to Incorporate In-vacuum Periscopes for ETM HR Video Cameras |
Michael Smith |
Sensing and Control
Memorandum
Auxiliary Optics
|
31 Oct 2011 |
L1100197-v4 |
Trade-off: porcelain coating vs. oxidized polished stainless steel for ACB |
Michael Smith |
Fabrication
Auxiliary Optics
|
04 Oct 2011 |
T1100113-v3 |
Mitigation Of Wide Angle Scatter From Hr Surface Of The Test Mass with the Arm Cavity Baffle |
Michael Smith |
Final Design
Auxiliary Optics
|
03 Oct 2011 |
L1100202-v1 |
Hybrid fabrication of ACB using black glass and oxidized polished stainless steel |
Michael Smith |
Final Design
Auxiliary Optics
|
07 Sep 2011 |
T1100325-v1 |
SLC Manifold/Cryopump Baffle Interface Control Document |
Michael Smith |
Final Design
Auxiliary Optics
|
16 Jun 2011 |
E1100538-x0 |
SLC Manifold/Cryopump Baffle Interface Control Document |
Michael Smith |
Final Design
Auxiliary Optics
|
14 Jun 2011 |
T1100258-v4 |
TMS Telescope Alignment |
Michael Smith et al. |
Final Design
Auxiliary Optics
|
08 Jun 2011 |
T0900239-v1 |
AOS: Optical Lever and Viewport Conceptual Design |
Robert Schofield et al. |
Auxiliary Optics
|
19 May 2009 |
T1100128-v2 |
aLIGO Beamsplitter coating angular acceptance based on as built wedges |
GariLynn Billingsley et al. |
Final Design
Core Optics
|
16 May 2011 |
G1100451-v3 |
AOS SLC Technical Talk aLIGO NSF Review SLC and VP 25-27 April 2011 |
Michael Smith |
Meeting
Detector
|
05 May 2011 |
E1100050-v5 |
Responses to AOS SLC ACB FDR Questions |
Mohana Mageswaran et al. |
Final Design
Auxiliary Optics
|
08 Apr 2011 |
E1100247-v1 |
Viewport Production Plan |
Michael Smith |
Final Design
Auxiliary Optics
|
13 Mar 2011 |
E1000892-v1 |
Arm Cavity Baffle Fabrication, Installation, and Test Plan |
Michael Smith |
Final Design
Auxiliary Optics
|
22 Mar 2011 |
T1000022-v4 |
Viewports Subsystem Requirements Document |
Michael Smith |
Requirements
Auxiliary Optics
|
21 Mar 2011 |
E1000246-v6 |
6.0 inch Vacuum Viewport Specification |
Michael Smith et al. |
Final Design
|
21 Mar 2011 |
E1100259-v1 |
IO Viewports List |
Michael Smith |
Final Design
Auxiliary Optics
|
18 Mar 2011 |
D1001678-v1 |
6.0 inch Vacuum Viewport |
Michael Smith |
Preliminary Design
Auxiliary Optics
|
12 Mar 2011 |
E1100093-x0 |
DCN 6in Vacuum Viewport |
Michael Smith |
Final Design
Detector
|
12 Mar 2011 |
E1100245-x0 |
DCN 6in Vacuum Viewport |
Michael Smith |
Final Design
Auxiliary Optics
|
12 Mar 2011 |
T1100059-v1 |
SLC Baffle Heights |
Michael Smith |
Final Design
Auxiliary Optics
|
25 Jan 2011 |
T980072-v1 |
COS IR Autocollimator Alignment System |
Michael Smith |
Final Design
|
24 Jan 2011 |
E1000891-v1 |
Arm Cavity Baffle Production Plan |
Michael Smith |
Final Design
Auxiliary Optics
|
03 Jan 2011 |
T1000023-v1 |
Viewports Subsystem Preliminary Design Document |
Michael Smith |
Preliminary Design
Auxiliary Optics
|
23 Dec 2010 |
T1000700-v2 |
Transmon Telescope Mirror Test Procedure |
Michael Smith et al. |
Final Design
Subsystem Test
Incoming Inspection
Auxiliary Optics
|
21 Dec 2010 |
E1000601-v2 |
aLIGO Optical Lever Coordinates, H1 |
Ignacio Romero et al. |
Final Design
Auxiliary Optics
|
16 Dec 2010 |
E1000607-v2 |
aLIGO Optical Lever Coordinates, H2 |
Ignacio Romero et al. |
Final Design
Auxiliary Optics
|
16 Dec 2010 |
E1000608-v2 |
aLIGO Optical Lever Coordinates, L1 |
Ignacio Romero et al. |
Final Design
Auxiliary Optics
|
14 Dec 2010 |
T1000726-v1 |
ALS Arm Cavity Baffle Photodetector Array |
Michael Smith |
Final Design
Auxiliary Optics
|
08 Dec 2010 |
T0900653-v2 |
MCA TUBE AND MCB TUBE VIEWPORTS |
Michael Smith |
Final Design
Vacuum
System Engineering
Auxiliary Optics
|
03 Nov 2010 |
E1000439-x0 |
DCN ETM Telescope Secondary Parabolic Mirror, ADLIGO, v9 |
Michael Smith |
Final Design
Auxiliary Optics
|
26 Oct 2010 |
E1000638-x0 |
DCN ETM Telescope Primary Parabolic Mirror, ADLIGO, v7 |
Michael Smith |
Final Design
Auxiliary Optics
|
26 Oct 2010 |
T1000275-v2 |
Transmon SUS Telescope Alignment Procedure |
Michael Smith |
Preliminary Design
Auxiliary Optics
|
22 Oct 2010 |
E1000519-x0 |
DCN: Output Faraday Rotator component specification |
Michael Smith |
Final Design
Auxiliary Optics
|
04 Oct 2010 |
E1000438-x0 |
DCN ETM Telescope Primary Parabolic Mirror, ADLIGO |
Michael Smith |
Final Design
|
17 Sep 2010 |
T1000493-v1 |
Initial Alignment of PR3, ITM, and ETM prior to 1st Light Down the Arms |
Michael Smith |
Installation
Auxiliary Optics
|
14 Sep 2010 |
E1000409-x0 |
DCN ETM Telescope Secondary Parabolic Mirror, ADLIGO, v7 |
Michael Smith |
Final Design
|
14 Sep 2010 |
E1000322-x0 |
DCN 6in Vacuum Viewport |
Michael Smith |
Final Design
Auxiliary Optics
|
16 Aug 2010 |
E1000316-x0 |
DCN ETM Telescope Secondary Parabolic Mirror, ADLIGO, v6 |
Michael Smith |
Final Design
|
11 Aug 2010 |
E1000315-x0 |
DCN ETM Telescope Primary Parabolic Mirror, ADLIGO |
Michael Smith |
Final Design
|
11 Aug 2010 |
T1000308-v1 |
AOS: Stray Light Control (SLC)-- Output Faraday Isolator FDR Responses |
Michael Smith et al. |
Final Design
Auxiliary Optics
|
29 Jun 2010 |
T0900324-v2 |
Design Equations for Initially Flat Blade Springs at Arbitrary Mounting Angles |
Michael Smith |
Preliminary Design
Auxiliary Optics
|
24 Jun 2010 |
E1000201-x0 |
DCN ETM Telescope Secondary Parabolic Mirror, ADLIGO, v5 |
Michael Smith |
Preliminary Design
Auxiliary Optics
|
04 Jun 2010 |
T1000191-v1 |
Output Faraday Isolator Drawing Package |
Michael Smith et al. |
Final Design
Auxiliary Optics
|
24 May 2010 |
E1000127-x0 |
Output Faraday Isolator Installation Procedure |
Michael Smith |
Final Design
Auxiliary Optics
|
12 Apr 2010 |
E1000117-x0 |
DCN: Output Faraday Rotator component specification |
Michael Smith |
Final Design
Auxiliary Optics
|
06 Apr 2010 |
E1000106-x0 |
DCN ETM Telescope Primary Parabolic Mirror, ADLIGO |
Michael Smith |
Final Design
|
01 Apr 2010 |
E1000105-x0 |
DCN ETM Telescope Secondary Parabolic Mirror, ADLIGO, v4 |
Michael Smith |
Preliminary Design
|
01 Apr 2010 |
T1000147-v1 |
TGG Crystal Wedge Angle for aLIGO Output Faraday Isolator |
Michael Smith |
Fabrication
Auxiliary Optics
|
17 Mar 2010 |
T0900453-v2 |
ETM-Telescope, Comparison of Off-axis Parabolic Telescope with Spherical Mirror Secondary, or Triplet Lens |
Michael Smith |
Preliminary Design
Auxiliary Optics
|
12 Mar 2010 |
E1000063-x0 |
DCN ETM Telescope Primary Parabolic Mirror, ADLIGO |
Michael Smith |
Final Design
Detector
|
03 Mar 2010 |
M080041-v1 |
Thickness of PR3 and SR3 and wedge information |
Norna Robertson |
Final Design
Suspensions
|
26 Feb 2010 |
E980131-v1 |
Output Faraday Isolator, 20 mm Specification |
Michael Smith |
Final Design
Auxiliary Optics
|
26 Feb 2010 |
E1000051-x0 |
DCN output Faraday isolator component specification |
Michael Smith |
Final Design
Auxiliary Optics
|
26 Feb 2010 |
G1000029-v1 |
Gravitational Waves and Precision Measurement |
Michael Smith |
Meeting
Detector
|
09 Feb 2010 |
E1000009-x0 |
DCN ETM Telescope Secondary Parabolic Mirror, ADLIGO |
Michael Smith |
Detector
Preliminary Design
|
15 Jan 2010 |
P1000002-v1 |
Scattered Light Control in Advanced LIGO |
Michael Smith |
Auxiliary Optics
|
07 Jan 2010 |
P070125-x0 |
dc readout experiment at the Caltech 40m prototype interferometer |
Robert Ward et al. |
Document Migration
Public relations
|
19 Oct 2009 |
G0900670-v2 |
Stray Light Control in Advanced LIGO |
Michael Smith |
Auxiliary Optics
|
07 Aug 2009 |
T0900334-v2 |
Response to Stray Light Control PDD Comments |
Michael Smith |
Preliminary Design
Auxiliary Optics
|
09 Jul 2009 |
T000083-v1 |
COS Faraday Isolator Pre-alignment Procedure |
Michael Smith |
Installation
|
07 Jul 2009 |
T080325-v1 |
Earthquake Stop Scatter |
Michael Smith |
Final Design
Suspensions
Auxiliary Optics
|
16 Apr 2009 |
T080308-v1 |
IAS Conceptual Design Document |
Michael Smith |
Conceptual Design
Auxiliary Optics
|
17 Mar 2009 |
T080277-v1 |
BS, CP, RM, ITM and ETM Wedge Angle Tolerance |
Michael Smith |
Core Optics
|
24 Feb 2009 |
T0810032-v1 |
ETM Transmon Pupil Relay |
Michael Smith |
Sensing and Control
Conceptual Design
Auxiliary Optics
|
24 Feb 2009 |
T080146-x0 |
Specification and Drawing Review Notes for Input Optics Long Lead Procurement Readiness Review |
GariLynn Billingsley et al. |
Document Migration
|
11 Jun 2008 |
T080120-x0 |
Retro-reflection from the ITM and ETM Flats and Barrel in the Arm Cavity |
Michael Smith |
Document Migration
|
04 Jun 2008 |
T080073-x0 |
ETM Reaction Mass Optical Irregularity Effect on the ETM Output Spot Size |
Michael Smith |
Document Migration
|
14 Apr 2008 |
G070025-x0 |
COMPARISON: ADLIGO UNSTABLE VS STABLE RECYCLING CAVITY OPTICAL LAYOUT |
Michael Smith |
Document Migration
|
11 Apr 2008 |
E030304-x0 |
Process Traveler - errant beam baffle LHO 6-2-03 |
Michael Smith |
Document Migration
|
12 Dec 2007 |
E050336-x0 |
Document Change Notice (DCN) - OMC Assembly |
Michael Smith |
Document Migration
|
21 Nov 2007 |
T070248-x0 |
Advanced LIGO Input Optics Preliminary Design Review Report |
Dennis Coyne et al. |
Document Migration
|
06 Nov 2007 |
D050379-x0 |
OUTPUT MODECLEANER ASSY |
Michael Smith |
Document Migration
|
12 Oct 2007 |
D050366-x0 |
BEZEL OMC |
Michael Smith |
Document Migration
|
12 Oct 2007 |
D050369-x0 |
BODY OMC |
Michael Smith |
Document Migration
|
12 Oct 2007 |
D050370-x0 |
COVER OMC |
Michael Smith |
Document Migration
|
12 Oct 2007 |
G070601-x0 |
Photon Calibrator DRR & CDR: Response to Reviewer`s Report |
Michael Smith et al. |
Document Migration
|
05 Oct 2007 |
T070062-x0 |
AOS: Stray Light Control (SLC) Conceptual Design |
Michael Smith |
Document Migration
|
17 Sep 2007 |
T070167-x0 |
Photon Calibrator Conceptual Design |
Michael Smith et al. |
Document Migration
|
16 Aug 2007 |
T060153-x0 |
Degenerate RC Core Optics Position & Orientation (Some revisions to T010076) |
Michael Smith |
Document Migration
|
25 May 2007 |
E990086-x0 |
COMPONENT SPECIFICATION - COS Viewport Window |
Jonathan Kern et al. |
Document Migration
|
05 Apr 2007 |
T060232-x0 |
A)S: Optical Lever System & Viewports Conceptual Design Requirements |
Michael Smith |
Document Migration
|
27 Oct 2006 |
T060360-x0 |
AOS: PO Mirror Assembly & Telescope, and OMMT Conceptual Design Requirements |
Michael Smith |
Document Migration
|
27 Oct 2006 |
G060498-x0 |
Thermal Compensation System Design Requirement and Conceptual Design Review Presentation - LSC Meeting, August 14-17th, 2006 @ Louisiana State University |
Michael Smith et al. |
Document Migration
|
20 Sep 2006 |
G060402-x0 |
Caltech 40m Lab Update - LSC Meeting, August 14-17th, 2006 @ Louisiana State University |
Benjamin Abbott et al. |
Document Migration
|
18 Aug 2006 |
E050222-x0 |
Document Change Notice (DCN) - OUTPUT MODE MATCHING TELESCOPE (OMMT) ASSEMBLY, 40M |
Michael Smith |
Document Migration
|
10 Jul 2006 |
G060127-x0 |
Results of 40m prototype - LSC Meeting, March 19-22, 2006, Hanford WA |
Benjamin Abbott et al. |
Document Migration
|
14 Apr 2006 |
D050372-x0 |
PZT ALIGNMENT FIXTURE OMC |
Michael Smith |
Document Migration
|
02 Nov 2005 |
D050317-x0 |
PINHOLE ALIGNMENT FIXTURE |
Michael Smith |
Document Migration
|
31 Oct 2005 |
D050319-x0 |
SECONDARY MIRROR HOLDER |
Michael Smith |
Document Migration
|
31 Oct 2005 |
D050320-x0 |
BASE PLATE, OMMT |
Michael Smith |
Document Migration
|
31 Oct 2005 |
D050313-x0 |
SECONDARY STEERING MIRROR |
Michael Smith |
Document Migration
|
31 Oct 2005 |
G050568-x0 |
Optical Spring and Optical Resonance in the 40m Detuned RSE Interferometer |
Benjamin Abbott et al. |
Document Migration
|
31 Oct 2005 |
D050316-x0 |
PRIMARY ALIGNMENT MIRROR |
Michael Smith |
Document Migration
|
31 Oct 2005 |
D050315-x0 |
SECONDARY ALIGNMENT MIRROR |
Michael Smith |
Document Migration
|
31 Oct 2005 |
D050367-x0 |
AG WASHER OMC |
Michael Smith |
Document Migration
|
31 Oct 2005 |
D050327-x0 |
FLEXURE ADJUSTING SCREW |
Michael Smith |
Document Migration
|
31 Oct 2005 |
D050326-x0 |
9962 LENS POST MOD |
Michael Smith |
Document Migration
|
31 Oct 2005 |
D050308-x0 |
OMMT Assembly, 40M |
Michael Smith |
Document Migration
|
31 Oct 2005 |
D020516-x0 |
FLEXURE, 40M IFO MMT |
Michael Smith |
Document Migration
|
31 Oct 2005 |
D050325-x0 |
LH-1 VAC MOD |
Michael Smith |
Document Migration
|
31 Oct 2005 |
D050323-x0 |
OUTRIGGER PLATE |
Michael Smith |
Document Migration
|
31 Oct 2005 |
D050318-x0 |
PRIMARY MIRROR HOLDER, OMMT |
Michael Smith |
Document Migration
|
31 Oct 2005 |
D050371-x0 |
PZT END CAP OMC |
Michael Smith |
Document Migration
|
31 Oct 2005 |
D050322-x0 |
DLC OUTRIGGER BASE |
Michael Smith |
Document Migration
|
31 Oct 2005 |
G050324-x0 |
Plans for DC Readout Experiment at the 40m Lab |
Benjamin Abbott et al. |
Document Migration
|
08 Sep 2005 |
T050066-x0 |
Beamsplitter Diffraction Loss (Advanced LIGO) |
Michael Smith |
Document Migration
|
22 Jun 2005 |
T050064-x0 |
Thermal Compensation System Description |
Stefan Ballmer et al. |
Document Migration
|
10 May 2005 |
T040057-x0 |
Heating Beam Pattern Optical Design CO2 Laser Thermal Compensation Bench |
Gerardo Moreno et al. |
Document Migration
|
30 Nov 2004 |
G040172-x0 |
Thermal Compensation Installation at LHO - GR17, July 18-23, 2004, Dublin Ireland |
Stefan Ballmer et al. |
Document Migration
|
30 Nov 2004 |
G040456-x0 |
Modeling and Prototyping a Zoom Telescope for LIGO Optical Levers |
D Mckay et al. |
Document Migration
|
12 Oct 2004 |
T030245-x0 |
LIGO Caltech 40-Meter PSL Supplemental Report |
Benjamin Abbott et al. |
Document Migration
|
10 Aug 2004 |
E040280-x0 |
Document Change Notice (DCN) - Thermal Compensation, CO2 Laser Mask Projector |
Michael Smith |
Document Migration
|
16 Jun 2004 |
D040098-x0 |
BESSEL APERTURE_REV1 ASSY |
Michael Smith |
Document Migration
|
15 Jun 2004 |
D040080-x0 |
OPTICAL BENCH SUPPORT BAR_1 HOLE |
Michael Smith |
Document Migration
|
15 Jun 2004 |
D040079-x0 |
OPTICAL BENCH SUPPORT BAR_2 HOLE |
Michael Smith |
Document Migration
|
15 Jun 2004 |
D030807-x0 |
FIXED BASE--METRIC |
Michael Smith |
Document Migration
|
15 Jun 2004 |
D040169-x0 |
AIM LASER MOUNT |
Michael Smith |
Document Migration
|
15 Jun 2004 |
D040099-x0 |
FIXED APERTURE ASSY |
Michael Smith |
Document Migration
|
15 Jun 2004 |
D040174-x0 |
POLARIZER PEDESTAL |
Michael Smith |
Document Migration
|
15 Jun 2004 |
D040035-x0 |
MASK BESSEL |
Michael Smith |
Document Migration
|
15 Jun 2004 |
D040272-x0 |
MASK FLIPPER ASSY |
Michael Smith |
Document Migration
|
15 Jun 2004 |
D040033-x0 |
MASK CENTRAL |
Michael Smith |
Document Migration
|
15 Jun 2004 |
D030804-x0 |
BACKING PLATE 4.5 IN |
Michael Smith |
Document Migration
|
15 Jun 2004 |
D040269-x0 |
2.625 DIA ELLIP MIRROR ASSY |
Michael Smith |
Document Migration
|
15 Jun 2004 |
D040058-x0 |
TUBE AUX MIRROR MOUNT |
Michael Smith |
Document Migration
|
15 Jun 2004 |
D040097-x0 |
BESSEL APERTURE_REV1 |
Michael Smith |
Document Migration
|
15 Jun 2004 |
D040057-x0 |
BASE AUX MIRROR MOUNT |
Michael Smith |
Document Migration
|
15 Jun 2004 |
D040034-x0 |
MASK ANNULAR 0.126 ID |
Michael Smith |
Document Migration
|
15 Jun 2004 |
D040166-x0 |
POLARIZER HOUSING ASSY |
Michael Smith |
Document Migration
|
15 Jun 2004 |
D030802-x0 |
MIRROR MOUNT BRACKET 4.5 IN |
Michael Smith |
Document Migration
|
15 Jun 2004 |
D040062-x0 |
MASK BESSEL ASSY |
Michael Smith |
Document Migration
|
15 Jun 2004 |
D040056-x0 |
RISER AUX MIRROR MOUNT |
Michael Smith |
Document Migration
|
15 Jun 2004 |
D030803-x0 |
MODIFICATION 4.5 IN MIRROR MT |
Michael Smith |
Document Migration
|
15 Jun 2004 |
D040270-x0 |
6 IN PARABOLIC MIRROR ASSY |
Michael Smith |
Document Migration
|
15 Jun 2004 |
D030809-x0 |
FIXED MOUNT 6 IN |
Michael Smith |
Document Migration
|
15 Jun 2004 |
D040173-x0 |
FIXED BASE_ENGLISH |
Michael Smith |
Document Migration
|
15 Jun 2004 |
D040055-x0 |
IRIS DIAPHRAGM PEDESTAL |
Michael Smith |
Document Migration
|
15 Jun 2004 |
D040095-x0 |
FIXED APERTURE |
Michael Smith |
Document Migration
|
15 Jun 2004 |
D030800-x0 |
HOLD DOWN SPACER 6 IN |
Michael Smith |
Document Migration
|
15 Jun 2004 |
D040175-x0 |
ASSEMBLY, CO2 LASER PROJECTOR 2K |
Michael Smith |
Document Migration
|
15 Jun 2004 |
D040273-x0 |
45 DEGREE MIRROR ASSY |
Michael Smith |
Document Migration
|
15 Jun 2004 |
D040263-x0 |
PD MOUNT |
Michael Smith |
Document Migration
|
15 Jun 2004 |
D030808-x0 |
45 DEG MIRROR ADAPTER |
Michael Smith |
Document Migration
|
15 Jun 2004 |
D030801-x0 |
BACKING PLATE 6 IN |
Michael Smith |
Document Migration
|
15 Jun 2004 |
D040167-x0 |
POLARIZER HOUSING |
Michael Smith |
Document Migration
|
15 Jun 2004 |
D040003-x0 |
ASSEMBLY, C02 LASER PROJECTOR 4K |
Michael Smith |
Document Migration
|
15 Jun 2004 |
D040061-x0 |
AUX MIRROR MOUNT ASSY |
Michael Smith |
Document Migration
|
15 Jun 2004 |
D030805-x0 |
HOLD DOWN SPACER 4.5 IN |
Michael Smith |
Document Migration
|
15 Jun 2004 |
G040081-x0 |
40m Laboratory Upgrade Progress Report - LSC Meeting, March 15 - 18th, Livingston, LA |
Benjamin Abbott et al. |
Document Migration
|
18 Mar 2004 |
T030141-x0 |
Errant Beam Baffle Installation LLO and LHO |
Michael Smith |
Document Migration
|
17 Sep 2003 |
D030176-x0 |
LOCATOR, BREWSTER MIRROR |
Michael Smith |
Document Migration
|
01 Jul 2003 |
D030175-x0 |
PLATFORM, BREWSTER MIRROR |
Michael Smith |
Document Migration
|
01 Jul 2003 |
D030177-x0 |
CLIP, BREWSTER MIRROR |
Michael Smith |
Document Migration
|
01 Jul 2003 |
E030164-x0 |
Document Change Notice (DCN): Brewster Mirror Assembly, Rev. 02 |
Michael Smith |
Document Migration
|
23 Jun 2003 |
E030143-x0 |
Document Change Notice (DCN) - Spectrum Analyzer Mount (D030167-A), Rev. 02 |
Michael Smith |
Document Migration
|
23 Jun 2003 |
G030206-x0 |
Hydraulic Actuators for Advanced LIGO and LIGO I - Aspen Conference 2003 |
Rich Abbott et al. |
Document Migration
|
17 Apr 2003 |
D030167-x0 |
Spectrum Analyzer Mount |
Michael Smith |
Document Migration
|
16 Apr 2003 |
T030028-x0 |
Faraday Isolator Alignment Procedure, 40M IFO |
Michael Smith |
Document Migration
|
25 Feb 2003 |
T030006-x0 |
Errant Beam Analysis, LIGO 1 |
Michael Smith |
Document Migration
|
22 Jan 2003 |
D980414-x0 |
ETM Transmission Monitor Assembly |
Michael Smith |
Document Migration
|
22 Jan 2003 |
T020203-x0 |
40 Meter Focal Lengthy Zoom Objective Lens for Optical Lever System-Position Memory |
Michael Smith |
Document Migration
|
03 Jan 2003 |
T020202-x0 |
Pre-Alignment of VIRGO Interferometer |
Michael Smith |
Document Migration
|
03 Jan 2003 |
T020204-x0 |
Beam Deviation Due to De-centering of Power Recycling Mirror Curved Surface |
Michael Smith |
Document Migration
|
03 Jan 2003 |
G020437-x0 |
Photon Actuation R & D Program |
Michael Smith |
Document Migration
|
09 Oct 2002 |
T020119-x0 |
IO Position and Angle Sensing System, 40m IFO |
Michael Smith |
Document Migration
|
03 Sep 2002 |
E010221-x0 |
Document Change Notice (DCN) |
Michael Smith |
Document Migration
|
20 May 2002 |
G020113-x0 |
Current Work on Hydraulics for LIGO I - LSC Meeting, March 20 - 23, Livingston LA |
Rich Abbott et al. |
Document Migration
|
08 Apr 2002 |
T010120-x0 |
40m Auxiliary Optics Support System Design Requirements Document & Conceptual Design |
Michael Smith |
Document Migration
|
07 Feb 2002 |
T980101-x0 |
Up-Conversion of Scattered Light Phase Noise from Large Amplitude Motions |
Michael Smith |
Document Migration
|
07 Feb 2002 |
E010094-x0 |
Installation Specification - Re-alignment of the LLO 4K Interferometer Vertex Region |
Dennis Coyne et al. |
Document Migration
|
06 Feb 2002 |
T010117-x0 |
40m Optical Systems and Sensing, Design Requirements Document & Conceptual Design |
Michael Smith |
Document Migration
|
13 Dec 2001 |
T010115-x0 |
Conceptual Design of the 40 meter Laboratory Upgrade for Prototyping a Advanced LIGO Interferometer |
Benjamin Abbott et al. |
Document Migration
|
26 Nov 2001 |
T000065-x0 |
COS 4K IFO Alignment Procedure |
Michael Smith |
Document Migration
|
28 Jun 2001 |
E000453-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
17 Oct 2000 |
E990376-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
15 Aug 2000 |
E000258-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
08 Aug 2000 |
E000131-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
08 Aug 2000 |
E000343-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
08 Aug 2000 |
E000157-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
08 Aug 2000 |
E000228-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
08 Aug 2000 |
E000227-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
08 Aug 2000 |
E000048-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
08 Aug 2000 |
E000124-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
08 Aug 2000 |
E000156-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
08 Aug 2000 |
E000169-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
08 Aug 2000 |
E000189-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
08 Aug 2000 |
E000318-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
08 Aug 2000 |
E000125-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
08 Aug 2000 |
E000172-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
08 Aug 2000 |
E000223-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
08 Aug 2000 |
E000271-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
08 Aug 2000 |
E000229-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
08 Aug 2000 |
E000319-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
08 Aug 2000 |
E000164-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
08 Aug 2000 |
E000191-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
08 Aug 2000 |
E000129-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
08 Aug 2000 |
E000050-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
08 Aug 2000 |
E000224-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
08 Aug 2000 |
E000192-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
08 Aug 2000 |
E000151-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
08 Aug 2000 |
E000176-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
08 Aug 2000 |
E000190-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
08 Aug 2000 |
E000163-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
08 Aug 2000 |
E000230-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
08 Aug 2000 |
E000342-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
08 Aug 2000 |
E000158-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
08 Aug 2000 |
E000051-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
08 Aug 2000 |
E000049-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
08 Aug 2000 |
E000175-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
08 Aug 2000 |
E000272-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
08 Aug 2000 |
E000149-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
08 Aug 2000 |
E000162-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
08 Aug 2000 |
E990370-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
08 Aug 2000 |
E000226-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
08 Aug 2000 |
E000154-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
08 Aug 2000 |
E000221-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
08 Aug 2000 |
E000225-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
08 Aug 2000 |
E000148-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
08 Aug 2000 |
E000152-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
08 Aug 2000 |
E000165-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
08 Aug 2000 |
D980341-x0 |
ETM Transmission Monitor, Alignment Sensing Control, Rev. B |
Michael Smith et al. |
Document Migration
|
22 May 2000 |
D000093-x0 |
ETM Cover Plate, Bottom, Rev. A |
Michael Smith |
Document Migration
|
21 May 2000 |
D000005-x0 |
Support Bracket, ETM Camera, Rev. B |
Michael Smith et al. |
Document Migration
|
21 May 2000 |
D000004-x0 |
Support Mount, ETM Camera, Rev. B |
Michael Smith et al. |
Document Migration
|
21 May 2000 |
D000094-x0 |
BSC2, Optical Lever Assembly |
Michael Smith |
Document Migration
|
24 Mar 2000 |
G000008-x0 |
Scattered Light Control in LIGO, 2000 Aspen Winter Conference |
Michael Smith |
Document Migration
|
14 Mar 2000 |
E990399-x0 |
Process Traveler: ETM Telescope Assembly, 004 |
Michael Smith |
Document Migration
|
02 Mar 2000 |
E000031-x0 |
Process Traveler: 4K IO Baffle, LLO |
Michael Smith |
Document Migration
|
01 Mar 2000 |
E990446-x0 |
Process Traveler: 4K IO Baffle |
Michael Smith |
Document Migration
|
01 Mar 2000 |
E000042-x0 |
Process Traveler: Mode Cleaner Baffle, LHO, Rev. 01 |
Michael Smith |
Document Migration
|
01 Mar 2000 |
E000086-x0 |
Process Traveler: High Vac Mirror Mount Assembly |
Michael Smith |
Document Migration
|
01 Mar 2000 |
E000030-x0 |
Process Traveler: 4K IO Baffle, LHO |
Michael Smith |
Document Migration
|
01 Mar 2000 |
E000012-x0 |
Process Traveler: LHO Pick Off Telescope, Rev. 01 |
Michael Smith |
Document Migration
|
01 Mar 2000 |
E000024-x0 |
Process Traveler: ETM PO Beam Dump, LLO |
Michael Smith |
Document Migration
|
01 Mar 2000 |
E000100-x0 |
Process Traveler: 2 in. High Vac Mirror Mount Assembly |
Michael Smith |
Document Migration
|
01 Mar 2000 |
E990322-x0 |
Process Traveler: APS P.O. Beam Optical Train |
Michael Smith |
Document Migration
|
01 Mar 2000 |
E000090-x0 |
Process Traveler: ETM PO Beam_Beam Dump, LLO |
Michael Smith |
Document Migration
|
01 Mar 2000 |
E000039-x0 |
Process Traveler: 4K IO Baffle, LLO |
Michael Smith |
Document Migration
|
01 Mar 2000 |
E990435-x0 |
Process Traveler: Eliptical Baffle Counter Weight Assembly |
Michael Smith |
Document Migration
|
01 Mar 2000 |
E000097-x0 |
Process Traveler: Beam Dump Assemblies, BSC4 |
Michael Smith |
Document Migration
|
01 Mar 2000 |
E000013-x0 |
Process Traveler: LHO Pick Off Telescope, Rev. 01 |
Michael Smith |
Document Migration
|
01 Mar 2000 |
E990442-x0 |
Process Traveler: Mode Cleaner Baffle (LLO) |
Michael Smith |
Document Migration
|
01 Mar 2000 |
E000091-x0 |
Process Traveler: ETM PO Beam_Beam Dump, LHO |
Michael Smith |
Document Migration
|
01 Mar 2000 |
E990398-x0 |
Process Traveler: ETM Telescope Assembly, 003 |
Michael Smith |
Document Migration
|
01 Mar 2000 |
E990397-x0 |
Process Traveler: ETM Telescope Assembly, 002 |
Michael Smith |
Document Migration
|
01 Mar 2000 |
E990444-x0 |
Process Traveler: Mode Cleaner Baffle |
Michael Smith |
Document Migration
|
01 Mar 2000 |
E000010-x0 |
Process Traveler: LHO Pick Off Telescope |
Michael Smith |
Document Migration
|
01 Mar 2000 |
E000087-x0 |
Process Traveler: Elliptical Baffle Assembly, LLO |
Michael Smith |
Document Migration
|
01 Mar 2000 |
E000040-x0 |
Process Traveler: 4K IO Baffle, LHO |
Michael Smith |
Document Migration
|
01 Mar 2000 |
E000016-x0 |
Process Traveler: ETM Telescope Assembly, Rev. 01 |
Michael Smith |
Document Migration
|
01 Mar 2000 |
E000088-x0 |
Process Traveler: 2 in. High Vac Mirror Mount Assembly |
Michael Smith |
Document Migration
|
01 Mar 2000 |
E990400-x0 |
Process Traveler: ETM Telescope Assembly, 005 |
Michael Smith |
Document Migration
|
01 Mar 2000 |
E000011-x0 |
Process Traveler: LLO Pick Off Telescope |
Michael Smith |
Document Migration
|
01 Mar 2000 |
E990429-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
03 Dec 1999 |
E990407-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
12 Nov 1999 |
E990394-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
05 Nov 1999 |
T990088-x0 |
COS 2K IFO Alignment Procedures, Rev. 01 |
Michael Smith |
Document Migration
|
04 Nov 1999 |
E990381-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
01 Nov 1999 |
E990315-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
07 Sep 1999 |
E990341-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
07 Sep 1999 |
E990289-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
07 Sep 1999 |
E990312-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
07 Sep 1999 |
E990318-x0 |
Process Traveler, Rev. 01 |
Michael Smith |
Document Migration
|
07 Sep 1999 |
E990326-x0 |
Process Traveler, Rev. 02 |
Michael Smith |
Document Migration
|
07 Sep 1999 |
E990306-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
07 Sep 1999 |
E990329-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
07 Sep 1999 |
E980130-x0 |
Component Specification: TEL_PAR SECONDARY MIRROR, Rev. B |
Jonathan Kern et al. |
Document Migration
|
14 Jul 1999 |
E990274-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
14 Jul 1999 |
E990280-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
14 Jul 1999 |
E990251-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
14 Jul 1999 |
E990238-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
14 Jul 1999 |
E990275-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
14 Jul 1999 |
E990083-x0 |
IFO COC and Beam Coordinate Data, Rev. A |
Dennis Rose et al. |
Document Migration
|
14 Jul 1999 |
E990257-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
14 Jul 1999 |
E990267-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
14 Jul 1999 |
E990266-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
14 Jul 1999 |
E990154-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
10 May 1999 |
E990194-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
28 Apr 1999 |
E990031-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
02 Feb 1999 |
E980129-x0 |
Component Specification: TEL_PAR PRIMARY MIRROR, Rev. B |
Jonathan Kern et al. |
Document Migration
|
02 Feb 1999 |
E980262-x0 |
Component Specification: Pick Off Telescope, Rev. B |
Jonathan Kern et al. |
Document Migration
|
01 Feb 1999 |
E990033-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
25 Jan 1999 |
E980356-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
25 Jan 1999 |
E990075-x0 |
Process Traveler |
Michael Smith |
Document Migration
|
25 Jan 1999 |
E980328-x0 |
Component Specification: ETM Telescope Lenses, Rev. A |
Jonathan Kern et al. |
Document Migration
|
24 Nov 1998 |
E980261-x0 |
Component Specifcation: ETM Telescope, Rev. A |
Jonathan Kern et al. |
Document Migration
|
24 Nov 1998 |
T980104-x0 |
COS Final Design, Rev. 01 |
Ara Badalian et al. |
Document Migration
|
19 Nov 1998 |
T980097-x0 |
Optical Lever Beams Mechanical Layout, Rev. 01 |
Michael Smith |
Document Migration
|
14 Nov 1998 |
E980263-x0 |
Component Specification: Conflat/Viewport - COS, Rev. A |
Jonathan Kern et al. |
Document Migration
|
14 Nov 1998 |
E980288-x0 |
COS Steering Mirror-1, -2, -3 High Reflectance Coating, Rev. A |
Jonathan Kern et al. |
Document Migration
|
06 Nov 1998 |
T980075-x0 |
Component Specification: Pick Off Telescope Requirements, Rev. 01 |
Jonathan Kern et al. |
Document Migration
|
22 Sep 1998 |
T980027-x0 |
Baffling Requirements for the 4K and 2K IFO, Rev. 01 |
Michael Smith |
Document Migration
|
11 Sep 1998 |
T980054-x0 |
PO Beam Waist Size and Location on the ISC Table, Rev. 02 |
Michael Smith |
Document Migration
|
11 Sep 1998 |
T980010-x0 |
Core Optics Support Preliminary Design, Rev. 01 |
Michael Smith |
Document Migration
|
11 May 1998 |
T980007-x0 |
Effect of PO Telescope Aberrations on Wavefront Sensor Performance |
Michael Smith |
Document Migration
|
05 Mar 1998 |
T970071-x0 |
Core Optics Support Design Requirements Document (DRD), Rev. 02 |
Michael Smith |
Document Migration
|
05 Mar 1998 |
T970112-x0 |
Physics Environmental Monitoring Final Design Document |
Alex Marin et al. |
Document Migration
|
23 Dec 1997 |
T970072-x0 |
Core Optics Support Conceptual Design |
Michael Smith |
Document Migration
|
12 May 1997 |
G970067-x0 |
Core Optics Support Design Requirements Review (DRR) |
Michael Smith |
Document Migration
|
28 Apr 1997 |