LIGO-Number |
Title |
Author(s) |
Topic(s) |
Last Updated |
T1200220-v5 |
LHO H1 Viewports-As Installed |
Lisa Austin et al. |
Installation
Auxiliary Optics
|
15 Apr 2015 |
D1101885-v2 |
aLIGO AOS ITM ELLIPTICAL BAFFLE SUSPENSION ASSY |
Jesse Terrazas et al. |
Basic R&D
Auxiliary Optics
|
27 Jun 2012 |
D1003183-v1 |
aLIGO_Manifold Cryo Baffle_Radial Segment Assembly |
Tim Nguyen |
Basic R&D
Auxiliary Optics
|
04 Aug 2011 |
D1300646-v1 |
Bracket Shim |
Lisa Austin et al. |
Assembly
|
25 Jul 2013 |
D1002084-v3 |
aLIGO_AOS_Manifold Cryo Baffle_Outer Ring Assy |
Tim Nguyen et al. |
Assembly
Installation
Auxiliary Optics
|
30 Jul 2013 |
D0900778-v2 |
Faraday Isolator Magnet Attachment Plate |
Manuel Ruiz |
Basic R&D
Auxiliary Optics
|
10 Jul 2012 |
E1100810-v14 |
Arm Cavity Baffle Installation/De-installation Procedure |
Lisa Austin et al. |
Installation
Auxiliary Optics
|
06 Dec 2016 |
E1100267-v1 |
6 inch Vacuum Viewport Window |
Peter Fritschel |
Vacuum
Auxiliary Optics
|
25 Mar 2011 |
T1100445-v2 |
AOS SLC: Signal Recycling Cavity Baffles Final Design |
Michael Smith et al. |
Final Design
Auxiliary Optics
|
13 Oct 2011 |
E1300577-v7 |
SLC ITM/ ETM Manifold Cryopump Baffle Assembly and Installation Document |
Michael Smith et al. |
Assembly
Installation
Auxiliary Optics
|
10 May 2017 |
T1000746-v1 |
Viewports Subsystem Final Design Document |
Michael Smith et al. |
Final Design
Auxiliary Optics
|
13 Mar 2011 |
T1200313-v3 |
BS Elliptical Baffle Final Design |
Michael Smith et al. |
Final Design
Auxiliary Optics
|
15 Dec 2016 |
T1100165-v2 |
AOS SLC Manifold/Cryopump and Mode Cleaner Tube Baffles FDR |
Lisa Austin et al. |
Final Design
Auxiliary Optics
|
14 Dec 2016 |
E1100718-v8 |
Mode Cleaner Tube Baffle Assembly and Installation Procedure |
Lisa Austin et al. |
Assembly
Installation
Auxiliary Optics
|
06 Dec 2016 |
E1000563-v7 |
DCN - Release of Output Faraday Isolator Assembly |
Manuel Ruiz et al. |
Final Design
Auxiliary Optics
|
11 Dec 2015 |
E1200914-v130 |
aLIGO AOS SLC and TMS Inventory |
Lisa Austin et al. |
Assembly
Installation
Cleaning
Auxiliary Optics
|
17 Apr 2015 |
T1000311-v7 |
aLIGO TransMonSUS Assembly & Installation Hazards Analysis |
Ken Mailand et al. |
Final Design
Safety
Auxiliary Optics
|
21 Jan 2015 |
E1201012-v8 |
TransMonSUS Assembly & Installation Procedure |
Ken Mailand et al. |
Sensing and Control
Final Design
Auxiliary Optics
|
22 Oct 2014 |
E1200498-x0 |
aLIGO, AOS, View Ports |
Lisa Austin |
Auxiliary Optics
|
04 Aug 2014 |
E1200499-x0 |
aLIGO, AOS, TMS |
Lisa Austin et al. |
Auxiliary Optics
|
07 Jul 2014 |
E1200050-v2 |
DCN -TMS Various Releases and Revisions for production |
Craig Conley et al. |
Change Control
Auxiliary Optics
|
20 Jun 2014 |
E1100730-v5 |
HAM and BSC SEI In-Vacuum Cabling Counts including payload cables as well as BSC SLC ACB and BSC TCS |
Calum Torrie et al. |
System Engineering
|
18 Jun 2014 |
D1300791-v1 |
OFI EQ Stops for magnets |
Lisa Austin |
Assembly
|
21 Feb 2014 |
E1100491-v6 |
SLC Mode Cleaner Tube Baffle Install Hazard Analysis |
Michael Smith et al. |
Safety
Auxiliary Optics
|
20 Feb 2014 |
E1000890-v8 |
SLC Arm Cavity Baffle Install Hazard Analysis |
Michael Smith et al. |
Installation
Final Design
Safety
Auxiliary Optics
|
20 Feb 2014 |
E1100984-v8 |
SLC Signal Recycling Cavity Baffle Install Hazard Analysis |
Michael Smith et al. |
Safety
Auxiliary Optics
|
20 Feb 2014 |
E1300634-v6 |
Advanced LIGO AOS ETM Arm Cavity Baffle Assembly Procedure |
Lisa Austin |
Assembly
Auxiliary Optics
|
19 Feb 2014 |
T1100468-v4 |
Stray Light Control - Baffle Locales |
Lisa Austin |
Installation
Auxiliary Optics
|
26 Oct 2011 |
T1200148-v2 |
SLC 3rd IFO Inventory |
Lisa Austin et al. |
Installation
Final Design
Procurements
Auxiliary Optics
|
27 Sep 2013 |
E1100867-v17 |
Advanced LIGO AOS ITM Arm Cavity Baffle Assembly Procedure |
Stephany Foley et al. |
Assembly
Auxiliary Optics
|
24 Sep 2013 |
T1300340-x0 |
AOS SLC Signal Recycling Cavity Baffles Assembly and Installation |
Lisa Austin et al. |
Assembly
Installation
Auxiliary Optics
|
13 Sep 2013 |
D1000549-v6 |
aLIGO TMS UPPER INTERMEDIATE MASS TOP ASSEMBLY |
Craig Conley et al. |
Installation
Final Design
Integration
Auxiliary Optics
|
23 Aug 2013 |
T1100446-v4 |
ITM Elliptical Baffle FD |
Michael Smith et al. |
Final Design
Auxiliary Optics
|
14 Aug 2013 |
E1300409-v3 |
Install Manifold/Cryo Baf LHO ETM X Test |
Michael Smith et al. |
Subsystem Test
Auxiliary Optics
|
02 Aug 2013 |
D1300658-x0 |
Manifold Cryopump Baffle Alignment Tool |
Lisa Austin |
Installation
Auxiliary Optics
|
25 Jul 2013 |
D1200525-v6 |
aLIGO TMS Mass Base Assembly |
Craig Conley et al. |
Auxiliary Optics
Suspensions
|
22 Jul 2013 |
D1101527-v6 |
aLIGO TMS Mass Secondary Assembly |
Craig Conley et al. |
Final Design
Auxiliary Optics
Suspensions
|
19 Jul 2013 |
D1300645-x0 |
FHCS, modified |
Lisa Austin et al. |
Assembly
|
18 Jul 2013 |
E1200497-x0 |
aLIGO, AOS, SLC |
Lisa Austin |
Auxiliary Optics
|
17 Jul 2013 |
D1200120-v4 |
aLIGO TMS Upper Stage Blade Cartridge |
Craig Conley et al. |
Auxiliary Optics
Suspensions
|
15 Jul 2013 |
D1300622-v1 |
Titanium Threaded Stud, cut to size |
Lisa Austin |
Assembly
Auxiliary Optics
|
11 Jul 2013 |
D1001005-v7 |
SLC ARM CAVITY BAFFLE BLADE ASSY |
Niem Nguyen et al. |
Modelling
Auxiliary Optics
|
03 Jul 2013 |
D1300616-x0 |
Manifold Cryopump Magnet Gap Tool |
Lisa Austin |
Assembly
Auxiliary Optics
|
03 Jul 2013 |
E1300420-v2 |
Manifold/cryo baffle Blade Balance Weight |
Michael Smith et al. |
Final Design
Auxiliary Optics
|
21 Jun 2013 |
E1100312-v1 |
DCN - AOS SLC Fixtures and Tooling |
Lisa Austin |
Assembly
Installation
Auxiliary Optics
|
18 Jun 2013 |
E1100842-v8 |
Specification for Oxidation of Polished Mirror (Super #8) Stainless Steel for aLIGO Baffles and Beam Dumps |
Heidy Kelman et al. |
Fabrication
Auxiliary Optics
|
17 Jun 2013 |
E1000458-v3 |
BOM-aLIGO TMS SEISMIC STOP SAFETY STRUCTURE |
Craig Conley |
Auxiliary Optics
|
01 Apr 2012 |
E1100837-v2 |
BOM HAM SCRAPER BAFFLE ASSEMBLY |
Michael Hillard et al. |
Final Design
Auxiliary Optics
|
02 May 2013 |
E1101001-v1 |
Signal Recycling Cavity Baffles Production Plan |
Michael Smith et al. |
Final Design
Auxiliary Optics
|
29 Apr 2013 |
E1101023-v1 |
Signal Recycling Cavity Baffles Fabrication and Installation Test Plan |
Michael Smith et al. |
Final Design
Auxiliary Optics
|
29 Apr 2013 |
E1200677-v5 |
Advanced LIGO AOS ITM Elliptical Baffle Assembly Procedure |
Lisa Austin et al. |
Assembly
Auxiliary Optics
|
23 Apr 2013 |
E070124-v3 |
Septum Window Coating Specification |
Lisa Austin et al. |
Fabrication
Auxiliary Optics
|
18 Mar 2013 |
E1101021-v4 |
AOS SLC ITM Elliptical Baffle Installation Procedure |
Michael Smith et al. |
Installation
Auxiliary Optics
|
14 Feb 2013 |
D1200781-v2 |
aLIGO_AOS_ACB Suspension Rod |
Tim Nguyen et al. |
Basic R&D
Auxiliary Optics
|
04 Feb 2013 |
E1100335-v10 |
DCN to Release Arm Cavity Baffle Revisions |
Lisa Austin et al. |
Assembly
Installation
Fabrication
Auxiliary Optics
|
03 Jan 2013 |
D1201508-x0 |
OFI Wire Loop Tool |
Lisa Austin |
Assembly
Auxiliary Optics
|
30 Nov 2012 |
D1201364-v1 |
Nickel Plated Drill Bushing |
Lisa Austin et al. |
Assembly
Procurements
Auxiliary Optics
|
13 Nov 2012 |
E1201011-x0 |
TransMonSUS Assembly & Installation Procedure |
Ken Mailand et al. |
Sensing and Control
Final Design
Auxiliary Optics
|
12 Nov 2012 |
D1201361-v1 |
SLC Baffle Earthquake Stop Sleeve |
Lisa Austin et al. |
Final Design
Auxiliary Optics
|
01 Nov 2012 |
E1200660-v3 |
AOS SLC BS Elliptical Baffle Installation Procedure |
Michael Smith et al. |
Final Design
Auxiliary Optics
|
02 Aug 2012 |
E1200662-v2 |
AOS SLC BS Elliptical Baffle Production Plan |
Michael Smith et al. |
Final Design
Auxiliary Optics
|
30 Jul 2012 |
E1101152-x0 |
DCN- Various TMS Telecope, Table and integration Components |
Craig Conley et al. |
Change Control
Auxiliary Optics
|
27 Apr 2012 |
C1202433-v4 |
Statement of Work Manifold Cryopump Tube Baffle ITM Weldment Assembly |
Lisa Austin |
Procurements
Fabrication
Auxiliary Optics
|
20 Apr 2012 |
E1100289-v2 |
DCN-Release of ALIGO SRM AR BAFFLE ASSY |
Lisa Austin |
Assembly
Auxiliary Optics
|
18 Apr 2012 |
E1000470-v3 |
BOM - AdLIGO_AOS_Damper Holder Assy |
Manuel Ruiz et al. |
Final Design
Auxiliary Optics
|
18 Apr 2012 |
E1100311-v2 |
BOM FOR ALIGO SRM AR BAFFLE ASSEMBLY |
Lisa Austin |
Assembly
Auxiliary Optics
|
16 Apr 2012 |
E1100391-v2 |
BOM FOR aLIGO SR3 HR-AR BAFFLE ASSY |
Norris Kilpatrick et al. |
Assembly
Auxiliary Optics
|
16 Apr 2012 |
G1200154-v8 |
AOS SLC Stray Light Control and Viewports |
Lisa Austin et al. |
NSF
Auxiliary Optics
|
09 Apr 2012 |
C1201789-v2 |
SOW - TMS Top Mass, machined parts |
Lisa Austin |
Procurements
Auxiliary Optics
|
03 Apr 2012 |
D1200434-v1 |
OFI Wedge Prism, 1.0 Inch |
Lisa Austin |
Installation
Auxiliary Optics
|
12 Mar 2012 |
C1107670-v3 |
Statement of Work - Cleaning of LHO Mode Cleaner Tube Baffles parts |
Lisa Austin |
Cleaning
Auxiliary Optics
|
04 Jan 2012 |
D1000684-v2 |
SLC TUBE LOWER MTG PLATE |
Niem Nguyen et al. |
Modelling
Auxiliary Optics
|
23 Nov 2011 |
D1101562-v1 |
Arm Cavity Baffle Photo Detector Holder |
Lisa Austin |
Auxiliary Optics
|
22 Aug 2011 |
E1100733-v1 |
6 inch Vacuum Viewport Window, uncoated |
Lisa Austin |
Vacuum
Auxiliary Optics
|
02 Aug 2011 |
D1101548-v1 |
Uncoated high quality, non-wedged, 6" Viewport, Optic |
Lisa Austin |
Vacuum
Auxiliary Optics
|
02 Aug 2011 |
C1104703-v1 |
SOW for 6 inch Viewport Clamps and Flanges |
Lisa Austin |
Procurements
Auxiliary Optics
|
20 Jun 2011 |
D1101528-v1 |
Flat Washer Natural Beige Color, #10 Screw |
Lisa Austin |
Assembly
Auxiliary Optics
|
28 Jul 2011 |
D1101529-v1 |
Flat Washer Natural Beige Color, 1/4 Screw |
Lisa Austin |
Assembly
Auxiliary Optics
|
28 Jul 2011 |
C1105144-v1 |
Statement of Work, Fabrication of Viewport Guard Assembly |
Lisa Austin |
Procurements
Auxiliary Optics
|
21 Jul 2011 |
C1101260-v1 |
Statement of Work (SOW) for Mode Cleaner Tube Baffle Assembly |
Heidy Kelman et al. |
Final Design
Procurements
Fabrication
Auxiliary Optics
|
08 Jul 2011 |
C1104441-v1 |
Statement of Work for High Quality, Wedged, Windows |
Lisa Austin |
Procurements
Auxiliary Optics
|
16 Jun 2011 |
E070069-v1 |
SPECIFICATION - High Quality Window Polish, Advanced LIGO |
GariLynn Billingsley et al. |
Document Migration
Auxiliary Optics
|
16 Jun 2011 |
C1101402-v3 |
Arm Cavity Baffle Statement of Work (Machined Parts) |
Lisa Austin |
Procurements
Auxiliary Optics
|
08 Mar 2011 |
E1100050-v5 |
Responses to AOS SLC ACB FDR Questions |
Mohana Mageswaran et al. |
Final Design
Auxiliary Optics
|
08 Apr 2011 |
E1100082-v1 |
DCN to Release Arm Cavity Baffle Photo-Detector Piece Parts |
Lisa Austin |
Procurements
Auxiliary Optics
|
06 Apr 2011 |
E1000285-v2 |
DCN TO RELEASE SLC ARM CAVITY BAFFLE TWO HOLE DRAWINGS |
Lisa Austin et al. |
Fabrication
Auxiliary Optics
|
28 Feb 2011 |
E1000868-v2 |
DCN TO RELEASE SLC ARM CAVITY BAFFLE ONE HOLE DRAWINGS |
Lisa Austin et al. |
Fabrication
Auxiliary Optics
|
24 Feb 2011 |