Document List by Author

Stephany Foley of LIGO - Massachusetts Institute of Technology is listed as an author on the following documents:
(List events moderated by Stephany Foley)

LIGO-Number Title Author(s) Topic(s) Last Updated
D0901182-v1 aLIGO, SEI, BSC-ISI, Top Assembly Stephany Foley et al. Final Design
Seismic Isolation
30 Aug 2024
D047823-v5 D047823- L4C Vacuum Chamber top Fabrice Matichard Final Design
Seismic Isolation
30 Apr 2010
D047822-v5 D047822 L4C chamber baseplate Fabrice Matichard Final Design
Seismic Isolation
30 Apr 2010
D1101180-v4 ALIGO HAM ISI Spacer Stephany Foley Final Design
Seismic Isolation
31 May 2023
E1100810-v14 Arm Cavity Baffle Installation/De-installation Procedure Lisa Austin et al. Installation
Auxiliary Optics
06 Dec 2016
D972610-v1 HAM Support Tube Stephany Foley Final Design
Seismic Isolation
10 Sep 2009
E080187-x0 Enhanced LIGO ISI Installation into LHO HAM6 Chamber Hazard Analysis Stephany Foley et al. Document Migration
13 May 2008
D972611-v1 LIGO HAM Expansion Bellows Stephany Foley Final Design
Seismic Isolation
01 Sep 2009
D0901075-v3 AdLIGO SEI Bulk Trim Masses Stephany Foley et al. Final Design
Seismic Isolation
20 Nov 2009
D0902749-x0 Large Actuator, aLIGO SEI HAM-ISI & BSC-ISI Stephany Foley et al. Final Design
Seismic Isolation
17 Jun 2019
D047812-v3 D047812- GS-13 Pod Top Mount Stephany Foley Seismic Isolation
11 Apr 2019
P1200011-v6 Dynamics Enhancements of Advanced LIGO Multi-Stage Active Vibration Isolators and Related Control Performance Improvement Fabrice Matichard et al. Seismic Isolation
Basic R&D
20 Jun 2018
G0900676-v3 Advanced LIGO Preliminary Design Review of the BSC ISI system - Overview Presentation Stephany Foley et al. Seismic Isolation
Reviews
Preliminary Design
20 Jun 2018
E970129-v2 Material, Process, Handling, and Shipping Specification for Welding Diaphragm Bellows Stephany Foley Seismic Isolation
Fabrication
27 Nov 2017
E1100718-v8 Mode Cleaner Tube Baffle Assembly and Installation Procedure Lisa Austin et al. Assembly
Installation
Auxiliary Optics
06 Dec 2016
D1100658-v2 ISC Rotary Beam Diverter - REED Plate Sam Waldman et al. Sensing and Control
Conceptual Design
21 Jan 2015
D1100656-v2 ISC Rotary Beam Diverter - Counter Weight Jason Fishner et al. Sensing and Control
Conceptual Design
21 Jan 2015
D1100646-v1 ISC Rotary Beam Diverter - Base Plate Jason Fishner et al. Sensing and Control
Conceptual Design
21 Jan 2015
D1100645-v5 ISC Rotary Beam Diverter - Magnet Keeper Jason Fishner et al. Sensing and Control
Conceptual Design
21 Jan 2015
D1100643-v5 ISC Rotary Beam Diverter - Rotary Holder Jason Fishner et al. Sensing and Control
Conceptual Design
21 Jan 2015
D1100642-v9 ISC Rotary Beam Diverter Assembly Jason Fishner et al. Sensing and Control
Final Design
20 Aug 2014
E0900037-v3 Statement of Work for Advanced LIGO HAM ISI Actuators Stephany Foley Seismic Isolation
31 Jul 2014
E0900357-v28 aLIGO BSC-ISI, General Assembly Procedure Michael Hillard et al. Assembly
Seismic Isolation
18 Jun 2014
E1100867-v17 Advanced LIGO AOS ITM Arm Cavity Baffle Assembly Procedure Stephany Foley et al. Assembly
Auxiliary Optics
24 Sep 2013
D1002663-v2 aLIGO BSC ISI Storage Container Stephany Foley Seismic Isolation
09 Jul 2013
D1102327-v1 Cover- ISC Transmon table Stephany Foley Sensing and Control
Final Design
09 Jul 2013
D1102388-v3 ALIGO HAM Viton Spring Leg Stack Assembly Stephany Foley et al. Final Design
Seismic Isolation
03 Jan 2013
D1102411-v2 cover- gap piece- ISC Transmon Assembly Stephany Foley Sensing and Control
Final Design
20 Dec 2012
D1102349-v2 Cover- right side- ISC transmon table Stephany Foley Sensing and Control
Final Design
20 Dec 2012
D1102329-v2 Cover- center piece- ISC transmon table Stephany Foley Sensing and Control
Final Design
20 Dec 2012
D1102328-v2 Cover end piece- ISC Transmon table Stephany Foley Sensing and Control
Final Design
20 Dec 2012
D1102387-v3 ALIGO HAM Optics Table Assembly- Passive Stack Stephany Foley et al. Final Design
Seismic Isolation
06 Dec 2012
T080261-v3 Building L4-C Pods Stephany Foley et al. Final Design
Seismic Isolation
12 Oct 2012
E1200486-x0 aLIGO, SEI Ken Mason et al. Seismic Isolation
16 May 2012
D1200683-v1 Optics Mounting Base- long Stephany Foley Sensing and Control
Final Design
07 May 2012
D1102350-x0 Standoff- cover- ISC transmon Stephany Foley Sensing and Control
Final Design
24 Jan 2012
D1101876-v1 Custom length precision rod Stephany Foley et al. Final Design
09 Nov 2011
D1101914-x0 Connector Bracket for mighty mouse connector Stephany Foley Sensing and Control
Final Design
06 Oct 2011
C1105628-v4 SOW SUS Upper Structure Weldment for use in TMS Stephany Foley Procurements
Auxiliary Optics
06 Oct 2011
D1101541-x0 ALIGO HAM ISI spacer shim Stephany Foley Final Design
Seismic Isolation
01 Aug 2011
E070273-v1 Process Traveler - HAM cable cleaning Stephany Foley et al. Seismic Isolation
Vacuum
23 Jun 2011
D1101183-x0 ALIGO HAM ISI Spacer Shims Stephany Foley Final Design
Seismic Isolation
21 Jun 2011
D1100542-v1 BSC ISI storage container- lifting rectangular beam Stephany Foley Seismic Isolation
13 Jun 2011
L0900118-v8 Advanced LIGO Preliminary Design Review of the BSC ISI system Fabrice Matichard et al. Seismic Isolation
Reviews
Preliminary Design
04 May 2011
C1002190-v3 SOW aLIGO BSC ISI Storage Containers Stephany Foley Seismic Isolation
Procurements
12 Apr 2011
C1002575-v2 Drawing Package for ALIGO BSC ISI storage containers Stephany Foley Seismic Isolation
Procurements
01 Apr 2011
D1002674-v1 base plate Stephany Foley Seismic Isolation
01 Apr 2011
D1002669-v1 seal plate Stephany Foley Seismic Isolation
25 Mar 2011
D1002670-v2 cover assembly Stephany Foley Seismic Isolation
25 Mar 2011
D1002681-v1 mounting plate Stephany Foley Seismic Isolation
25 Mar 2011
D1002673-v2 base I-beam B Stephany Foley Seismic Isolation
25 Mar 2011
D1002672-v2 base plate i-beam A Stephany Foley Seismic Isolation
25 Mar 2011
D1002671-v1 rectangular beam Stephany Foley Seismic Isolation
25 Mar 2011
D1002682-v2 base assembly Stephany Foley Seismic Isolation
25 Mar 2011
C1100780-v2 SOW ALIGO BSC ISI Table Masses Stephany Foley Seismic Isolation
Procurements
03 Feb 2011
C1100499-v2 SOW ALIGO BSC ISI wall masses and keel weights Stephany Foley Seismic Isolation
Procurements
03 Feb 2011
C1002686-v3 SOW Mu Metal Shields for ALIGO BSC ISI GS-13 pods Stephany Foley Seismic Isolation
Procurements
03 Feb 2011
E070341-x0 HAM_ISI_Installation_Hazard_Analysis Fabrice Matichard et al. Installation
Seismic Isolation
Document Migration
26 Oct 2010
D1003360-v1 short support I-beam, BSC ISI storage container Stephany Foley Seismic Isolation
21 Dec 2010
D1002667-v1 container o-ring Stephany Foley Seismic Isolation
16 Dec 2010
D1002665-v1 top plate Stephany Foley Seismic Isolation
16 Dec 2010
D1002664-v1 container wall Stephany Foley Seismic Isolation
16 Dec 2010
D1002666-v1 wall support ring Stephany Foley Seismic Isolation
16 Dec 2010
D1002668-v1 valve assembly Stephany Foley Seismic Isolation
16 Dec 2010
D1002684-v1 guide post Stephany Foley Seismic Isolation
16 Dec 2010
D1002683-v1 guide stand base Stephany Foley Seismic Isolation
16 Dec 2010
D1002685-v1 guide post assembly Stephany Foley Seismic Isolation
16 Dec 2010
D1002680-v1 support I-beam Stephany Foley Seismic Isolation
16 Dec 2010
E1000729-x0 Stage 1-2 Safety Restraint, Revise Nut Material Stephany Foley et al. Final Design
Seismic Isolation
17 Nov 2010
D1000176-v1 Thermal Bar, Right, Large Actuator, aLIGO BSC ISI Stephany Foley et al. Final Design
Seismic Isolation
28 Jul 2010
D1000175-v1 Thermal Bar, Left, Large Actuator, aLIGO BSC ISI Stephany Foley et al. Final Design
Seismic Isolation
28 Jul 2010
C1000620-v3 Drawing Table for SOW for BSC SEI Machined Parts Batch 2 Stephany Foley Seismic Isolation
Procurements
22 Jun 2010
C1000241-v4 SOW for Fabrication of Machined Parts (batch 2) for ALIGO BSC ISI Stephany Foley Seismic Isolation
Procurements
22 Jun 2010
C1000770-v1 Drawing list for SOW of BSC ISI Tooling in ALIGO (C1000769) Stephany Foley Seismic Isolation
Procurements
10 Jun 2010
C1000621-v1 Drawing Package for SOW for SEI BSC Machined Parts- Batch 2 Stephany Foley Seismic Isolation
Procurements
10 Jun 2010
C1000769-v1 SOW- Fabrication of aLIGO BSC ISI Tooling Stephany Foley Seismic Isolation
Procurements
09 Jun 2010
C1000827-v1 Drawing package for SOW C1000769 Stephany Foley Seismic Isolation
Procurements
08 Jun 2010
C1000391-v4 SOW for aLIGO HAM ISI Storage Only Containers Stephany Foley Seismic Isolation
Procurements
25 May 2010
C1000154-v5 SOW BSC ISI Vaccum Pods components for Seismometers Stephany Foley Seismic Isolation
Procurements
24 May 2010
C1000209-v5 SOW Fabrication of Flexure Rods and Cups for Advanced LIGO BSC ISI Stephany Foley Seismic Isolation
Procurements
20 May 2010
C1000181-v4 SOW for Machined Internal and External Vacuum Pod parts Stephany Foley Seismic Isolation
Procurements
18 May 2010
C1000233-v6 SOW for the Fabrication of Maraging Steel Blade Springs for ALIGO BSC ISI Stephany Foley Seismic Isolation
Procurements
11 May 2010
C1000210-v5 SOW Fabrication of Machined Parts -batch 1- for aLIGO BSC ISI Stephany Foley Seismic Isolation
Procurements
03 May 2010
C1000356-v1 Drawing Table for SOW BSC Machined Parts Batch1 Stephany Foley Seismic Isolation
Procurements
27 Apr 2010
C1000387-v2 SOW for UHV chemical cleaning of large plates for aLIGO BSC ISI Stephany Foley Procurements
15 Apr 2010
C1000025-v7 SOW- ALIGO BSC ISI Large Plates Fabrication Stephany Foley Seismic Isolation
Procurements
12 Apr 2010
C1000355-v1 Drawing Set for SOW BSC Machined Parts Batch1 Stephany Foley Seismic Isolation
Procurements
01 Apr 2010
C1000254-v2 SOW for Fabrication of HAM Crossbeam Clamp Parts Stephany Foley Seismic Isolation
Procurements
23 Mar 2010
C1000185-v2 SOW- aLIGO BSC ISI vacuum pod catalog parts Stephany Foley Seismic Isolation
Procurements
01 Mar 2010
T0900593-x0 Trillium OBS Pod Assembly Procedure Adv LIGO BSC ISI Stephany Foley et al. Final Design
Seismic Isolation
25 Nov 2009
T0900592-x0 GS-13 Pod Assembly Procedure for Adv LIGO BSC ISI Stephany Foley et al. Final Design
Seismic Isolation
25 Nov 2009
E080166-v1 HAM Crossbeam Redesign for Advanced LIGO: FEA Study Andy Stein Seismic Isolation
Conceptual Design
03 Sep 2009
D0901483-x0 Hanging STS-2 or Trillium Vacuum Pod Stephany Foley Final Design
Seismic Isolation
23 Jul 2009
D0901282-x0 breadboards- BSC ISI AdLIGO Stephany Foley Seismic Isolation
19 Jun 2009
D0901247-x0 AdLIGO BSC ISI Position sensor assembly bracket- horizontal Stephany Foley Seismic Isolation
15 Jun 2009
D0901238-x0 AdLIGO BSC ISI Large acutator position sensor assembly bracket Stephany Foley Seismic Isolation
12 Jun 2009
D0901236-x0 AdLIGO BSC ISI Actuator Position Sensor Assembly Stephany Foley Seismic Isolation
12 Jun 2009
D0901235-x0 AdLIGO BSC ISI Actuator Target Assembly Stephany Foley Seismic Isolation
12 Jun 2009
D0901196-x0 AdLIGO BSC ISI large horizontal actuator connector Stephany Foley Seismic Isolation
10 Jun 2009
D0901195-x0 AdLIGO BSC ISI Large Vertical Actuator Coil Bracket Stephany Foley Seismic Isolation
10 Jun 2009
D0901194-x0 AdLIGO BSC ISI Large Vertical Actuator Assembly Stephany Foley Seismic Isolation
10 Jun 2009
D0901187-x0 AdLIGO BSC ISI large horizontal actuator coil bracket Stephany Foley Seismic Isolation
09 Jun 2009
D0901186-x0 AdLIGO BSC ISI large horizontal actuator magnet bracket Stephany Foley Seismic Isolation
09 Jun 2009
D0901185-x0 AdLIGO BSC ISI Large Horizontal Actuator Assembly Stephany Foley Seismic Isolation
09 Jun 2009
D0901184-x0 large vertical actuator magnet bracket- BSC ISI AdLIGO Stephany Foley Seismic Isolation
09 Jun 2009
D0901171-x0 actuator post - AdLIGO BSC ISI Stephany Foley Seismic Isolation
08 Jun 2009
E0810011-v1 Wiki Page for HAM ISI Preliminary Design Review Stephany Foley Reviews
02 Apr 2009
E080502-x0 Process Traveler - LASTI BSC ISI prototype actuator parts Stephany Foley Document Migration
23 Dec 2008
E080348-x0 Process Traveler - AdLIGO large actuators- LASTI Stephany Foley Document Migration
22 Nov 2008
E080076-x0 Process Traveler - SEI ISI barrel nuts for LHO Stephany Foley Document Migration
22 Nov 2008
E070320-x0 Process Traveler - SEI LHO Spring Posts for Enhanced LIGO Stephany Foley Document Migration
22 Nov 2008
E070314-x0 Process Traveler - H1 Feedthroughs for enhanced LIGO Stephany Foley Document Migration
22 Nov 2008
E070325-x0 Process Traveler - SEI LHO HAM feedthroughs- Enhanced LIGO Stephany Foley Document Migration
22 Nov 2008
E070318-x0 Process Traveler - SEI LHO actuators for Enhanced LIGO Stephany Foley Document Migration
22 Nov 2008
E080003-x0 Process Traveler - Gang Barrel Nut cleaning for SEI Stephany Foley Document Migration
25 Apr 2008
E070340-x0 Process Traveler - Enhanced LIGO SEI HAM springs Stephany Foley Document Migration
25 Apr 2008
E070328-x0 Process Traveler - SEI position sensor probes- Enhanced LIGO Stephany Foley Document Migration
25 Apr 2008
E080019-x0 Process Traveler - Bellows for HAM6 at LLO Stephany Foley Document Migration
25 Apr 2008
E080004-x0 Process Traveler - Helicoil inserts- SEI Stephany Foley Document Migration
25 Apr 2008
E070301-x0 Process Traveler - SEI bellows for ELIGO Stephany Foley Document Migration
24 Apr 2008
E070324-x0 Process Traveler - SEI LHO maraging steel parts Stephany Foley Document Migration
11 Mar 2008
E070323-x0 Process Traveler - SEI LHO stainless parts- Enhanced LIGO Stephany Foley Document Migration
11 Mar 2008
E070302-x0 Process Traveler - SEI Bellows- ELIGO Stephany Foley Document Migration
11 Mar 2008
E070322-x0 Process Traveler - SEI LHO-enhanced LIGO- stage 0 Stiffening Ribs Stephany Foley Document Migration
11 Mar 2008
E070311-x0 Process Traveler - Enhanced LIGO SEI maraging steel spring Stephany Foley Document Migration
11 Mar 2008
E070327-x0 Process Traveler - SEI fasteners for Hanford- enhanced LIGO Stephany Foley Document Migration
11 Mar 2008
E070346-x0 Process Traveler - SEI HAM 12inch feedthrough Stephany Foley Document Migration
11 Mar 2008
E070306-x0 Process Traveler - ELIGO HAM ISI Spring Post Cleaning Stephany Foley Document Migration
10 Mar 2008
E070316-x0 Process Traveler - SEI-LHO Aluminum parts for Enhanced LIGO Stephany Foley Document Migration
10 Mar 2008
E070281-x0 Process Traveler - SEI HAM fastener Stephany Foley Document Migration
06 Feb 2008
E070310-x0 Process Traveler - Enhanced LIGO SEI Actuator Cleaning Stephany Foley Document Migration
06 Feb 2008
E070356-x0 Process Traveler - SEI Riser Fasteners- cleaning Stephany Foley Document Migration
06 Feb 2008
E070237-x0 Process Traveler - SEI L1 stainless cleaning at LHO Stephany Foley Document Migration
12 Dec 2007
E070248-x0 Process Traveler - SEI feedthru for L1 Stephany Foley Document Migration
12 Dec 2007
E070236-x0 Process Traveler - HAM Aluminum parts cleaning Stephany Foley Document Migration
10 Dec 2007
E070145-x0 Process Traveler - Actuator Cleaning Stephany Foley Document Migration
03 Dec 2007
E070144-x0 Process Traveler - BSC Ballast Weight Cleaning Stephany Foley Document Migration
03 Dec 2007
E070262-x0 Process Traveler - SEI actuator Stephany Foley Document Migration
30 Nov 2007
E070193-x0 Process Traveler - Accu-Glass Cables LASTI Stephany Foley Document Migration
27 Sep 2007

Number of documents found: 139


DCC Version 3.4.3, contact Document Database Administrators