LIGO-Number |
Title |
Author(s) |
Topic(s) |
Last Updated |
E1100530-v10 |
PSL/IO/TCS Beckhoff (Slow Controls) Chassis Cabling/Wiring Diagram |
Jose Puente et al. |
Laser Systems
State Control and Monitoring
Installation
|
16 Aug 2024 |
E1000654-v5 |
Specification for LIGO BSC Work Platforms |
John Worden et al. |
Installation
|
19 Oct 2023 |
E1000828-v2 |
Prism bonding jig settings calculation sheet for the ERM and TCP |
Marielle van Veggel |
Installation
Suspensions
|
13 Sep 2011 |
E1000006-v24 |
Advanced LIGO Quad Suspension Metal-Build Assembly Procedure |
Joe ODell et al. |
Assembly
Installation
Suspensions
|
06 Aug 2020 |
T1000489-v9 |
Specification for LIGO Installation Cleanrooms |
John Worden et al. |
Procurements
Installation
|
01 Aug 2018 |
E1000752-v5 |
Preparation of a thermal compensation plate (TCP) or end reaction mass (ERM) (Gluing wire break-off prisms and earthquake stops) |
Margot Hennig et al. |
Installation
Suspensions
|
08 Mar 2016 |
D1001797-v2 |
aLIGO Installation, LHO Y-End Station, Cartridge & Cleanroom, Layout |
Dennis Coyne |
Installation
|
14 Jan 2015 |
D1002153-v3 |
aLIGO BS/FM Prism holder |
Marielle van Veggel et al. |
Installation
Suspensions
|
11 Dec 2013 |
D1101585-v2 |
TRANSMON ISC as installed for the H2OAT |
Lisa Barsotti |
Installation
Auxiliary Optics
|
25 Nov 2013 |
D1101048-v3 |
aLIGO, PLATE, TEMPLATE, ALIGNMENT , BSC STRUCTURE |
Scott Shankle et al. |
Fabrication
Installation
Final Design
Suspensions
|
25 Aug 2011 |
T1200385-v2 |
LLO BS Prism Gluing Issue and Resolution |
Janeen Romie et al. |
Modelling
Installation
Suspensions
|
18 Oct 2013 |
T1100073-v3 |
List of Suspensions in Chambers |
Norna Robertson |
Installation
Suspensions
|
07 Feb 2011 |
D1101120-v2 |
Name plate Laser/Ante PSL |
Jose Puente |
Laser Systems
Installation
|
22 Feb 2013 |
D1101121-v2 |
PSL/IO/TCS Chassis Name Plate |
Jose Puente |
Laser Systems
Installation
|
22 Feb 2013 |
D1001990-v3 |
Platform Walkway, BSC Installation |
Sam Barnum |
Installation
Seismic Isolation
|
01 Oct 2012 |
D1101489-v16 |
LASTI Wiring Diagram |
Sam Waldman et al. |
Installation
|
20 Jul 2012 |
T080230-v3 |
Quad Pendulum Structure Pushers |
Calum Torrie et al. |
Installation
|
02 Jul 2012 |
D070125-v3 |
LHO CDS Lans and Gateways |
David Barker |
Installation
Observatory Facilities
|
29 Nov 2011 |
T1100238-v2 |
Report on hydroxide catalysis bonding done at LHO in March and April 2011 |
Marielle van Veggel et al. |
Core Optics
Installation
Suspensions
|
02 Aug 2011 |
D1101462-v2 |
ISC End Station Transmission Monitor In-Vacuum Cable Sets |
Charles Osthelder |
Installation
|
29 Jul 2011 |
E1100659-v1 |
DCN, aLIGO TCS Ring Heater Replacement Fixture |
Mindy Jacobson |
Vacuum
System Engineering
Fabrication
Upgrades
Installation
Auxiliary Optics
|
20 Jul 2011 |
E1100660-v1 |
BOM, aLIGO TCS Ring Heater Replacement Fixture Assembly |
Mindy Jacobson |
Vacuum
System Engineering
Upgrades
Installation
Auxiliary Optics
Final Design
|
12 Jul 2011 |
D080180-v1 |
AdL SUS LASTI Noise Prototype Controls Wiring |
Jay Heefner |
Installation
Suspensions
|
11 Jul 2011 |
D060294-v1 |
LASTI AdL SUS Triple Controls Wiring |
Jay Heefner |
Installation
Suspensions
|
11 Jul 2011 |
E1100612-v1 |
H2 PSL Bill of Materials |
Jose Puente |
Laser Systems
Installation
|
05 Jul 2011 |
G1100759-x0 |
Building aLIGO at LIGO Hanford Observatory |
Fred Raab |
Detector
Installation
|
21 Jun 2011 |
D1002926-v2 |
Module-E, BSC Cartridge installation, aLIGO |
Sam Barnum et al. |
Installation
Observatory Facilities
|
15 Jun 2011 |
D1100919-v1 |
Extended Unified Plate Flipper Tooling Optics Table, BSC-ISI |
Sam Barnum |
Installation
Seismic Isolation
|
02 Jun 2011 |
D070586-v1 |
HAM ISI, INSTALLATION FIXTURE, aLIGO |
Sam Barnum et al. |
Document Migration
Upgrades
Installation
Seismic Isolation
|
31 May 2011 |
D1100991-x0 |
DC Power Cable |
Charles Osthelder |
Installation
|
25 May 2011 |
D1002812-v1 |
SLC ACB INTERFACE MOUNTING LOCATION |
Niem Nguyen |
Installation
Auxiliary Optics
|
13 May 2011 |
T1100264-v1 |
Evaluation of Cable Crosstalk and Shielding |
Rich Abbott et al. |
System Engineering
Installation
|
12 May 2011 |
E0900124-x0 |
AFWFS parts for HAM6 Traveler |
Sam Waldman |
Vacuum
Installation
|
07 May 2011 |
E1000678-v2 |
Optical Lever Heights above the Floor |
Dennis Coyne |
System Engineering
Installation
Auxiliary Optics
Final Design
|
04 May 2011 |
E1000711-v3 |
ALIGO LA Corner Station VE Installation Specification |
John Worden et al. |
Installation
|
11 Apr 2011 |
E1000712-v3 |
Anchor Bolt Installation |
John Worden et al. |
Installation
|
06 Apr 2011 |
D1100555-v1 |
Metrology baseplate for ear and prism position measurements |
Gerardo Moreno et al. |
Installation
Suspensions
|
31 Mar 2011 |
E1000708-v1 |
WA Corner Station Installation |
Jodi Fauver et al. |
Installation
|
29 Mar 2011 |
D1002152-v1 |
aLIGO BS/FM Prism holder assembly |
Marielle van Veggel et al. |
Installation
Suspensions
|
09 Mar 2011 |
D1002150-x0 |
aLIGO BS/FM Prism bonding alignment guide |
Marielle van Veggel et al. |
Installation
Suspensions
|
09 Mar 2011 |
D1002146-v1 |
aLIGO TCP/ERM Prism holder |
Marielle van Veggel et al. |
Installation
Suspensions
|
09 Mar 2011 |
D1002142-v2 |
aLIGO TCP Prism bonding baseplate |
Marielle van Veggel et al. |
Installation
Suspensions
|
09 Mar 2011 |
D1002141-v2 |
aLIGO TCP Prism bonding fixture |
Marielle van Veggel et al. |
Installation
Suspensions
|
09 Mar 2011 |
D1002144-v1 |
aLIGO TCP Prism bonding support cylinder |
Marielle van Veggel et al. |
Installation
Suspensions
|
09 Mar 2011 |
D1002143-v1 |
aLIGO TCP Prism bonding alignment guide |
Marielle van Veggel et al. |
Installation
Suspensions
|
09 Mar 2011 |
D1002140-v2 |
aLIGO TCP Prism bonding jig |
Marielle van Veggel et al. |
Installation
Suspensions
|
09 Mar 2011 |
D1002203-v2 |
aLIGO ERM Prism bonding baseplate |
Marielle van Veggel et al. |
Installation
Suspensions
|
09 Mar 2011 |
D1002145-v1 |
aLIGO TCP/ERM Prism holder assembly |
Marielle van Veggel et al. |
Installation
Suspensions
|
09 Mar 2011 |
D1002202-v2 |
aLIGO ERM Prism bonding fixture |
Marielle van Veggel et al. |
Installation
Suspensions
|
09 Mar 2011 |
D1002201-v2 |
aLIGO ERM Prism bonding jig |
Marielle van Veggel et al. |
Installation
Suspensions
|
09 Mar 2011 |
D0900373-v2 |
ALIGO SUS ETM/ITM Monolithic Assembly_Advanced Welding Hub |
Giles Hammond et al. |
Basic R&D
Installation
Suspensions
|
08 Mar 2011 |
E1000718-v1 |
Specification for Vacuum/Clean Air Piping |
John Worden et al. |
Installation
|
03 Mar 2011 |
E1000717-v1 |
Specification for Piping Thermal Insulation |
John Worden et al. |
Installation
|
03 Mar 2011 |
E1000713-v1 |
Specification for Piping Design and Material |
John Worden et al. |
Installation
|
03 Mar 2011 |
E1000715-v1 |
Specification for Pipe Cleaning |
John Worden et al. |
Installation
|
03 Mar 2011 |
D070124-v1 |
Rack Input Power Box |
Gary McIntyre |
System Engineering
Installation
|
01 Mar 2011 |
D1003179-v2 |
aLIGO Installation, LHO Corner Station Vacuum Equipment Layout |
John Worden et al. |
Installation
|
28 Feb 2011 |
D1003180-v2 |
aLIGO Installation, LLO Corner Station Vacuum Equipment Layout |
John Worden et al. |
Installation
|
24 Feb 2011 |
E1000707-v5 |
WA Mid/End VE Installation |
John Worden et al. |
Installation
|
04 Feb 2011 |
D1100113-v1 |
Mid-Station Spool-LHO |
John Worden et al. |
Installation
|
21 Jan 2011 |
D1100111-v1 |
Adapter A-17 |
John Worden et al. |
Installation
|
21 Jan 2011 |
E1000716-v1 |
Component Alignment Procedure |
John Worden et al. |
Installation
|
20 Jan 2011 |
E1000719-v1 |
Contamination Control for Adv. LIGO Vacuum Equipment Installation |
John Worden et al. |
Installation
|
20 Jan 2011 |
D1003175-v2 |
aLIGO Installation, LHO Y (Left) Mid Station Vacuum Equipment Layout |
John Worden et al. |
Installation
|
20 Jan 2011 |
D1003176-v2 |
aLIGO Installation, LHO X (Right) Mid Station Vacuum Equipment Layout |
John Worden et al. |
Installation
|
20 Jan 2011 |
C1001535-v7 |
Statement of Work for LIGO Installation Cleanrooms |
John Worden et al. |
Procurements
Installation
|
20 Jan 2011 |
E080426-v1 |
Advanced LIGO ERGO Arm Hazard Analysis |
Gregg Harry et al. |
Core Optics
Installation
|
06 Mar 2009 |
E070341-x0 |
HAM_ISI_Installation_Hazard_Analysis |
Fabrice Matichard et al. |
Document Migration
Installation
Seismic Isolation
|
26 Oct 2010 |
C1002236-v8 |
SOW Fabrication of aLIGO SEI Install Test Stands |
John Worden et al. |
Procurements
Installation
|
07 Jan 2011 |
D1003178-v1 |
aLIGO Installation, LHO X (Right) End Station Vacuum Equipment Layout |
John Worden et al. |
Installation
|
03 Jan 2011 |
D1003177-v1 |
aLIGO Installation, LHO Y (Left) End Station Vacuum Equipment Layout |
John Worden et al. |
Installation
|
03 Jan 2011 |
C1002426-v6 |
Statement of Work for BSC Work Platforms |
John Worden et al. |
Installation
|
02 Dec 2010 |
E1000714-x0 |
Vacuum Valves |
John Worden et al. |
Installation
|
16 Nov 2010 |
C1001836-v1 |
Specification for De-Installation - Washington site. |
John Worden et al. |
Procurements
Installation
Observatory Facilities
|
11 Nov 2010 |
D1002291-v1 |
aLIGO TCP/ERM Prism holder fixing screw |
Marielle van Veggel et al. |
Installation
Suspensions
|
21 Oct 2010 |
D1002290-v1 |
aLIGO TCP/ERM Prism holder alignment bush |
Marielle van Veggel et al. |
Installation
Suspensions
|
21 Oct 2010 |
D1002289-v1 |
aLIGO TCP/ERM Prism holder alignment screw |
Marielle van Veggel et al. |
Installation
Suspensions
|
21 Oct 2010 |
T1000016-v1 |
ALIGO NP-type: - Preparations of Ear Bonding at LASTI (February 2010) |
Marielle van Veggel et al. |
Installation
Suspensions
|
12 Oct 2010 |
D0900537-v2 |
LHO As Built HAM6 optical layout |
Sam Waldman |
Sensing and Control
Installation
|
07 Oct 2010 |
L1000368-v1 |
LHO Installation Leader responsibilities and authorities |
David Shoemaker |
Detector
Installation
Management
|
04 Oct 2010 |
D1001685-v1 |
V-block - assembly |
Marielle van Veggel |
Installation
Suspensions
|
21 Sep 2010 |
T1000493-v1 |
Initial Alignment of PR3, ITM, and ETM prior to 1st Light Down the Arms |
Michael Smith |
Installation
Auxiliary Optics
|
14 Sep 2010 |
T1000472-v1 |
Technical Design Document of the fibre guard in the aLIGO ETM/ITM quad suspension |
Marielle van Veggel et al. |
Installation
Suspensions
|
26 Aug 2010 |
D1001633-v1 |
aLIGO ETM/ITM ear bonding jig - T-piece |
Russell Jones |
Installation
Suspensions
|
04 Aug 2010 |
D030715-v1 |
Relevant Dimensions for Quad and SEI Installation at LASTI |
Dennis Coyne |
Installation
|
25 Jun 2010 |
E1000097-v1 |
ETM TransMon Telescope SUS Installation Plan |
Ken Mailand |
Installation
Auxiliary Optics
|
30 Mar 2010 |
T1000170-x0 |
Installation Plan Transmon_Telescope_SUS |
Ken Mailand |
Installation
Auxiliary Optics
|
30 Mar 2010 |
T1000114-v1 |
ALIGO NP-type: - Ear Bonding at LASTI - February 2010 |
Gerardo Moreno et al. |
Installation
Suspensions
|
15 Mar 2010 |
T080108-v1 |
Notes on Lower Quad Installation at LASTI |
Gerardo Moreno et al. |
Subsystem Test
Installation
Suspensions
|
20 Jan 2010 |
E1000002-v1 |
Certification for Viton for L1 HAM6 OMC damping struts |
Robert Taylor et al. |
Commissioning
Incoming Inspection
Installation
Suspensions
Seismic Isolation
|
11 Jan 2010 |
D0902795-x0 |
aLIGO_Mezzanine_Lab_Floor_Layout |
Ken Mailand |
Installation
Auxiliary Optics
|
04 Dec 2009 |
D0901353-v1 |
Adv LIGO COC R Optic Container, Cover, Ring, Alum Box Rnd |
Jose Eduardo Chavez |
System Engineering
Installation
|
17 Jul 2009 |
G0900349-v4 |
The Present and Near Future of LIGO |
Jeffrey Kissel |
Commissioning
Meeting
Basic R&D
Upgrades
Installation
Final Design
|
15 Jul 2009 |
T000083-v1 |
COS Faraday Isolator Pre-alignment Procedure |
Michael Smith |
Installation
|
07 Jul 2009 |
F080008-v8 |
Advanced LIGO Inventory Database PO/Line Parts Import Template |
Dwayne Giardina et al. |
Commissioning
Quality Assurance
Procurements
Installation
Operations Business
|
10 Jun 2009 |
E0900131-v2 |
35 Watt Air Cooled Beam Dump Assembly Procedures |
Ken Mailand |
Installation
Auxiliary Optics
|
21 May 2009 |
D0901044-x0 |
BSC2_TABLE_RING_DIMENSIONS_ |
Ken Mailand |
Installation
Auxiliary Optics
|
20 May 2009 |
T980044-v1 |
Determination of Global and Local Coordinate Axes for the LIGO Sites |
Albert Lazzarini |
Vacuum
System Engineering
Integration
Installation
|
11 May 2009 |
D950148-v2 |
LVEA and VEA Foundations Relative to the Beam Tube Center Line |
Dennis Coyne |
Vacuum
System Engineering
Integration
Installation
|
10 May 2009 |
E0900126-v2 |
LLO HAM6 AFWFS installation |
Sam Waldman |
Sensing and Control
Installation
|
08 May 2009 |
T0900222-v1 |
CIT Sprayed First Contact & Charging Tests 5-6-09 |
Rand Dannenberg |
Core Optics
Installation
|
07 May 2009 |
T0900221-v1 |
CIT Sprayed First Contact Peeling & Charging Tests 5-3-09 |
Rand Dannenberg |
Core Optics
Installation
|
07 May 2009 |
D070569-v1 |
ELIGO OMC SUS Wiring |
Jay Heefner |
Installation
Suspensions
|
25 Feb 2009 |