LIGO Document E1000752-v5
Home
Recent Changes
Topics
Login
Preparation of a thermal compensation plate (TCP) or end reaction mass (ERM) (Gluing wire break-off prisms and earthquake stops)
Document #:
LIGO-E1000752-v5
Document type:
E - Engineering documents
Other Versions:
LIGO-E1000752-v4
19 Sep 2012, 10:55
LIGO-E1000752-v1
02 Dec 2010, 05:39
Abstract:
This document describes the procedure for gluing the wire break-off prisms and earthquake stops to the TCP or ERM
Files in Document:
E1000752-v5.pdf
(484.3 kB)
Other Files:
E1000752-v5.docx
(177.6 kB)
E1000752-v5.pdf
(484.3 kB)
e-mail chains with E1000752.pdf
(34.4 kB)
Topics:
Installation
Suspensions
Authors:
Margot Hennig
Marielle van Veggel
Russell Jones
Michael Meyer
Betsy Weaver
Liam Cunningham
Mark Barton
Keywords:
aLIGO
SUS
TCP
ERM
wire-break
off
prisms
Notes and Changes:
-v5 (Mark Barton) - Deleted step on removing First Contact during final airbake. Added references to
T1300322
for up-to-the-minute gluing guidance.
Related Documents:
LIGO-D1000980:
aLIGO, TCP OPTICS WITH PRISM ASSEMBLY
LIGO-D1000979:
D1000979_ALIGO, COC TCP (THIN COMPENSATION PLATE) SUBSTRATE
LIGO-D080750:
aLIGO SUS ERM/TCP Wire Break-off Prism
LIGO-D1002140:
aLIGO TCP Prism bonding jig
LIGO-D080116:
End Reaction Mass (ERM)
LIGO-D1002201:
aLIGO ERM Prism bonding jig
LIGO-E1200821:
Guidelines for use in de-bonding of epoxy bonds from optics
Referenced by:
LIGO-E1200821-v2:
Guidelines for use in de-bonding of epoxy bonds from optics
LIGO-T1000337-v4:
Quadruple Suspension Monolithic Stage Final Design
Home
Recent Changes
Topics
Login
DCC
Version 3.4.3
, contact
Document Database Administrators