E2300136-v1 DCN Revised Disc Insert (welding puck) GariLynn Billingsley et al. Fabrication
Suspensions
15 May 2023
D080117-v1 Penultimate Mass, ETM Quad Russell Jones Final Design
Fabrication
Suspensions
14 Feb 2020
D060149-v3 aLIGO_SUS_CO2 Laser Machine_Spinning Mirror Assembly_[CO2_GLA_ASM_04] Russell Jones Assembly
Fabrication
Suspensions
15 Jan 2020
D1800134-v1 CO2 Laser Pulling Machine_Alignment Plate 2 Russell Jones et al. Fabrication
Basic R&D
09 Jul 2019
D060152-v3 aLIGO_SUS_CO2 Laser Machine_PULL_Assembly_[CO2_GLA_ASM_07] Russell Jones Assembly
Fabrication
Suspensions
09 Jul 2019
D1800133-v1 CO2 Laser Pulling Machine_Alignment Plate 1 Russell Jones et al. Fabrication
Basic R&D
09 Jul 2019
D1001504-v5 aLIGO SUS ETM ITM Monolithic Assembly_Fibre Cartridge Assembly Russell Jones et al. Assembly
Fabrication
Suspensions
09 Jul 2019
D070551-v2 aLIGO SUS ETM/ITM Monolithic Assembly_ Fuse Jig Russell Jones Preliminary Design
Fabrication
Suspensions
Basic R&D
09 Jul 2019
D1000575-v2 ALIGO_SUS_CO2 Laser Machine_Dovetail Clamp Interface Assembly [CO2_GLA_ASM_11] Russell Jones et al. Fabrication
Suspensions
09 Jul 2019
D060150-v2 aLIGO_SUS_CO2 Laser Machine_Conical Mirror FEED Assembly_[CO2_GLA_ASM_05] Russell Jones Assembly
Fabrication
Suspensions
09 Jul 2019
D060148-v1 aLIGO_SUS_CO2 Laser Machine_Horizontal Drive Unit_[CO2_GLA_ASM_03] Russell Jones Assembly
Fabrication
Suspensions
09 Jul 2019
D060147-v2 aLIGO_SUS_CO2 Laser Machine_Motor Drive Assembly_[CO2_GLA_ASM_02] Russell Jones Assembly
Fabrication
Suspensions
09 Jul 2019
D060146-v1 ALIGO_SUS_CO2 Laser Machine_Twin Ballscrew and Support Frame_[CO2_GLA_ASM_01] Russell Jones Assembly
Fabrication
Suspensions
09 Jul 2019
D070560-v2 ALIGO SUS CO2 Laser Machine_Overall Assembly_[CO2_GLA_ASM_OVERALL] Russell Jones et al. Assembly
Fabrication
Suspensions
09 Jul 2019
G1800845-v1 Cryogenic suspensions for future gravitational wave detectors Marielle van Veggel et al. Conceptual Design
Suspensions
Basic R&D
16 May 2018
E1000278-v7 Preparation of an end or input test mass (ETM/ITM) (Hydroxide-Catalysis Bonding of ears) Margot Hennig et al. Final Design
Suspensions
28 Aug 2012
G1701240-x0 Glasgow speed meter proof-of-principle experiment update Sean Leavey et al. Basic R&D
09 Jul 2017
T1000017-v1 Monolithic Test Hang Procedure Notes Matthew Maxwell et al. Suspensions
Subsystem Test
12 Apr 2017
D1000760-v4 Advanced LIGO SUS ITM Production Monolithic Assembly Russell Jones et al. Assembly
Final Design
Suspensions
19 Jul 2016
D1000759-v3 Advanced LIGO SUS ETM Production Monolithic Assembly Russell Jones et al. Assembly
Final Design
Suspensions
12 Jul 2016
G1601144-v1 Factors pertaining to the strength of four-fiber monolithic silica test mass suspensions Kirill Tokmakov et al. Suspensions
19 May 2016
E1000752-v5 Preparation of a thermal compensation plate (TCP) or end reaction mass (ERM) (Gluing wire break-off prisms and earthquake stops) Margot Hennig et al. Suspensions
Installation
08 Mar 2016
D080116-v2 End Reaction Mass (ERM) Russell Jones Final Design
Suspensions
02 Sep 2015
D080201-v1 IGR MKII Strength Testing Machine_Pivot Test Assembly Russell Jones Suspensions
Basic R&D
20 Apr 2015
D080200-v1 IGR MKII Strength Testing Machine_Worm Wheel Drive Assembly Russell Jones Suspensions
Basic R&D
20 Apr 2015
D080199-v1 IGR MKII Strength Testing Machine_Load Cell Pull Assembly Russell Jones Suspensions
Basic R&D
20 Apr 2015
D080198-v1 IGR MKII Strength Testing Machine_Drive_Pull Module Russell Jones Suspensions
Basic R&D
20 Apr 2015
D080197-v2 IGR MKII Strength Testing Machine Russell Jones Suspensions
Basic R&D
20 Apr 2015
D080188-v1 IGR Strength Testing Machine Design (2002)_Interface Pulling Plate Russell Jones Suspensions
Basic R&D
20 Apr 2015
E1000036-v38 SUS Drawing Tracker Bobby Moore et al. Reports
Suspensions
17 Apr 2015
D1002147-v1 aLIGO BS/FM Prism bonding jig Marielle van Veggel et al. Suspensions
Installation
11 Dec 2013
D1002153-v3 aLIGO BS/FM Prism holder Marielle van Veggel et al. Suspensions
Installation
11 Dec 2013
D1002149-v1 aLIGO BS/FM Prism bonding baseplate Marielle van Veggel et al. Suspensions
Installation
11 Nov 2013
D1002151-v3 aLIGO BS/FM Prism bonding support cylinder Marielle van Veggel et al. Suspensions
Installation
11 Nov 2013
G1300798-v1 Photographic and Ultra-Fast Video Imaging of Fracture of Pristine Silica Glass Fibers Kirill Tokmakov et al. Suspensions
26 Jul 2013
E1000277-v13 Preparation of an end or input penultimate mass (ETM-PM/ITM-PM) (Hydroxide-Catalysis Bonding of ears and gluing prisms and magnet flags) Marielle van Veggel et al. Final Design
Suspensions
25 Jul 2013
D1000128-v3 Penultimate mass prism holder for D0901592 bonding jig Marielle van Veggel et al. Preliminary Design
Suspensions
18 Jul 2013
D1001623-v2 aLIGO ETM/ITM penultimate mass prism holder assembly Marielle van Veggel et al. Suspensions
Installation
18 Jul 2013
D020677-v3 Library of Clamps (HSTS/OMCS) Michael Meyer Final Design
Suspensions
17 Apr 2013
D1102247-v1 ALIGO SUS CO2 Laser Machine_Spinning Mirror Assembly_Stage to Clamp Coupling Piece Russell Jones et al. Assembly
Fabrication
Suspensions
20 Dec 2012
D080750-v1 aLIGO SUS ERM/TCP Wire Break-off Prism Russell Jones et al. Assembly
Final Design
Suspensions
27 Aug 2012
D1101017-v3 aLIGO SUS ETM ITM MONOLITHIC CENTRAL PROTECTIVE FIN ASSEMBLY Russell Jones Final Design
Suspensions
02 May 2012
D070391-v1 ALIGO SUS ETM NP-type (Glass Mass) Ear Bonding Jig GA (General Arrangement) Russell Jones Document Migration
13 Mar 2012
D1102245-v1 ALIGO SUS CO2 Laser Machine_Spinning Mirror Assembly_Stage to Mirror Assembly Coupling Russell Jones et al. Assembly
Fabrication
Suspensions
28 Nov 2011
T1000345-v2 The Design of the IGR MKII Strength Testing Machine Russell Jones et al. Suspensions
Basic R&D
11 Oct 2011
D0900957-v1 ALIGO SUS ETM/ITM monolithic assembly - spring clamp for weld mirror on weld hub Giles Hammond et al. Preliminary Design
09 Sep 2011
G1100720-v1 Breaking tests of fused silica fibers conducted with high speed photography and video imaging. Kirill Tokmakov et al. Suspensions
10 Jul 2011
G1100719-v1 Tools for GEO-600 test mass repair suspension. Kirill Tokmakov et al. Suspensions
10 Jul 2011
T010103-v1 aLIGO Suspension System Conceptual Design Russell Jones et al. Conceptual Design
Suspensions
09 Jun 2011
G0900791-v1 Flame welding tests for monolithic suspension of a 40-kg test mass (as backup for Advanced LIGO) Giles Hammond et al. Suspensions
17 May 2011
D080389-v5 aLIGO SUS ETM ITM Monolithic Assembly Tooling_Welding Scaffold_Bearing holder Russell Jones et al. Assembly
Preliminary Design
Fabrication
Suspensions
21 Apr 2011
D080036-v4 aLIGO SUS_Monolithic Assembly_CO2 Laser Welding_Welding Shelf Russell Jones Assembly
Fabrication
Suspensions
24 Mar 2011
D1002152-v1 aLIGO BS/FM Prism holder assembly Marielle van Veggel et al. Suspensions
Installation
09 Mar 2011
D1002150-x0 aLIGO BS/FM Prism bonding alignment guide Marielle van Veggel et al. Suspensions
Installation
09 Mar 2011
D1002146-v1 aLIGO TCP/ERM Prism holder Marielle van Veggel et al. Suspensions
Installation
09 Mar 2011
D1002142-v2 aLIGO TCP Prism bonding baseplate Marielle van Veggel et al. Suspensions
Installation
09 Mar 2011
D1002141-v2 aLIGO TCP Prism bonding fixture Marielle van Veggel et al. Suspensions
Installation
09 Mar 2011
D1002144-v1 aLIGO TCP Prism bonding support cylinder Marielle van Veggel et al. Suspensions
Installation
09 Mar 2011
D1002143-v1 aLIGO TCP Prism bonding alignment guide Marielle van Veggel et al. Suspensions
Installation
09 Mar 2011
D1002140-v2 aLIGO TCP Prism bonding jig Marielle van Veggel et al. Suspensions
Installation
09 Mar 2011
D1002203-v2 aLIGO ERM Prism bonding baseplate Marielle van Veggel et al. Suspensions
Installation
09 Mar 2011
D1002145-v1 aLIGO TCP/ERM Prism holder assembly Marielle van Veggel et al. Suspensions
Installation
09 Mar 2011
D1002288-v1 aLIGO ERM prism bonding support cylinder Marielle van Veggel et al. Final Design
Suspensions
09 Mar 2011
D1002202-v2 aLIGO ERM Prism bonding fixture Marielle van Veggel et al. Suspensions
Installation
09 Mar 2011
D1002201-v2 aLIGO ERM Prism bonding jig Marielle van Veggel et al. Suspensions
Installation
09 Mar 2011
D0900373-v2 ALIGO SUS ETM/ITM Monolithic Assembly_Advanced Welding Hub Giles Hammond et al. Suspensions
Installation
Basic R&D
08 Mar 2011
D080390-v4 aLIGO SUS ETM ITM Monolithic Assembly Tooling_Welding Scaffold_3-hole Plate Russell Jones et al. Assembly
Preliminary Design
Fabrication
Suspensions
07 Mar 2011
D080396-v4 aLIGO SUS ETM ITM Monolithic Assembly Tooling_Welding Scaffold_Micrometer Interface Boss Russell Jones et al. Assembly
Preliminary Design
Fabrication
Suspensions
07 Mar 2011
D080394-v5 aLIGO SUS ETM ITM Monolithic Assembly Tooling_Welding Scaffold_Crossbar Russell Jones et al. Assembly
Preliminary Design
Fabrication
Suspensions
07 Mar 2011
D080393-v5 aLIGO SUS ETM ITM Monolithic Assembly Tooling_Welding Scaffold_C-section side piece Russell Jones et al. Assembly
Preliminary Design
Fabrication
Suspensions
07 Mar 2011
D070077-v2 Proof bounce tester top plate Russell Jones et al. Suspensions
01 Mar 2011
D1002105-v2 aLIGO SUS UK PROOF BOUNCE TESTER BASEPLATE Russell Jones et al. Suspensions
01 Mar 2011
D1002082-v1 aLIGO SUS UK PROOF TESTER Russell Jones et al. Suspensions
28 Feb 2011
D080048-v3 aLIGO SUS_Monolithic Assembly_CO2 Laser Welding_Galvo box_Articulated Arm_Connector Russell Jones Assembly
Fabrication
Suspensions
25 Feb 2011
D080046-v2 aLIGO SUS_Monolithic Assembly_CO2 Laser Welding_Galvo box_Side wall Russell Jones Assembly
Fabrication
Suspensions
25 Feb 2011
D070075-v2 Proof bounce tester joint for clevis pin Russell Jones et al. Suspensions
25 Feb 2011
D1002071-v1 aLIGO SUS UK PROOF BOUNCE TESTER 15KG PROOF MASS Russell Jones et al. Suspensions
25 Feb 2011
D1002069-v1 aLIGO SUS UK PROOF BOUNCE TESTER DOOR Russell Jones et al. Suspensions
25 Feb 2011
D1002067-v1 aLIGO SUS UK PROOF BOUNCE TESTER ENCLOSURE Russell Jones et al. Suspensions
25 Feb 2011
D080047-v2 aLIGO SUS_Monolithic Assembly_CO2 Laser Welding_Galvo Box_sunroof Russell Jones Assembly
Fabrication
Suspensions
25 Feb 2011
D080045-v1 aLIGO SUS_Monolithic Assembly_CO2 Laser Welding_Galvo box_baseplate Russell Jones et al. Assembly
Fabrication
Suspensions
25 Feb 2011
D080044-v1 aLIGO SUS_Monolithic Assembly_CO2 Laser Welding_Galvo box_Galvo Holder Russell Jones Assembly
Fabrication
Suspensions
25 Feb 2011
D080041-v2 aLIGO SUS_Monolithic Assembly_CO2 Laser Welding_Galvo box_Mounting bracket Russell Jones Assembly
Fabrication
Suspensions
25 Feb 2011
D080669-v2 aLIGO 40kg (Mock Silica sized) Aluminium Mass Russell Jones Assembly
Fabrication
Suspensions
Basic R&D
24 Feb 2011
D060189-v3 ERM ESD PATTERN Kurt Buckland et al. System Engineering
14 Oct 2009
D1002291-v1 aLIGO TCP/ERM Prism holder fixing screw Marielle van Veggel et al. Suspensions
Installation
21 Oct 2010
D1002290-v1 aLIGO TCP/ERM Prism holder alignment bush Marielle van Veggel et al. Suspensions
Installation
21 Oct 2010
D1002289-v1 aLIGO TCP/ERM Prism holder alignment screw Marielle van Veggel et al. Suspensions
Installation
21 Oct 2010
D1001803-v1 aLIGO SUS CO2 Laser Machine Welding Galvo Box_Side Wall 2 Russell Jones Conceptual Design
Suspensions
06 Oct 2010
E1000273-v1 Design document for PM wire break-off prisms Ken Strain et al. Final Design
Suspensions
02 Sep 2010
T1000472-v1 Technical Design Document of the fibre guard in the aLIGO ETM/ITM quad suspension Marielle van Veggel et al. Suspensions
Installation
26 Aug 2010
T0900586-v1 Proof load test and vertical bounce frequency test apparatus for ITM/ETM silica suspension fibres Ken Strain et al. Final Design
Suspensions
26 Aug 2010
D1001633-v1 aLIGO ETM/ITM ear bonding jig - T-piece Russell Jones Suspensions
Installation
04 Aug 2010
T080245-v1 ALIGO NP-type: - Report on bonding Viton stops, magnet holders and break-off prisms at LASTI Russell Jones et al. Suspensions
Subsystem Test
13 Jul 2010
T0900629-v2 Response to questions from the review panel on the Final Design Review of the ETM/ITM ears Giles Hammond et al. Final Design
Suspensions
17 Dec 2009
T0900278-v2 ALIGO NP-type: Preparations and hazard analysis for test hangs at LASTI in July/August 2009 Giles Hammond et al. System Test
Suspensions
02 Jul 2009
G0900586-v1 Flame welding tests for monolithic suspensions of the mirrors of future GW interferometers. Giles Hammond et al. Suspensions
Basic R&D
19 Jun 2009
G0900507-v2 Overview of monolithic suspension work for Advanced LIGO Timothy Bodiya et al. Suspensions
Basic R&D
19 Jun 2009
T0900203-v2 Assembly procedure of monolithic part of the suspension for advanced LIGO Giles Hammond et al. Preliminary Design
09 Jun 2009
T0900211-x0 Welding tests at Glasgow (5-8 May 2009) Marielle van Veggel et al. Final Design
Suspensions
06 May 2009
T0900055-v1 Rehang of the Quad NP with glass masses but metal wires (January 12-23 2009) Douglas Cook et al. Suspensions
29 Apr 2009
E080112-v1 Component Specification: ITM Penultimate Mass Russell Jones Final Design
Fabrication
Suspensions
16 Mar 2009
E080090-v1 Component Specification: ETM Penultimate Mass Russell Jones Final Design
Fabrication
Suspensions
16 Mar 2009
D080128-v1 Penultimate Mass, ITM Quad Russell Jones Final Design
Fabrication
Suspensions
16 Mar 2009
E080172-v1 DCN: ETM and ITM Quad Penultimate Mass drawings and specifications Russell Jones Final Design
Change Control
Suspensions
02 Mar 2009
E080171-v1 DCN: ALIGO SUS ETM QUAD End Reaction Mass (ERM) Drawing & Specification Russell Jones Final Design
Change Control
Suspensions
02 Mar 2009
E080089-v1 Component Specification: ETM QUAD End Reaction Mass (ERM) Russell Jones Final Design
Suspensions
02 Mar 2009
T080048-v2 The Review of Production Drawings for the ALIGO ETM Quad End Reaction Mass: Support Notes Ken Strain et al. Final Design
System Test
Suspensions
27 Feb 2009
T080326-v1 A Strategy to Prove and Provide Monolithic Suspensions Giles Hammond et al. Suspensions
20 Feb 2009
D080701-x0 Advanced LIGO, SUS, Monolithic Assembly, Confirmation of Tooling Holes Russell Jones Document Migration
05 Nov 2008
T080239-x0 Report on R. Jones visit to MIT (4th-9th August 2008) as part of NP-type Monolithic Assembly Activity Alastair Heptonstall et al. Document Migration
07 Oct 2008
T080152-x0 Questions preliminary design review of silica masses for advanced LIGO Mark Barton et al. Document Migration
20 Jun 2008
T080098-x0 UK Glass masses FDR overview document Russell Jones et al. Document Migration
03 Jun 2008
T080047-x0 The review of production drawings for the ALIGO ETM Penultimate Mass: support notes Mark Barton et al. Document Migration
23 Apr 2008
D070279-x0 ADVANCED LIGO SUS ETM PENULTIMATE MASS METAL WIRE STAND-OFF Russell Jones Document Migration
22 Apr 2008
D070504-x0 ALIGO SUS ETM Reaction Mass (ERM) Bonding Template Russell Jones Document Migration
22 Apr 2008
D070505-x0 ALIGO SUS ETM Reaction Mass (ERM) ERM Prism holder_bonding Russell Jones Document Migration
22 Apr 2008
D060166-x0 Advanced LIGO SUS N-Ptype Reaction Test Mass Break-off Prism Russell Jones Document Migration
22 Apr 2008
D070507-x0 ALIGO SUS ETM NP-type Reaction Mass (ERM) ERM Prism Bonding Jig Russell Jones Document Migration
22 Apr 2008
T080091-x0 Proposal for baseline change from ribbons to fibres in AdvLIGO test mass suspension monolithic stage Mark Barton et al. Document Migration
21 Apr 2008
G080220-x0 Update on Bonding Ears and Prisms to the Test Masses for LASTI - LSC/Virgo Collaborations Meeting @ Caltech, March 17-20, 2008 Helena Armandula et al. Document Migration
04 Apr 2008
T060135-x0 Design development of the SUS ETM structures Mark Barton et al. Document Migration
14 Mar 2008
T060113-x0 Welding and cleaning specification for SUS ETM structures Mark Barton et al. Document Migration
14 Mar 2008
T080023-x0 Test prism glueing on disc insert plates Helena Armandula et al. Document Migration
26 Feb 2008
T080020-x0 ALIGO NP-Type: Preparations of prism bonding at LASTI on 11th - 17th February 2008 Helena Armandula et al. Document Migration
26 Feb 2008
T080041-x0 ALIGO NP-type - Report on prism bonding at LASTI on 11th -17th February 2008 Helena Armandula et al. Document Migration
26 Feb 2008
E060235-x0 Document Change Notice (DCN) - Advanced LIGO SUS N-Ptype ETM QUAD Penultimate and Reaction Masses Russell Jones Document Migration
25 Jan 2008
T080006-x0 Laboratory layout during ear bonding at LASTI Helena Armandula et al. Document Migration
17 Jan 2008
T070305-x0 ALIGO NP-Type: Report on Ear Bonding at LASTI on 10th -14th December 2007 Helena Armandula et al. Document Migration
16 Jan 2008
G070444-x0 Production and characterisation of fused silica suspension ribbons for Advanced LIGO - 7th Edoardo Amaldi Conference on Gravitational Waves, July 8 -14 2007, Sydney Australia Mark Barton et al. Document Migration
21 Dec 2007
T070298-x0 ALIGO NP-Type: Preparations of Ear Bonding at LASTI on 10th -14th December 2007 Helena Armandula et al. Document Migration
06 Dec 2007
T070138-x0 Ribbon/Fibre Length Budget Mark Barton et al. Document Migration
25 Sep 2007
E070164-x0 Test report on flatness of `B` ears for Advanced LIGO NP-type monolithic suspension Mark Barton et al. Document Migration
18 Sep 2007
E070163-x0 Test report on `A` ears for Advanced LIGO NP-type monolithic suspension Mark Barton et al. Document Migration
18 Sep 2007
T070158-x0 Tooling-induced deformation of ears for Advanced LIGO monolithic suspension Mark Barton et al. Document Migration
18 Sep 2007
T060088-x0 Finite Element Analysis of Advanced LIGO SUS ETM structures using ANSYS workbench Mark Barton et al. Document Migration
07 Aug 2007
T060087-x0 Finite Element Analysis of Advanced LIGO SUS ETM Structures using ANSYS Classic beam models Mark Barton et al. Document Migration
07 Aug 2007
T060262-x0 Accommodation of Glasgow CO2 laser fibre pulling & welding machine at LASTI for noise prototype installation – site visit October 2006 Caroline Cantley et al. Document Migration
20 Nov 2006
T060022-x0 Early tests on a bonded ear/welded fibre assembly Caroline Cantley et al. Document Migration
07 Nov 2006
E060234-x0 Document Change Notice (DCN) - ADVANCED LIGO SUS N-Ptype Electrostatic Drive Evaporation Mask Russell Jones Document Migration
25 Oct 2006
T050215-x0 Monolithic stage conceptual design for Advanced LIGO ETM/ITM Helena Armandula et al. Document Migration
25 Sep 2006
T060147-x0 Bonding, Ear, Ribbon/Fibre PDR - Response to Committee Report Helena Armandula et al. Document Migration
23 Jun 2006
T030137-x0 ETM Controls Prototype: Mass Estimate of an ETM Suspension Layout Caroline Cantley et al. Document Migration
13 Apr 2006
T050237-x0 Advanced LIGO Preliminary Frequency Analysis of the Quadruple Pendulum Controls Prototype (second) Structure Mark Barton et al. Document Migration
13 Apr 2006
T060039-x0 Caltech controls method for suspending masses Mark Barton et al. Document Migration
10 Apr 2006
T060059-x0 Finite Element Analysis of Advanced LIGO SUS ETM Structures Mark Barton et al. Document Migration
16 Mar 2006
T050171-x0 Selection of Aluminum Alloys for Use on Advanced LIGO UK Parts Dennis Coyne et al. Document Migration
02 Dec 2005
T050214-x0 Concept for variable load clamp for ETM/ITM monolithic assembly Caroline Cantley et al. Document Migration
18 Oct 2005
T050206-x0 Production and characterization of synthetic fused silica ribbons for Advanced LIGO suspensions Gianpietro Cagnoli et al. Document Migration
18 Oct 2005
T050207-x0 Optical profiling device for dimensional characterization of ribbons/fibres Gianpietro Cagnoli et al. Document Migration
18 Oct 2005
T040213-x0 Update on development of a CO2 laser machine for pulling and welding silica fibres and ribbons Gianpietro Cagnoli et al. Document Migration
18 Oct 2005
T050211-x0 Bonded ear strength tests (serial number 0001, 0002 and 0011 to 0014) Helena Armandula et al. Document Migration
18 Oct 2005
G050316-x0 Update on Aspects of the Suspension Design for Advanced LIGO Helena Armandula et al. Document Migration
28 Jun 2005
G050187-x0 ADVANCED LIGO SUS ETM STRUCTURAL DESIGN SUMMARY - LSC Meeting, March 20-23, 2005, Livingston LA Caroline Cantley et al. Document Migration
07 Apr 2005
T030278-x0 Advanced LIGO SUS Preliminary Frequency Analysis of the Mode Cleaner Structure Mark Barton et al. Document Migration
07 Apr 2005
T040214-x0 Advanced LIGO Parameters for Current ETM/ITM Main Chain Noise Prototype Design Helena Armandula et al. Document Migration
14 Dec 2004
T040080-x0 Advanced LIGO Catcher Jig Product Design Specification for the ETM Controls Prototype Caroline Cantley et al. Document Migration
14 Sep 2004
T040084-x0 Advanced LIGO ETM Controls Prototype Catcher Jig: Design Brief Caroline Cantley et al. Document Migration
14 Sep 2004
G040433-x0 Development of a CO2 laser machine for pulling and welding of silica fibres and ribbons (GR17 presentation) J Bogenstahl et al. Document Migration
02 Sep 2004
T040016-x0 ADVANCED LIGO SUS QUAD ETM CONTROLS PROTOTYPE TASK SUMMARY Caroline Cantley et al. Document Migration
26 Aug 2004
T030125-x0 Controls Prototype: - Library of Clamps for the Cantilever Blades in the Mode Cleaner Suspension. Russell Jones et al. Document Migration
25 Aug 2004
D030123-x0 SPACER FOR COIL FORMER BRACKET Russell Jones et al. Document Migration
04 Aug 2004
D030710-x0 Coil Former Clamp One Piece Alt Russell Jones et al. Document Migration
04 Aug 2004
D030264-x0 Damper Arm Russell Jones et al. Document Migration
04 Aug 2004
D030263-x0 Copper Sleeve Russell Jones et al. Document Migration
04 Aug 2004
D020188-x0 Coil Former Janeen Romie et al. Document Migration
04 Aug 2004
D020225-x0 Coil Assembly Russell Jones et al. Document Migration
04 Aug 2004
D030183-x0 COIL FORMER CLAMP ONE PIECE Russell Jones et al. Document Migration
04 Aug 2004
D030269-x0 Blade Damper Assembly Russell Jones et al. Document Migration
04 Aug 2004
D030122-x0 SHOULDER FOR COIL FORMER BRACKET Russell Jones et al. Document Migration
04 Aug 2004
D020215-x0 small catcher for lower blades Russell Jones et al. Document Migration
03 Aug 2004
D020282-x0 Coil Former Bracket Russell Jones et al. Document Migration
03 Aug 2004
T040091-x0 Brief Summary of Visit to LIGO (Caltech), November 9th - 24th, 2003 Russell Jones Document Migration
25 May 2004
T040015-x0 Advanced LIGO SUS Controls Prototype Mass Catcher Research: Process Diagram for Use of the GEO600 Mass Catcher Russell Jones Document Migration
07 May 2004
E030568-x0 Mass Catcher Design for Mode Cleaner Controls Prototype - Product Design Specification Russell Jones Document Migration
07 May 2004
E040017-x0 Mass Catcher Design for the Mode Cleaner Controls Prototype Russell Jones Document Migration
07 May 2004
T040004-x0 Review of the GEO 600 Blade Eddy Current Damper Russell Jones et al. Document Migration
03 May 2004
T030273-x0 Case Study: Using ANSYS to Predict the Lowest Flexural Internal Mode Frequency of the MC and RM Upper Blades Russell Jones et al. Document Migration
03 May 2004
T030257-x0 Discussion: Supply of COILS and ASSOCIATED PARTS FOR THE LASTI CONTROLS PROTOTYPES Russell Jones et al. Document Migration
04 Nov 2003
D030713-x0 Glasgow `fullscale` sapphire optic Russell Jones Document Migration
29 Oct 2003
T030242-x0 Advanced LIGO SUS Summary of Cantilever Blade Wire Clamp Testing Caroline Cantley et al. Document Migration
09 Oct 2003
T030223-x0 Review of basic shorting tests on Coil Formers D020188-04 and D020188-08 Russell Jones et al. Document Migration
07 Oct 2003
T030220-x0 ADVANCED LIGO SUSPENSIONS, VISIT TO RUTHERFORD APPLETON LABORATORY, MAY 2002 Russell Jones et al. Document Migration
07 Oct 2003
G030384-x0 Update and Status on the Controls Prototype Local Control Coil for the MC and RM Suspension Helena Armandula et al. Document Migration
12 Sep 2003

Number of documents found: 184