| LIGO-Number |
Title |
Author(s) |
Topic(s) |
Last Updated |
| T1400723-v1 |
LLO Y beamtube leak & outgassing rates |
Michael Zucker |
Operations
System Test
Vacuum
System Engineering
|
04 Oct 2025 |
| G1500936-v3 |
Vacuum problems |
Michael Zucker et al. |
Technical Review Board
Reviews
System Test
Vacuum
Risk Management
Quality Assurance
|
04 Oct 2025 |
| T1700485-v1 |
LLO X beamtube leakage |
Michael Zucker |
System Test
Risk Management
System Engineering
Vacuum
|
04 Oct 2025 |
| T1200375-v2 |
Transient response of a beam tube during leak checking |
Michael Zucker et al. |
Vacuum
System Test
|
04 Oct 2025 |
| T1300553-v1 |
Effect of leak-test port separation; measurement of He transient at z = 250m |
Michael Zucker |
Operations
System Test
Vacuum
|
04 Oct 2025 |
| G2502104-v1 |
Beamtube Fabrication and Assembly Tradeoffs |
Michael Zucker |
Vacuum
Cosmic Explorer
|
29 Sep 2025 |
| G2502103-v1 |
CEBEX- The Cosmic Explorer Beamtube Experiment |
Michael Zucker |
Vacuum
Cosmic Explorer
|
29 Sep 2025 |
| T080062-v2 |
UK Satellite Amplifier Test Plan |
Jay Heefner et al. |
System Test
Suspensions
|
18 Sep 2013 |
| E1200519-x0 |
aLIGO, AOS, TCS |
Mindy Jacobson |
System Engineering
Subsystem Test
Auxiliary Optics
Vacuum
System Test
Installation
|
16 Nov 2012 |
| E1000369-x0 |
aLIGO Testing and Commissioning Documentation |
Dennis Coyne |
System Test
System Engineering
Subsystem Test
|
24 Jun 2022 |
| T0900140-v1 |
AdL Triple Acquisition Driver Board Prototype Test Plan |
Jay Heefner |
Suspensions
System Test
|
19 Aug 2009 |
| T1200518-v1 |
Leak localization of the Y arm beamtube at LLO |
Michael Meyer et al. |
System Test
Vacuum
|
06 Jul 2020 |
| G0900436-v1 |
eLIGO: So how's it turning out? |
Michael Zucker et al. |
Integration
Commissioning
Detector
System Test
Upgrades
Installation
Meeting
|
30 Jul 2019 |
| T0900291-v1 |
PUM Driver Board Test Plan |
Ron Cutler |
System Test
|
12 Oct 2018 |
| E1200702-v1 |
ITM04 Transmission |
Liyuan Zhang et al. |
Core Optics
System Test
|
12 Jun 2018 |
| E1700190-v1 |
ITM01 Integrated Scatter |
Liyuan Zhang et al. |
System Test
Core Optics
|
12 Jun 2018 |
| M1500313-v2 |
Process Flow for Engineering Operations of the LIGO Detector Systems |
Dennis Coyne et al. |
Final Design
Requirements
System Engineering
Subsystem Test
Operations
Commissioning
Integration
Detector
Fabrication
System Test
Policies
Installation
Conceptual Design
|
07 Jun 2018 |
| M1600168-v1 |
Hipot testing procedure for Withstand testing of HV coax cabling using the Vitrek 955i Electrical Safety Analyzer: |
Carl Adams et al. |
System Test
|
01 Jun 2016 |
| G1501546-v3 |
aLIGO OFI Summary of the requirements, specifications, and test results |
Koji Arai |
Auxiliary Optics
Requirements
Fabrication
System Test
Installation
|
28 Jan 2016 |
| E1000722-x0 |
PSL Testing: High-Power-Laser (HPL) |
Benno Willke |
System Test
Laser Systems
|
08 Apr 2015 |
| T0900301-v1 |
PSI Actuator Test Plan |
Fabrice Matichard |
System Test
|
03 Apr 2015 |
| T1100291-v2 |
aLIGO ISC Whitening Chassis Test Procedure |
Rich Abbott et al. |
System Test
Sensing and Control
|
16 Mar 2015 |
| G1200070-v2 |
Ideal Order/Contents of aLIGO Triple SUS Testing / Commissioning |
Jeffrey Kissel |
Subsystem Test
Requirements
System Test
Integration
Commissioning
Assembly
Suspensions
Installation
|
08 Mar 2015 |
| P1000018-v1 |
[Thesis] Length Sensing and Control of an Advanced Prototype Interferometric Gravitational Wave Detector |
Robert Ward |
Sensing and Control
System Test
Stochastic
|
09 Sep 2014 |
| G1100693-v5 |
Ideal Order/Contents of aLIGO QUAD Testing / Commissioning |
Jeffrey Kissel |
Installation
Suspensions
Assembly
Commissioning
Integration
System Test
Requirements
Subsystem Test
|
22 Aug 2014 |
| Q1300010-v1 |
dcc Release 3.1.0 test doc |
Cleveland Mak et al. |
System Test
Upgrades
Temporary Test Document
|
22 Aug 2014 |
| T1200482-v2 |
aLIGO SEI / SUS Watchdog Design |
Jeffrey Kissel et al. |
Seismic Isolation
Installation
Suspensions
Data Acquisition System
Integration
System Test
System Engineering
Final Design
|
10 Jul 2014 |
| E1300789-v2 |
ECR for 135MHz signal chain (REFLAIR-B on ISCT6) |
Rich Abbott |
Sensing and Control
System Test
|
19 Jun 2014 |
| E1300788-v1 |
ECR: add baffle to PR3 Suspensions to prevent wire heating |
Dennis Coyne |
System Test
Change Control
Auxiliary Optics
Suspensions
|
19 Jun 2014 |
| E1100991-x0 |
aLIGO BSC-ISI, Phase III Testing Reports (Control Commissioning) |
Fabrice Matichard |
Seismic Isolation
System Test
|
18 Jun 2014 |
| G1400671-v1 |
DAQ Acceptance Testing |
Rolf Bork |
Data Acquisition System
System Test
|
16 Jun 2014 |
| T1400403-v1 |
Scatter measurement of small aLIGO Lenses |
GariLynn Billingsley et al. |
System Test
Input Optics
|
13 Jun 2014 |
| D1300749-v1 |
testing the public view setting bug |
Cleveland Mak |
System Test
Temporary Test Document
Upgrades
|
11 Mar 2014 |
| T1200415-v1 |
aLIGO LHO Resonances |
Mark Barton |
System Test
Subsystem Test
|
03 Mar 2014 |
| T980121-v1 |
Preliminary results from Livingston VE vibration & acoustic testing |
Michael Zucker |
System Test
Vacuum
|
19 Feb 2014 |
| E1200844-v2 |
aLIGO SUS Acceptance Criteria and Deliverables |
Jeffrey Kissel et al. |
Suspensions
System Test
|
11 Dec 2013 |
| E1200639-v1 |
aLIGO, AOS, TCS, Acceptance of CO2 Laser Projection System |
Aidan Brooks et al. |
Installation
Auxiliary Optics
Subsystem Test
System Engineering
System Test
Integration
|
22 Nov 2013 |
| L1300208-v4 |
the testing of BUGS 339, 340 and 341 and now 347 & 348 too! |
Cleveland Mak |
Temporary Test Document
System Test
|
20 Nov 2013 |
| E1300766-v3 |
the testing of BuGS 339, 340 and 341 plus other items on IE |
Cleveland Mak et al. |
Upgrades
Temporary Test Document
System Test
|
12 Nov 2013 |
| G1301146-v2 |
the testing of BUGS 339, 340 and 341 plus other items on chrome |
Cleveland Mak |
System Test
Temporary Test Document
|
14 Oct 2013 |
| T1300854-v2 |
3.1.0 patch test document abc |
Cleveland Mak et al. |
Temporary Test Document
System Test
|
11 Oct 2013 |
| E1300746-v2 |
3.1.0 patch test doc for IE |
Cleveland Mak |
System Test
Temporary Test Document
|
07 Oct 2013 |
| G1300955-x0 |
dcc 3.1.0 release test document number three |
Cleveland Mak et al. |
System Test
Quality Assurance
Temporary Test Document
|
02 Oct 2013 |
| G1301123-v2 |
3.1.0 patch test doc for chrome |
Cleveland Mak |
Temporary Test Document
System Test
|
02 Oct 2013 |
| E1300719-v3 |
DCC release 3.1.0 test doc #2 |
Cleveland Mak et al. |
System Test
Temporary Test Document
|
21 Sep 2013 |
| M1300504-v1 |
dcc release 3.1.0 test document #4 |
Cleveland Mak |
Temporary Test Document
System Test
|
18 Sep 2013 |
| T0900080-v1 |
OMC Suspension Advanced LIGO Test Plan |
Norna Robertson et al. |
System Test
Suspensions
|
06 Sep 2013 |
| T1100160-v9 |
aLIGO ISC QPD Transimpedance Amplifier Test Procedure |
Rich Abbott et al. |
System Test
Sensing and Control
|
27 Aug 2013 |
| T1300558-v1 |
L1 DRMI Measurements: a checklist |
Peter Fritschel et al. |
Commissioning
System Test
|
18 Jun 2013 |
| T1300419-v1 |
OFI 1st Article Data_hanford iLog |
Keita Kawabe |
System Test
Auxiliary Optics
|
25 Apr 2013 |
| E1300299-x0 |
SLC & VP Test documents |
Michael Smith |
Auxiliary Optics
System Test
|
22 Apr 2013 |
| G1100769-v2 |
QUAD Testing Outline, Phase 2B |
Jeffrey Kissel et al. |
Auxiliary Optics
Core Optics
System Engineering
Subsystem Test
Basic R&D
Commissioning
System Test
Fabrication
Suspensions
|
25 Mar 2013 |
| D1201511-v2 |
aLIGO Pcal Tooling, Periscope Video Target Plate |
Craig Conley |
Auxiliary Optics
System Test
|
10 Jan 2013 |
| D1200795-v1 |
Breakout Board - DB9 |
Tobin Fricke |
Subsystem Test
System Test
|
18 Jul 2012 |
| T1200171-v1 |
Status of acoustic isolation of the H2 PSL enclosure |
Robert Schofield |
System Test
|
13 Apr 2012 |
| D0901875-v1 |
Breakout Board - SCSI 68 |
David Kinzel |
Subsystem Test
System Test
|
02 Apr 2012 |
| E080462-v1 |
Infrasonic Microphone and PEM++ |
Gabor Szeifert et al. |
Computing/archiving
Data quality / vetoes
Conceptual Design
Calibration
Sensing and Control
Observatory Facilities
Preliminary Design
Requirements
Upgrades
Other data analysis
Integration
Data Acquisition System
Fabrication
System Test
Data and Computing
Basic R&D
|
01 Apr 2012 |
| T1200147-v1 |
IO Chassis Temperature Study |
Rich Abbott et al. |
System Test
System Engineering
|
22 Mar 2012 |
| G1101178-v1 |
Research activities at the Caltech 40m prototype |
Koji Arai |
Sensing and Control
Basic R&D
System Test
Commissioning
|
24 Oct 2011 |
| G1100831-v1 |
eTraveler Overview |
Rich Abbott |
System Engineering
System Test
|
13 Jul 2011 |
| D0901351-v2 |
Universal PDH Servo |
Rich Abbott et al. |
System Test
|
23 May 2011 |
| G1100439-v4 |
AOS TMS Technical Presentation for aLIGO NSF Review April 2011 |
Eric Gustafson |
System Test
Auxiliary Optics
Management
|
05 May 2011 |
| T080021-v3 |
UK UIM Driver Pre-Production Prototype Test Plan |
Jay Heefner |
Suspensions
System Test
|
11 Apr 2011 |
| T0900322-v1 |
Satellite Box Test Plan |
Ron Cutler |
System Test
|
29 Mar 2011 |
| T0900229-v2 |
Quad Monitor Board Test Plan |
Ron Cutler |
System Test
|
29 Mar 2011 |
| T0900230-v2 |
Quad Top Driver Unit Test Plan |
Ron Cutler |
System Test
|
28 Mar 2011 |
| T0900237-v1 |
UIM Driver Board Test Plan |
Ron Cutler |
System Test
|
28 Mar 2011 |
| T0900292-v1 |
PUM Driver Unit Test Plan |
Ron Cutler |
System Test
|
28 Mar 2011 |
| T0900231-v3 |
TOP Driver Board Test Plan |
Ron Cutler |
System Test
|
24 Mar 2011 |
| T0900236-v3 |
UIM Driver Unit Test Plan |
Ron Cutler |
System Test
|
24 Mar 2011 |
| E0900028-v1 |
BSC ISI-Quad Modal analysis |
Fabrice Matichard |
Seismic Isolation
System Test
|
02 Aug 2010 |
| T080014-v2 |
UK Top Driver Pre-Production Prototype Test Plan |
Jay Heefner |
System Test
Suspensions
|
12 May 2010 |
| D0901871-v1 |
Breakout Board - DB37 |
David Kinzel |
Subsystem Test
System Test
|
04 Nov 2009 |
| D0901869-v1 |
Breakout Board - DB15 |
David Kinzel |
Subsystem Test
System Test
|
04 Nov 2009 |
| T0900164-v1 |
UK PUM Driver Pre-Production Prototype Test Plan |
Jay Heefner |
Suspensions
System Test
|
26 Aug 2009 |
| T0900278-v2 |
ALIGO NP-type: Preparations and hazard analysis for test hangs at LASTI in July/August 2009 |
Giles Hammond et al. |
Suspensions
System Test
|
02 Jul 2009 |
| T0900190-v1 |
AdL Triple Low Current Driver Board Prototype Test Plan |
Jay Heefner |
System Test
Suspensions
|
06 May 2009 |
| T0900170-v1 |
UK Top Driver Pre-Production Prototype Bench Test and Evaluation |
Jay Heefner |
Suspensions
System Test
|
23 Apr 2009 |
| T080340-v1 |
Searching for Isolated Pulsars Using Einstein@Home: Setting up S4R2 |
Alicia M Sintes et al. |
System Test
|
06 Mar 2009 |
| T080111-v1 |
UK Satellite Amplifier Pre-Production Prototype Bench Test and Evaluation |
Jay Heefner et al. |
Suspensions
System Test
|
02 Mar 2009 |
| T080048-v2 |
The Review of Production Drawings for the ALIGO ETM Quad End Reaction Mass: Support Notes |
Ken Strain et al. |
System Test
Final Design
Suspensions
|
27 Feb 2009 |
| T0900014-v2 |
UK UIM Coil Driver Pre-Production Prototype Bench Test and Evaluation |
Jay Heefner et al. |
Suspensions
System Test
|
24 Feb 2009 |