LIGO-Number Title Author(s) Topic(s) Last Updated
E1200519-x0 aLIGO, AOS, TCS Mindy Jacobson Subsystem Test
Vacuum
Installation
System Test
System Engineering
Auxiliary Optics
16 Nov 2012
E1000369-x0 aLIGO Testing and Commissioning Documentation Dennis Coyne Subsystem Test
System Engineering
System Test
24 Jun 2022
T0900140-v1 AdL Triple Acquisition Driver Board Prototype Test Plan Jay Heefner Suspensions
System Test
19 Aug 2009
T1200518-v1 Leak localization of the Y arm beamtube at LLO Michael Meyer et al. System Test
Vacuum
06 Jul 2020
G0900436-v1 eLIGO: So how's it turning out? Michael Zucker et al. Meeting
Commissioning
Installation
System Test
Upgrades
Integration
Detector
30 Jul 2019
T0900291-v1 PUM Driver Board Test Plan Ron Cutler System Test
12 Oct 2018
E1200702-v1 ITM04 Transmission Liyuan Zhang et al. Core Optics
System Test
12 Jun 2018
E1700190-v1 ITM01 Integrated Scatter Liyuan Zhang et al. System Test
Core Optics
12 Jun 2018
M1500313-v2 Process Flow for Engineering Operations of the LIGO Detector Systems Dennis Coyne et al. Policies
Installation
Operations
Commissioning
Conceptual Design
Subsystem Test
Detector
System Engineering
Integration
Fabrication
Final Design
Requirements
System Test
07 Jun 2018
M1600168-v1 Hipot testing procedure for Withstand testing of HV coax cabling using the Vitrek 955i Electrical Safety Analyzer: Carl Adams et al. System Test
01 Jun 2016
G1501546-v3 aLIGO OFI Summary of the requirements, specifications, and test results Koji Arai Installation
Fabrication
Requirements
System Test
Auxiliary Optics
28 Jan 2016
E1000722-x0 PSL Testing: High-Power-Laser (HPL) Benno Willke System Test
Laser Systems
08 Apr 2015
T0900301-v1 PSI Actuator Test Plan Fabrice Matichard System Test
03 Apr 2015
T1100291-v2 aLIGO ISC Whitening Chassis Test Procedure Rich Abbott et al. System Test
Sensing and Control
16 Mar 2015
G1200070-v2 Ideal Order/Contents of aLIGO Triple SUS Testing / Commissioning Jeffrey Kissel Installation
Subsystem Test
Commissioning
Suspensions
Integration
System Test
Requirements
Assembly
08 Mar 2015
P1000018-v1 [Thesis] Length Sensing and Control of an Advanced Prototype Interferometric Gravitational Wave Detector Robert Ward Sensing and Control
System Test
Stochastic
09 Sep 2014
G1100693-v5 Ideal Order/Contents of aLIGO QUAD Testing / Commissioning Jeffrey Kissel System Test
Requirements
Assembly
Suspensions
Integration
Subsystem Test
Commissioning
Installation
22 Aug 2014
Q1300010-v1 dcc Release 3.1.0 test doc Cleveland Mak et al. Temporary Test Document
Upgrades
System Test
22 Aug 2014
T1200482-v2 aLIGO SEI / SUS Watchdog Design Jeffrey Kissel et al. Final Design
Data Acquisition System
Seismic Isolation
System Test
System Engineering
Suspensions
Integration
Installation
10 Jul 2014
E1300789-v2 ECR for 135MHz signal chain (REFLAIR-B on ISCT6) Rich Abbott Sensing and Control
System Test
19 Jun 2014
E1300788-v1 ECR: add baffle to PR3 Suspensions to prevent wire heating Dennis Coyne Change Control
System Test
Auxiliary Optics
Suspensions
19 Jun 2014
E1100991-x0 aLIGO BSC-ISI, Phase III Testing Reports (Control Commissioning) Fabrice Matichard System Test
Seismic Isolation
18 Jun 2014
G1400671-v1 DAQ Acceptance Testing Rolf Bork Data Acquisition System
System Test
16 Jun 2014
T1400403-v1 Scatter measurement of small aLIGO Lenses GariLynn Billingsley et al. Input Optics
System Test
13 Jun 2014
D1300749-v1 testing the public view setting bug Cleveland Mak Upgrades
System Test
Temporary Test Document
11 Mar 2014
T1200415-v1 aLIGO LHO Resonances Mark Barton Subsystem Test
System Test
03 Mar 2014
T980121-v1 Preliminary results from Livingston VE vibration & acoustic testing Michael Zucker System Test
Vacuum
19 Feb 2014
E1200844-v2 aLIGO SUS Acceptance Criteria and Deliverables Jeffrey Kissel et al. System Test
Suspensions
11 Dec 2013
E1200639-v1 aLIGO, AOS, TCS, Acceptance of CO2 Laser Projection System Aidan Brooks et al. Auxiliary Optics
System Engineering
Integration
System Test
Installation
Subsystem Test
22 Nov 2013
L1300208-v4 the testing of BUGS 339, 340 and 341 and now 347 & 348 too! Cleveland Mak System Test
Temporary Test Document
20 Nov 2013
E1300766-v3 the testing of BuGS 339, 340 and 341 plus other items on IE Cleveland Mak et al. Upgrades
System Test
Temporary Test Document
12 Nov 2013
G1301146-v2 the testing of BUGS 339, 340 and 341 plus other items on chrome Cleveland Mak Temporary Test Document
System Test
14 Oct 2013
T1300854-v2 3.1.0 patch test document abc Cleveland Mak et al. Temporary Test Document
System Test
11 Oct 2013
E1300746-v2 3.1.0 patch test doc for IE Cleveland Mak Temporary Test Document
System Test
07 Oct 2013
G1300955-x0 dcc 3.1.0 release test document number three Cleveland Mak et al. Temporary Test Document
Quality Assurance
System Test
02 Oct 2013
G1301123-v2 3.1.0 patch test doc for chrome Cleveland Mak System Test
Temporary Test Document
02 Oct 2013
E1300719-v3 DCC release 3.1.0 test doc #2 Cleveland Mak et al. Temporary Test Document
System Test
21 Sep 2013
M1300504-v1 dcc release 3.1.0 test document #4 Cleveland Mak Temporary Test Document
System Test
18 Sep 2013
T080062-v2 UK Satellite Amplifier Test Plan Jay Heefner et al. System Test
Suspensions
18 Sep 2013
T0900080-v1 OMC Suspension Advanced LIGO Test Plan Norna Robertson et al. System Test
Suspensions
06 Sep 2013
T1100160-v9 aLIGO ISC QPD Transimpedance Amplifier Test Procedure Rich Abbott et al. Sensing and Control
System Test
27 Aug 2013
T1300558-v1 L1 DRMI Measurements: a checklist Peter Fritschel et al. Commissioning
System Test
18 Jun 2013
T1300419-v1 OFI 1st Article Data_hanford iLog Keita Kawabe System Test
Auxiliary Optics
25 Apr 2013
E1300299-x0 SLC & VP Test documents Michael Smith System Test
Auxiliary Optics
22 Apr 2013
G1100769-v2 QUAD Testing Outline, Phase 2B Jeffrey Kissel et al. Subsystem Test
Commissioning
Basic R&D
Core Optics
System Test
Fabrication
Suspensions
Auxiliary Optics
System Engineering
25 Mar 2013
D1201511-v2 aLIGO Pcal Tooling, Periscope Video Target Plate Craig Conley System Test
Auxiliary Optics
10 Jan 2013
D1200795-v1 Breakout Board - DB9 Tobin Fricke System Test
Subsystem Test
18 Jul 2012
T1200171-v1 Status of acoustic isolation of the H2 PSL enclosure Robert Schofield System Test
13 Apr 2012
D0901875-v1 Breakout Board - SCSI 68 David Kinzel Subsystem Test
System Test
02 Apr 2012
E080462-v1 Infrasonic Microphone and PEM++ Gabor Szeifert et al. Requirements
Observatory Facilities
Data Acquisition System
System Test
Fabrication
Upgrades
Integration
Other data analysis
Data and Computing
Calibration
Conceptual Design
Sensing and Control
Basic R&D
Data quality / vetoes
Computing/archiving
Preliminary Design
01 Apr 2012
T1200147-v1 IO Chassis Temperature Study Rich Abbott et al. System Test
System Engineering
22 Mar 2012
G1101178-v1 Research activities at the Caltech 40m prototype Koji Arai Basic R&D
Sensing and Control
Commissioning
System Test
24 Oct 2011
G1100831-v1 eTraveler Overview Rich Abbott System Test
System Engineering
13 Jul 2011
D0901351-v2 Universal PDH Servo Rich Abbott et al. System Test
23 May 2011
G1100439-v4 AOS TMS Technical Presentation for aLIGO NSF Review April 2011 Eric Gustafson Management
Auxiliary Optics
System Test
05 May 2011
T080021-v3 UK UIM Driver Pre-Production Prototype Test Plan Jay Heefner Suspensions
System Test
11 Apr 2011
T0900322-v1 Satellite Box Test Plan Ron Cutler System Test
29 Mar 2011
T0900229-v2 Quad Monitor Board Test Plan Ron Cutler System Test
29 Mar 2011
T0900230-v2 Quad Top Driver Unit Test Plan Ron Cutler System Test
28 Mar 2011
T0900237-v1 UIM Driver Board Test Plan Ron Cutler System Test
28 Mar 2011
T0900292-v1 PUM Driver Unit Test Plan Ron Cutler System Test
28 Mar 2011
T0900231-v3 TOP Driver Board Test Plan Ron Cutler System Test
24 Mar 2011
T0900236-v3 UIM Driver Unit Test Plan Ron Cutler System Test
24 Mar 2011
E0900028-v1 BSC ISI-Quad Modal analysis Fabrice Matichard System Test
Seismic Isolation
02 Aug 2010
T080014-v2 UK Top Driver Pre-Production Prototype Test Plan Jay Heefner System Test
Suspensions
12 May 2010
D0901871-v1 Breakout Board - DB37 David Kinzel System Test
Subsystem Test
04 Nov 2009
D0901869-v1 Breakout Board - DB15 David Kinzel System Test
Subsystem Test
04 Nov 2009
T0900164-v1 UK PUM Driver Pre-Production Prototype Test Plan Jay Heefner Suspensions
System Test
26 Aug 2009
T0900278-v2 ALIGO NP-type: Preparations and hazard analysis for test hangs at LASTI in July/August 2009 Giles Hammond et al. System Test
Suspensions
02 Jul 2009
T0900190-v1 AdL Triple Low Current Driver Board Prototype Test Plan Jay Heefner Suspensions
System Test
06 May 2009
T0900170-v1 UK Top Driver Pre-Production Prototype Bench Test and Evaluation Jay Heefner Suspensions
System Test
23 Apr 2009
T080340-v1 Searching for Isolated Pulsars Using Einstein@Home: Setting up S4R2 Alicia M Sintes et al. System Test
06 Mar 2009
T080111-v1 UK Satellite Amplifier Pre-Production Prototype Bench Test and Evaluation Jay Heefner et al. Suspensions
System Test
02 Mar 2009
T080048-v2 The Review of Production Drawings for the ALIGO ETM Quad End Reaction Mass: Support Notes Ken Strain et al. Final Design
System Test
Suspensions
27 Feb 2009
T0900014-v2 UK UIM Coil Driver Pre-Production Prototype Bench Test and Evaluation Jay Heefner et al. Suspensions
System Test
24 Feb 2009

Number of documents found: 75