Document List by Author

Jeffrey Kissel of LIGO - Hanford Observatory is listed as an author on the following documents:
(List events moderated by Jeffrey Kissel)

LIGO-Number Title Author(s) Topic(s) Last Updated
G1100968-v10 Suspensions Controls Design Summary Table Jeffrey Kissel Final Design
Suspensions
02 Jul 2018
T1200264-v4 SUS HAM-A Coil Driver Design Study Rich Abbott et al. Final Design
Suspensions
Input Optics
17 Sep 2024
T1400030-v1 aLIGO HTTS Controls Design Description Mark Barton et al. Preliminary Design
Suspensions
19 Nov 2020
T1400029-v1 aLIGO HAUX Controls Design Description Mark Barton et al. Preliminary Design
Suspensions
19 Nov 2020
T1000388-v18 aLIGO SEI Actuators and Sensors Change of Basis (ISI, Transformation, Orientation, Matrix, Coordinates) Fabrice Matichard et al. Seismic Isolation
30 Aug 2024
D1002704-v7 Rack and Cable Tray Layout_LVEA_H1 Dennis Coyne et al. Observatory Facilities
System Engineering
28 Aug 2024
G1200071-v8 LIGO Seismic Isolation and Suspensions Cartoon Jeffrey Kissel Final Design
Seismic Isolation
Suspensions
22 Aug 2024
T1200015-v4 SUS Sensor/Actuator Sign Conventions Jeffrey Kissel Final Design
Suspensions
13 Nov 2017
G1400519-v3 Impressions of CARM/ALS Jeffrey Kissel Modelling
Sensing and Control
Commissioning
Suspensions
Input Optics
Installation
System Engineering
Laser Systems
12 Jul 2024
G2401313-v2 GWANW 2024 Welcome! Jeffrey Kissel Collaboration
Astrophysics / Multi-messenger
26 Jun 2024
G2401337-v1 NANOGrav Overview / Status, GWANW 2024 (Jerry Sun) Jeffrey Kissel External Collaboration
Astrophysics / Multi-messenger
25 Jun 2024
G2401332-v1 LISA Overview, GWANW 2024 (Tom Wagg) Jeffrey Kissel External Collaboration
Astrophysics / Multi-messenger
25 Jun 2024
G2401324-v1 LVK Alerts Tutorial, GWANW 2024 (Mervyn Chan) Jeffrey Kissel Astrophysics / Multi-messenger
24 Jun 2024
G2401325-v1 NANOGrav Tutorial, GWANW 2024 (Jerry Sun) Jeffrey Kissel Astrophysics / Multi-messenger
24 Jun 2024
T1100617-v4 Transformation (Projection) Matrices Between SEI/SUS Coordinates (ISI to SUS) Jeffrey Kissel et al. Sensing and Control
Seismic Isolation
Commissioning
17 Apr 2024
T1500467-v1 Actuation force of the ESD with charges and cage effects Leonid Prokhorov et al. Suspensions
28 Mar 2024
E030350-v5 Configuration Control & Drawing Requirements Calum Torrie et al. System Engineering
06 Mar 2024
G2400476-v1 Proposal for GWANW Conference Logo Jeffrey Kissel Collaboration
Astrophysics / Multi-messenger
04 Mar 2024
D1001575-v10 aLIGO SEI (Seismic) Sensor (Sensors) and Actuator (Actuators) Electronics Chains Jeffrey Kissel Assembly
Final Design
Seismic Isolation
Commissioning
20 Feb 2024
T0900450-v5 Sensor Noise Estimates for Advanced LIGO Seismic Isolation Systems (SEI_sensor_noise.m) Brian Lantz et al. Final Design
Seismic Isolation
Preliminary Design
Requirements
Basic R&D
03 Nov 2023
T2300137-v2 Report from the Heavy Suspension Workshop @ MIT Brian Lantz et al. Suspensions
A#
19 Oct 2023
E1200933-x0 aLIGO SUS General Documentation Jeffrey Kissel et al. Suspensions
06 Oct 2023
T080138-x0 MATLAB OMC SUS Model Norna Robertson Document Migration
03 Jun 2008
G1100431-v1 aLIGO Active Seismic Isolation Jeffrey Kissel Final Design
Seismic Isolation
Commissioning
Subsystem Test
Installation
15 Sep 2023
G2201909-v3 A+ / O4 OMC DCPD Whitening Chassis Redesign Oct 2022 Update Jeffrey Kissel et al. Sensing and Control
Commissioning
Subsystem Test
Incoming Inspection
05 Sep 2023
T1900248-v7 Record of Real-Time Calibration Pipeline Parameter Configuration Changes: O3 (and ER14) -- H1 Jeffrey Kissel Change Control
Calibration
24 Aug 2023
D1000599-v7 aLIGO SUS HAM 3-4 System Wiring Diagrams Jay Heefner et al. Suspensions
11 May 2022
G2301256-v2 GWANW 2023 Closeout & Pictures Jeffrey Kissel Collaboration
28 Jun 2023
G2301225-v1 GWANW 2023 Welcome! Jeffrey Kissel et al. Astrophysics / Multi-messenger
Education, Outreach
26 Jun 2023
G1500623-v6 aLIGO, CAL, Official Advanced LIGO Sensitivity Plots Jeffrey Kissel et al. Commissioning
Calibration
23 Jun 2023
E1600151-x0 aLIGO, PSL, Intensity Stabilization (ISS) Second Loop Jeffrey Kissel Sensing and Control
Input Optics
Integration
Laser Systems
23 Jun 2023
G1300621-v4 aLIGO TMTS "Level 2" Damping Loop Design Jeffrey Kissel Commissioning
Suspensions
10 May 2023
E1500442-x0 aLIGO, CAL, Publications Jeffrey Kissel Calibration
10 Feb 2023
G1601472-v4 Calibration Measurement / DARM Loop Time Delay (Timing) Diagrams Jeffrey Kissel et al. Modelling
Sensing and Control
Calibration
02 Feb 2023
G2102370-v1 Co-Designing the Post O5 Quadruple Suspension: Podcast Episode 1 -- Controlling the Top Mass Jeffrey Kissel et al. Suspensions
Basic R&D
17 Oct 2022
T1700106-v7 Update to Tracking Temporal Variations in DARM Loop Model Parameters Jeffrey Kissel et al. Sensing and Control
Commissioning
Calibration
04 Dec 2018
T1100232-x0 aLIGO Damping Loop Design and Performance (Level 2.0 Design) Jeffrey Kissel Commissioning
Requirements
Suspensions
Subsystem Test
Integration
19 Sep 2022
P2100207-v3 Characterization of systematic error in Advanced LIGO calibration in the second half of O3 (O3B) Joseph Betzwieser et al. Calibration
09 Sep 2022
P1900244-v12 Initial Results from the LIGO Newtonian Calibrator Michael Ross et al. Sensing and Control
A+
Calibration
Basic R&D
25 Aug 2022
E2000214-x0 aLIGO, CAL, NCAL, Essential Technical Notes Jeffrey Kissel Calibration
25 Aug 2022
G1501518-v21 aLIGO DARM Signal Chain (Calibration Subway Map) Sudarshan Karki et al. Calibration
22 Jun 2022
G2200585-v1 "Staring up at Space" Panelist: Gravitational Waves Jeffrey Kissel Astrophysics / Multi-messenger
24 Mar 2022
G2200527-v1 Science Show and Tell: Gravitational Astronomy Jeffrey Kissel Public relations
Astrophysics / Multi-messenger
16 Mar 2022
T1300645-v6 Re-assessing HAM-ISI Noise Budget Performance Model for aLIGO Jeffrey Kissel Modelling
Seismic Isolation
14 Mar 2022
G1300086-v2 HAM6 Coordinate System Definitions Jeffrey Kissel Modelling
Sensing and Control
Final Design
Seismic Isolation
Commissioning
Suspensions
Integration
System Engineering
08 Mar 2015
E1900133-x0 LIGO Calibration Pipeline Parameter Configurations: O3 Jeffrey Kissel et al. Change Control
Calibration
08 Dec 2021
T1900253-v6 Record of Real-Time Calibration Pipeline Parameter Configuration Changes: O3 (and ER14) -- L1 Joseph Betzwieser et al. Change Control
Calibration
08 Dec 2021
T040072-v1 Triple Model Pendulum Parameter Descriptions and Naming Convention Jeffrey Kissel et al. Document Migration
30 Nov 2021
P1700236-v12 Reconstructing the calibrated strain signal in the Advanced LIGO detectors Aaron Viets et al. Calibration
18 Nov 2021
G2102364-v3 Overview and Lessons of LIGO Calibration through the lens of LISA Calibration Jeffrey Kissel Calibration
Astrophysics / Multi-messenger
12 Nov 2021
P1900245-v7 Characterization of systematic error in Advanced LIGO calibration Ling Sun et al. Calibration
11 Nov 2021
P2000293-v5 physiCal: A physical approach to the marginalization of LIGO calibration uncertainties Salvatore Vitale et al. Compact Binaries
Calibration
Astrophysics / Multi-messenger
Data Analysis
11 Nov 2021
P2000294-v6 Gravitational-wave astronomy with a physical calibration model Ethan Payne et al. Compact Binaries
Calibration
11 Nov 2021
G2101393-v2 Group Projects: Western Washington University (Svenja Fleischer) Jeffrey Kissel Basic R&D
29 Jun 2021
G2101390-v1 Initial Results from the LIGO Newtonian Calibrator Colin Weller et al. Calibration
29 Jun 2021
G2101395-v1 Group Projects: Post-Merger Evolution of Compact Binaries (Matthew Duez, WSU Pullman) Jeffrey Kissel Astrophysics / Multi-messenger
29 Jun 2021
T2100221-v2 H1 NCAL Prototype: PEM Coupling Timesh Mistry et al. Commissioning
Detector Characterization
25 Jun 2021
T2100095-v2 NCal PUM Contribution Note Michael Ross et al. Modelling
Calibration
25 Jun 2021
T2100103-v1 NCal LSSA Force Extraction Michael Ross et al. Calibration
25 Jun 2021
T2000238-v9 Review of NCAL Analytic (Analytical) Force Estimates, Mathematical Details Laurence Datrier et al. Calibration
25 Jun 2021
T2000417-v7 NCAL Prototype H1 Surveying Distance Measurement Timesh Mistry et al. Integration
Basic R&D
25 Jun 2021
G2101334-v1 Welcome to GWANW 2021 Day 2! Jeffrey Kissel Astrophysics / Multi-messenger
24 Jun 2021
T2100066-v4 NCal Ratio Analysis Michael Ross et al. Calibration
Basic R&D
18 Jun 2021
T2100088-v7 NCal Torque to Force Calculations Michael Ross et al. Modelling
Calibration
18 Jun 2021
T2000584-v3 Characterization of systematic error in Advanced LIGO calibration in the second half of O3 (O3B) Jeffrey Kissel et al. Calibration
01 Jun 2021
G2001293-v3 H1's OMC Whitening Systematic Error Impact on TDCF Optical Gain and Cavity Pole Estimate Jeffrey Kissel Calibration
01 Jun 2021
G2000527-v5 Understanding H1's O3 B Electronics Compensation Systematic Error Jeffrey Kissel Calibration
01 Jun 2021
G1500622-x0 Advanced LIGO Sensitivity Plots, H1 Jeffrey Kissel Commissioning
Calibration
23 Mar 2021
G1200524-v2 Magnetic Coupling to Suspension Magnets Jeffrey Kissel Modelling
Seismic Isolation
Commissioning
Suspensions
17 Mar 2021
G2100282-v1 Gravitational Wave Astronomy: History in the Making (CSEE Colloquium @ OSU, 2021-03-01) Jeffrey Kissel Public Talk / Colloquium
01 Mar 2021
G2000923-v2 GWTC-2: Fig. 1 LIGO Scientific Collaboration et al. Compact Binaries
28 Oct 2020
G2002026-v1 LIGO: New Window into the Universe Jeffrey Kissel Public Talk / Colloquium
23 Nov 2020
G1801321-v1 LIGO's New Role in Physics & Astronomy (2018 PNNL Colloquium) Jeffrey Kissel Compact Binaries
Astrophysics / Multi-messenger
Education, Outreach
20 Aug 2020
G1800094-v1 LIGO's New Role in Neutron Star Physics (Outreach Talk to Eastern WA ANS Chapter) Jeffrey Kissel Public Talk / Colloquium
20 Aug 2020
G2001006-v1 Welcome to GWANW 2020! Jeffrey Kissel Collaboration
Astrophysics / Multi-messenger
29 Jun 2020
P1800038-v4 Towards windproofing LIGO: Reducing the effect of wind-driven floor tilt by using rotation sensors in active seismic isolation. Krishna Venkateswara et al. Seismic Isolation
Basic R&D
12 Mar 2020
G2000362-v1 The Search for Lumbering Giants (Talk by Jeff Hazboun) Jeffrey Kissel Astrophysics / Multi-messenger
12 Mar 2020
T1100602-v2 Beam Splitter BSFM Triple Suspension Actuator (Actuation) Control Range (Ranges) Norna Robertson et al. Final Design
Suspensions
20 Feb 2020
T1100595-v4 ETM/ITM Quad Suspension Actuator (Actuation) Control Range (Ranges) Norna Robertson et al. Final Design
Suspensions
20 Feb 2020
E1100397-x0 aLIGO GS-13 testing Jeffrey Kissel Seismic Isolation
Subsystem Test
07 Feb 2020
G1900379-v3 Status Update on Absolute Uncertainty in the GW Detector Network Jeffrey Kissel et al. Sensing and Control
Calibration
Basic R&D
27 Jan 2020
T1900768-v4 SEI Roadmap - Plans and Ideas for better isolation and control for Advanced LIGO Brian Lantz et al. Seismic Isolation
26 Dec 2019
G1902339-v1 LIGO Exploration Center (LExC) Workshop Diagrams Jeffrey Kissel Education, Outreach
12 Dec 2019
P1600063-v11 Improving LIGO calibration accuracy by tracking and compensating for slow temporal variations Darkhan Tuyenbayev et al. Calibration
21 Nov 2019
G1902196-v1 Third Time's a Charm! (2019-11-14 Outreach Talk @ Embry-Riddle) Jeffrey Kissel Commissioning
17 Nov 2019
E1200068-v18 aLIGO SEI STS and T240 Ground Seismometer Inventory Celine Ramet et al. Seismic Isolation
Installation
01 Aug 2016
P1500248-v15 Calibration of the Advanced LIGO detectors for the discovery of the binary black-hole merger GW150914 LIGO Scientific Collaboration et al. Calibration
13 Oct 2019
P1200040-v55 Seismic Isolation of Advanced LIGO: Review of Strategy, Instrumentation, and Performance (CQG 2015) Fabrice Matichard et al. Seismic Isolation
Basic R&D
03 Sep 2019
P1500249-v17 The Advanced LIGO Photon Calibrators Richard Savage et al. Calibration
Auxiliary Optics
23 Jul 2019
P1600139-v16 Calibration Uncertainty for Advanced LIGO’s First and Second Observing Runs Craig Cahillane et al. Calibration
23 Jul 2019
G1901201-v1 LISA Status [Robin 'Tuck' Stebbins] Jeffrey Kissel Astrophysics / Multi-messenger
24 Jun 2019
G1901193-v1 Pulsar Timing Arrays CHIME in on Gravitational Waves [Deborah Good] Jeffrey Kissel Astrophysics / Multi-messenger
24 Jun 2019
G1901176-v1 Numerical Relativity for Vacuum Binary Black Hole [Luisa T. Buchman] Jeffrey Kissel GW source predictions
23 Jun 2019
T1900321-v1 Benefits of the trees around the LIGO Livingston Buildings Brian Lantz et al. Seismic Isolation
Observatory Facilities
30 May 2019
G1900641-v1 Labsphere: Advancing Technology of Light (Chris Durell) Jeffrey Kissel Calibration
19 Mar 2019
G1900401-v2 UW NCal Poster Krishna Venkateswara et al. Sensing and Control
Calibration
Basic R&D
19 Mar 2019
G1900640-v1 Toward the Next Generation of Standards for Laser Power Measurements (Michelle Stephens) Jeffrey Kissel Calibration
19 Mar 2019
G1900638-v1 Laser Power Meter Calibrations at NIST (Matt Spidell) Jeffrey Kissel Calibration
19 Mar 2019
G1900639-v1 Laser Power Meter Calibrations at LNE (Jimmy Dubard) Jeffrey Kissel Calibration
19 Mar 2019
G1900635-v1 Consensus Building: Statistical Treatment of Multiple Results of the Same Measurand (Amanda Koepke) Jeffrey Kissel Calibration
19 Mar 2019
G1900634-v1 Laser Power Measurements at PTB (Stefan Kück) Jeffrey Kissel Calibration
19 Mar 2019
G1900633-v1 EUROMET International Power Comparisons 2005-2007 (Stefan Kück) Jeffrey Kissel Calibration
19 Mar 2019
G1900632-v1 Welcome, The EUROMET 2010, Workshop Goals (John H. Lehman) Jeffrey Kissel Calibration
19 Mar 2019
P0900155-v6 Accurate calibration of test mass displacement in the LIGO interferometers Jeffrey Kissel et al. Commissioning
Calibration
Observatory Facilities
16 Mar 2019
P1000103-v1 [Thesis] Calibrating and Improving the Sensitivity of the LIGO Detectors Jeffrey Kissel Modelling
Final Design
Seismic Isolation
Commissioning
Upgrades
Calibration
16 Mar 2019
T1400256-v17 Time Domain Calibration in Advanced LIGO (circa O1, Now Outdated) Xavier Siemens et al. Calibration
16 Mar 2019
G1900466-v1 LIGO NCAL Status Update Jeffrey Kissel et al. Sensing and Control
Preliminary Design
Calibration
15 Mar 2019
G1900396-v3 Calibrating of the LIGO Interferometers: Third Time's a Charm (NIST Workshop) Jeffrey Kissel Sensing and Control
Commissioning
Calibration
15 Mar 2019
G1800953-v1 [GWADW] Absolute Calibration of a Galactic Gravitational Wave Detector Network Jeffrey Kissel Modelling
Sensing and Control
Preliminary Design
Upgrades
Calibration
External Collaboration
Integration
GW source predictions
Observatory Facilities
System Engineering
Astrophysics / Multi-messenger
Basic R&D
12 Mar 2019
G1700810-v1 [GWADW] Calibration Considerations for the 3G Detector Era Jeffrey Kissel Calibration
12 Mar 2019
T1300993-v3 Suggestions for modifications to future suspension designs Brian Lantz et al. Basic R&D
28 Feb 2019
G1800319-v1 O2 C02 Calibration Uncertainty Results Review / Update / Summary Jeffrey Kissel et al. Sensing and Control
Calibration
08 Feb 2019
T1800066-v2 typical motion of HAM Suspension points in O2 Brian Lantz et al. Seismic Isolation
Installation
17 Dec 2018
G1801952-v1 L1 Calibrated Sensitivity Spectra Aug 06 2017 (Representative Best of O2 -- C02, With Cleaning/Subtraction) Jeffrey Kissel Calibration
01 Dec 2018
G1701571-v1 L1 Calibrated Sensitivity Spectra Jul 20 2017 (Representative Best of O2 -- C01, No Subtraction) Jeffrey Kissel Calibration
29 Nov 2018
G1801951-v1 L1 Calibrated Sensitivity Spectra Aug 06 2017 (Representative Best of O2 -- C02, No Subtraction) Jeffrey Kissel Calibration
29 Nov 2018
G1701570-v1 H1 Calibrated Sensitivity Spectra Dec 08 2016 (Representative Best of O2 -- C01, No Subtraction) Jeffrey Kissel Calibration
29 Nov 2018
G1801950-v1 H1 Calibrated Sensitivity Spectra Jun 10 2017 (Representative Best of O2 -- C02, With Cleaning/Subtraction) Jeffrey Kissel Calibration
29 Nov 2018
G1801949-v1 H1 Calibrated Sensitivity Spectra Jun 10 2017 (Representative Best of O2 -- C02, No Subtraction) Jeffrey Kissel Calibration
29 Nov 2018
G1802165-v1 L1 Calibrated Sensitivity Spectra Oct 20 2018 (Representative for ER13) Jeffrey Kissel et al. Calibration
09 Nov 2018
G1802164-v1 H1 Calibrated Sensitivity Spectra Nov 08 2018 (Representative for ER13) Jeffrey Kissel et al. Calibration
09 Nov 2018
G1601003-v7 O1 C02 Uncertainty Estimation of Calibration: Review of Methods and Results Craig Cahillane et al. Commissioning
Calibration
09 Nov 2018
G1802078-v1 What’s Next for Gravitational Wave Astronomy? Jeffrey Kissel Sensing and Control
Commissioning
26 Oct 2018
G1500456-v4 CARM / ALS Electro-Optical Controls Diagram Jeffrey Kissel Final Design
05 Sep 2018
P1200011-v6 Dynamics Enhancements of Advanced LIGO Multi-Stage Active Vibration Isolators and Related Control Performance Improvement Fabrice Matichard et al. Seismic Isolation
Basic R&D
20 Jun 2018
M1500313-v2 Process Flow for Engineering Operations of the LIGO Detector Systems Dennis Coyne et al. Operations
Final Design
Policies
Conceptual Design
Detector
Commissioning
Requirements
Fabrication
System Test
Subsystem Test
Installation
Integration
System Engineering
07 Jun 2018
T020059-v3 Are Reaction Chains Needed for aLIGO HAM Optics? Norna Robertson et al. Modelling
Sensing and Control
Seismic Isolation
Requirements
Document Migration
Suspensions
13 Feb 2018
D020214-x0 Hydraulic External Pre-Isolation (HEPI): Piping and Instrumentation Diagram Dennis Coyne Document Migration
11 Apr 2003
T1100030-v1 Optical Paths Lengths Through a Wedged Optic at Non-normal Incidence: The aLIGO Mode Cleaner Jeffrey Kissel Modelling
Sensing and Control
Input Optics
23 Jan 2018
E1700352-v1 (OFIS) Output Faraday Isolator Suspension Controls Arrangement Poster Jeffrey Kissel Final Design
Suspensions
13 Nov 2017
E1200045-v3 (TMTS) Transmission Monitor & Telescope Suspension Controls Arrangement Poster Jeffrey Kissel Assembly
Sensing and Control
Commissioning
Suspensions
13 Nov 2017
E1700390-v1 (OPOS) Optical Parametric Oscillator Suspension Controls Arrangement Poster Jeffrey Kissel Assembly
Sensing and Control
Final Design
Suspensions
Subsystem Test
Integration
Squeezer
13 Nov 2017
T1100378-v12 aLIGO QUAD Controls Design Description Jay Heefner et al. Final Design
Suspensions
06 Sep 2017
P1700149-v7 Tilt Seismology Michael Ross et al. Seismic Isolation
11 Jul 2017
G1700809-v1 What Does Low Frequency Control Look Like in the 2G+ and 3G Era? Jeffrey Kissel Sensing and Control
Seismic Isolation
Conceptual Design
State Control and Monitoring
Upgrades
Suspensions
Integration
Squeezer
System Engineering
Basic R&D
12 Jun 2017
G1700316-v2 O2 DARM Loop Design Comparisons and Critiques Evan Goetz et al. Modelling
Sensing and Control
Calibration
05 Apr 2017
G1400135-v1 Hierarchical Control of Toy Double Pendulum for Practice (HIFO-XY) Jeffrey Kissel Sensing and Control
Commissioning
Suspensions
System Engineering
07 Mar 2017
G1501372-v1 O1 DARM Loop Design Comprisons and Critiques Jeffrey Kissel Modelling
Sensing and Control
Calibration
Incoming Inspection
Integration
07 Mar 2017
P1600285-v21 Validating gravitational-wave detections: The Advanced LIGO hardware injection system Christopher Biwer et al. Detector
20 Feb 2017
G1700086-v2 L1 Calibrated Sensitivity Spectra Dec 13 2016 (Representative for Early O2) Jeffrey Kissel Calibration
24 Jan 2017
G1700085-v2 H1 Calibrated Sensitivity Spectra Dec 13 2016 (Representative for Early O2) Jeffrey Kissel Sensing and Control
Commissioning
Calibration
Detector Characterization
24 Jan 2017
E1600022-x0 Long-Term Studies of Site Ground Motion Jeffrey Kissel Modelling
Seismic Isolation
Observatory Facilities
Basic R&D
23 Jan 2017
P1500278-v4 Subtracting tilt from a horizontal-seismometer using a ground-rotation-sensor Krishna Venkateswara et al. Seismic Isolation
Basic R&D
14 Dec 2016
G1600699-v1 Interaction of the ESD with electrical charges of the test masses in Advanced LIGO Jeffrey Kissel et al. Core Optics
Suspensions
Calibration
Basic R&D
28 Nov 2016
T1400349-v13 Documentation of the Advanced LIGO Hardware Injection Infrastructure Eric Thrane et al. Data analysis software
GW Bursts
Data quality / vetoes
Compact Binaries
Stochastic
Continuous Wave
Computing/archiving
26 Oct 2016
G1602009-v1 Gravitational Wave Astronomy Begins! (2016-09-28 Astronomy on Tap, Seattle) Jeffrey Kissel Public Talk / Colloquium
Astrophysics / Multi-messenger
28 Sep 2016
T1300950-v8 Calibration Uncertainty Budget Requirements for early aLIGO Xavier Siemens et al. Calibration
23 Sep 2016
T1500377-v8 Tracking temporal variations in the DARM calibration parameters. Darkhan Tuyenbayev et al. Calibration
12 Sep 2016
G1601529-v1 Tilt- and Sensor-correction filter tuning at LHO Conor Mow-Lowry et al. Seismic Isolation
Commissioning
02 Sep 2016
G1400001-v3 The Status of Advanced LIGO: Light at the End of the Tunnels! Jeffrey Kissel et al. Data Acquisition System
Sensing and Control
Seismic Isolation
Core Optics
Commissioning
State Control and Monitoring
Public Talk / Colloquium
Suspensions
Input Optics
Integration
System Engineering
Laser Systems
Auxiliary Optics
17 Aug 2016
P0900120-v17 Calibration of the LIGO Gravitational Wave Detectors in the Fifth Science Run (S5 Calibration Paper) LIGO Scientific Collaboration et al. Sensing and Control
Calibration
04 Aug 2016
E1500291-x0 aLIGO, INJ Eric Thrane et al. GW Bursts
Compact Binaries
Stochastic
Calibration
Continuous Wave
Detector Characterization
27 Jul 2016
T1300503-v4 Redesign of quad UIM coil driver and magnet size to reduce magnetic coupling Norna Robertson et al. Final Design
Suspensions
14 Jun 2016
T1500120-v1 Suggested Improvements to SEI / SUS Designs for aLIGO Upgrades Jeffrey Kissel et al. Sensing and Control
Seismic Isolation
Conceptual Design
Core Optics
Commissioning
Upgrades
Suspensions
System Engineering
Auxiliary Optics
26 May 2016
G1401291-v3 aLIGO HSTS Damping Loop Design Comparison Jeffrey Kissel et al. Modelling
Sensing and Control
Commissioning
Suspensions
Integration
25 May 2016
G1401290-v1 aLIGO HSTS "Level 2" Damping Loop Design Betsy Weaver et al. Modelling
Sensing and Control
Seismic Isolation
Commissioning
Suspensions
Integration
25 May 2016
G1400151-x0 aLIGO HLTS "Level 2" Damping Loop Design Jeffrey Kissel Modelling
Sensing and Control
Commissioning
Suspensions
25 May 2016
E1200343-v96 OSEM Chart Stuart Aston et al. Assembly
Suspensions
Subsystem Test
22 Oct 2015
G1501223-v3 H1 Calibrated Sensitivity Spectra Oct 1 2015 (Representative for Start of O1) Jeffrey Kissel Sensing and Control
Commissioning
Calibration
Detector Characterization
19 Oct 2015
G1500823-v4 H1 Calibrated Sensitivity Spectra Jun 9 2015 (Best for ER7) Jeffrey Kissel Sensing and Control
Commissioning
Calibration
Detector Characterization
09 Jul 2015
G1401207-v4 Advanced LIGO Seismic Isolation and Control Brett Shapiro et al. Sensing and Control
Seismic Isolation
Suspensions
03 Apr 2015
E1000169-v20 SUS HAM Production Blades - Characterization Spreadsheet Janeen Romie et al. Fabrication
Suspensions
08 Mar 2015
D1101493-v2 HSTS / HLTS / OMCS OSEM Orientations Jeffrey Kissel Suspensions
Installation
08 Mar 2015
G1200070-v2 Ideal Order/Contents of aLIGO Triple SUS Testing / Commissioning Jeffrey Kissel Assembly
Commissioning
Requirements
System Test
Suspensions
Subsystem Test
Installation
Integration
08 Mar 2015
P1400105-v5 Achieving Resonance in the Advanced LIGO Gravitational-Wave Interferometer Alexa N Staley et al. Sensing and Control
Integration
Basic R&D
05 Mar 2015
G080570-x0 aLIGO HAM-ISI PDR: Part 2 - Preliminary Performance Review Jeffrey Kissel Document Migration
29 Jan 2015
E1300917-v1 L1 SUS ITMY Acceptance Document Stuart Aston et al. Suspensions
06 Nov 2014
E1100427-v4 aLIGO SEI Testing, HAM-ISI, Results Compilation Hugo Paris et al. Seismic Isolation
Subsystem Test
05 Nov 2014
E1400434-v2 ECR: Revision of SUS OpLev and OpLev damping channels to be stored in the data frames Stuart Aston et al. Suspensions
04 Nov 2014
T1400672-x0 Report from the Commissioning Workshop on Suspensions at Virgo Jeffrey Kissel et al. Modelling
Seismic Isolation
Meeting
Commissioning
Suspensions
Installation
Integration
Basic R&D
21 Oct 2014
G1401248-v1 Photos From Oct 2014 SEI & SUS Commissioning Workshop @ VIRGO Jeffrey Kissel et al. Seismic Isolation
Commissioning
Vacuum
Suspensions
21 Oct 2014
G1200692-v3 Hierarchical Control Notes – Blending Style Brett Shapiro et al. Basic R&D
16 Oct 2014
T1300130-v3 Longitudinal-to-Angle Coupling in Optical Levers Thomas Vo et al. Modelling
Auxiliary Optics
23 Sep 2014
E1300513-v1 L1 SUS PR2 Acceptance Document Stuart Aston et al. Suspensions
05 Sep 2014
E1201042-v2 L1 SUS MC2 Acceptance Document Jeffrey Kissel et al. Suspensions
05 Sep 2014
E1201038-v5 aLIGO SUS QUAD General Acceptance Documentation Jeffrey Kissel et al. Suspensions
05 Sep 2014
E1201040-v12 aLIGO SUS HSTS General Acceptance Documentation Norna Robertson Suspensions
05 Sep 2014
E1300497-x0 3rd IFO SUS PRM Acceptance Document Jeffrey Kissel Suspensions
Subsystem Test
05 Sep 2014
E1300514-x0 3rd IFO SUS MC1 Acceptance Document Jeffrey Kissel Suspensions
Subsystem Test
05 Sep 2014
G1100693-v5 Ideal Order/Contents of aLIGO QUAD Testing / Commissioning Jeffrey Kissel Assembly
Commissioning
Requirements
System Test
Suspensions
Subsystem Test
Installation
Integration
22 Aug 2014
T1200482-v2 aLIGO SEI / SUS Watchdog Design Jeffrey Kissel et al. Data Acquisition System
Final Design
Seismic Isolation
System Test
Suspensions
Installation
Integration
System Engineering
10 Jul 2014
T1400448-v1 Single Pendulum Parameter Descriptions and Naming Conventions Jeffrey Kissel et al. Modelling
Suspensions
07 Jul 2014
E1201048-x0 aLIGO SUS OMCS Individual Acceptance Reports Jeffrey Kissel Suspensions
21 Jun 2014
E1201047-x0 aLIGO SUS HSTS Individual Acceptance Reports Jeffrey Kissel Suspensions
21 Jun 2014
E1201046-x0 aLIGO SUS HLTS Individual Acceptance Reports Jeffrey Kissel Suspensions
21 Jun 2014
E1201045-x0 aLIGO SUS BSFM Individual Acceptance Reports Jeffrey Kissel Suspensions
21 Jun 2014
E1201044-x0 aLIGO SUS QUAD Individual Acceptance Reports Jeffrey Kissel Suspensions
21 Jun 2014
E1201043-v3 aLIGO SUS OMCS General Acceptance Documentation Jeffrey Kissel et al. Suspensions
21 Jun 2014
E1201041-v7 aLIGO SUS HLTS General Acceptance Documentation Jeffrey Kissel et al. Suspensions
21 Jun 2014
E1201039-v9 aLIGO SUS BSFM General Acceptance Documentation Jeffrey Kissel et al. Suspensions
21 Jun 2014
E1400078-v2 ECR for modification of SUS BS RCG model to allow damping of bounce and roll modes Nicolas Smith et al. Suspensions
20 Jun 2014
G1301192-v3 Simulink/Front Model & MEDM Screen Mods from ECR E1300578 Jeffrey Kissel Sensing and Control
Commissioning
Suspensions
19 Jun 2014
G1000125-v9 aLIGO BSC-ISI, HAM-ISI, and HEPI Basis and Naming Conventions Jeffrey Kissel et al. Seismic Isolation
Vacuum
Installation
Observatory Facilities
18 Jun 2014
F0900070-v6 GS-13 Inspection Checklist Joe Hanson et al. Seismic Isolation
Subsystem Test
Installation
Incoming Inspection
18 Jun 2014
E1100395-v1 aLIGO GS-13 Post Modification testing results Jeffrey Kissel et al. Seismic Isolation
Subsystem Test
18 Jun 2014
E1100394-v1 aLIGO GS-13 prior shipping testing results Jeffrey Kissel Seismic Isolation
Subsystem Test
18 Jun 2014
E1100393-v2 aLIGO GS-13 as received testing results Jeffrey Kissel et al. Seismic Isolation
Subsystem Test
18 Jun 2014
E1000058-v46 aLIGO GS-13 Status Chart Jeffrey Kissel et al. Seismic Isolation
Installation
18 Jun 2014
G1400636-v1 2014-06-10 H1 SUS ITMY Install Jeffrey Kissel Suspensions
Installation
10 Jun 2014
E070285-x0 Process Traveler - SEI HAM misc aluminum cleaning Jeffrey Kissel Document Migration
25 Mar 2014
E1400107-v2 ECR: store suspension mis/alignment values separately in EPICS database Jameson Graef Rollins et al. Change Control
Suspensions
15 Mar 2014
T0900060-v2 OMC Suspension Final Design Document Jay Heefner et al. Final Design
Suspensions
20 Feb 2014
G1301210-v1 Software Watchdogs for SUS + ISI + HEPI Brian Lantz et al. Seismic Isolation
Suspensions
Data and Computing
Integration
29 Jan 2014
T1300435-v1 Suspension Module Guardian Design Jeffrey Kissel et al. Preliminary Design
Commissioning
State Control and Monitoring
Suspensions
20 Jan 2014
T0900555-v6 Error Estimation of the LIGO Response Function Jeffrey Kissel Modelling
Sensing and Control
Calibration
18 Dec 2013
T1300998-v2 Reasons to Integrate Control System Design with Mechanical Design for Seismic Isolation and Alignment Systems Brett Shapiro et al. Conceptual Design
12 Dec 2013
G1200632-v3 Towards Applied Heirarchical Control Jeffrey Kissel Sensing and Control
Seismic Isolation
Preliminary Design
Commissioning
Suspensions
11 Dec 2013
G1300530-v2 The aLIGO Guardian Jeffrey Kissel Preliminary Design
Commissioning
State Control and Monitoring
11 Dec 2013
E1200844-v2 aLIGO SUS Acceptance Criteria and Deliverables Jeffrey Kissel et al. System Test
Suspensions
11 Dec 2013
G1300561-v1 aLIGO BSFM "Level 2" Damping Loop Design Jeffrey Kissel Commissioning
Suspensions
11 Dec 2013
G1300537-v3 aLIGO QUAD "Level 2" Damping Loop Design Jeffrey Kissel Commissioning
Suspensions
11 Dec 2013
T1300936-v1 HEPI model updates Nov 2013 Brian Lantz et al. Seismic Isolation
Installation
Integration
09 Dec 2013
T1000012-v6 HAM Large Triple Suspension (HLTS) Final Design Document Norna Robertson et al. Final Design
Suspensions
17 Oct 2013
G1300952-v1 aLIGO Output Mode Cleaner: Design, Fabrication, and Installation Rich Abbott et al. Sensing and Control
Final Design
Fabrication
Installation
20 Sep 2013
T0900435-v9 HAM Small Triple Suspension (HSTS) Final Design Document Norna Robertson et al. Final Design
Suspensions
10 Sep 2013
T1300563-v4 H1 AOS Optical Lever Commissioning and Testing Eric Black et al. Subsystem Test
03 Sep 2013
E1300578-v1 ECR: Topology Changes to SUS models as a result of ISC Informed Interaction Jeffrey Kissel Commissioning
Change Control
Suspensions
02 Jul 2013
G1100769-v2 QUAD Testing Outline, Phase 2B Jeffrey Kissel et al. Core Optics
Commissioning
Fabrication
System Test
Suspensions
Subsystem Test
System Engineering
Basic R&D
Auxiliary Optics
25 Mar 2013
G1200753-v1 aLIGO H2 One Arm Test Update Keita Kawabe et al. Detector
Commissioning
03 Dec 2012
T1200400-x0 Magnetic Modeling in ANSYS Workbench (version 13.0) Jeffrey Kissel Modelling
Suspensions
20 Aug 2012
D1101489-v16 LASTI Wiring Diagram Sam Waldman et al. Installation
20 Jul 2012
T0900285-v2 L1 HAM6 ISI eLIGO Final Performance Measurements (March 24 2010) Jeffrey Kissel Final Design
Seismic Isolation
Commissioning
Requirements
12 Mar 2012
P1200020-x0 Design, Control, and Performance of a Prototype Advanced LIGO Single-Stage Seismic Isolation Platform Jeffrey Kissel et al. Final Design
Seismic Isolation
Commissioning
Requirements
Subsystem Test
27 Feb 2012
G1100481-v1 Advanced LIGO Interferometers: The Rubber Hits the Road! Jeffrey Kissel et al. Final Design
System Engineering
24 May 2011
P080016-x0 The LSC glitch group: monitoring noise transients during the fifth LIGO science run Robert Schofield et al. Document Migration
Public relations
22 Oct 2009
G0900349-v4 The Present and Near Future of LIGO Jeffrey Kissel Final Design
Meeting
Commissioning
Upgrades
Installation
Basic R&D
15 Jul 2009
G0900427-v2 Results from Prototype Advanced LIGO Seismic Isolation Jeffrey Kissel Seismic Isolation
29 May 2009
G0900141-v3 Performance of eLIGO Prototype HAM ISIs and improvements for aLIGO HAM ISIs Jeffrey Kissel Modelling
Final Design
Seismic Isolation
Commissioning
Requirements
Upgrades
13 Apr 2009
E0900075-v1 Response to HAM-ISI Watchdog Committee Recommendations Jeffrey Kissel et al. Seismic Isolation
Commissioning
09 Mar 2009
T0900011-v5 The HAM ISI Watchdog Jeffrey Kissel Seismic Isolation
30 Jan 2009
T080251-x0 Enhanced LIGO HAM ISI Prototype - Preliminary Performance Review Jeffrey Kissel et al. Document Migration
13 Oct 2008
T080254-x0 HAM ISI List of "Gotchas", Needs and Reminders Joe Hanson et al. Document Migration
07 Oct 2008
T080262-x0 Cleaning and Assembly Procedure for ISI Sensor Pods Joe Hanson et al. Document Migration
07 Oct 2008
T080125-x0 HAM ISI Damping Loop Turn On Procedure Jeffrey Kissel Document Migration
21 May 2008
E070287-x0 Process Traveler - SEI stage 0 plate Jeffrey Kissel Document Migration
24 Apr 2008
E070286-x0 Process Traveler - SEI HAM class B Jeffrey Kissel Document Migration
24 Apr 2008
G080246-x0 Activities of the LSC glitch group during S5 Lindy Blackburn et al. Document Migration
11 Apr 2008
G080216-x0 Investigation of Discrepancies Between Photon Calibrator, VCO and Official (Coil) Calibration Techniques - LSC/Virgo Collaborations Meeting @ Caltech, March 17-20, 2008 Justin Garofoli et al. Document Migration
04 Apr 2008
G080182-x0 LIGO In-vacuum Sensors - LSC/Virgo Collaborations Meeting @ Caltech, March 17-20, 2008 Jeffrey Kissel Document Migration
04 Apr 2008
E070283-x0 Process Traveler - SEI HAM misc stainless cleaning Jeffrey Kissel Document Migration
06 Feb 2008

Number of documents found: 240


DCC Version 3.4.3, contact Document Database Administrators