G2201909-v3 |
A+ / O4 OMC DCPD Whitening Chassis Redesign Oct 2022 Update |
Jeffrey Kissel et al. |
Commissioning
Sensing and Control
Incoming Inspection
Subsystem Test
|
05 Sep 2023 |
Q2000005-v1 |
TMS shroud Post-coating Inspection |
Kyle Baric et al. |
Incoming Inspection
|
30 Nov 2021 |
E1700080-x0 |
AERM08 Characterization |
GariLynn Billingsley |
Incoming Inspection
Core Optics
|
16 Jun 2020 |
E1700079-x0 |
AERM07 Characterization |
GariLynn Billingsley |
Incoming Inspection
Core Optics
|
16 Jun 2020 |
E1700078-x0 |
AERM06 Characterization |
GariLynn Billingsley |
Core Optics
Incoming Inspection
|
16 Jun 2020 |
E1700077-x0 |
AERM05 Characterization |
GariLynn Billingsley |
Core Optics
Incoming Inspection
|
16 Jun 2020 |
T1900395-v1 |
Incoming Test of Spare SQZ Mephisto 1000NE Laser System |
Jason Oberling |
Laser Systems
Incoming Inspection
|
06 Aug 2019 |
E1800096-v1 |
CVD Silicon Carbide Beam Dump Inspection |
Regina Lee |
Incoming Inspection
|
08 Nov 2018 |
E1800039-v3 |
Baffle Inspection D1003301-v9 |
Regina Lee |
Incoming Inspection
System Engineering
|
08 Nov 2018 |
T1600204-v2 |
Mirror loss estimates for aLIGO pre-modecleaners |
Liyuan Zhang et al. |
Incoming Inspection
Operations
Laser Systems
|
30 Jul 2016 |
G1501372-v1 |
O1 DARM Loop Design Comprisons and Critiques |
Jeffrey Kissel |
Incoming Inspection
Integration
Calibration
Sensing and Control
Modelling
|
07 Mar 2017 |
E0900426-v5 |
HEPI Kaman Sensor Receiving Analysis |
Hugh Radkins et al. |
Seismic Isolation
Incoming Inspection
|
10 Mar 2015 |
D1101941-v2 |
ETM HWS EtherCAT breakout box |
Aidan Brooks et al. |
Auxiliary Optics
Incoming Inspection
|
25 Jun 2014 |
F0900070-v6 |
GS-13 Inspection Checklist |
Joe Hanson et al. |
Installation
Incoming Inspection
Seismic Isolation
Subsystem Test
|
18 Jun 2014 |
T0900564-v2 |
aLIGO Large Actuator Test Results from Qinetiq |
Brian O'Reilly |
Seismic Isolation
Incoming Inspection
|
18 Jun 2014 |
E1000295-v8 |
aLIGO TCS Ring Heater Assembies, Formal Drawing Tree & BOM Reference |
Guido Mueller et al. |
Incoming Inspection
Vacuum
Fabrication
Auxiliary Optics
|
25 Oct 2013 |
T1300812-v1 |
Manifold-cryo-baf_Blades_Weight_Req |
Michael Smith |
Auxiliary Optics
Incoming Inspection
|
17 Sep 2013 |
T1300789-v1 |
OFI Wedge Prism Reflectance Data |
Michael Smith |
Auxiliary Optics
Incoming Inspection
|
16 Sep 2013 |
E1300424-v1 |
Thickness Inspection D0902817–v4 Blade Manifold/Cryo Baf |
Michael Smith |
Auxiliary Optics
Incoming Inspection
|
13 Sep 2013 |
E1100583-v1 |
SEM Examination of Spotted and Rusted Cantilever Blades |
Jeffrey Lewis |
Incoming Inspection
|
13 Sep 2013 |
E1300368-v1 |
Install BS Elliptical Baffle LLO BSC2 X&Y Test |
Michael Smith |
Incoming Inspection
Auxiliary Optics
|
15 May 2013 |
F1100002-v4 |
Winding Template, aLIGO TCS Ring Heater Elements |
Mindy Jacobson et al. |
Incoming Inspection
Vacuum
Fabrication
Auxiliary Optics
|
07 Mar 2013 |
T1200083-v1 |
aLIGO Kepco DC Power Supply Acceptance Testing Scripts |
Carl Adams |
Incoming Inspection
|
16 Apr 2012 |
E1101200-v1 |
6in VP Type 1 Run Numbers-Serial Numbers |
Michael Smith |
Incoming Inspection
|
15 Dec 2011 |
E1101199-v1 |
6in VP Type 1 AR data |
Michael Smith |
Incoming Inspection
|
15 Dec 2011 |
G1100147-v1 |
HLTS Kickoff Presentation |
Derek Bridges et al. |
Assembly
Suspensions
Meeting
Subsystem Test
Incoming Inspection
|
06 Jul 2011 |
E1000498-x0 |
aLIGO SUS BOSEM Testing Documentation |
Derek Bridges et al. |
Suspensions
Incoming Inspection
Subsystem Test
|
04 Mar 2011 |
T1000700-v2 |
Transmon Telescope Mirror Test Procedure |
Michael Smith et al. |
Auxiliary Optics
Subsystem Test
Incoming Inspection
Final Design
|
21 Dec 2010 |
E1000376-v1 |
RGA Test Results: A-OSEM Circuit Board Sub-Assembly (223 units) |
Dennis Coyne et al. |
Vacuum
Incoming Inspection
System Engineering
Suspensions
|
01 Sep 2010 |
E1000217-v1 |
LHO QUAD Lower Structure FTIR Post Bake, Repeat |
Betsy Weaver |
Suspensions
Incoming Inspection
|
11 Aug 2010 |
E1000102-v2 |
LHO LABO FTIR Sample Record HR202 |
Hugh Radkins |
Seismic Isolation
Incoming Inspection
|
08 Apr 2010 |
E1000002-v1 |
Certification for Viton for L1 HAM6 OMC damping struts |
Robert Taylor et al. |
Seismic Isolation
Incoming Inspection
Suspensions
Installation
Commissioning
|
11 Jan 2010 |