Document List by Topic
Home
Recent Changes
Topics
Login
These documents on
Incoming Inspection
(subtopic of
Activity
) are available:
LIGO-Number
Title
Author(s)
Topic(s)
Last Updated
G2201909-v3
A+ / O4 OMC DCPD Whitening Chassis Redesign Oct 2022 Update
Jeffrey Kissel
et al.
Subsystem Test
Incoming Inspection
Commissioning
Sensing and Control
05 Sep 2023
Q2000005-v1
TMS shroud Post-coating Inspection
Kyle Baric
et al.
Incoming Inspection
30 Nov 2021
E1700080-x0
AERM08 Characterization
GariLynn Billingsley
Incoming Inspection
Core Optics
16 Jun 2020
E1700079-x0
AERM07 Characterization
GariLynn Billingsley
Incoming Inspection
Core Optics
16 Jun 2020
E1700078-x0
AERM06 Characterization
GariLynn Billingsley
Incoming Inspection
Core Optics
16 Jun 2020
E1700077-x0
AERM05 Characterization
GariLynn Billingsley
Incoming Inspection
Core Optics
16 Jun 2020
T1900395-v1
Incoming Test of Spare SQZ Mephisto 1000NE Laser System
Jason Oberling
Incoming Inspection
Laser Systems
06 Aug 2019
E1800096-v1
CVD Silicon Carbide Beam Dump Inspection
Regina Lee
Incoming Inspection
08 Nov 2018
E1800039-v3
Baffle Inspection D1003301-v9
Regina Lee
Incoming Inspection
System Engineering
08 Nov 2018
T1600204-v2
Mirror loss estimates for aLIGO pre-modecleaners
Liyuan Zhang
et al.
Incoming Inspection
Laser Systems
Operations
30 Jul 2016
G1501372-v1
O1 DARM Loop Design Comprisons and Critiques
Jeffrey Kissel
Incoming Inspection
Integration
Sensing and Control
Modelling
Calibration
07 Mar 2017
E0900426-v5
HEPI Kaman Sensor Receiving Analysis
Hugh Radkins
et al.
Incoming Inspection
Seismic Isolation
10 Mar 2015
D1101941-v2
ETM HWS EtherCAT breakout box
Aidan Brooks
et al.
Incoming Inspection
Auxiliary Optics
25 Jun 2014
F0900070-v6
GS-13 Inspection Checklist
Joe Hanson
et al.
Subsystem Test
Incoming Inspection
Installation
Seismic Isolation
18 Jun 2014
T0900564-v2
aLIGO Large Actuator Test Results from Qinetiq
Brian O'Reilly
Incoming Inspection
Seismic Isolation
18 Jun 2014
E1000295-v8
aLIGO TCS Ring Heater Assembies, Formal Drawing Tree & BOM Reference
Guido Mueller
et al.
Vacuum
Incoming Inspection
Auxiliary Optics
Fabrication
25 Oct 2013
T1300812-v1
Manifold-cryo-baf_Blades_Weight_Req
Michael Smith
Incoming Inspection
Auxiliary Optics
17 Sep 2013
T1300789-v1
OFI Wedge Prism Reflectance Data
Michael Smith
Incoming Inspection
Auxiliary Optics
16 Sep 2013
E1300424-v1
Thickness Inspection D0902817–v4 Blade Manifold/Cryo Baf
Michael Smith
Incoming Inspection
Auxiliary Optics
13 Sep 2013
E1100583-v1
SEM Examination of Spotted and Rusted Cantilever Blades
Jeffrey Lewis
Incoming Inspection
13 Sep 2013
E1300368-v1
Install BS Elliptical Baffle LLO BSC2 X&Y Test
Michael Smith
Incoming Inspection
Auxiliary Optics
15 May 2013
F1100002-v4
Winding Template, aLIGO TCS Ring Heater Elements
Mindy Jacobson
et al.
Vacuum
Incoming Inspection
Auxiliary Optics
Fabrication
07 Mar 2013
T1200083-v1
aLIGO Kepco DC Power Supply Acceptance Testing Scripts
Carl Adams
Incoming Inspection
16 Apr 2012
E1101200-v1
6in VP Type 1 Run Numbers-Serial Numbers
Michael Smith
Incoming Inspection
15 Dec 2011
E1101199-v1
6in VP Type 1 AR data
Michael Smith
Incoming Inspection
15 Dec 2011
G1100147-v1
HLTS Kickoff Presentation
Derek Bridges
et al.
Subsystem Test
Assembly
Incoming Inspection
Meeting
Suspensions
06 Jul 2011
E1000498-x0
aLIGO SUS BOSEM Testing Documentation
Derek Bridges
et al.
Subsystem Test
Incoming Inspection
Suspensions
04 Mar 2011
T1000700-v2
Transmon Telescope Mirror Test Procedure
Michael Smith
et al.
Subsystem Test
Incoming Inspection
Auxiliary Optics
Final Design
21 Dec 2010
E1000376-v1
RGA Test Results: A-OSEM Circuit Board Sub-Assembly (223 units)
Dennis Coyne
et al.
Vacuum
Incoming Inspection
System Engineering
Suspensions
01 Sep 2010
E1000217-v1
LHO QUAD Lower Structure FTIR Post Bake, Repeat
Betsy Weaver
Incoming Inspection
Suspensions
11 Aug 2010
E1000102-v2
LHO LABO FTIR Sample Record HR202
Hugh Radkins
Incoming Inspection
Seismic Isolation
08 Apr 2010
E1000002-v1
Certification for Viton for L1 HAM6 OMC damping struts
Robert Taylor
et al.
Incoming Inspection
Commissioning
Installation
Suspensions
Seismic Isolation
11 Jan 2010
Number of documents found: 32
Home
Recent Changes
Topics
Login
DCC
Version 3.4.3
, contact
Document Database Administrators