LIGO-Number |
Title |
Author(s) |
Topic(s) |
Last Updated |
E1300519-x0 |
aLIGO, ISC, OMC, Optical Components |
Koji Arai et al. |
Sensing and Control
|
28 Aug 2024 |
D1201515-v2 |
Assembly, OMC Transport Fixture |
Jeffrey Lewis |
Sensing and Control
|
27 Jun 2023 |
E1300521-x0 |
aLIGO, ISC, OMC, Electrical Components |
Koji Arai et al. |
Sensing and Control
|
08 Apr 2024 |
D1201273-v3 |
OMC DCPD Mount Assembly |
Jeffrey Lewis et al. |
Sensing and Control
|
08 Nov 2022 |
M960076-v5 |
LIGO Quality Assurance Plan |
Jeffrey Lewis et al. |
Quality Assurance
|
26 Mar 2024 |
E1300896-x0 |
aLIGO, ISC, OMC, Design, Electrical |
Koji Arai et al. |
Sensing and Control
|
15 Mar 2024 |
E1100187-v6 |
LIGO Music Wire Specification. |
Calum Torrie et al. |
System Engineering
Requirements
Suspensions
|
15 Feb 2024 |
D1201439-v4 |
aLIGO OMC Breadboard Assembly Layout |
Jeffrey Lewis et al. |
Sensing and Control
|
22 Jul 2021 |
E0900364-v10 |
Metal components intended for use in the Adv LIGO Vacuum System |
Dennis Coyne et al. |
System Engineering
|
02 Dec 2020 |
T1500060-v3 |
aLIGO Output Mode Cleaner: Optical Testing and Results |
Koji Arai et al. |
Subsystem Test
Sensing and Control
|
22 Aug 2023 |
D1300046-v2 |
aLIGO OMC ADAPTER, CABLE |
Jeffrey Lewis |
Sensing and Control
|
22 Nov 2013 |
D1300052-v1 |
aLIGO OMC BRACKET, CABLE CONNECTOR |
Jeffrey Lewis |
Sensing and Control
|
22 Nov 2013 |
D1300057-v2 |
aLIGO OMC CABLE PEG |
Jeffrey Lewis et al. |
Sensing and Control
|
24 Feb 2023 |
D1201279-v3 |
OMC QPD Mount Assembly |
Jeffrey Lewis et al. |
Sensing and Control
|
31 Mar 2015 |
D1201518-v1 |
Side, Upper, OMC Transport Fixture |
Jeffrey Lewis |
Sensing and Control
|
10 Dec 2012 |
D1300965-v1 |
TUBE, BEAM DUMP, HAM6, aLIGO |
Sam Barnum et al. |
Sensing and Control
|
04 Feb 2022 |
E1200404-v1 |
ITM-05 Fiducial Line Measurements |
Jeffrey Lewis |
Quality Assurance
Core Optics
|
07 Nov 2021 |
D1201285-v1 |
OMC V Baffle Assembly |
Jeffrey Lewis |
Sensing and Control
|
14 Jul 2014 |
D1201287-v1 |
OMC Baffle, Fused Silica Base |
Jeffrey Lewis et al. |
Sensing and Control
|
14 Sep 2021 |
E1300893-x0 |
aLIGO, ISC, OMC, Design, General |
Koji Arai et al. |
Sensing and Control
|
03 Mar 2021 |
T1300642-v1 |
Sapphire Prism bond test: Results |
GariLynn Billingsley et al. |
System Engineering
Activity
Suspensions
|
23 Sep 2020 |
E1100159-v2 |
aLIGO Music Wire Specification |
Jeffrey Lewis |
Requirements
|
02 Mar 2011 |
D1201467-v1 |
OMC PD SHIM |
Jeffrey Lewis |
Sensing and Control
|
15 Nov 2012 |
E1200503-v1 |
IMCF-09 Fiducial Line Measurements |
Jeffrey Lewis |
Quality Assurance
Core Optics
|
23 Jan 2018 |
E1200504-v1 |
IMCF-08 Fiducial Line Measurements |
Jeffrey Lewis |
Quality Assurance
Core Optics
|
23 Jan 2018 |
E1200505-v1 |
IMCF-07 Fiducial Line Measurements |
Jeffrey Lewis |
Quality Assurance
Core Optics
|
23 Jan 2018 |
E1200458-v1 |
IMCF-06 Fiducial Line Measurements |
Jeffrey Lewis |
Quality Assurance
Core Optics
|
23 Jan 2018 |
E1200459-v1 |
IMCF-05 Fiducial Line Measurements |
Jeffrey Lewis |
Quality Assurance
Core Optics
|
23 Jan 2018 |
E1200440-v1 |
IMCF-03 Fiducial Line Measurements |
Jeffrey Lewis |
Quality Assurance
Core Optics
|
23 Jan 2018 |
E1200441-v1 |
IMCF-04 Fiducial Line Measurements |
Jeffrey Lewis |
Quality Assurance
Core Optics
|
23 Jan 2018 |
E1200339-v2 |
IMCF-02 Fiducial Line Measurements |
Jeffrey Lewis |
Quality Assurance
Core Optics
|
23 Jan 2018 |
E1200338-v1 |
IMCF-01 Fiducial Line Measurements |
Jeffrey Lewis |
Quality Assurance
Core Optics
|
23 Jan 2018 |
E1300450-v6 |
FMP Acceptance-Facility Modifications |
Carolyn Peterson et al. |
Observatory Facilities
|
26 Sep 2017 |
E1300522-x0 |
aLIGO, ISC, OMC, L1 |
Koji Arai et al. |
Sensing and Control
|
04 Dec 2016 |
E1300523-x0 |
aLIGO, ISC, OMC, H1 |
Koji Arai et al. |
Sensing and Control
|
04 Dec 2016 |
E1300520-x0 |
aLIGO, ISC, OMC, Mechanical Components |
Koji Arai et al. |
Sensing and Control
|
04 Dec 2016 |
D1300187-v2 |
aLIGO OMC CURVED MIRROR BONDING FIXTURE BACK |
Jeffrey Lewis |
Sensing and Control
|
31 Aug 2016 |
T1400367-v2 |
Some Notes on Assembly of Modified UIM Magnet/Flag Unit |
Norna Robertson et al. |
Assembly
Basic R&D
Suspensions
|
14 Jun 2016 |
D1300225-v2 |
Upper, Flashlight Holder |
Jeffrey Lewis |
Cleaning
|
03 Jun 2016 |
D1300224-v2 |
Base, Flashlight Holder |
Jeffrey Lewis |
Cleaning
|
03 Jun 2016 |
E1300894-x0 |
aLIGO, ISC, OMC, Design, Optical |
Koji Arai et al. |
Sensing and Control
|
08 Jan 2016 |
E1200964-v1 |
ERM-04 Fiducial Line Measurements |
Jeffrey Lewis |
Quality Assurance
Core Optics
|
21 May 2015 |
D1300185-v1 |
aLIGO OMC CURVED MIRROR BONDING FIXTURE ASSY |
Jeffrey Lewis |
Sensing and Control
|
16 Mar 2015 |
T1200525-v1 |
User Instructions for D1201515 OMC Transport Fixture |
Jeffrey Lewis |
Sensing and Control
|
09 Mar 2015 |
D1300507-v1 |
aLIGO L1 OMC as-built diagram |
William Korth et al. |
Sensing and Control
Fabrication
|
08 Mar 2015 |
E1300158-x0 |
DCN FOR OMC CURVED MIRROR BOND FIXTURE |
Jeffrey Lewis |
Sensing and Control
|
08 Mar 2015 |
E1300138-v1 |
DCN for OMC Darkside Bonding Fixture |
Jeffrey Lewis |
Sensing and Control
|
08 Mar 2015 |
E1300068-x0 |
DCN for OMC Breadboard Accessories and Cable Adapter |
Jeffrey Lewis |
Sensing and Control
|
08 Mar 2015 |
E1300288-v1 |
ECR for OMC Invar Shims |
Jeffrey Lewis |
Sensing and Control
|
08 Mar 2015 |
E1300537-v1 |
Addendum to E0900042 aLIGO OMC Hazard Analysis |
Jeffrey Lewis |
Sensing and Control
Installation
Safety
Suspensions
|
08 Mar 2015 |
T1000276-v5 |
Output Mode Cleaner (OMC) Design |
Koji Arai et al. |
Sensing and Control
Final Design
|
02 Mar 2015 |
D1300188-v1 |
aLIGO OMC CURVED MIRROR BONDING FIXTURE RING |
Jeffrey Lewis |
Sensing and Control
|
28 Feb 2015 |
D1300186-v1 |
aLIGO OMC CURVED MIRROR BONDING FIXTURE FRONT |
Jeffrey Lewis |
Sensing and Control
|
28 Feb 2015 |
E0900042-v4 |
AdvLIGO Output Mode Cleaner Suspension Hazard Analysis |
Michael Meyer et al. |
Installation
Safety
Suspensions
|
07 Feb 2015 |
D1201466-v1 |
(OBSOLETE) OMC NUT PLATE, PEEK |
Jeffrey Lewis |
Sensing and Control
|
07 Feb 2015 |
E1500053-x0 |
aLIGO OMC BONDING TEMPLATE - LIGHTSIDE |
Koji Arai et al. |
Sensing and Control
|
07 Feb 2015 |
E1500052-x0 |
aLIGO OMC BONDING TEMPLATE - DARKSIDE |
Koji Arai et al. |
Sensing and Control
|
07 Feb 2015 |
T1400220-v1 |
Fast Shutter D1003318 Assembly Instructions |
Jeffrey Lewis |
Assembly
Sensing and Control
|
22 Jan 2015 |
D1301024-v1 |
Tube, wire protection, ISC Fast Shutter |
Jeffrey Lewis |
Sensing and Control
|
22 Jan 2015 |
E1300933-x0 |
DCN To Add Insulation to OMC DCPD Pre-Amp Mounts |
Jeffrey Lewis |
Sensing and Control
|
22 Jan 2015 |
D1100785-v5 |
SUS Nitronic Flat Washers |
Eduardo Sanchez et al. |
Conceptual Design
Preliminary Design
Suspensions
|
22 Jan 2015 |
D1300972-v2 |
Bracket, Wire, Fast Shutter, HAM6 |
Jeffrey Lewis |
Sensing and Control
|
18 Sep 2014 |
D1300958-x0 |
PIN, FAST SHUTTER, ISC, aLIGO |
Jeffrey Lewis |
Sensing and Control
|
18 Sep 2014 |
D1300223-v3 |
Flashlight Holder Assembly (Flashlight Array) |
Jeffrey Lewis |
Cleaning
|
03 Sep 2014 |
T0900060-v2 |
OMC Suspension Final Design Document |
Jay Heefner et al. |
Final Design
Suspensions
|
20 Feb 2014 |
D1301028-v1 |
Viton Tube, Hardstop, ISC Fast Shutter |
Jeffrey Lewis |
Sensing and Control
|
11 Dec 2013 |
D1301023-v1 |
Key, ISC Fast Shutter |
Jeffrey Lewis |
Sensing and Control
|
10 Dec 2013 |
T1300862-v1 |
200 psi air knife silvent nozzle and top gun pictures - proof of concept |
Jeffrey Lewis et al. |
System Engineering
|
06 Dec 2013 |
D1301012-v1 |
Modified Flat Washer Natural Beige Color, 1/4 Screw |
Jeffrey Lewis |
Sensing and Control
|
05 Dec 2013 |
D1301013-v1 |
Kapton Sleeve |
Jeffrey Lewis |
Sensing and Control
|
05 Dec 2013 |
E1300895-x0 |
aLIGO, ISC, OMC, Design, Mechanical |
Koji Arai et al. |
Sensing and Control
|
22 Nov 2013 |
D1201527-v1 |
Top, OMC Transport Fixture |
Jeffrey Lewis |
Sensing and Control
|
22 Nov 2013 |
D1201526-v1 |
Bottom, OMC Transport Fixture |
Jeffrey Lewis |
Sensing and Control
|
22 Nov 2013 |
D1201525-v1 |
Pin, Z, OMC Transport Fixture |
Jeffrey Lewis |
Sensing and Control
|
22 Nov 2013 |
D1201524-v1 |
Pin, X, OMC Transport Fixture |
Jeffrey Lewis |
Sensing and Control
|
22 Nov 2013 |
D1201523-v1 |
Pad, Top, OMC Transport Fixture |
Jeffrey Lewis |
Sensing and Control
|
22 Nov 2013 |
D1201522-v1 |
Pad, Bottom, OMC Transport Fixture |
Jeffrey Lewis |
Sensing and Control
|
22 Nov 2013 |
D1201519-v1 |
End, Upper, OMC Transport Fixture |
Jeffrey Lewis |
Sensing and Control
|
22 Nov 2013 |
D1201521-v1 |
Pad, Corner, OMC Transport Fixture |
Jeffrey Lewis |
Sensing and Control
|
22 Nov 2013 |
D1201520-v1 |
Skid, OMC Transport Fixture |
Jeffrey Lewis |
Sensing and Control
|
22 Nov 2013 |
D1201516-v1 |
Side, Lower, OMC Transport Fixture |
Jeffrey Lewis |
Sensing and Control
|
22 Nov 2013 |
D1201517-v1 |
End, Lower, OMC Transport Fixture |
Jeffrey Lewis |
Sensing and Control
|
22 Nov 2013 |
D1200971-v3 |
Lower Wire Clamp (OMCS) |
Jeffrey Lewis |
Sensing and Control
Suspensions
|
22 Nov 2013 |
D1300354-v1 |
aLIGO OMC DIODE MOUNT SHIM |
Jeffrey Lewis |
Sensing and Control
|
22 Nov 2013 |
D1300060-v1 |
aLIGO OMC BRACKET, MASS MOUNTING |
Jeffrey Lewis |
Sensing and Control
|
22 Nov 2013 |
E1300518-x0 |
aLIGO, ISC, OMC, Design Documentation |
Koji Arai et al. |
Sensing and Control
|
22 Nov 2013 |
D1003324-v2 |
ISC Fast Shutter Bracket aLIGO |
Sam Barnum et al. |
Sensing and Control
Fabrication
|
13 Nov 2013 |
D1300969-v1 |
Mirror, Bobbin, Fast Shutter, aLIGO |
Jeffrey Lewis |
Sensing and Control
|
01 Nov 2013 |
D1300966-v1 |
CAP, BEAMDUMP, HAM6, aLIGO |
Jeffrey Lewis |
Sensing and Control
|
01 Nov 2013 |
L1300210-v1 |
H1OMC installation plan |
Koji Arai et al. |
Sensing and Control
Installation
|
11 Oct 2013 |
G1300952-v1 |
aLIGO Output Mode Cleaner: Design, Fabrication, and Installation |
Rich Abbott et al. |
Sensing and Control
Installation
Final Design
Fabrication
|
20 Sep 2013 |
E1100583-v1 |
SEM Examination of Spotted and Rusted Cantilever Blades |
Jeffrey Lewis |
Incoming Inspection
|
13 Sep 2013 |
T1300673-v1 |
Mobility Mock-up at CIT of T1300456 Wafer |
Jeffrey Lewis |
System Engineering
|
05 Aug 2013 |
T1300662-v1 |
Wafer Photo Test |
Jeffrey Lewis |
System Engineering
|
05 Aug 2013 |
D1300111-v2 |
aLIGO OMC BONDING TEMPLATE, LIGHTSIDE |
Jeffrey Lewis |
Sensing and Control
|
24 Jun 2013 |
E1100842-v8 |
Specification for Oxidation of Polished Mirror (Super #8) Stainless Steel for aLIGO Baffles and Beam Dumps |
Heidy Kelman et al. |
Fabrication
Auxiliary Optics
|
17 Jun 2013 |
G1300474-v1 |
OMC Status Update |
Koji Arai et al. |
Assembly
Sensing and Control
|
03 Jun 2013 |
D1201335-v2 |
Metal Breadboard Adapter, Metal Bench (OMCS) |
Jeffrey Lewis |
Sensing and Control
Suspensions
|
28 May 2013 |
D1201469-v2 |
Metal Breadboard Shim, Metal Bench (OMCS) |
Jeffrey Lewis |
Sensing and Control
Suspensions
|
28 May 2013 |
D1300081-v1 |
Modified Amphenol 2051 Jaw (OMCS) |
Jeffrey Lewis |
Sensing and Control
Suspensions
|
16 May 2013 |
D1300083-v1 |
Lower Wire Crimpers (OMCS) |
Jeffrey Lewis |
Sensing and Control
Suspensions
|
16 May 2013 |
D1300355-v1 |
aLIGO OMC DIODE MOUNT SHIM ALIGNMENT BLOCK |
Jeffrey Lewis |
Sensing and Control
|
19 Apr 2013 |
D1201334-v1 |
Metal Mounting Bracket, Metal Bench (OMCS) |
Jeffrey Lewis |
Sensing and Control
Suspensions
|
17 Apr 2013 |
G1300405-v1 |
OMC status update |
Koji Arai et al. |
Assembly
Sensing and Control
|
29 Mar 2013 |
D1201228-v2 |
aLIGO_ACB-ITM Elliptical_Anti-Rotation Assembly |
Jeffrey Lewis et al. |
Assembly
Auxiliary Optics
|
19 Mar 2013 |
G1300172-v1 |
OMC status update |
Koji Arai et al. |
Assembly
Sensing and Control
|
08 Mar 2013 |
D1300201-v1 |
aLIGO OMC QPD ALIGNMENT DISK |
Jeffrey Lewis |
Sensing and Control
|
05 Mar 2013 |
D1300200-v1 |
aLIGO OMC DCPD ALIGNMENT DISK |
Jeffrey Lewis |
Sensing and Control
|
05 Mar 2013 |
D1300134-v2 |
aLIGO OMC BONDING TEMPLATE ASSY, DARKSIDE |
Jeffrey Lewis |
Sensing and Control
|
25 Feb 2013 |
D1300135-v2 |
aLIGO OMC BONDING TEMPLATE, DARKSIDE |
Jeffrey Lewis |
Sensing and Control
|
25 Feb 2013 |
D1300107-v1 |
L4C Pod microDsub Backshell |
Jeffrey Lewis |
Data Acquisition System
|
13 Feb 2013 |
D1300115-v1 |
aLIGO OMC BONDING TEMPLATE MICROMETER BRACKET |
Jeffrey Lewis |
Sensing and Control
|
13 Feb 2013 |
D1300114-v1 |
aLIGO OMC BONDING TEMPLATE SHIM STOP |
Jeffrey Lewis |
Sensing and Control
|
13 Feb 2013 |
D1300112-v1 |
aLIGO OMC BONDING TEMPLATE BAR |
Jeffrey Lewis |
Sensing and Control
|
13 Feb 2013 |
D1300110-v1 |
aLIGO OMC BONDING TEMPLATE ASSY, LIGHTSIDE |
Jeffrey Lewis |
Sensing and Control
|
13 Feb 2013 |
D1300113-x0 |
aLIGO OMC BONDING TEMPLATE PIN |
Jeffrey Lewis |
Sensing and Control
|
06 Feb 2013 |
T1300081-v2 |
OMC Lower Wire Clamp Development, Crimp and Testing Procedures |
Jeffrey Lewis |
Sensing and Control
Suspensions
|
04 Feb 2013 |
E1201018-x0 |
DCN for OMC Lower Wire Clamps and Metal Breadboard Accessories |
Jeffrey Lewis |
Sensing and Control
Suspensions
|
15 Nov 2012 |
E1200706-v1 |
ITM-04 Fiducial Line Measurements |
Jeffrey Lewis |
Quality Assurance
Core Optics
|
28 Nov 2012 |
D1201277-v1 |
OMC DCPD Plasma Spray Mask |
Jeffrey Lewis |
Sensing and Control
|
19 Nov 2012 |
E1200997-x0 |
DCN for OMC DCPD and QPD Mounting hardware and Connectors |
Jeffrey Lewis et al. |
Sensing and Control
|
15 Nov 2012 |
D1201283-v1 |
OMC QPD Plasma Spray Mask |
Jeffrey Lewis |
Sensing and Control
|
15 Nov 2012 |
D1201281-v1 |
OMC QPD Face Plate |
Jeffrey Lewis |
Sensing and Control
|
15 Nov 2012 |
D1201275-v1 |
OMC DCPD Face Plate |
Jeffrey Lewis |
Sensing and Control
|
15 Nov 2012 |
D1201274-v1 |
OMC DCPD Housing |
Jeffrey Lewis |
Sensing and Control
|
15 Nov 2012 |
T1200491-v1 |
Analysis of Rosin Core Solder for UHV Applications |
Rich Abbott et al. |
System Engineering
Cleaning
|
01 Nov 2012 |
D1201251-v1 |
aLIGO_SLC_ACB_ Variable Height Bracket, 9 Degree |
Jeffrey Lewis et al. |
Modelling
Auxiliary Optics
|
30 Oct 2012 |
E1200700-x0 |
DCN to release PCAL Periscope |
Scott Shankle et al. |
Fabrication
|
28 Sep 2012 |
E1200845-v1 |
TMS Blade Spring Characterization Data |
Jeffrey Lewis |
Auxiliary Optics
|
27 Sep 2012 |
C1203960-v5 |
PCAL Periscope Frame SOW |
Jeffrey Lewis |
Auxiliary Optics
|
13 Sep 2012 |
D1201199-v2 |
ANTI-ROTATION CLAMP, ACB |
Jeffrey Lewis et al. |
Auxiliary Optics
|
19 Sep 2012 |
D1201198-v2 |
ANTI-ROTATION BLOCK, ACB |
Jeffrey Lewis et al. |
Auxiliary Optics
|
19 Sep 2012 |
D1000909-v3 |
SLC COPPER PLATE |
Niem Nguyen et al. |
Modelling
Auxiliary Optics
|
07 Sep 2012 |
D1201079-x0 |
Thread Test Block for PCAL Periscope Frame Flathead Screws |
Jeffrey Lewis |
Auxiliary Optics
|
31 Jul 2012 |
D1200669-v2 |
Safety Stop, Spring Blade Characterization |
Jeffrey Lewis |
Auxiliary Optics
|
21 May 2012 |
D1200673-v1 |
Mounting Clamp, Spring Characterization |
Jeffrey Lewis |
Auxiliary Optics
|
02 May 2012 |
E1000083-v6 |
Specification for Enameled Steel to be used in the LIGO Ultra-High Vacuum System |
Heidy Kelman et al. |
Fabrication
Auxiliary Optics
|
19 Aug 2011 |
D1100704-v1 |
ALIGO IMASS OFS ADAPTER ASSY., 3/16 HEX |
Eduardo Sanchez et al. |
Final Design
Fabrication
|
26 Apr 2011 |
D1100703-v1 |
ALIGO IMASS OFS ADAPTER ASSY, 5/16 HEX |
Eduardo Sanchez et al. |
Final Design
Fabrication
|
26 Apr 2011 |
D1100702-v1 |
ALIGO IMASS OFS ADAPTER ASSY. HEX WRENCH |
Eduardo Sanchez et al. |
Final Design
Fabrication
|
26 Apr 2011 |
D1100700-v1 |
ALIGO IMASS OFS ADAPTER, 5/16 TO 3/8 SQUARE DRIVE |
Eduardo Sanchez et al. |
Final Design
Fabrication
|
26 Apr 2011 |
D1100697-v1 |
ALIGO I MASS OFS ADAPTER, 3/16 TO 3/8 SQ. DRIVE |
Eduardo Sanchez et al. |
Final Design
Fabrication
|
26 Apr 2011 |
E1100386-x0 |
DCN, INITIAL RELEASE OF IMASS OFS 5/16 AND 3/16 HEX, OFS ADAPTERS |
Eduardo Sanchez et al. |
Final Design
Fabrication
|
22 Apr 2011 |
D1100760-v2 |
BSC CLEANING TEST PLATE |
Jeffrey Lewis et al. |
Seismic Isolation
Fabrication
|
22 Apr 2011 |
Q0900001-v5 |
Advanced LIGO Supplier Quality Requirements |
Jeffrey Lewis et al. |
Quality Assurance
|
11 Mar 2011 |
Q1100003-v1 |
Acceptable Quality Level (AQL) for Inspection of LIGO Components |
Jeffrey Lewis et al. |
Quality Assurance
|
11 Feb 2011 |
Q1100001-v1 |
Request for Deviation |
Jeffrey Lewis et al. |
Quality Assurance
|
25 Jan 2011 |