Document List by Author

Calum Torrie of LIGO - California Institute of Technology is listed as an author on the following documents:
(List events moderated by Calum Torrie)

LIGO-Number Title Author(s) Topic(s) Last Updated
E960022-v24 Vacuum Compatibility, Cleaning Methods and Qualification Procedures Dennis Coyne Cleaning
Vacuum
Fabrication
11 Mar 2016
D070560-v2 ALIGO SUS CO2 Laser Machine_Overall Assembly_[CO2_GLA_ASM_OVERALL] Russell Jones et al. Fabrication
Assembly
Suspensions
06 Dec 2024
M2300107-v5 LIGO Laboratory White Paper to NextGenGW committee: A Roadmap for the LIGO Observatories in the Era of Cosmic Explorer Michael Landry et al. NSF
Reports
Advisory Boards (e.g., PAC, PAP, ...)
Operations
Management
04 Dec 2024
L2100140-v3 Calum Torrie Resume, Cover Letter and Engineering Documents Oct 2021 Calum Torrie System Engineering
28 Mar 2023
D1800027-v26 Top Level Conceptual Layout of A+ Calum Torrie et al. Operations
A+
System Engineering
02 Dec 2021
M1500263-v1 Guidelines for Advanced LIGO Detector Upgrade Development Review Dennis Coyne Final Design
Requirements
Upgrades
Policies
Preliminary Design
System Engineering
Conceptual Design
Fabrication
05 Oct 2016
E1400310-v2 aLIGO Availability Estimate Dennis Coyne Operations
System Engineering
02 May 2024
D1002874-v8 Flange Layout - H1 Horizontal Access Module 3 (HAM 3) Emery Brown et al. System Engineering
Preliminary Design
21 Jan 2015
D1002890-v8 Flange Layout – L1 Horizontal Access Module 6 (HAM 6) Emery Brown et al. System Engineering
Preliminary Design
16 Dec 2015
D1002872-v9 Flange Layout - H1 Horizontal Access Module1 (HAM 1) Emery Brown et al. Preliminary Design
System Engineering
27 Sep 2024
D1002877-v15 Flange Layout - H1 Horizontal Access Module 6 (HAM 6) v15 is the O5 configuration. Emery Brown et al. Integration
Preliminary Design
System Engineering
Installation
10 Sep 2024
D0900520-v13 aLIGO Systems, LHAM3-L1 Top Level Chamber Assembly Ignacio Romero et al. Final Design
System Engineering
24 May 2016
D2300135-v4 SPECIFICATION CONTROL DRAWING: LIGO, VE, COMFORMANT VIEWPORTS. Madeline Lesovsky et al. System Engineering
Fabrication
Vacuum
27 Aug 2024
M060323-v17 LIGO Laboratory Charter Hannah Hansen et al. NSF
Operations Business
Policies
Organizational Relations
Operations
Management
05 Aug 2024
M1400339-v1 Vacuum Review Board (VRB) Charter Dennis Coyne System Engineering
Vacuum
Technical Review Board
23 Oct 2014
D0901880-v5 aLIGO AOS SUS Transmission Monitor System (TMS, TMTS) Assembly Calum Torrie et al. Final Design
Auxiliary Optics
09 Jul 2024
E0900023-v14 PROCESS FOR MANUFACTURING CANTILEVER SPRING BLADES FOR AdvLIGO Douglas Cook et al. Basic R&D
System Engineering
27 Oct 2021
D0900365-v14 aLIGO Systems, LHAM2-L1 Top Level Chamber Assembly Ignacio Romero et al. System Engineering
Final Design
21 Apr 2016
E1800082-x0 Vacuum System Dennis Coyne et al. Vacuum
15 May 2024
D040046-x0 ADVANCED LIGO, SUS, ETM CPTYPE TEST MASS, FACEPLATE, MAIN BODY Calum Torrie Document Migration
13 Oct 2006
D0900492-v5 aLIGO Systems, BSC3-L1 Top Level Chamber Assembly Ignacio Romero Final Design
System Engineering
12 Jul 2012
G2400914-v1 LA Surf and LIGO Calum Torrie System Engineering
11 Apr 2024
E030350-v5 Configuration Control & Drawing Requirements Calum Torrie et al. System Engineering
06 Mar 2024
G2400401-v1 Public Outreach: Lunch With A..." Series @ Cathedral High School STEM Class Calum Torrie Public Talk / Colloquium
22 Feb 2024
E1100187-v6 LIGO Music Wire Specification. Calum Torrie et al. System Engineering
Suspensions
Requirements
15 Feb 2024
D1001679-v6 aLIGO TCS Upper Monolithic Ring Heater Shield Mindy Jacobson et al. Auxiliary Optics
Fabrication
Vacuum
02 Jun 2023
T1300595-v1 Estimate of thermal and seismic noise from aLIGO quad suspension blade springs Liam Cunningham et al. Basic R&D
Suspensions
08 Dec 2023
D0900428-v8 aLIGO Systems, LBSC2-L1 Top Level Chamber Assembly Eduardo Sanchez et al. Final Design
System Engineering
04 Dec 2023
D070441-v6 HLTS Prism Breakoff, Lower Wire, Optic Calum Torrie et al. Suspensions
Final Design
14 Nov 2023
D0810033-v4 HSTS LOWER MASS PRIMARY PRISM Calum Torrie Suspensions
Final Design
14 Nov 2023
D1001680-v5 aLIGO TCS Lower Monolithic Ring Heater Shield Mindy Jacobson et al. Vacuum
Auxiliary Optics
Fabrication
04 Mar 2011
E0900364-v10 Metal components intended for use in the Adv LIGO Vacuum System Dennis Coyne et al. System Engineering
02 Dec 2020
T040111-v1 Galling Tendencies and Particles Produced by Ultra Clean Screw Threads Michael Gerfen et al. Basic R&D
System Engineering
07 Sep 2023
D1700361-v3 Layout of SLC Baffles with new 2017 SLiC Baffles Eduardo Sanchez et al. Integration
System Engineering
22 Jun 2023
Q2300018-v1 Waiver: Exceptions to E0900048 for fabrication of custom ported spool Eduardo Sanchez et al. A+
System Engineering
26 May 2023
E1201035-v25 aLIGO Chamber Entry & Exit Procedures Calum Torrie et al. System Engineering
Safety
27 Mar 2023
E1000046-v1 Vacuum System Viton O-ring Procurement Specification John Worden et al. Vacuum
02 Mar 2023
E0900237-v5 Acceptable Machining Fluids for UHV parts Michael Meyer Fabrication
03 Feb 2011
D020700-v2 HSTS Overall Assembly Janeen Romie Installation
Suspensions
31 Oct 2022
E0900394-v6 aLIGO optic container shipping and storage procedure GariLynn Billingsley et al. Core Optics
20 Sep 2022
E2200368-v2 FTIR: Novamet 760 Pre-Bake Calum Torrie et al. Vacuum
Cleaning
07 Sep 2022
T080188-v2 Models of the Advanced LIGO Suspensions in MATLAB Mark Barton et al. Suspensions
Modelling
24 Aug 2022
T1600486-x0 The Coating RIng-down MEasurement system (CRiMe) Document Tree Eric Gustafson et al. Basic R&D
03 Jan 2022
E030518-v22 HSTS Assembly Procedure Janeen Romie et al. Assembly
Suspensions
07 Mar 2013
T050172-x0 Modifications to Quad Controls Prototype to fix the “d’s” Calum Torrie Document Migration
12 Nov 2021
D080177-v4 Compensation Plate ESD Pattern Drawing Kurt Buckland et al. Core Optics
Preliminary Design
Sensing and Control
08 Oct 2021
E1800198-v1 FTIR staining sample from beam tube @ LLO June 2018 (JPL) Calum Torrie Operations
System Engineering
09 Jul 2018
E1300017-v8 First Contact Spray Application & Removal Procedure Calum Torrie et al. System Engineering
12 Aug 2021
D1800103-v5 aLIGO, AOS, SLiC, OFI SHROUD Alena Ananyeva et al. System Engineering
Fabrication
Suspensions
12 Jun 2018
D080658-v6 aLIGO, COC End Test Mass (ETM) Substrate (D080658_ALIGO COC_ETM_SUBSTRATE) Calum Torrie Core Optics
Final Design
14 Jul 2021
D080657-v7 aLIGO, COC Input Test Mass (ITM) Substrate (D080657 ALIGO COC ITM SUBSTRATE) Calum Torrie Core Optics
Final Design
14 Jul 2021
E1700309-v3 Procedure for handling, cleaning and baking DLC coated stray light baffles Alena Ananyeva et al. Cleaning
System Engineering
29 Aug 2018
T1300493-v1 "Known" Particulate Sample Poster Kaitlin Gushwa et al. System Engineering
11 Feb 2021
T1100530-v7 Overall Work flow for in-vacuum cables. Calum Torrie et al. System Engineering
08 Dec 2020
E1900306-v2 FTIR: Nozzle Baffles x4 (D1800227) - Report from JPL Alena Ananyeva et al. System Engineering
02 Dec 2020
T1300642-v1 Sapphire Prism bond test: Results GariLynn Billingsley et al. System Engineering
Activity
Suspensions
23 Sep 2020
E0900047-v23 LIGO Contamination Control Plan Betsy Weaver et al. Observatory Facilities
Cleaning
Risk Management
17 Sep 2020
T1900258-v2 Static Structural Analysis (ANSYS) of APlus Beam Splitter Optic Danielle Petterson et al. Modelling
Core Optics
System Engineering
A+
16 Sep 2020
T1800485-v6 U200 Mount Damping Study Craig Worley et al. Input Optics
Basic R&D
04 Sep 2020
E1400028-x0 aLIGO, Particulate Contamination Talks, Papers and Posters Calum Torrie System Engineering
01 Jun 2020
T1600046-v4 Recent Results and Conclusions from Tests of the UIM Blade Non-Magnetic Damper Norna Robertson et al. Basic R&D
Suspensions
Final Design
05 Mar 2020
D0900931-v6 gold coating pattern compensation plates (CP) barrel Calum Torrie System Engineering
Core Optics
14 Dec 2009
E2000003-v2 Aplus Vacuum Feedthrough Performance Requirements Rich Abbott et al. System Engineering
A+
09 Jan 2020
E1400026-x0 aLIGO, Parts Cleaning / Processing & Material Qualification Calum Torrie System Engineering
20 Dec 2019
D1900269-v1 End Test Mass Substrate re-polish Calum Torrie et al. Final Design
Core Optics
02 Dec 2019
T1500105-v1 3IFO Viewport Inventory Jodi Fauver et al. System Engineering
17 Jul 2019
P1900316-v1 Cosmic Explorer: The U.S. Contribution to Gravitational-Wave Astronomy beyond LIGO David Reitze et al. Activity
Basic R&D
Detector
11 Oct 2019
E0900048-v9 Welding Specification for Weldments used within the Advanced LIGO Vacuum System Dennis Coyne et al. Final Design
System Engineering
21 Aug 2019
T1800358-v3 Final Report - Printing and Assembling LIGO Mini Model (scale 1:24) Agnese Sanavio et al. Education, Outreach
System Engineering
26 Jul 2019
T1900444-v1 Virtual Reality Setup and User Guide Agnese Sanavio et al. System Engineering
Preliminary Design
22 Jul 2019
T1900410-v1 Desired results of the Cosmic Explorer engineering study Rana Adhikari et al. Observatory Facilities
Vacuum
Conceptual Design
09 Jul 2019
D020023-v6 HSTS Structural Weldment Michael Meyer et al. Final Design
Suspensions
13 Jul 2011
T080233-x0 Beam Splitter Optical Surface Deformation Due to Gravity Dennis Coyne et al. Document Migration
18 Apr 2019
T1700128-v9 Infrared Reflectance & Scatter Tests for Potential Scattered Light Mitigation Coatings (R^2 vs. BRDF) Alena Ananyeva et al. Basic R&D
System Engineering
01 Apr 2019
T040027-v2 Conceptual Design of Beamsplitter Suspension for aLIGO Norna Robertson et al. Conceptual Design
Suspensions
14 Mar 2019
G1801900-v5 Alignment of the LIGO Detector: International Workshop on Accelerator Alignment  2018 at FNAL Calum Torrie et al. Operations
System Engineering
08 Oct 2018
G1400804-v3 Risk Reduction Work on Advanced LIGO Suspensions Norna Robertson et al. Basic R&D
Suspensions
01 Oct 2018
M1300164-v8 3rd IFO Long-Term Storage Acceptance and Punchlist Calum Torrie et al. Installation
LIGO-India
System Engineering
01 Apr 2015
E1700389-v1 Epo-Tek 302-3M glue vacuum compatibility testing for AMD Alena Ananyeva et al. Basic R&D
System Engineering
29 Aug 2018
G1800061-v1 Beam dump materials evaluation - scatter, reflectivity and laser damage threshold (CW 1064nm) Alena Ananyeva et al. Basic R&D
System Engineering
29 Aug 2018
T1600060-v5 Resonances & jitter suppression observation on the PZT-actuated steering mirrors of the PSL/IO Periscope Alena Ananyeva et al. Other data analysis
Assembly
Reports
Input Optics
29 Aug 2018
E1800216-v1 Procedure to test water and air outgassing contribution from components Calum Torrie et al. System Engineering
Operations
29 Aug 2018
G1800420-v1 Laser Damage investigations of 1064 nm absorbing materials in vacuum Alena Ananyeva et al. Public Talk / Colloquium
System Engineering
29 Aug 2018
E1400363-x0 Collection of Documents associated with cleaning optics for advanced LIGO Calum Torrie et al. Core Optics
System Engineering
01 Aug 2018
D0901477-v6 aLIGO HANFORD SYSTEMS LAYOUT Calum Torrie et al. System Engineering
Final Design
12 Apr 2017
T1800253-v1 LCP-4 (cryo-trap) Internal Photos (Livingston) Scott McCormick et al. Vacuum
Operations
Quality Assurance
System Engineering
09 Jul 2018
E1800049-x0 Electric Field Meter (Top Level) Calum Torrie et al. System Engineering
Operations
27 Jun 2018
T080267-v1 Redesign of Blades for Improved Vertical Isolation for Triple Suspensions in Advanced LIGO Norna Robertson et al. Suspensions
Modelling
26 Jun 2018
E1800121-v2 Zemax model of OFI bench for input to OFI shroud analysis / design - 1st and 2nd order ghost beams Calum Torrie et al. Operations
System Engineering
12 Jun 2018
E1800050-v3 Electric Field Meter Final Design Document Calum Torrie et al. Operations
System Engineering
12 Jun 2018
T1400713-v3 Test Mass Discharge System (TMDS): Design Document Eduardo Sanchez et al. System Engineering
Vacuum
Final Design
25 Apr 2018
E1800029-v1 FTIR Analysis - PCAL Flat Baffle Panels PART 1 Betsy Weaver et al. Installation
15 Feb 2018
D1600453-v5 P-Cal Periscope Shield Top Level Assembly Concept Images Calum Torrie et al. System Engineering
30 Jan 2018
D1101821-v2 aLIGO, PESDESTAL,2IN MIRROR MOUNT Ayodele Cole et al. Final Design
Assembly
Cleaning
Vacuum
Fabrication
Auxiliary Optics
05 Nov 2012
D1101844-v2 aLIGO, PESDESTAL,HAM4,HWSY, 2IN MIRROR MOUNT Ayodele Cole et al. Auxiliary Optics
Basic R&D
05 Nov 2012
F030014-v2 Clean and Bake Request Form John Worden et al. Assembly
Policies
18 Apr 2011
G1501076-v1 C is For Charging - Update on aLIGO Test Mass Charging Kaitlin Gushwa et al. System Engineering
07 Mar 2017
E1500214-v6 Assembly procedure - OMC stray light baffle aka Black Glass Shroud Kaitlin Gushwa et al. System Engineering
07 Mar 2017
E1600262-v4 aLIGO OMC: Spare OMC production plan Koji Arai et al. Sensing and Control
Assembly
09 Dec 2016
G1601553-v5 projecting 3D renderings Jeffrey Wang System Engineering
14 Sep 2016
D1000759-v3 Advanced LIGO SUS ETM Production Monolithic Assembly Russell Jones et al. Assembly
Suspensions
Final Design
12 Jul 2016
G1601083-v7 Third Interferometer aka 3IFO Storage - NSF Break0out Session June 2016 Nichole Washington et al. System Engineering
18 Jun 2016
E1100818-v3 HAM3-L Top Level Chamber Assembly BOM Calum Torrie System Engineering
14 Jun 2016
E1100820-v3 HAM2-L Top Level Chamber Assembly BOM Calum Torrie System Engineering
14 Jun 2016
T1500137-v1 3IFO IAS Cross Check and Custody (BOM for IAS) Jodi Fauver et al. System Engineering
14 Jun 2016
T1400555-v1 How to Use Anti-Fog Cloths Sabrina Waller et al. System Engineering
Cleaning
07 Jun 2016
T1500135-v2 3IFO Viewport Cross Check and Custody Jodi Fauver et al. System Engineering
19 May 2016
T1400711-v1 Prism removal from ITM09 GariLynn Billingsley et al. Suspensions
Core Optics
16 Dec 2015
D1500271-v1 QUAD, SUS, Bounce & Roll mode damper, Mass .5g (C'BORED) Eduardo Sanchez et al. Suspensions
Fabrication
20 Oct 2015
D0902001-v8 CP COC OPTIC CONTAINER ASSEMBLY Kurt Buckland System Engineering
09 Sep 2015
D0900958-v7 GOLD COATING PATTERN END REACTION MASS BARREL Kurt Buckland Core Optics
System Engineering
02 Sep 2015
T1500282-v1 Needle samples from TMDS - Contamination Calum Torrie et al. System Engineering
04 Jun 2015
G1500539-v3 You can look but you can't touch - slides prepared for SYS meeting 22nd April 2015 Calum Torrie et al. System Engineering
06 Jun 2015
E1500236-x0 Test Mass Discharging System (with top gun and conductive sheet) Calum Torrie System Engineering
Operations
06 Jun 2015
E1500233-x0 Test Mass Discharge Effort Calum Torrie Operations
System Engineering
06 Jun 2015
E1400029-x0 LIGO, Contamination Control Training Material Calum Torrie System Engineering
13 May 2015
E1400027-x0 aLIGO, Particulate Contamination Tools of the trade Calum Torrie System Engineering
13 May 2015
E1400030-x0 aLIGO, Particulate Contamination Requirement and Policy Documents Calum Torrie System Engineering
13 May 2015
E1201096-v5 Contamination Sample Handling - How to receive, use, send, buy and store samples. Calum Torrie et al. System Engineering
06 May 2015
L1500019-v1 LHO Installation Acceptance Review Report Michael Landry et al. Reviews
06 May 2015
L1400006-x0 Fabrication Acceptance Review Documents and Status David Shoemaker et al. Detector
Reviews
06 May 2015
E1300806-v38 Stray Light Control and Viewport Fabrication Acceptance Punch List Robert Schofield et al. Auxiliary Optics
17 Apr 2015
T1400596-v7 Characterization of Green Lantern Images - 3" Optic Vacuum Test Bed Calum Torrie et al. System Engineering
10 Apr 2015
T1500119-v2 3IFO ISC Cross Check and Custody Jodi Fauver et al. System Engineering
01 Apr 2015
T1500133-v2 3IFO SEI Combined Cross Check and Custody Jodi Fauver et al. System Engineering
31 Mar 2015
T1500111-v3 3IFO TCS Cross Check and Custody Jodi Fauver et al. System Engineering
31 Mar 2015
T1400181-v16 Status of SUS Individual and General Acceptance Reports Norna Robertson et al. Suspensions
Fabrication
Installation
21 Jun 2014
T1500132-v2 3IFO IAS Storage Verification Jodi Fauver et al. System Engineering
30 Mar 2015
T1500107-v5 3IFO SUS Cross Check and Custody Jodi Fauver et al. System Engineering
30 Mar 2015
T1500128-v2 3IFO INS/FMP Cross Check and Custody Jodi Fauver et al. System Engineering
30 Mar 2015
T1500106-v3 3IFO SLC aka Baffles Cross Check and Custody Jodi Fauver et al. System Engineering
26 Mar 2015
T1500124-v1 3IFO IO Cross Check and Custody Jodi Fauver et al. Input Optics
25 Mar 2015
T1500108-v2 3IFO OpLev Cross Check and Custody Jodi Fauver et al. System Engineering
23 Mar 2015
T1500091-v1 3IFO PSL ISS Photodetector Array Inventory Peter King Email Gary Davis et al. Project Controls
20 Mar 2015
T1500110-v1 3IFO COC Cross Check and Inventory Jodi Fauver et al. System Engineering
20 Mar 2015
T1500112-v2 3IFO SLC BOM Mitchell Robinson et al. System Engineering
20 Mar 2015
T1500109-v1 3IFO PCal Cross Check and Custody Jodi Fauver et al. System Engineering
20 Mar 2015
T1400712-v1 aLIGO OpLev BOM Spreadsheets OBSOLETE Jodi Fauver et al. System Engineering
18 Mar 2015
E1300769-v4 Core Optics Fabrication Acceptance Documentation GariLynn Billingsley et al. Core Optics
12 Mar 2015
E1500123-v2 Fabrication Acceptance Review Status of Input Optics EOM Testing, Modeling and Discussion of need for Waivers from Systems Christopher Guido et al. Reviews
Input Optics
11 Mar 2015
Q1500011-v1 Waiver: no impulse response, dynamic testing of the L1 BS with Elliptical Baffle Calum Torrie System Engineering
Quality Assurance
Suspensions
11 Mar 2015
Q1500008-v1 Waiver Request from Suspensions - room temp out-gassing cure of EP-30-2 on ITM-Y only Calum Torrie et al. Quality Assurance
Vacuum
System Engineering
Suspensions
11 Mar 2015
Q1500007-v1 Waiver: Class A Waiver Request for 6 blanks at LLO Calum Torrie Quality Assurance
Vacuum
System Engineering
11 Mar 2015
Q1500004-v1 Waiver: to roughen surface of HLTS pen mass in situ Calum Torrie Suspensions
Vacuum
Quality Assurance
System Engineering
11 Mar 2015
Q1500001-v1 Waiver: Class B cleaning of 3 Alu parts for the SLC Elliptical Baffle Calum Torrie Auxiliary Optics
Quality Assurance
Vacuum
System Engineering
11 Mar 2015
L1300049-v1 Wiha (Hex) Allen Keys - waiver on bake Calum Torrie System Engineering
11 Mar 2015
L1200291-v5 TRB Report: Recommendation related to the discrepancy between single version of the quad ITM suspensions and the optical layout which calls for a left and right handed versions Calum Torrie et al. Installation
System Engineering
11 Mar 2015
T1500083-v1 3IFO PSL Table Contents Packing Lists/Inventory Gary Davis et al. Project Controls
System Engineering
04 Mar 2015
E1000222-v2 Interface Control Document, ICD - Trans Mon Suspension (TMS) to Interferometer Sensing and Control (ISC) and TMS to Suspension (SUS) Calum Torrie Suspensions
Sensing and Control
System Engineering
Auxiliary Optics
11 Feb 2015
E1400019-v1 aLIGO SUS Grouping of Fabrication Acceptance Documentation Calum Torrie et al. Suspensions
11 Feb 2015
G1000095-v1 Feb 2010 Upgraded LASTI Ergo-arm videos Margot Hennig et al. System Engineering
03 Feb 2015
D1002834-v2 aLIGO Installation, LLO Y-End Station, Cartridge & Cleanroom, Layout Brian O'Reilly et al. Conceptual Design
Installation
Observatory Facilities
14 Jan 2015
E1200344-v4 All BSC, Install Completed Cartridge Into Chamber Procedure, aLIGO Sam Barnum et al. Core Optics
Installation
Suspensions
Seismic Isolation
18 Dec 2014
E1400472-v3 Test Mass In Situ Cleaning Procedure GariLynn Billingsley et al. System Engineering
Core Optics
15 Dec 2014
T1400492-v3 1" Witness Optic: Ionizer Kaitlin Gushwa et al. System Engineering
02 Dec 2014
G1401337-v1 Test Mass Discharging System (TMDS) Design Review Presentation Rich Abbott et al. Final Design
System Engineering
Vacuum
20 Nov 2014
D1200962-v3 aLIGO AOS OpLev Passive Damping Assembly Eric James et al. Fabrication
05 Nov 2014
P1400205-v8 Coming Clean: Understanding and Mitigating Optical Contamination and Laser Induced Damage in Advanced LIGO Kaitlin Gushwa et al. Core Optics
System Engineering
28 Oct 2014
G1400378-v2 Hanford Contamination Control Update - Back to Basics (March 2014) Kaitlin Gushwa et al. System Engineering
21 Oct 2014
G1400396-v5 Plenary Lecture for SPIE Laser Damage 2014 Calum Torrie et al. System Engineering
18 Sep 2014
G1400209-v2 Laser Induced Damage due to Particulate Contamination GariLynn Billingsley et al. Basic R&D
Core Optics
08 Sep 2014
T1200149-v1 Cleaning Procedure for Optics Lens Caps Calum Torrie et al. Cleaning
19 Aug 2014
T020011-x0 Suspension model comparisons Mark Barton et al. Document Migration
11 Jul 2014
E1400216-v1 aLIGO Installation Acceptance Document for L1 DAQ Brian O'Reilly et al. Installation
21 Jun 2014
E1400215-v3 aLIGO Installation Acceptance Document for LLO Vacuum Equipment. Calum Torrie Installation
21 Jun 2014
E1400197-v1 aLIGO Installation Acceptance Document for LHAM5 Calum Torrie Installation
21 Jun 2014
E1400196-v1 aLIGO Installation Acceptance Document for LHAM4 Calum Torrie Installation
21 Jun 2014
E1400195-v1 aLIGO Installation Acceptance Document for LHAM3 Calum Torrie Installation
21 Jun 2014
E1400185-v6 aLIGO Installation Acceptance Document for LBSC4 (X) Dennis Coyne et al. Installation
21 Jun 2014
E1400181-v2 aLIGO Installation Acceptance Document for LBSC3 (X) Dennis Coyne et al. Installation
21 Jun 2014
E1400179-v3 aLIGO Installation Acceptance Document for LBSC1 (Y) Dennis Coyne et al. Installation
21 Jun 2014
L1400082-v2 LLO Installation Acceptance Review Report Michael Landry et al. Reviews
Detector
Installation
21 Jun 2014
E1400305-v1 ECR: Beamsplitter Suspension Wire Shielding Baffle Calum Torrie Change Control
System Engineering
Suspensions
20 Jun 2014
E1300122-v2 ECR - ISS PD Array Calum Torrie et al. System Engineering
19 Jun 2014
E1300662-v1 ECR - Upgrade of ISS PD Array lid Calum Torrie et al. Laser Systems
System Engineering
Installation
19 Jun 2014
E1400258-v3 Contamination Control Mitigation Processes and the resulting Cleanliness Levels Calum Torrie et al. Core Optics
System Engineering
Installation
Operations
19 Jun 2014
D0901490-v5 aLIGO LIVINGSTON SYSTEM LAYOUT Jose Eduardo Chavez et al. System Engineering
19 Jun 2014
E1100730-v5 HAM and BSC SEI In-Vacuum Cabling Counts including payload cables as well as BSC SLC ACB and BSC TCS Calum Torrie et al. System Engineering
18 Jun 2014
T1300665-v9 The LIGO Particulate Evaluation Tool (PET) Kaitlin Gushwa et al. System Engineering
03 Jun 2014
D080660-v3 D080660_ALIGO COC_BS_SUBSTRATE Calum Torrie Core Optics
Final Design
03 Jun 2014
T1400386-x0 LIGO Contamination Control Processes and Mitigation Steps - Obsolete Calum Torrie et al. System Engineering
03 Jun 2014
E1000338-v4 Vibration Absorber : Final Design Review Sebastien Biscans et al. Basic R&D
Suspensions
20 May 2014
E1200562-v4 aLIGO Tree and Chamber Level DCC Drawing Numbers Calum Torrie et al. System Engineering
21 Apr 2014
D0901491-v3 aLIGO, Mechanical Layout Calum Torrie et al. System Engineering
07 Apr 2014
P1300192-v2 Optical contamination control in the Advanced LIGO ultra-high vacuum system Margot Hennig et al. System Engineering
Core Optics
11 Mar 2014
G1301249-v3 Hanford and Livingston Contamination Control Update Dec 2013-Jan2014 Kaitlin Gushwa et al. System Engineering
11 Mar 2014
G1400142-v1 Summary of 4" Wafer Data Calum Torrie et al. System Engineering
11 Mar 2014
T0900060-v2 OMC Suspension Final Design Document Jay Heefner et al. Final Design
Suspensions
20 Feb 2014
T1400056-x0 3IFO Viewport Requirements by Chamber (LTS) Calum Torrie et al. Requirements
13 Feb 2014
D080659-v3 D080659_ALIGO COC_CP_SUBSTRATE Calum Torrie Final Design
Core Optics
07 Feb 2014
L1000357-v3 Advanced LIGO Review Committee Report: Monolithic Stage of the Quad Suspension Douglas Cook et al. Suspensions
Final Design
Reviews
05 Feb 2014
D1301007-v6 Particle Evaluation Tool - Custom Microscope Templates Calum Torrie et al. System Engineering
08 Jan 2014
T1300860-v1 ISS PD Array Alignment Procedure Rich Abbott et al. Laser Systems
Subsystem Test
07 Jan 2014
D040401-v1 D040401 Calum Torrie Basic R&D
Suspensions
16 Dec 2013
D1002147-v1 aLIGO BS/FM Prism bonding jig Marielle van Veggel et al. Installation
Suspensions
11 Dec 2013
D1002153-v3 aLIGO BS/FM Prism holder Marielle van Veggel et al. Installation
Suspensions
11 Dec 2013
T1300862-v1 200 psi air knife silvent nozzle and top gun pictures - proof of concept Jeffrey Lewis et al. System Engineering
06 Dec 2013
D1002149-v1 aLIGO BS/FM Prism bonding baseplate Marielle van Veggel et al. Suspensions
Installation
11 Nov 2013
D1002151-v3 aLIGO BS/FM Prism bonding support cylinder Marielle van Veggel et al. Suspensions
Installation
11 Nov 2013
D0902368-v2 Adv LIGO SUS FM / BS Secondary Prism Metal Calum Torrie Suspensions
System Engineering
05 Nov 2013
T1300093-v7 Prudential Body Box Results Kaitlin Gushwa et al. System Engineering
Basic R&D
01 Nov 2013
T1000012-v6 HAM Large Triple Suspension (HLTS) Final Design Document Norna Robertson et al. Final Design
Suspensions
17 Oct 2013
E1200329-v3 aLIGO Chamber (Top Level) Installation Procedure: LBSC2 Dennis Coyne et al. Installation
08 Oct 2013
M1200070-v1 Advanced LIGO Committee Report for the AOS SLC Manifold/Cryopump and Mode Cleaner Tube Baffles FDR Calum Torrie System Engineering
13 Sep 2013
T0900435-v9 HAM Small Triple Suspension (HSTS) Final Design Document Norna Robertson et al. Final Design
Suspensions
10 Sep 2013
E1200923-x0 aLIGO HAM Safety Procedures (associated with install) Calum Torrie System Engineering
Installation
14 Aug 2013
D070038-x0 Bar Jig Step Plate, Upper Wire Jig (OMCS) Calum Torrie Document Migration
28 May 2013
D070023-x0 Upper Blade Wire Clamp Attachment, Upper Wire Jig (OMCS) Calum Torrie Document Migration
28 May 2013
D020540-x0 Wire Start Matched Height (Grooved Clamp), Upper Wire Jig (OMCS) Calum Torrie Document Migration
28 May 2013
D020440-x0 Upper Wire Height Balance, Upper Wire Jig (OMCS) Calum Torrie Document Migration
28 May 2013
D080121-x0 Bar Jig for Upper Wires, Upper Wire Jig (OMCS) Calum Torrie Document Migration
28 May 2013
D070027-v1 Metal Dummy Optical Bench (OMCS) Calum Torrie Suspensions
28 May 2013
D020133-v1 Lower Blade Wire Clamp Plate (OMCS) Derek Bridges Suspensions
Final Design
28 May 2013
D020132-v2 Lower Blade Wire Clamp (HSTS/OMCS) Bobby Moore Suspensions
Final Design
28 May 2013
D020482-v2 Screwdrive System, Upper Mass (HSTS/OMCS) Janeen Romie Final Design
Suspensions
28 May 2013
D080019-v1 Lower Blade (OMCS) Michael Meyer Final Design
Suspensions
28 May 2013
D070022-v1 Wire Clamp, Top Blade (OMCS) Michael Meyer Final Design
Suspensions
28 May 2013
D020139-v1 Wire Clamp Plate, Upper Mass (OMCS) Michael Meyer Final Design
Suspensions
28 May 2013
D020309-v1 Wire Clamp Plate with Groove, Upper Mass (OMCS) Michael Meyer Suspensions
Final Design
28 May 2013
D070030-v1 C-Clamp for Top Wire (OMCS) Michael Meyer Suspensions
Final Design
28 May 2013
D030042-v1 Wire Clamp Plate, Upper Blade (OMCS) Michael Meyer Suspensions
Final Design
28 May 2013
D080018-v1 Upper Blade (OMCS) Michael Meyer Suspensions
Final Design
28 May 2013
D020336-v2 Lower Blade Clamp, Lower Side, 2.5 Degree (HSTS/OMCS) Bobby Moore Final Design
Suspensions
22 May 2013
D020313-v2 Lower Blade Clamp, Lower Side, 2.0 Degree (HSTS/OMCS) Bobby Moore Final Design
Suspensions
22 May 2013
D020335-v2 Lower Blade Clamp, Lower Side, 1.5 Degree (HSTS/OMCS) Bobby Moore Suspensions
Final Design
22 May 2013
D020334-v2 Lower Blade Clamp, Lower Side, 1.0 Degree (HSTS/OMCS) Bobby Moore Suspensions
Final Design
22 May 2013
D020333-v2 Lower Blade Clamp, Lower Side, 0.5 Degree (HSTS/OMCS) Bobby Moore Final Design
Suspensions
22 May 2013
D020308-v2 Lower Blade Clamp, Lower Side, 0.0 Degree (HSTS/OMCS) Derek Bridges Suspensions
Final Design
22 May 2013
D020340-v2 Lower Blade Clamp, Upper Side, 2.5 Degree (HSTS/OMCS) Bobby Moore Final Design
Suspensions
22 May 2013
D020314-v2 Lower Blade Clamp, Upper Side, 2.0 Degree (HSTS/OMCS) Bobby Moore Suspensions
Final Design
22 May 2013
D020339-v2 Lower Blade Clamp, Upper Side, 1.5 Degree (HSTS/OMCS) Bobby Moore Suspensions
Final Design
22 May 2013
D020338-v2 Lower Blade Clamp, Upper Side, 1.0 Degree (HSTS/OMCS) Bobby Moore Suspensions
Final Design
22 May 2013
D020337-v2 Lower Blade Clamp, Upper Side, 0.5 Degree (HSTS/OMCS) Bobby Moore Suspensions
Final Design
22 May 2013
D020119-v2 Lower Blade Clamp, Upper Side, 0.0 Degree (HSTS/OMCS) Bobby Moore Suspensions
Final Design
22 May 2013
D020680-v2 Upper Blade Clamp Shim, 2mm (HSTS/OMCS) Bobby Moore Final Design
Suspensions
22 May 2013
D020679-v2 Upper Blade Clamp Shim, 1mm (HSTS/OMCS) Bobby Moore Suspensions
Final Design
22 May 2013
D030466-v2 Upper Blade Clamp, Lower Side, 3.5 Degree (HSTS/OMCS) Bobby Moore Suspensions
Final Design
22 May 2013
D030465-v2 Upper Blade Clamp, Lower Side, 3.0 Degree (HSTS/OMCS) Bobby Moore Suspensions
Final Design
22 May 2013
D030463-v2 Upper Blade Clamp, Lower Side, 2.0 Degree (HSTS/OMCS) Bobby Moore Suspensions
Final Design
22 May 2013
D030462-v2 Upper Blade Clamp, Lower Side, 1.5 Degree (HSTS/OMCS) Bobby Moore Suspensions
Final Design
22 May 2013
D030461-v2 Upper Blade Clamp, Lower Side, 1.0 Degree (HSTS/OMCS) Bobby Moore Final Design
Suspensions
22 May 2013
D030460-v2 Upper Blade Clamp, Lower Side, 0.5 Degree (HSTS/OMCS) Bobby Moore Suspensions
Final Design
22 May 2013
D030459-v3 Upper Blade Clamp, Lower Side, 0.0 Degree (HSTS/OMCS) Bobby Moore Suspensions
Final Design
22 May 2013
D030464-v2 Upper Blade Clamp, Lower Side, 2.5 Degree (HSTS/OMCS) Bobby Moore Final Design
Suspensions
22 May 2013
D020690-v2 Upper Blade Clamp, Upper Side, 3.5 Degree (HSTS/OMCS) Bobby Moore Final Design
Suspensions
21 May 2013
D020689-v2 Upper Blade Clamp, Upper Side, 3.0 Degree (HSTS/OMCS) Bobby Moore Suspensions
Final Design
21 May 2013
D020328-v2 Upper Blade Clamp, Upper Side, 2.5 Degree (HSTS/OMCS) Bobby Moore Suspensions
Final Design
21 May 2013
D020312-v2 Upper Blade Clamp, Upper Side, 2.0 Degree (HSTS/OMCS) Bobby Moore Suspensions
Final Design
21 May 2013
D020327-v2 Upper Blade Clamp, Upper Side, 1.5 Degree (HSTS/OMCS) Bobby Moore Suspensions
Final Design
21 May 2013
D020326-v2 Upper Blade Clamp, Upper Side, 1.0 Degree (HSTS/OMCS) Bobby Moore Suspensions
Final Design
21 May 2013
D020325-v2 Upper Blade Clamp, Upper Side, 0.5 Degree (HSTS/OMCS) Michael Meyer Final Design
Suspensions
21 May 2013
D020116-v2 Upper Blade Clamp, Upper Side, 0.0 Degree (HSTS/OMCS) Bobby Moore Final Design
Suspensions
21 May 2013
D070035-v4 Metal Bench Assembly (OMCS) Derek Bridges Suspensions
Sensing and Control
14 May 2013
D020159-x0 Lower Blade Wire Clamp, Lower Wire Jig (OMCS) Calum Torrie Document Migration
17 Apr 2013
D070250-v4 Base Plate, Lower Wire Jig (OMCS) Derek Bridges Final Design
Suspensions
17 Apr 2013
D020677-v3 Library of Clamps (HSTS/OMCS) Michael Meyer Final Design
Suspensions
17 Apr 2013
D0900308-v4 Structural Weldment (OMCS) Michael Meyer et al. Final Design
Suspensions
16 Apr 2013
E1200902-x0 aLIGO BSC Test Procedures (associated with install) Calum Torrie System Engineering
25 Mar 2013
G020394-x0 Advanced LIGO Suspension Research Dan Mason et al. Document Migration
07 Aug 2003
T1000558-v2 Output Faraday Isolator (OFI) Table Deflection and Modal Analysis Dennis Coyne et al. Auxiliary Optics
24 Jan 2013
T1200491-v1 Analysis of Rosin Core Solder for UHV Applications Rich Abbott et al. Cleaning
System Engineering
01 Nov 2012
D1000587-v3 5 AXIS INSTALLATION TABLE on CART - Historical Reference Only Calum Torrie System Engineering
18 Oct 2012
E1200700-x0 DCN to release PCAL Periscope Scott Shankle et al. Fabrication
28 Sep 2012
D070068-v1 C-Spacer, OMC Derek Bridges Suspensions
25 Sep 2012
D0900419-v2 AdvLIGO SUS BSC6-H2, XYZ Local CS for TMS ETM Tel Assy Jose Eduardo Chavez et al. Auxiliary Optics
14 Aug 2012
D020534-v2 Upper Mass Assembly, HSTS Michael Meyer et al. Suspensions
Final Design
13 Jul 2012
D020535-v2 Upper Mass and Coil Holder Assembly, HSTS Michael Meyer et al. Suspensions
Final Design
12 Jul 2012
T080230-v3 Quad Pendulum Structure Pushers Calum Torrie et al. Installation
02 Jul 2012
D020239-v1 Coil Holder, HSTS Bobby Moore Suspensions
Final Design
25 Jun 2012
D020199-v1 Magnet/Flag Base (Short), Upper Mass, HSTS Bobby Moore Final Design
Suspensions
21 Jun 2012
D020211-v1 Magnet Holder Brace, Upper Mass, HSTS Bobby Moore Suspensions
Final Design
21 Jun 2012
D030078-v2 Add-on Mass, 20g Michael Meyer Suspensions
Final Design
21 Jun 2012
D020351-v2 Add-on Mass, 50g Michael Meyer Suspensions
Final Design
21 Jun 2012
D020350-v3 Add-on Mass, 100g Michael Meyer Suspensions
Final Design
21 Jun 2012
D020203-v2 Lower Wire Clamp, HSTS Bobby Moore Suspensions
Final Design
18 Jun 2012
D020202-v2 Lower Wire Clamp Mount, HSTS Bobby Moore Suspensions
Final Design
18 Jun 2012
D030044-v1 Lower Blade Wire Clamp Plate, Angled, HSTS Bobby Moore Final Design
Suspensions
31 May 2012
D070442-v7 Structural Weldment, HLTS Derek Bridges et al. Suspensions
Final Design
29 May 2012
T080266-v1 Suspending optics on steel wire loops Norna Robertson et al. Basic R&D
Suspensions
02 Mar 2009
D020137-v1 Pitch Insert, T-Section, Upper Mass, HSTS Bobby Moore Suspensions
Final Design
08 Apr 2012
D020676-v1 Roll Insert, T-Section, Upper Mass, HSTS Bobby Moore Final Design
Suspensions
08 Apr 2012
D020136-v1 T-Section, Upper Mass, HSTS Bobby Moore Final Design
Suspensions
08 Apr 2012
D020134-v1 Main Section, Upper Mass, HSTS Bobby Moore Suspensions
Final Design
08 Apr 2012
D020198-v1 Upper Blade Wire Clamp, HSTS Bobby Moore Suspensions
Final Design
08 Apr 2012
D020481-v1 Upper Mass C-Clamp, HSTS Bobby Moore Suspensions
Final Design
08 Apr 2012
E0810008-v1 DRAWING TREE FOR D030243 Calum Torrie Suspensions
Basic R&D
01 Apr 2012
D970075-v2 Dumbbell Standoff Calum Torrie Suspensions
Final Design
17 Mar 2012
D020617-v2 Upper Blade, HLTS Calum Torrie et al. Suspensions
Final Design
16 Mar 2012
D1000429-v1 SLC FM ELLIPTICAL BAFFLE ASSY Calum Torrie Auxiliary Optics
Modelling
30 Dec 2011
D020682-v2 HSTS/OMC Lower Blade Clamp, Shim, 1mm Bobby Moore Final Design
Suspensions
22 Nov 2011
D040259-v1 Tablecloth and Upper Mass Table Jig Calum Torrie Final Design
Suspensions
11 Nov 2011
T1000345-v2 The Design of the IGR MKII Strength Testing Machine Russell Jones et al. Basic R&D
Suspensions
11 Oct 2011
T1000734-v5 FM / BS PROPOSED LAYOUTS Calum Torrie et al. System Engineering
20 Jul 2011
E0900167-v4 Bill of Materials for the ETM / ITM Quad Suspension Assembly (Production) Joe ODell et al. Suspensions
12 Jul 2011
T010103-v1 aLIGO Suspension System Conceptual Design Russell Jones et al. Conceptual Design
Suspensions
09 Jun 2011
D080503-v3 ADVANCED LIGO, SUS, THIS, BEAM SPLITTER UPPER STRUCTURE, SHEAR PLATE Joe ODell et al. Suspensions
24 May 2011
E0900412-x0 DCN for optic container (cake tin) updates Kurt Buckland et al. System Engineering
Core Optics
18 Mar 2011
Q0900001-v5 Advanced LIGO Supplier Quality Requirements Jeffrey Lewis et al. Quality Assurance
11 Mar 2011
D1002152-v1 aLIGO BS/FM Prism holder assembly Marielle van Veggel et al. Installation
Suspensions
09 Mar 2011
D1002150-x0 aLIGO BS/FM Prism bonding alignment guide Marielle van Veggel et al. Installation
Suspensions
09 Mar 2011
D070077-v2 Proof bounce tester top plate Russell Jones et al. Suspensions
01 Mar 2011
D1002105-v2 aLIGO SUS UK PROOF BOUNCE TESTER BASEPLATE Russell Jones et al. Suspensions
01 Mar 2011
D1002082-v1 aLIGO SUS UK PROOF TESTER Russell Jones et al. Suspensions
28 Feb 2011
D070075-v2 Proof bounce tester joint for clevis pin Russell Jones et al. Suspensions
25 Feb 2011
D1002071-v1 aLIGO SUS UK PROOF BOUNCE TESTER 15KG PROOF MASS Russell Jones et al. Suspensions
25 Feb 2011
D1002069-v1 aLIGO SUS UK PROOF BOUNCE TESTER DOOR Russell Jones et al. Suspensions
25 Feb 2011
D1002067-v1 aLIGO SUS UK PROOF BOUNCE TESTER ENCLOSURE Russell Jones et al. Suspensions
25 Feb 2011
D020380-v2 Wire Start Clamp, Outside Derek Bridges Preliminary Design
Suspensions
23 Feb 2011
D980184-v2 LOS Clamp, Long Derek Bridges System Engineering
Final Design
07 Feb 2011
D020660-v1 Blade Pulldown Device, HAM Suspensions Derek Bridges Suspensions
Final Design
26 Jan 2011
Q1100001-v1 Request for Deviation Jeffrey Lewis et al. Quality Assurance
25 Jan 2011
E0900422-x0 DCN for updates to CP & ERM barrel gold coating pattern Kurt Buckland et al. System Engineering
18 Jan 2011
D010266-v1 Wire Clamp Cylinder, Blade Pulldown Device Derek Bridges Final Design
Suspensions
21 Dec 2010
D010268-v1 Lower Wire Clamp, Blade Pulldown Device Derek Bridges Suspensions
Final Design
08 Dec 2010
D010261-v1 Lower Wire Clamp Plate, Blade Pulldown Device Derek Bridges Suspensions
Final Design
06 Dec 2010
D060189-v3 ERM ESD PATTERN Kurt Buckland et al. System Engineering
14 Oct 2009
T1000353-v3 EXCEL spreadsheet for design of HLTS Blades Norna Robertson et al. Suspensions
Final Design
07 Sep 2010
T1000452-v2 Update on the Production Redesign of the HAM Large Triple Suspension Structure Derek Bridges et al. Modelling
Final Design
Reports
Suspensions
27 Aug 2010
T0900586-v1 Proof load test and vertical bounce frequency test apparatus for ITM/ETM silica suspension fibres Ken Strain et al. Suspensions
Final Design
26 Aug 2010
T0900365-v2 EXCEL spreadsheet for design of OMC SUS Blades Norna Robertson et al. Suspensions
Final Design
06 Aug 2010
T1000352-v3 EXCEL spreadsheet for design of HSTS Blades Norna Robertson et al. Final Design
Suspensions
06 Aug 2010
C1000290-v4 SOW for the BSC installation tooling 5-axis tables Kurt Buckland et al. System Engineering
15 Jul 2010
D080663-v3 D080663_AdLIGO_COC_F-PR3_SUBSTRATE Calum Torrie Core Optics
Final Design
09 Jun 2010
D080664-v3 D080664_AdLIGO_COC_SR3_SUBSTRATE Calum Torrie Core Optics
Final Design
28 May 2010
D080662-v3 D080662_ALIGO COC_PR3_SUBSTRATE Calum Torrie Final Design
Core Optics
28 May 2010
D080661-v4 D080661_ALIGO COC_FM_SUBSTRATE Calum Torrie Core Optics
Final Design
28 May 2010
D060102-v1 aLIGO ETM and ITM SUS Recycling Mirror Envelope Calum Torrie Conceptual Design
Suspensions
28 Feb 2010
L1000003-v3 Ear Fabrication Readiness Review Gregg Harry et al. Reviews
Final Design
Suspensions
15 Jan 2010
T0900595-v1 Production Readiness review for Test Mass and Suspension Mass Ears Questions from the Committee Gregg Harry et al. Final Design
Suspensions
25 Nov 2009
D070213-v1 ADVANCED LIGO, SUS OMC, Lower Clamp Wire Clamp Assembly, Wire Clamp For Optical Bench Calum Torrie Suspensions
14 Jul 2009
G0900507-v2 Overview of monolithic suspension work for Advanced LIGO Timothy Bodiya et al. Suspensions
Basic R&D
19 Jun 2009
D0900945-v1 Gold Coating Pattern, Test Mass Barrel Calum Torrie System Engineering
12 May 2009
D020466-v1 SMALL TRIPLES 10x10mm Magnet Calum Torrie Suspensions
Basic R&D
07 May 2009
D020324-v1 UPPER BLADE CLAMP, LOWER SIDE, ANGLED 2.5 DEGREES Michael Meyer Final Design
Suspensions
24 Apr 2009
T070205-x0 OMC STRUCTURE SUMMARY (inc. FEA & EXPT results and weld tests) Calum Torrie Preliminary Design
Suspensions
25 Feb 2009
D020307-v1 UPPER BLADE CLAMP, LOWER SIDE Michael Meyer Suspensions
Final Design
24 Apr 2009
D020321-v1 UPPER BLADE CLAMP, LOWER SIDE, ANGLED 0.5 DEGREES Michael Meyer Suspensions
Final Design
24 Apr 2009
D020311-v1 UPPER BLADE CLAMP, LOWER SIDE, ANGLED 2.0 DEGREES Michael Meyer Suspensions
Final Design
24 Apr 2009
D020323-v1 UPPER BLADE CLAMP, LOWER SIDE, ANGLED 1.5 DEGREES Michael Meyer Final Design
Suspensions
24 Apr 2009
D020322-v1 UPPER BLADE CLAMP, LOWER SIDE, ANGLED 1.0 DEGREES Michael Meyer Suspensions
Final Design
24 Apr 2009
D020687-v1 Upper Blade Clamp, Lower Side, 3.0 Degree Derek Bridges Suspensions
Final Design
24 Apr 2009
D020688-v1 Upper Blade Clamp, Lower Side, 3.5 Degree Derek Bridges Final Design
Suspensions
24 Apr 2009
D020201-v1 HSTS Lower Blade Bobby Moore Suspensions
01 Apr 2009
D030243-v2 Cu Damper 2x2 Array Stripped Calum Torrie Basic R&D
Suspensions
06 Mar 2009
D030215-v3 Eddy Current Magnet Holder Calum Torrie Suspensions
Basic R&D
06 Mar 2009
T060264-x0 Output Mode Cleaner Concept Christopher Echols et al. Document Migration
25 Feb 2009
D070070-v1 Wire Clamp for Optical Bench, OMC Calum Torrie Suspensions
Basic R&D
24 Feb 2009
D020475-v1 SUS SMALLTRIPLE 2x2ARRARY (ECD) 2x2copperarray Calum Torrie Basic R&D
Suspensions
23 Jan 2009
D030735-v1 SUS_SMALLTRIPLE_2x2ARRARY_ECD_MACHINED HEX IN SHCS_SUB-ASSEMBLY Calum Torrie Suspensions
Basic R&D
23 Jan 2009
D070069-x0 Advanced LIGO, SUS, OMC Lower Wire Jig, INTERFACE TO WIRE JIG FOR Glass Bench Wire Clamp Assembly Calum Torrie Document Migration
18 Dec 2008
D070248-x0 ADVANCED LIGO, SUSPENSIONS, OMC LOWER WIRE JIG, OMC INTERFACE FOR WIRE JIG Calum Torrie Document Migration
17 Dec 2008
E070186-x0 Document Change Notice (DCN) - Advanced LIGO SUS OMC Bench Assembly Calum Torrie Document Migration
17 Dec 2008
D070036-x0 ADVANCED LIGO, SUS, OMC, METAL BENCH CYLINDERS Calum Torrie Document Migration
17 Dec 2008
E070025-x0 Document Change Notice (DCN) - ADVANCED LIGO SUS OMC FOR METAL BENCH ASSEMBLY Calum Torrie Document Migration
17 Dec 2008
E070194-x0 Document Change Notice (DCN) - GLASS C SPACER Calum Torrie Document Migration
17 Dec 2008
E080111-x0 Document Change Notice (DCN) - ADVANCED LIGO SUS OMC METAL BENCH ASSEMBLY Calum Torrie Document Migration
16 Dec 2008
D020318-x0 Advanced LIGO, SUS, MC: Upper Mass, Lower Blade Wire Clamp Assembly Calum Torrie Document Migration
16 Dec 2008
D070067-x0 Advanced LIGO, SUS OMC, Optical Bench, Lower Clamp Wire Clamp Assembly Calum Torrie Document Migration
16 Dec 2008
T080168-x0 Concepts for the Gold Barrel Sleeve For both the ETM and TCP Optics Amanda Brummitt et al. Document Migration
30 Jul 2008
T080158-x0 SPI interface to structure sleeve discussion Amanda Brummitt et al. Document Migration
21 Jul 2008
T030135-x0 Controls Prototype: - Measurements on the Mode Cleaner Triple Pendulum at Caltech Mark Barton et al. Document Migration
16 Jul 2008
E080169-x0 Document Change Notice (DCN) - OMC & RM blades Calum Torrie Document Migration
06 May 2008
T080091-x0 Proposal for baseline change from ribbons to fibres in AdvLIGO test mass suspension monolithic stage Mark Barton et al. Document Migration
21 Apr 2008
T060135-x0 Design development of the SUS ETM structures Mark Barton et al. Document Migration
14 Mar 2008
T060113-x0 Welding and cleaning specification for SUS ETM structures Mark Barton et al. Document Migration
14 Mar 2008
T080053-x0 Comments and Questions and Responses on the BOSEM FDR and FRR, and Responses Betsy Weaver et al. Document Migration
06 Mar 2008
G070444-x0 Production and characterisation of fused silica suspension ribbons for Advanced LIGO - 7th Edoardo Amaldi Conference on Gravitational Waves, July 8 -14 2007, Sydney Australia Mark Barton et al. Document Migration
21 Dec 2007
T070248-x0 Advanced LIGO Input Optics Preliminary Design Review Report Dennis Coyne et al. Document Migration
06 Nov 2007
G070656-x0 Welding Experiences: Output Modecleaner and Recycling Mirror Designs - LSC/Virgo Collaborations Meeting, October 22-25 2007, Hannover Germany Calum Torrie Document Migration
29 Oct 2007
T070138-x0 Ribbon/Fibre Length Budget Mark Barton et al. Document Migration
25 Sep 2007
T070185-x0 Summary of work on LIGO structures Tim Hayler et al. Document Migration
17 Aug 2007
T070155-x0 Preliminary Measured and Predicted Frequency Analysis of the Noise Prototype Structures Caroline Cantley et al. Document Migration
07 Aug 2007
T060088-x0 Finite Element Analysis of Advanced LIGO SUS ETM structures using ANSYS workbench Mark Barton et al. Document Migration
07 Aug 2007
T060087-x0 Finite Element Analysis of Advanced LIGO SUS ETM Structures using ANSYS Classic beam models Mark Barton et al. Document Migration
07 Aug 2007
T050255-x0 Investigation into Blade Torsion, Blade Lateral Flexibility, and the Effect They Have on Blade and Wire Performance Mark Barton et al. Document Migration
06 Jun 2007
T060257-x0 Conceptual Design of a Double Pendulum for the Output Mode Cleaner Dennis Coyne et al. Document Migration
10 Jan 2007
D060104-x0 ENHANCED/ADVANCED LIGO, SUSPENSIONS, HAM CHAMBER, OUTPUT MODE CLEANER OVERALL ASSEMBLY Calum Torrie Document Migration
06 Nov 2006
D050247-x0 ADVANCED LIGO, SUS, LOWER STR, SPACER FOR BETWEEN THE LOWER CHAINS Calum Torrie Document Migration
26 Oct 2006
E060057-x0 Document Change Notice (DCN) - ADVANCED LIGO SUS ETM CPTYPE Calum Torrie Document Migration
19 Oct 2006
E060059-x0 ADVANCED LIGO SUS ETM CPTYPE OVERALL PROJECT DRAWING TREE Calum Torrie Document Migration
18 Oct 2006
D040381-x0 ADVANCED LIGO, SUS, CPTYPE ETM TOP MASS, TOP WIRE BREAK OFF - MAIN BODY Calum Torrie et al. Document Migration
16 Oct 2006
D040380-x0 ADVANCED LIGO, SUS, TOP MASS, TOP MASS WIRE BREAK OFF AND PITCH PLATE Calum Torrie et al. Document Migration
16 Oct 2006
D040186-x0 ADVANCED LIGO, SUS, ETM CPTYPE PENULTIMATE REACTION MASS, ADJUSTABLE CYLINDER FOR PITCH Calum Torrie Document Migration
16 Oct 2006
D060095-x0 ADVANCED LIGO, SUS, ALT CLAMP FOR UI MASS AS USED IN LASTI Calum Torrie Document Migration
16 Oct 2006
D040145-x0 ADVANCED LIGO, SUS, ETM CONT TEST MASS, REACTION MASS REMOVABLE FACE PLATE Calum Torrie Document Migration
16 Oct 2006
D050333-x0 ADVANCED LIGO, SUS, CPTYPE ETM TOP MASS, U-I WIRE CLAMP MAIN BODY Calum Torrie Document Migration
16 Oct 2006
D040171-x0 ADVANCED LIGO, SUS, REMOVABLE CYLINDER Calum Torrie Document Migration
16 Oct 2006
D050334-x0 ADVANCED LIGO, SUS, CPTYPE ETM TOP MASS, U-I WIRE CLAMP PLATE Calum Torrie Document Migration
16 Oct 2006
D040382-x0 ADVANCED LIGO, SUS, CPTYPE ETM TOP MASS, TOP WIRE BREAK OFF - MAIN BODY Calum Torrie et al. Document Migration
16 Oct 2006
D040052-x0 ADVANCED LIGO, SUS, ETM CPTYPE, TEST MASS FACES Calum Torrie Document Migration
13 Oct 2006
D040142-x0 ADVANCED LIGO, SUS, ETM CONT, PEN REACTION MASS ASSEMBLY Calum Torrie Document Migration
13 Oct 2006
D040143-x0 ADVANCED LIGO, SUS, ETM CPTYPE, PEN REACTION MASS MAIN SECTION Calum Torrie Document Migration
13 Oct 2006
D040422-x0 ADVANCED LIGO, SUS, REACTION TEST MASS BUNG INSERT Calum Torrie Document Migration
13 Oct 2006
D040164-x0 ADVANCED LIGO, SUS, ETM CPTYPE REACTION TEST MASS, MAIN BODY REACTION TEST MASS Calum Torrie Document Migration
13 Oct 2006
D040161-x0 ADVANCED LIGO, SUS, ETM CPTYPE, REACTION MASS ASSEMBLY Calum Torrie Document Migration
13 Oct 2006
D050338-x0 ADVANCED LIGO, SUS, MAIN CHAIN PEN MASS, MAIN CHAIN PEN MASS BUNG INSERT Calum Torrie Document Migration
13 Oct 2006
D040185-x0 ADVANCED LIGO, SUS ETM CPTYPE, PENULTIMATE REACTION MASS, REMOVABLE BACK FACE PLATE Calum Torrie Document Migration
13 Oct 2006
D040398-x0 ADVANCED LIGO, SUS, ETM CPTYPE, HEX MAGNET SPACER Calum Torrie Document Migration
13 Oct 2006
D040445-x0 ADVANCED LIGO, SUS, ETM CPTYPE, WIRE BREAK OFF Calum Torrie Document Migration
13 Oct 2006
D040421-x0 Advanced LIGO, SUS, ETM CPTYPE PEN MASS, TWO WIRE BREAK OFF ASSEMBLY PEN MASS Calum Torrie Document Migration
12 Oct 2006
D040135-x0 ADVANCED LIGO, SUS, ETM CPTYPE PEN MASS, FACE PLATE, MAIN BODY PEN MASS Calum Torrie Document Migration
12 Oct 2006
D040043-x0 Advanced LIGO, SUS, ETM CPTYPE TEST MASS, TWO WIRE BREAK OFF ASSEMBLY Calum Torrie Document Migration
12 Oct 2006
D040037-x0 Advanced LIGO, SUS, ETM CPTYPE TEST + PEN. MASS, INSERTS, MAIN BODY Calum Torrie Document Migration
12 Oct 2006
D040325-x0 Advanced LIGO, SUS, Test Mass Assembly, Main Section Bung Calum Torrie Document Migration
12 Oct 2006
D040136-x0 Advanced LIGO, SUS, ETM CPTYPE PEN TEST MASS, MAIN BODY PEN MASS Calum Torrie Document Migration
12 Oct 2006
D040397-x0 ADVANCED LIGO, SUS, ETM CPTYPE, ASSEMBLY MAGNET FLAG & HEX SPACER Calum Torrie Document Migration
12 Oct 2006
D040420-x0 Advanced LIGO, SUS, ETM CPTYPE PEN MASS, PEN MASS WIRE BREAK OFF & CLAMP Calum Torrie Document Migration
12 Oct 2006
D040132-x0 ADVANCED LIGO, SUS, ETM CPTYPE, PENULTIMATE MASS ASSEMBLY Calum Torrie Document Migration
12 Oct 2006
D040036-x0 Advanced LIGO, SUS, ETM CPTYPE TEST MASS, Main Body Test Mass Calum Torrie Document Migration
12 Oct 2006
D040038-x0 ADVANCED LIGO, SUS, ETM CPTYPE, TEST MASS ASSEMBLY Calum Torrie Document Migration
12 Oct 2006
D060093-x0 Advanced LIGO, SUS, Interface Ring Assembly (TD-1039-410) Calum Torrie Document Migration
11 Oct 2006
D050236-x0 Advanced LIGO, SUS, Lower STR, UI Mass Top Safety Stops Vertical Calum Torrie Document Migration
11 Oct 2006
D050047-x0 Advanced LIGO, SUS, Lower STR, ETM Lower STR Assembly Rig Calum Torrie Document Migration
11 Oct 2006
D060053-x0 ADVANCED LIGO, SUS, INSTALL FIXTURES, QUAD MOVERS Calum Torrie Document Migration
11 Oct 2006
D050178-x0 Advanced LIGO, SUS, ETM CPTYPE Upper Structure, Dog Clamp Alt Large Calum Torrie Document Migration
11 Oct 2006
D050050-x0 Advanced LIGO, SUS, Lower STR, Longitudinal Cross Strut Calum Torrie Document Migration
11 Oct 2006
D050237-x0 Advanced LIGO, SUS, Lower STR, UI MASS STOP BETWEEN CHAIN Calum Torrie Document Migration
11 Oct 2006
D050051-x0 Advanced LIGO, SUS, Lower STR, Side Plate for Safety Stops Calum Torrie Document Migration
11 Oct 2006
D050043-x0 Advanced LIGO, SUS, Lower STR Assembly, Lower STR Long Side-Straps Calum Torrie Document Migration
11 Oct 2006
D050213-x0 Advanced LIGO, SUS, Catcher/Assembly Rig, PFA 440 HP Bearing Pad for Assembly Calum Torrie Document Migration
11 Oct 2006
D050240-x0 Advanced LIGO, SUS, Lower STR, Tie for Angled Trans Side Strap Calum Torrie Document Migration
11 Oct 2006
D050035-x0 Advanced LIGO, SUS, Assembly Rig_Single Catcher, Faceplate Calum Torrie Document Migration
11 Oct 2006
D050038-x0 Advanced LIGO, SUS, Lower STR, Lower STR Faceplate Connector Calum Torrie Document Migration
11 Oct 2006
D030703-x0 Advanced LIGO, SUS, ETM: Coil, Coil Former Bracket Calum Torrie Document Migration
11 Oct 2006
D060072-x0 Advanced LIGO, SUS, INTERFACE PART Calum Torrie Document Migration
11 Oct 2006
D040516-x0 Advanced LIGO, SUS, ETM Lower STR Assembly Rig Calum Torrie Document Migration
11 Oct 2006
D040524-x0 Advanced LIGO, SUS, CPTYPE ETM Suspension, Upper Structure with Suspended & Non Suspended Items Calum Torrie Document Migration
11 Oct 2006
D040514-x0 Advanced LIGO, SUS, ETM Upper Str Calum Torrie Document Migration
11 Oct 2006
D050188-x0 Advanced LIGO, SUS ETM CPTYPE, Lower Structure, Lower Structure Top E-Stops Calum Torrie Document Migration
11 Oct 2006
D050036-x0 Advanced LIGO, SUS, Lower STR, Mass Support Strut Calum Torrie Document Migration
11 Oct 2006
D050044-x0 Advanced LIGO, SUS, Lower STR, Lower STR Angled Long Front Strap Calum Torrie Document Migration
11 Oct 2006
D040400-x0 Advanced LIGO, SUS, CPTYPE ETM Suspension, Quad Assembly (Suspended) Calum Torrie Document Migration
11 Oct 2006
D050203-x0 Advanced LIGO, SUS, Lower STR, UI Mass Top Safety Stops Vertical Calum Torrie Document Migration
11 Oct 2006
D050042-x0 Advanced LIGO, SUS, Lower STR Assembly, Lower STR Long Zed Straps Calum Torrie Document Migration
11 Oct 2006
D060052-x0 ADVANCED LIGO, SUS, INSTALL FIXTURES, QUAD PUSHERS Calum Torrie Document Migration
11 Oct 2006
D050090-x0 Advanced LIGO, SUS, Assembly Rig_Single Catcher, Inner Faceplate Calum Torrie Document Migration
11 Oct 2006
D040045-x0 Advanced LIGO, SUS, ETM CPTYPE, Wire Break Off Calum Torrie Document Migration
11 Oct 2006
D050053-x0 Advanced LIGO, SUS, Catcher/Assembly Rig, Teflon Bearing Pad Calum Torrie Document Migration
11 Oct 2006
D040044-x0 Advanced LIGO, SUS, ETM CPTYPE, Wire Break Off Plate Calum Torrie Document Migration
11 Oct 2006
D050195-x0 Advanced LIGO, SUS, Lower Structure, Facestop Calum Torrie Document Migration
11 Oct 2006
D050040-x0 Advanced LIGO, SUS, ETM Lower Structure Single Catcher Calum Torrie Document Migration
11 Oct 2006
D030712-x0 Advanced LIGO, SUS, ETM: Coil, Coil Former Clamp Onepiece_Alt Calum Torrie Document Migration
11 Oct 2006
D050329-x0 ADVANCED LIGO, SUS, TOP BLADE, TOP BLADE WIRE CLAMP ASSEMBLY FOR DOUBLE CLAMP & PIN Calum Torrie Document Migration
11 Oct 2006
D050328-x0 Advanced LIGO, SUS, CPTYPE, Top Blades (Top Stage), Top Blade Wire Clamp Body Cpad Calum Torrie Document Migration
11 Oct 2006
D040170-x0 Advanced LIGO, SUS, ETM: Coil, Coil Assembly Calum Torrie Document Migration
11 Oct 2006
D050041-x0 Advanced LIGO, SUS, Lower Structure, Long. Angled V Strap Calum Torrie Document Migration
11 Oct 2006
D050201-x0 Advanced LIGO, SUS, Interface J Nut Calum Torrie Document Migration
11 Oct 2006
T050215-x0 Monolithic stage conceptual design for Advanced LIGO ETM/ITM Helena Armandula et al. Document Migration
25 Sep 2006
E060178-x0 AOS Pick Off Beam Suspension and ETM Telescope Suspension Requirements Janeen Romie et al. Document Migration
28 Jul 2006
T060147-x0 Bonding, Ear, Ribbon/Fibre PDR - Response to Committee Report Helena Armandula et al. Document Migration
23 Jun 2006
G060058-x0 All-Metal Controls Prototype Quadruple Pendulum Suspension (ETM) - LSC Meeting, March 19-22, 2006, Hanford WA Calum Torrie Document Migration
14 Apr 2006
G060055-x0 All-Metal Controls Prototype Quadruple Pendulum Suspension - LSC Meeting, March 19-22, 2006, Hanford WA Calum Torrie Document Migration
14 Apr 2006
T030137-x0 ETM Controls Prototype: Mass Estimate of an ETM Suspension Layout Caroline Cantley et al. Document Migration
13 Apr 2006
T050237-x0 Advanced LIGO Preliminary Frequency Analysis of the Quadruple Pendulum Controls Prototype (second) Structure Mark Barton et al. Document Migration
13 Apr 2006
T060039-x0 Caltech controls method for suspending masses Mark Barton et al. Document Migration
10 Apr 2006
T060059-x0 Finite Element Analysis of Advanced LIGO SUS ETM Structures Mark Barton et al. Document Migration
16 Mar 2006
T060012-x0 COMMENTS RELATING TO THE CONTROLS PROTOTYPE ELECTROSTATIC DRIVE DESIGN Helena Armandula et al. Document Migration
25 Jan 2006
T050171-x0 Selection of Aluminum Alloys for Use on Advanced LIGO UK Parts Dennis Coyne et al. Document Migration
02 Dec 2005
T050077-x0 Separation of chains in quad suspensions Caroline Cantley et al. Document Migration
15 Sep 2005
T050084-x0 LIGO Output Mode Cleaner HAM Seismic Attenuation System Alessandro Bertolini et al. Document Migration
25 Aug 2005
G050461-x0 A method for Killing the parametric instabilities dead Eric Black et al. Document Migration
25 Aug 2005
T050095-x0 Response to Advanced LIGO Suspensions Subsystem (SUS) Design Requirements Review Report (L010161-00-D) Norna Robertson et al. Document Migration
27 Jul 2005
T040071-x0 Top Mass for ETM Controls Prototype Quad Pendulum Suspension - Product Design Specification Caroline Cantley et al. Document Migration
27 Jul 2005
G050316-x0 Update on Aspects of the Suspension Design for Advanced LIGO Helena Armandula et al. Document Migration
28 Jun 2005
E050148-x0 Document Change Notice (DCN) - Initial Release of Drawing Requirements Calum Torrie Document Migration
26 May 2005
G050267-x0 Passive seismic attenuation for the LIGO Output mode cleaner; HAM-SAS Alessandro Bertolini et al. Document Migration
25 May 2005
T050067-x0 New mirror support point design Riccardo DeSalvo et al. Document Migration
28 Apr 2005
T030278-x0 Advanced LIGO SUS Preliminary Frequency Analysis of the Mode Cleaner Structure Mark Barton et al. Document Migration
07 Apr 2005
G050187-x0 ADVANCED LIGO SUS ETM STRUCTURAL DESIGN SUMMARY - LSC Meeting, March 20-23, 2005, Livingston LA Caroline Cantley et al. Document Migration
07 Apr 2005
T050046-x0 Seismic and Thermal Noise Peaks from Blade Internal Modes in an ETM/ITM Quadruple Pendulum Norna Robertson et al. Document Migration
29 Mar 2005
T050034-x0 ETM Controls Prototype: “3 &1” Assembly Technique plus additional discussion material Caroline Cantley et al. Document Migration
28 Mar 2005
G050178-x0 Passive attenuation for the LIGO Output mode cleaner; HAM SAS - LSC Meeting, March 20-23, 2005, Livingston LA Alessandro Bertolini et al. Document Migration
28 Mar 2005
T050033-x0 Advanced LIGO SUS ETM Controls Prototype: The Question of Mass To Mass Separation Within the Catcher / Assembly Rig Caroline Cantley et al. Document Migration
28 Mar 2005
G050175-x0 ADVANCED LIGO SUS ETM ADVANCED LIGO Sub-assembly procedure tooling development and associated testing leading to the build of the sus prototypes - LSC Meeting, March 20-23, 2005, Livingston LA Calum Torrie Document Migration
25 Mar 2005
T050019-x0 ADVANCED LIGO: Information Related to the Procurement of Cantilever Blades for the Controls Prototype Quad ETM Suspension Calum Torrie Document Migration
02 Mar 2005
D050018-x0 ADVANCED LIGO SUS QUAD ETM C-PTYPE DRUM ENDED WIRE TOP STAGE Calum Torrie Document Migration
17 Feb 2005
E050051-x0 Document Change Notice (DCN) - ADVANCED LIGO SUS QUAD ETM C-PTYPE DRUM ENDED WIRE TOP STAGE Calum Torrie Document Migration
17 Feb 2005
T050010-x0 Monolithic Suspension Workshop (Glasgow Jan 2005): Minutes & Actions Helena Armandula et al. Document Migration
15 Feb 2005
T040214-x0 Advanced LIGO Parameters for Current ETM/ITM Main Chain Noise Prototype Design Helena Armandula et al. Document Migration
14 Dec 2004
T040038-x0 Investigation of Suspension of Compensator Plate in ITM Reaction Chain Norna Robertson et al. Document Migration
14 Dec 2004
T040206-x0 Sketches of Blade and Clamp to an Assist Explanation of the Placement of the Recess in the Blade Clamp Alastair Grant et al. Document Migration
13 Oct 2004
T040080-x0 Advanced LIGO Catcher Jig Product Design Specification for the ETM Controls Prototype Caroline Cantley et al. Document Migration
14 Sep 2004
D040183-x0 ADVANCED LIGO SUS ETM CPTYPE FLEXURE POINT OF A SPRING STEEL WIRE Caroline Cantley et al. Document Migration
08 Sep 2004
T040016-x0 ADVANCED LIGO SUS QUAD ETM CONTROLS PROTOTYPE TASK SUMMARY Caroline Cantley et al. Document Migration
26 Aug 2004
T030125-x0 Controls Prototype: - Library of Clamps for the Cantilever Blades in the Mode Cleaner Suspension. Russell Jones et al. Document Migration
25 Aug 2004
E030507-x0 ADVANCED LIGO SUS MC PROJECT DRAWING TREE FOR OVERALL ASSEMBLY, D020700 Calum Torrie Document Migration
24 Aug 2004
E030508-x0 ADVANCED LIGO SUS MC MATERIAL LIST (OR OVERALL BOM) Calum Torrie Document Migration
24 Aug 2004
E040355-x0 Document Change Notice (DCN) - Blade Spring Quad ETM Controls Prototype Justin Greenhalgh et al. Document Migration
06 Aug 2004
E040329-x0 Advanced LIGO Quadruple Pendulum Suspension Failure Modes and Subsequent Repair Approaches Michael M Perreur-Lloyd et al. Document Migration
06 Aug 2004
T040141-x0 ETM Upper Structure Product Design Specification Michael M Perreur-Lloyd et al. Document Migration
06 Aug 2004
T040153-x0 Blade Specification Document (Quad Controls Prototype) Michael M Perreur-Lloyd et al. Document Migration
05 Aug 2004
D040297-x0 MIDDLE BLADE SPRING QUAD CONTROLS PROTOTYPE Justin Greenhalgh et al. Document Migration
05 Aug 2004
D040296-x0 Bottom Blade Springs Quad Controls Prototype Justin Greenhalgh et al. Document Migration
05 Aug 2004
D040298-x0 TOP STAGE BLADES QUAD CONTROLS PROTOTYPE Justin Greenhalgh et al. Document Migration
05 Aug 2004
D030269-x0 Blade Damper Assembly Russell Jones et al. Document Migration
04 Aug 2004
D030076-x0 MAGNET SPACER (STEEL) Calum Torrie Document Migration
04 Aug 2004
D020225-x0 Coil Assembly Russell Jones et al. Document Migration
04 Aug 2004
D020188-x0 Coil Former Janeen Romie et al. Document Migration
04 Aug 2004
D020494-x0 Alignment Target Calum Torrie Document Migration
04 Aug 2004
D010264-x0 Upper Blade Wire Clamp Calum Torrie Document Migration
04 Aug 2004
D020153-x0 Bar Jig for Int. & Upper Wires Calum Torrie Document Migration
04 Aug 2004
D020533-x0 Assembly Magnet and Flag Calum Torrie Document Migration
04 Aug 2004
D030183-x0 COIL FORMER CLAMP ONE PIECE Russell Jones et al. Document Migration
04 Aug 2004
D030264-x0 Damper Arm Russell Jones et al. Document Migration
04 Aug 2004
E040303-x0 DOCUMENT CHANGE NOTICE (DCN) - ADVANCED LIGO SUS CPTYPE MODE CLEANER SUSPENSION D020700 INITIAL RELEASE AS BUILT FOR LASTI JUNE 2004 Calum Torrie Document Migration
04 Aug 2004
D030263-x0 Copper Sleeve Russell Jones et al. Document Migration
04 Aug 2004
D020532-x0 Assembly Magnet and Flag (for pitch) Calum Torrie Document Migration
04 Aug 2004
D030122-x0 SHOULDER FOR COIL FORMER BRACKET Russell Jones et al. Document Migration
04 Aug 2004
D010265-x0 Wire Clamp Plate Calum Torrie Document Migration
04 Aug 2004
D020204-x0 Lower Wire Clamp Shim Calum Torrie Document Migration
04 Aug 2004
D020316-x0 Assembly Lower Wire Clamp Calum Torrie Document Migration
04 Aug 2004
D030123-x0 SPACER FOR COIL FORMER BRACKET Russell Jones et al. Document Migration
04 Aug 2004
D020197-x0 Flag Calum Torrie Document Migration
04 Aug 2004
D030710-x0 Coil Former Clamp One Piece Alt Russell Jones et al. Document Migration
04 Aug 2004
D020210-x0 Bridge Spacer for Magnet Calum Torrie Document Migration
03 Aug 2004
D020154-x0 Bar Jig Step Plate Calum Torrie Document Migration
03 Aug 2004
D020282-x0 Coil Former Bracket Russell Jones et al. Document Migration
03 Aug 2004
D020156-x0 Clamp Mass Jig Calum Torrie Document Migration
03 Aug 2004
D020155-x0 Spacer for Mass Jig Calum Torrie Document Migration
03 Aug 2004
D020215-x0 small catcher for lower blades Russell Jones et al. Document Migration
03 Aug 2004
D020157-x0 Test Mass_Jig Calum Torrie Document Migration
03 Aug 2004
D020158-x0 Angled Attachment Upper Blade Clamp Piece Calum Torrie Document Migration
03 Aug 2004
D030079-x0 UPPER MASS 10g ADD ON MASS Calum Torrie Document Migration
02 Aug 2004
D020161-x0 Assembly Upper Wire Jig Calum Torrie Document Migration
02 Aug 2004
D020501-x0 Bar Jig Adjuster Block Calum Torrie Document Migration
02 Aug 2004
D020449-x0 catcher bar for test mass Calum Torrie Document Migration
02 Aug 2004
D020542-x0 Assembly Upper Blade Guard Calum Torrie Document Migration
02 Aug 2004
D030457-x0 Spacer 120g Mass Calum Torrie Document Migration
02 Aug 2004
D020445-x0 v-clamp for catcher bar Calum Torrie Document Migration
02 Aug 2004
D030468-x0 40g ADD ON MASS Calum Torrie Document Migration
02 Aug 2004
D030048-x0 SPACER FOR MASS JIG (LOWER WIRE) Calum Torrie Document Migration
02 Aug 2004
D020541-x0 Lower and Intermediate Mass Calum Torrie Document Migration
02 Aug 2004
D020162-x0 Lower Wire Jig Calum Torrie Document Migration
02 Aug 2004
D020499-x0 Upper Wire Clamp with Pitch Adjustment Alastair Grant et al. Document Migration
02 Aug 2004
D030454-x0 Spacer 60g Mass Calum Torrie Document Migration
02 Aug 2004
D020448-x0 catcher bar for intermediate mass Calum Torrie Document Migration
02 Aug 2004
D030455-x0 Spacer 35g Mass Calum Torrie Document Migration
02 Aug 2004
D020562-x0 Catcher Assembly Plate Calum Torrie Document Migration
02 Aug 2004
D020458-x0 Catcher Int & Test Mass Calum Torrie Document Migration
02 Aug 2004
D030047-x0 CLAMP MASS JIG (WITH GROOVE) Calum Torrie Document Migration
02 Aug 2004
D030049-x0 Assembly Intermediate Wire Jig Calum Torrie Document Migration
02 Aug 2004
D020376-x0 Wire Start Grooved Clamp .006 Calum Torrie Document Migration
02 Aug 2004
D020446-x0 Bar Attach Lower Calum Torrie Document Migration
02 Aug 2004
D020148-x0 Wire Standoff, Mode Cleaner Calum Torrie Document Migration
02 Aug 2004
D030456-x0 Spacer 75g Mass Calum Torrie Document Migration
02 Aug 2004
D020447-x0 Bar Attach Upper Calum Torrie Document Migration
02 Aug 2004
D020205-x0 Upper Blade Michael M Perreur-Lloyd et al. Document Migration
02 Aug 2004
D020319-x0 Upper Blade Wire Clamp Assembly Michael M Perreur-Lloyd et al. Document Migration
30 Jul 2004
D020200-x0 Magnet Holder (Longitudinal and Yaw) Calum Torrie Document Migration
30 Jul 2004
D020443-x0 Catcher Assembly Plate Calum Torrie Document Migration
30 Jul 2004
D020135-x0 Upper Blade Wire Clamp Plate Michael M Perreur-Lloyd et al. Document Migration
30 Jul 2004
D020450-x0 Alum Bar Plate Lower Blades Calum Torrie Document Migration
30 Jul 2004
D020236-x0 GUARD, TOP BLADE Janeen Romie et al. Document Migration
29 Jul 2004
T040096-x0 Upper-Intermediate Mass for the ETM Controls Prototype Quad Pendulum Suspension - Product Design Specification Michael M Perreur-Lloyd et al. Document Migration
28 Jul 2004
D020196-x0 Magnet Spacer Calum Torrie Document Migration
27 Jul 2004
T040118-x0 Mode Cleaner Top Blade Rotational Adjuster Design Alastair Grant et al. Document Migration
23 Jul 2004
T040095-x0 Upper-Intermediate Mass for the ETM Controls Prototype Quad Pendulum Suspension - Design Brief Michael M Perreur-Lloyd et al. Document Migration
02 Jun 2004
T040112-x0 Summary of Results of CAD File Format Compatibility Tests Michael M Perreur-Lloyd et al. Document Migration
26 May 2004
T040073-x0 Top Mass for the ETM Controls Prototype Quad Pendulum Suspension Michael M Perreur-Lloyd et al. Document Migration
03 May 2004
T030273-x0 Case Study: Using ANSYS to Predict the Lowest Flexural Internal Mode Frequency of the MC and RM Upper Blades Russell Jones et al. Document Migration
03 May 2004
T040004-x0 Review of the GEO 600 Blade Eddy Current Damper Russell Jones et al. Document Migration
03 May 2004
G040095-x0 A Quad for Christmas - LSC Meeting, March 15 - 18th, Livingston, LA Calum Torrie Document Migration
18 Mar 2004
G040058-x0 Some recent work on blade performance - LSC Meeting, March 15 - 18th, Livingston, LA Caroline Cantley et al. Document Migration
17 Mar 2004
G040059-x0 Blade committee notes - LSC Meeting, March 15 - 18th, Livingston, LA Caroline Cantley et al. Document Migration
17 Mar 2004
T040028-x0 Investigation of Wire Lengths in Advanced LIGO Quadruple Pendulum Design for ETM/ITM Mark Barton et al. Document Migration
25 Feb 2004
T030734-x0 Concept for Addition/Subtraction of 500g to/from the Recycling Mirror Intermediate Mass Alastair Grant et al. Document Migration
06 Feb 2004
D030383-x0 Advanced LIGO SUS Customised Toolbox for SolidWorks Calum Torrie et al. Document Migration
06 Feb 2004
T030143-x0 Designing in Solidworks: Customised Tools for Design and Documentation of LIGO Parts, Assemblies, and Drawings Michael M Perreur-Lloyd et al. Document Migration
06 Feb 2004
T030257-x0 Discussion: Supply of COILS and ASSOCIATED PARTS FOR THE LASTI CONTROLS PROTOTYPES Russell Jones et al. Document Migration
04 Nov 2003
G030530-x0 Introduction to Advanced LIGO Suspension Design and Development Norna Robertson et al. Document Migration
14 Oct 2003
D030576-x0 9 Degree Clamp for Mn Blades Michael M Perreur-Lloyd et al. Document Migration
13 Oct 2003
T030211-x0 Advanced LIGO SUS ETM Summary of Work for a Blade Test Facility Caroline Cantley et al. Document Migration
09 Oct 2003
T030241-x0 MEETING ADVANCED LIGO MODE CLEANER MIRROR SUSPENSION NOISE REQUIREMENTS WITH COMBINATIONS OF ACTIVE AND EDDY CURRENT LOCAL DAMPING Ken Strain et al. Document Migration
09 Oct 2003
T030197-x0 Advanced LIGO SUS Controls Prototype: - Advanced LIGO Suspension Workshop Schedule, 13-18 October 2003 Janeen Romie et al. Document Migration
09 Oct 2003
T030242-x0 Advanced LIGO SUS Summary of Cantilever Blade Wire Clamp Testing Caroline Cantley et al. Document Migration
09 Oct 2003
T030104-x0 Mode Cleaner Controls Prototype Blade Length Measurements with Deflection & Thickness Measurements Embedded as an Excel File Helena Armandula et al. Document Migration
09 Oct 2003
T030147-x0 Advanced LIGO SUS Mode Cleaner Spacers & Standoffs for the Top Mass Michael M Perreur-Lloyd et al. Document Migration
09 Oct 2003
T030220-x0 ADVANCED LIGO SUSPENSIONS, VISIT TO RUTHERFORD APPLETON LABORATORY, MAY 2002 Russell Jones et al. Document Migration
07 Oct 2003
T030223-x0 Review of basic shorting tests on Coil Formers D020188-04 and D020188-08 Russell Jones et al. Document Migration
07 Oct 2003
T030222-x0 ADVANCED LIGO SUSPENSIONS - Questions: How much work is required to dis-assemble and re-assemble the 2001 quadruple pendulum at MIT? And what if instead work was done to align the two suspensions with respect to each other? Calum Torrie Document Migration
07 Oct 2003
G030387-x0 BSC Overview - One Possible Method of assembly for the Advanced LIGO Controls Prototype ETM Quadruple Pendulum Suspension - LSC Meeting, August 18th - 21st, Hannover, Germany Michael M Perreur-Lloyd et al. Document Migration
18 Sep 2003
G030386-x0 HAM Overview - One Possible method of Assembly for the Advanced LIGO Mode Cleaner Controls Prototype Triple Pendum Suspension - LSC Meeting, August 18th - 21st, Hannover, Germany Calum Torrie Document Migration
18 Sep 2003
T030107-x0 Cantilever Blade Spring Analysis for the Modecleaner Suspension of Advanced LIGO Michael M Perreur-Lloyd et al. Document Migration
15 Sep 2003
G030384-x0 Update and Status on the Controls Prototype Local Control Coil for the MC and RM Suspension Helena Armandula et al. Document Migration
12 Sep 2003
G030410-x0 Recycling Mirror Suspension Michael M Perreur-Lloyd et al. Document Migration
12 Sep 2003
G030388-x0 Methods of Adjustment used in the Controls Prototype Mode Cleaner Suspension at Caltech Michael M Perreur-Lloyd et al. Document Migration
12 Sep 2003
G030385-x0 Suspension Eddy Current Damper Assembly Mark Barton et al. Document Migration
12 Sep 2003
G030350-x0 Triple Update - LSC Meeting, August 18th - 21st, Hannover, Germany Mark Barton et al. Document Migration
09 Sep 2003
G010291-x0 Prototype Quadtruple Pendulum Update, Part 1 - LSC Meeting August 13 - 16, Hanford WA Norna Robertson et al. Document Migration
15 Aug 2001

Number of documents found: 589


DCC Version 3.5.0, contact DCC Help