LIGO-Number |
Title |
Author(s) |
Topic(s) |
Last Updated |
E1000309-v13 |
aLIGO HAM-ISI Testing Procedure, Phase I: Assembly Validation |
Fabrice Matichard et al. |
Subsystem Test
Seismic Isolation
|
27 Feb 2013 |
E1100860-v4 |
AOSEM Electronic Noise Test Procedure |
Mark Barton |
Subsystem Test
Suspensions
|
10 Jul 2019 |
T1100083-v4 |
Test Procedure for Low Noise VCO |
Daniel Sigg et al. |
Subsystem Test
|
21 Mar 2019 |
E1000617-v6 |
(QUAD) Quadruple Suspension Controls Arrangement Poster |
Derek Bridges |
Subsystem Test
Assembly
Suspensions
|
13 Nov 2017 |
E1000304-v3 |
aLIGO SEI Testing and Commissioning Documentation |
Fabrice Matichard et al. |
Subsystem Test
Seismic Isolation
|
16 Sep 2014 |
T1100343-v3 |
ISC 4 channel differential to single ended converter chassis test procedure |
Rich Abbott |
Subsystem Test
Sensing and Control
|
24 Sep 2012 |
E1000312-v5 |
aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #3 |
Hugo Paris et al. |
Subsystem Test
Seismic Isolation
|
24 May 2012 |
T1100455-v2 |
Analysis of position/voltage data on a BOSEM |
Mark Barton et al. |
Subsystem Test
Suspensions
|
21 Feb 2012 |
T1100062-v6 |
aLIGO I&Q Demodulator Test Procedure |
Rich Abbott et al. |
Subsystem Test
Sensing and Control
|
09 Jan 2012 |
D1001133-v2 |
HAM Suspension Testing Cover |
Derek Bridges |
Subsystem Test
Final Design
Suspensions
|
19 Dec 2011 |
T1100370-v2 |
Surface figure calibration and uncertainty estimate for measurement of ETM04 |
GariLynn Billingsley |
Subsystem Test
Core Optics
|
22 Nov 2011 |
E1101109-v1 |
PR303 Mass Measurement at Caltech 12.145 Kg |
GariLynn Billingsley |
Subsystem Test
Core Optics
|
18 Nov 2011 |
G1101199-v1 |
aLIGO LSC RF photodetector test |
Koji Arai et al. |
Subsystem Test
Sensing and Control
|
28 Oct 2011 |
G1100127-v2 |
ALS at 40m |
Koji Arai |
Subsystem Test
Sensing and Control
Basic R&D
|
28 Oct 2011 |
E1000306-x0 |
aLIGO BSC-ISI Testing and Commissioning Documentation |
Fabrice Matichard et al. |
Subsystem Test
Seismic Isolation
|
06 Oct 2011 |
D1101800-x0 |
HWS Opto Mechanical Layout, ITMy, HAM10 |
Mindy Jacobson et al. |
Subsystem Test
Vacuum
System Engineering
Preliminary Design
Auxiliary Optics
Final Design
Fabrication
|
12 Sep 2011 |
D1101799-x0 |
HWS Opto Mechanical Layout, ITMx, HAM10 |
Mindy Jacobson et al. |
Subsystem Test
Vacuum
System Engineering
Preliminary Design
Auxiliary Optics
Final Design
Fabrication
|
12 Sep 2011 |
D1101798-x0 |
aLIGO TCS HWS Optics Assy, HAM10 |
Mindy Jacobson et al. |
Subsystem Test
Vacuum
System Engineering
Preliminary Design
Auxiliary Optics
Final Design
Fabrication
|
12 Sep 2011 |
T1100444-v1 |
Vibration Absorber Modal Testing |
Jeffrey Bartlett et al. |
Subsystem Test
Suspensions
Fabrication
|
17 Aug 2011 |
E1100684-v1 |
Figure measurement ETM04 |
GariLynn Billingsley |
Subsystem Test
Core Optics
|
20 Jul 2011 |
T1000482-v2 |
BOSEMs for Transmon suspension tests |
Norna Robertson |
Subsystem Test
Auxiliary Optics
Suspensions
|
18 Jul 2011 |
G1100147-v1 |
HLTS Kickoff Presentation |
Derek Bridges et al. |
Subsystem Test
Assembly
Incoming Inspection
Meeting
Suspensions
|
06 Jul 2011 |
D1100992-x0 |
25 conductor DSUB Ribbon Cable With Mirror Adapters |
Charles Osthelder |
Subsystem Test
|
25 May 2011 |
F1000025-v1 |
Quad Suspension Metal Build Test Report Template |
Mark Barton et al. |
Subsystem Test
Assembly
Suspensions
Reports
|
19 Apr 2011 |
E1100285-x0 |
HLTS Metal Build Test Reports |
Derek Bridges |
Subsystem Test
Suspensions
Reports
|
30 Mar 2011 |
T1000568-v1 |
OMC Coil Driver Unit Test Plan |
Ron Cutler |
Subsystem Test
|
28 Mar 2011 |
T1000572-v1 |
Transmon Coil Driver Board Test Plan |
Ron Cutler |
Subsystem Test
|
28 Mar 2011 |
T1000571-v1 |
Transmon Coil Driver Unit Test Plan |
Ron Cutler |
Subsystem Test
|
28 Mar 2011 |
T1000567-v1 |
OMC Coil Driver Board Test Plan |
Ron Cutler |
Subsystem Test
|
28 Mar 2011 |
E1000498-x0 |
aLIGO SUS BOSEM Testing Documentation |
Derek Bridges et al. |
Subsystem Test
Incoming Inspection
Suspensions
|
04 Mar 2011 |
E1000500-x0 |
aLIGO SUS Test Stand and Electronics Testing and Commissioning Documentation |
Derek Bridges et al. |
Subsystem Test
Commissioning
Suspensions
|
28 Feb 2011 |
T1000256-v2 |
Test Procedure for RF Distribution Amplifier |
Daniel Sigg et al. |
Subsystem Test
|
14 Feb 2011 |
T1100087-v1 |
SR785 Machine Settings File |
Rich Abbott |
Subsystem Test
Sensing and Control
|
10 Feb 2011 |
T1000700-v2 |
Transmon Telescope Mirror Test Procedure |
Michael Smith et al. |
Subsystem Test
Incoming Inspection
Auxiliary Optics
Final Design
|
21 Dec 2010 |
T1000657-v1 |
DC Power Strip Test Results |
Rich Abbott |
Subsystem Test
System Engineering
|
02 Nov 2010 |
E1000510-x0 |
aLIGO SUS BSC Suspension Test Stand and Electronics Testing and Commissioning Documentation |
Derek Bridges et al. |
Subsystem Test
Assembly
Commissioning
Final Design
Suspensions
|
04 Oct 2010 |
E1000511-x0 |
aLIGO SUS HAM Suspension Test Stand and Electronics Testing and Commissioning Documentation |
Derek Bridges et al. |
Subsystem Test
Assembly
Commissioning
Suspensions
|
04 Oct 2010 |
E1000507-v1 |
aLIGO BSC-ISI, Stage 1 Structural Testing |
Fabrice Matichard |
Subsystem Test
Seismic Isolation
|
01 Oct 2010 |
E1000399-v1 |
BSC-ISI passive damping experiments |
Fabrice Matichard |
Subsystem Test
Seismic Isolation
|
08 Sep 2010 |
E1000400-v1 |
Quad Local resonances |
Fabrice Matichard |
Subsystem Test
Seismic Isolation
|
08 Sep 2010 |
E1000370-v1 |
GPIB Control Software |
Rich Abbott |
Subsystem Test
System Engineering
|
27 Aug 2010 |
E1000341-v1 |
HAM-ISI LHO test stand: software, electronic checks, and user guide |
Fabrice Matichard |
Subsystem Test
Seismic Isolation
|
20 Aug 2010 |
E1000307-x0 |
aLIGO HAM-HEPI Testing and Commissioning Documentation |
Fabrice Matichard |
Subsystem Test
Seismic Isolation
|
11 Aug 2010 |
G1000699-v1 |
40m TAC Meeting Jul 2010 Presentation |
Rana Adhikari et al. |
Subsystem Test
Detector
Basic R&D
|
15 Jul 2010 |
T080245-v1 |
ALIGO NP-type: - Report on bonding Viton stops, magnet holders and break-off prisms at LASTI |
Russell Jones et al. |
Subsystem Test
Suspensions
|
13 Jul 2010 |
T1000380-v1 |
Caltech WYKO pixel calibration |
GariLynn Billingsley |
Subsystem Test
Quality Assurance
Core Optics
|
09 Jul 2010 |
E1000153-x0 |
DCN - HAM Suspension Testing Cover |
Derek Bridges |
Subsystem Test
Final Design
Suspensions
|
13 May 2010 |
D1000960-v1 |
HAM Suspension Testing Cover Assembly |
Derek Bridges |
Subsystem Test
Final Design
Suspensions
|
13 May 2010 |
D1001085-v1 |
HAM Suspension Testing Cover Door Weldment |
Derek Bridges |
Subsystem Test
Final Design
Suspensions
|
13 May 2010 |
D1000961-v1 |
HAM Suspension Testing Cover Weldment |
Derek Bridges |
Subsystem Test
Final Design
Suspensions
|
13 May 2010 |
T1000049-v3 |
Procedure for monolithic rehang at LASTI |
Douglas Cook et al. |
Subsystem Test
Suspensions
|
25 Feb 2010 |
T080108-v1 |
Notes on Lower Quad Installation at LASTI |
Gerardo Moreno et al. |
Subsystem Test
Installation
Suspensions
|
20 Jan 2010 |
D0901871-v1 |
Breakout Board - DB37 |
David Kinzel |
Subsystem Test
System Test
|
04 Nov 2009 |
D0901869-v1 |
Breakout Board - DB15 |
David Kinzel |
Subsystem Test
System Test
|
04 Nov 2009 |
T0900391-v1 |
Pulling/Welding Procedure (LASTI, September 2009) |
Mark Barton |
Subsystem Test
Suspensions
|
08 Oct 2009 |
T0900443-v2 |
AOSEM Initial Electrical Test Results |
Rich Abbott |
Subsystem Test
Basic R&D
|
23 Sep 2009 |