LIGO-Number |
Title |
Author(s) |
Topic(s) |
Last Updated |
E1200366-v2 |
Shutter Controller Count |
Daniel Sigg |
Sensing and Control
Operations
|
29 Apr 2025 |
D1001426-v14 |
ISC R3 |
Rich Abbott et al. |
Sensing and Control
Final Design
|
23 Apr 2025 |
D0900492-v5 |
aLIGO Systems, BSC3-L1 Top Level Chamber Assembly |
Ignacio Romero |
Final Design
System Engineering
|
12 Jul 2012 |
D0900442-v7 |
aLIGO Systems, BSC1-L1 Top Level Chamber Assembly |
Ignacio Romero et al. |
Final Design
System Engineering
|
17 Apr 2025 |
D0900471-v5 |
aLIGO Systems, BSC4-L1 Top Level Chamber Assembly |
Ignacio Romero |
Final Design
System Engineering
|
23 Jan 2014 |
D0900506-v6 |
aLIGO Systems BSC5-L1, Top Level Chamber Assembly |
Ignacio Romero |
System Engineering
Final Design
|
11 Jun 2018 |
D0901154-v4 |
aLIGO Systems, WBSC10-H1 Top Level Chamber Assembly |
Jose Eduardo Chavez |
Final Design
System Engineering
|
11 Apr 2013 |
D0901137-v5 |
aLIGO Systems, BSC1-H1 Top Level Chamber Assembly |
Jose Eduardo Chavez |
System Engineering
Final Design
|
17 Apr 2025 |
D0901146-v5 |
aLIGO Systems, BSC3-H1 Top Level Chamber Assembly |
Jose Eduardo Chavez |
System Engineering
Final Design
|
17 Apr 2025 |
G2500225-v2 |
CEBEX program status update |
Michael Zucker |
Collaboration
Vacuum
Basic R&D
Cosmic Explorer
|
15 Apr 2025 |
T2400273-v2 |
Seismic, Acoustic, and Electromagnetic Field Tests and Site Assessments for Cosmic Explorer (CE) |
Milena Tsioma et al. |
Data Acquisition System
Modelling
Seismic Isolation
Cosmic Explorer
Other data analysis
|
08 Apr 2025 |
D1001425-v10 |
ISC R2 |
Rich Abbott et al. |
Conceptual Design
Sensing and Control
|
03 Apr 2025 |
D0901075-v3 |
AdLIGO SEI Bulk Trim Masses |
Stephany Foley et al. |
Final Design
Seismic Isolation
|
20 Nov 2009 |
P2500114-v1 |
Development and application of phase cameras for advanced gravitational wave detectors |
Mitchell Schiworski et al. |
Laser Systems
Thesis/Dissertation
|
13 Mar 2025 |
E960022-v26 |
LIGO Clean and Bake Methods and Procedures |
Betsy Weaver et al. |
Cleaning
Vacuum
Fabrication
|
12 Mar 2025 |
L1300203-x0 |
yet another test |
Melody Araya |
Temporary Test Document
|
27 Feb 2025 |
D1000225-v7 |
D25F to D25F In-vac CUSTOM CABLE V25A-TBD (28 AWG) |
Benjamin Abbott et al. |
Sensing and Control
Fabrication
|
26 Feb 2025 |
D1000227-v11 |
D25M to 2x D9F In-vac "Pigtail" CUSTOM CABLE V25M (28AWG) |
Benjamin Abbott et al. |
Seismic Isolation
Fabrication
|
26 Feb 2025 |
D1000918-v4 |
D3W3F to 2 Free Pins In-vac ISI Actuator CUSTOM CABLE V3A-70 (14AWG) |
Benjamin Abbott et al. |
Fabrication
Suspensions
|
26 Feb 2025 |
D1000222-v7 |
CUSTOM CABLE V25A-120 |
Benjamin Abbott et al. |
Fabrication
Seismic Isolation
|
31 May 2012 |
D1000919-v2 |
CUSTOM CABLE V3A-95 |
Emery Brown et al. |
Seismic Isolation
Fabrication
|
13 Jul 2012 |
D1000221-v6 |
CUSTOM CABLE V25A-100 |
Emery Brown et al. |
Seismic Isolation
Fabrication
|
12 Oct 2011 |
D1003111-v2 |
SLC PHOTODETECTOR CABLE LOWER ASSY |
Niem Nguyen |
Modelling
Auxiliary Optics
|
22 Jul 2011 |
D1001518-v6 |
Cable Assy, Upper Ring Heater Segment to Lower Quad Terminal Block |
Mindy Jacobson et al. |
Auxiliary Optics
Vacuum
Final Design
Fabrication
|
15 Nov 2010 |
D1001519-v7 |
Cable Assy, Lower Ring Heater Segment |
Mindy Jacobson et al. |
Fabrication
Assembly
Cleaning
Vacuum
Auxiliary Optics
Final Design
|
30 Aug 2012 |
D1000920-v2 |
CUSTOM CABLE V3A-135 |
Emery Brown et al. |
Fabrication
Seismic Isolation
|
13 Jul 2012 |
D1003117-v1 |
SLC PHOTODETECTOR CABLE UPPER ASSY |
Niem Nguyen |
Auxiliary Optics
Modelling
|
06 May 2011 |
D1000218-v6 |
CUSTOM CABLE V3A -25 |
Benjamin Abbott et al. |
Fabrication
Seismic Isolation
|
05 Jul 2012 |
D1000220-v7 |
CUSTOM CABLE V25A-40 |
Emery Brown et al. |
Fabrication
Seismic Isolation
Sensing and Control
|
01 May 2012 |
D1000234-v10 |
CUSTOM CABLE V25X-TBD |
Jay Heefner et al. |
Fabrication
Suspensions
|
24 Jul 2012 |
D1000231-v6 |
CUSTOM CABLE V25T-36 v6 |
Rich Abbott et al. |
Sensing and Control
Fabrication
|
06 Jun 2012 |
D1000566-v4 |
CUSTOM CABLE V25G |
Jay Heefner et al. |
Suspensions
Fabrication
|
10 May 2012 |
D1000565-v5 |
CUSTOM CABLE V25AM-33-B |
Jay Heefner et al. |
Fabrication
Suspensions
|
29 Jun 2012 |
D1000564-v4 |
CUSTOM CABLE V25AM-33-A |
Jay Heefner et al. |
Fabrication
Suspensions
|
10 May 2012 |
D1000563-v4 |
CUSTOM CABLE V25AM-23-B |
Jay Heefner et al. |
Suspensions
Fabrication
|
18 May 2012 |
D1000562-v4 |
CUSTOM CABLE V25AM-23-A |
Jay Heefner et al. |
Fabrication
Suspensions
|
10 May 2012 |
D1000236-v2 |
CUSTOM CABLE V25Z-60 |
Emery Brown |
Fabrication
Suspensions
|
21 Sep 2011 |
D1000233-v2 |
CUSTOM CABLE V25W |
Emery Brown |
Fabrication
Sensing and Control
|
21 Sep 2011 |
D1000230-v1 |
CUSTOM CABLE V25R |
Emery Brown |
Suspensions
Fabrication
|
02 Mar 2010 |
D1000229-v2 |
CUSTOM CABLE V25P |
Emery Brown |
Fabrication
Suspensions
|
21 Sep 2011 |
D1000224-v4 |
CUSTOM CABLE V25D - v4 |
Benjamin Abbott et al. |
Fabrication
Sensing and Control
|
03 May 2012 |
D1000226-v1 |
CUSTOM CABLE V25F |
Emery Brown |
Seismic Isolation
Fabrication
|
03 Mar 2010 |
E0900480-v6 |
FTIR Testing to Qualify Parts for LIGO UHV Service |
Dennis Coyne |
Fabrication
Vacuum
|
20 Feb 2025 |
G2500277-v1 |
LIGO A# - Post O5 upgrade - for Stanford compact object group |
Brian Lantz |
A#
|
12 Feb 2025 |
G2302230-v2 |
ISI motion targets for A# calculations |
Brian Lantz |
Suspensions
A#
Seismic Isolation
|
08 Feb 2025 |
D1101904-v11 |
ISC R4 |
Charles Osthelder et al. |
Conceptual Design
Sensing and Control
|
05 Feb 2025 |
E2100086-v1 |
Class A Fluoroelastomers Processing Procedure |
Jordan Vanosky et al. |
Vacuum
Cleaning
|
18 Oct 2022 |
E970129-v1 |
Material, Process, Handling, and Shipping Specification for Welding Diaphragm Bellows |
Stephany Foley |
Seismic Isolation
Fabrication
|
03 Sep 2009 |
D1001460-v13 |
ISC R1 |
Rich Abbott et al. |
Installation
Sensing and Control
|
30 Jan 2025 |
D1001427-v25 |
ISC C1-C4 (CER Rack Layout) |
Rich Abbott et al. |
Sensing and Control
Conceptual Design
|
30 Jan 2025 |
E960050-v12 |
LIGO Vacuum Compatible Materials List |
Dennis Coyne |
Fabrication
Vacuum
Final Design
|
07 Nov 2013 |
P2400584-v2 |
Optical torques in the folding Fabry Perot cavity |
XINGRUI PENG et al. |
Detector
A#
|
31 Dec 2024 |
P2400578-v2 |
Effect of Type II Strong Gravitational Lensing on Tests of General Relativity |
Purnima Narayan et al. |
Activity
Compact Binaries
|
25 Nov 2024 |
G2402499-v1 |
CEBEX program startup |
Michael Zucker |
Cosmic Explorer
Basic R&D
Vacuum
Collaboration
|
09 Dec 2024 |
T2300163-v4 |
Summary of A# BHQS main chain parameters. |
Edgard Bonilla et al. |
Suspensions
A#
|
05 Dec 2024 |
G2402471-v1 |
Triple suspensions need better local sensors |
Brian Lantz et al. |
A#
Suspensions
|
03 Dec 2024 |
D1101775-v10 |
aLIGO, ELECTRICAL FEEDTHROUGH TYPES, and TYPICAL SUBFLANGES |
Eduardo Sanchez |
System Engineering
Integration
Installation
|
02 Dec 2024 |
G2402201-v2 |
Improving the accuracy of photon-radiation pressure calibrators for gravitational-wave observatories. |
Francisco Llamas et al. |
Thesis/Dissertation
|
25 Nov 2024 |
D1001895-v7 |
aLIGO TCS Ring Heater Assembly, Lower Segment |
Giacomo Ciani et al. |
Fabrication
Auxiliary Optics
Vacuum
|
19 Jun 2013 |
P2400572-v1 |
Gravitational Waveform Modelling for Inference of Spin Precession in Binary Black Hole Mergers |
Lucy Thomas |
Compact Binaries
Thesis/Dissertation
|
20 Nov 2024 |
G2402406-v1 |
CEBEX program startup |
Michael Zucker |
Collaboration
Cosmic Explorer
Basic R&D
Vacuum
|
20 Nov 2024 |
D1001838-v6 |
aLIGO TCS Ring Heater Assembly, Upper Segment |
Mindy Jacobson et al. |
Fabrication
Vacuum
Auxiliary Optics
|
04 Jan 2013 |
D1800027-v26 |
Top Level Conceptual Layout of A+ |
Calum Torrie et al. |
Operations
A+
System Engineering
|
02 Dec 2021 |
D1003319-v4 |
BOBBIN-COIL Assembly, ISC, aLIGO |
Sam Barnum |
Sensing and Control
Conceptual Design
|
24 Oct 2024 |
M1500263-v1 |
Guidelines for Advanced LIGO Detector Upgrade Development Review |
Dennis Coyne |
System Engineering
Fabrication
Requirements
Upgrades
Preliminary Design
Conceptual Design
Policies
Final Design
|
05 Oct 2016 |
C2400201-v2 |
Cosmic Explorer Beamtube Experiment (CEBEX) Commercial Items or Services Contract General Provisions |
Dolly Richards et al. |
Cosmic Explorer
Procurements
|
17 Oct 2024 |
D0901318-v4 |
GS-13, Flexure, Bottom |
Sam Barnum et al. |
Seismic Isolation
Final Design
|
08 Oct 2024 |
D0901319-v4 |
GS-13, Flexure, Top |
Sam Barnum et al. |
Seismic Isolation
Final Design
|
08 Oct 2024 |
E0900027-v1 |
LIGO Project Modifications to the GS-13 |
Brian Lantz |
Final Design
Seismic Isolation
|
08 Oct 2024 |
P2300422-v4 |
Interferometric Precision Measurement with Macroscopic Silicon Optomechanics |
Aaron Markowitz |
Thesis/Dissertation
|
04 Sep 2024 |
D1200196-v15 |
ISC R5 |
Charles Osthelder et al. |
Conceptual Design
Sensing and Control
|
28 Aug 2024 |
G2401190-v14 |
AlGaAs Mirror Noise Scalings |
Andri M Gretarsson |
A#
|
13 Aug 2024 |
P1500087-v1 |
[Thesis] Lock Acquisition and Sensitivity Analysis of Advanced LIGO Interferometers |
Denis Martynov |
Thesis/Dissertation
|
06 Aug 2024 |
D060218-v2 |
BOSEM |
Betsy Weaver et al. |
Preliminary Design
Suspensions
|
28 Jul 2020 |
E0900023-v14 |
PROCESS FOR MANUFACTURING CANTILEVER SPRING BLADES FOR AdvLIGO |
Douglas Cook et al. |
System Engineering
Basic R&D
|
27 Oct 2021 |
D1000342-v18 |
ISC HAM6 Assembly |
Lisa Barsotti |
Sensing and Control
Final Design
|
16 Jul 2015 |
G2400740-v3 |
Suspending a 100kg mass |
Edgard Bonilla |
A#
|
07 May 2024 |
T1400660-v2 |
LIGO Docent Survey Results - Key Findings |
William Katzman |
Education, Outreach
|
07 May 2024 |
T2200287-v3 |
Report of the LSC Post-O5 Study Group |
Peter Fritschel et al. |
Reports
Upgrades
A#
|
07 May 2024 |
D071165-v2 |
Sensor Target |
Andy Stein et al. |
Final Design
Seismic Isolation
|
11 May 2009 |
G2400888-v2 |
Tutorial on continuous gravitational wave searches in Open Data Workshop 7 |
TakahiroS Yamamoto et al. |
Continuous Wave
Activity
|
16 Apr 2024 |
P2300166-v10 |
LSC White Paper on NGGW: Dovetailing with Next Generation Faciltiies |
Patrick Brady et al. |
Data Analysis
A#
A+
Astrophysics / Multi-messenger
|
25 Mar 2024 |
E0900041-v6 |
Advanced LIGO Input Test Mass Coating Specification |
Gregg Harry |
Final Design
Core Optics
Requirements
|
12 Mar 2024 |
E0900068-v5 |
Advanced LIGO End Test Mass (ETM) Coating Specification |
Rand Dannenberg |
Final Design
Core Optics
|
12 Mar 2024 |
E080031-v1 |
MIRROR BLANK MATERIAL, AdLIGO ITM MIRROR |
GariLynn Billingsley et al. |
Final Design
Core Optics
Fabrication
|
11 Mar 2024 |
E080047-v1 |
Mirror Blank Material, AdLIGO ETM Mirror Specification |
GariLynn Billingsley et al. |
Core Optics
Fabrication
Final Design
|
11 Mar 2024 |
E1200225-v8 |
Coding Standard for TwinCAT Slow Controls Software |
Daniel Sigg |
State Control and Monitoring
|
05 Mar 2024 |
D1001575-v10 |
aLIGO SEI (Seismic) Sensor (Sensors) and Actuator (Actuators) Electronics Chains |
Jeffrey Kissel |
Commissioning
Assembly
Seismic Isolation
Final Design
|
20 Feb 2024 |
E1100187-v6 |
LIGO Music Wire Specification. |
Calum Torrie et al. |
Requirements
Suspensions
System Engineering
|
15 Feb 2024 |
G2301738-v3 |
LIGO A# - Post O5 upgrade and step toward Cosmic Explorer |
Brian Lantz |
Upgrades
A#
Detector
|
05 Feb 2024 |
G2300686-v4 |
A# Reaction chain - requirements and use of a double suspension |
Brian Lantz et al. |
A#
Suspensions
|
28 Nov 2023 |
D070441-v6 |
HLTS Prism Breakoff, Lower Wire, Optic |
Calum Torrie et al. |
Final Design
Suspensions
|
14 Nov 2023 |
D0810033-v4 |
HSTS LOWER MASS PRIMARY PRISM |
Calum Torrie |
Final Design
Suspensions
|
14 Nov 2023 |
T0900450-v5 |
Sensor Noise Estimates for Advanced LIGO Seismic Isolation Systems (SEI_sensor_noise.m) |
Brian Lantz et al. |
Final Design
Seismic Isolation
Basic R&D
Preliminary Design
Requirements
|
03 Nov 2023 |
P2200287-v1 |
[Thesis] Catching the Waves in the Sea of Noise: Squeezed Light in Advanced LIGO and Beyond |
Nutsinee Kijbunchoo et al. |
Thesis/Dissertation
|
02 Nov 2023 |
D1003029-v1 |
Work Platform Example Drawing |
Sam Barnum et al. |
Observatory Facilities
Requirements
|
26 Oct 2023 |
T0900457-v1 |
LT1012 is the best op-amp for the GS13 preamp |
Brian Lantz |
Final Design
Seismic Isolation
Requirements
|
24 Oct 2023 |
E1300945-x0 |
aLIGO, System Requirements |
Dennis Coyne |
Requirements
System Engineering
|
20 Oct 2023 |
T2300137-v2 |
Report from the Heavy Suspension Workshop @ MIT |
Brian Lantz et al. |
A#
Suspensions
|
19 Oct 2023 |
E1000654-v5 |
Specification for LIGO BSC Work Platforms |
John Worden et al. |
Installation
|
19 Oct 2023 |
E080138-v2 |
Coated Substrate, ALIGO PRE-MODE MATCHING TELESCOPE MIRROR #2 |
Rodica Martin et al. |
Input Optics
Preliminary Design
|
05 Oct 2023 |
D1101847-v5 |
aLIGO TCS HWS OPTO MECHANICAL LAYOUT, ITMX, L1 |
Aidan Brooks et al. |
Auxiliary Optics
Vacuum
Final Design
System Engineering
Integration
Fabrication
Preliminary Design
|
23 Oct 2019 |
D1101846-v1 |
aLIGO TCS HWS Optics Assembly In Vacuum, L1 HAM4 |
Aidan Brooks et al. |
Auxiliary Optics
Vacuum
Final Design
System Engineering
Integration
Fabrication
Preliminary Design
|
24 May 2012 |
D1101848-v1 |
aLIGO TCS HWS OPTO MECHANICAL LAYOUT, ITMY, L1 |
Aidan Brooks et al. |
Preliminary Design
Fabrication
Integration
System Engineering
Final Design
Vacuum
Auxiliary Optics
|
03 May 2012 |
G1100431-v1 |
aLIGO Active Seismic Isolation |
Jeffrey Kissel |
Commissioning
Subsystem Test
Installation
Final Design
Seismic Isolation
|
15 Sep 2023 |
G2301746-v4 |
Heavy Test Mass suspension for A# |
Brian Lantz |
Suspensions
A#
|
13 Sep 2023 |
G2201909-v3 |
A+ / O4 OMC DCPD Whitening Chassis Redesign Oct 2022 Update |
Jeffrey Kissel et al. |
Commissioning
Subsystem Test
Incoming Inspection
Sensing and Control
|
05 Sep 2023 |
D071462-v2 |
Asm, Position Sensor Target Face |
Andy Stein et al. |
Seismic Isolation
Final Design
|
03 Aug 2023 |
D1003013-v3 |
SLC ACB PHOTODETECTOR ASSY |
Niem Nguyen |
Auxiliary Optics
Modelling
|
06 Jul 2023 |
G1500623-v6 |
aLIGO, CAL, Official Advanced LIGO Sensitivity Plots |
Jeffrey Kissel et al. |
Calibration
Commissioning
|
23 Jun 2023 |
T952011-v1 |
Optical Pathlength Noise in Sensitive Interferometers Due to Residual Gas |
Rainer Weiss et al. |
Requirements
Document Migration
Vacuum
|
24 Apr 2023 |
T840003-v1 |
Optical Pathlength Fluctuations in an Interferometer Due To Residual Gas |
Stan Whitcomb |
Vacuum
Requirements
|
18 Apr 2023 |
D060546-v1 |
Impact Absorber for Glass Stops, Earthquake Stop |
Derek Bridges |
Suspensions
Preliminary Design
|
15 May 2009 |
D000442-x0 |
Staging Building for Livingston, Issued for Construction - Second Level Mechanical Plan |
John Desmond |
Document Migration
|
12 Dec 2000 |
T2000002-v2 |
A+ Filter Cavity Tube, Expansion Joints and Tube Supports: Conceptual Design and Requirements. |
Dennis Coyne |
A+
Vacuum
Conceptual Design
Requirements
System Engineering
|
15 Mar 2023 |
D0901749-v4 |
3/4" Diameter Optics Post |
Richard Savage |
Sensing and Control
Operations
Conceptual Design
Input Optics
Fabrication
|
27 Feb 2023 |
T0900449-v1 |
Changing the op-amp for the L-4C seismometer preamp |
Brian Lantz |
Final Design
Seismic Isolation
Basic R&D
Requirements
|
12 Feb 2023 |
G1300394-v24 |
LSC Logo Slide |
Marco Cavaglia et al. |
Public Talk / Colloquium
|
11 Dec 2022 |
E2100222-v10 |
Specification: Silicon Test Mass HR/AR Coatings, 40m Mariner phase I (ITM & ETM) |
Francisco Carcoba et al. |
Activity
Core Optics
|
23 Aug 2021 |
D070447-v2 |
HLTS Overall Assembly |
Derek Bridges |
Final Design
Suspensions
|
31 Oct 2022 |
T1100232-x0 |
aLIGO Damping Loop Design and Performance (Level 2.0 Design) |
Jeffrey Kissel |
Requirements
Integration
Commissioning
Subsystem Test
Suspensions
|
19 Sep 2022 |
E2200368-v2 |
FTIR: Novamet 760 Pre-Bake |
Calum Torrie et al. |
Cleaning
Vacuum
|
07 Sep 2022 |
P2200268-v1 |
[Thesis] Environmental Noise in Gravitational Wave Detectors and the Search for Gravitational Wave Signals Associated with Gamma-Ray Bursts During LIGO's Third Observing Run |
Philippe Nguyen |
Data analysis software
Astrophysics / Multi-messenger
GW Bursts
Detector Characterization
Data quality / vetoes
Thesis/Dissertation
|
29 Aug 2022 |
P1200087-v58 |
Prospects for Observing and Localizing Gravitational-Wave Transients with Advanced LIGO, Advanced Virgo and KAGRA |
LIGO Scientific Collaboration et al. |
GW Bursts
Astrophysics / Multi-messenger
Compact Binaries
Commissioning
|
01 Aug 2022 |
E080512-v6 |
E080512_ETM_Polishing_Specification |
Mick Flanigan |
Core Optics
Final Design
|
01 Aug 2022 |
E1200519-x0 |
aLIGO, AOS, TCS |
Mindy Jacobson |
Subsystem Test
System Engineering
Vacuum
Installation
System Test
Auxiliary Optics
|
16 Nov 2012 |
T2200264-v1 |
Detector Improvements and Optimization to Advance Gravitational-wave Astronomy |
Varun Srivastava |
Basic R&D
A+
Conceptual Design
Thesis/Dissertation
Modelling
Commissioning
|
15 Jul 2022 |
E1900159-v2 |
OSEM Satellite Box Noise Analysis |
Rich Abbott et al. |
A+
|
30 Jun 2022 |
E1000369-x0 |
aLIGO Testing and Commissioning Documentation |
Dennis Coyne |
System Test
System Engineering
Subsystem Test
|
24 Jun 2022 |
E0900347-v9 |
ETM Telescope Primary Parabolic Mirror, ADLIGO |
Michael Smith et al. |
Final Design
Auxiliary Optics
|
08 Feb 2012 |
T2000526-v1 |
Damage test Ink and First Contact |
GariLynn Billingsley et al. |
Cleaning
Core Optics
|
24 May 2022 |
E1100439-v7 |
General Optics Cleaning Procedure |
Margot Hennig |
System Engineering
Core Optics
Input Optics
Cleaning
Auxiliary Optics
|
29 Apr 2022 |
T2200028-v2 |
LLO FC Tube cleaning |
Michael Fyffe |
A+
Vacuum
Cleaning
|
06 Apr 2022 |
T1300645-v6 |
Re-assessing HAM-ISI Noise Budget Performance Model for aLIGO |
Jeffrey Kissel |
Seismic Isolation
Modelling
|
14 Mar 2022 |
G2100331-v1 |
G1 Calibrated Sensitivity Spectra Apr 11 2020 (Representative best of O3GK -- C02) |
Nikhil Mukund et al. |
Cleaning
Commissioning
Calibration
|
03 Mar 2022 |
T1800447-v7 |
Design Requirement Document of the A+ filter cavity (HSTS) and relay optics (HDS, HXDS) for frequency dependent squeezing |
Lee McCuller et al. |
A+
|
09 Feb 2022 |
D071100-v3 |
Spring |
Andy Stein et al. |
Seismic Isolation
Final Design
|
03 Feb 2022 |
D070483-v6 |
PUM Driver Board Circuit Diagrams |
Ron Cutler |
Final Design
|
10 Oct 2018 |
G1300086-v2 |
HAM6 Coordinate System Definitions |
Jeffrey Kissel |
Final Design
Sensing and Control
Seismic Isolation
Suspensions
Integration
System Engineering
Commissioning
Modelling
|
08 Mar 2015 |
D071120-v2 |
Actuator Magnet Mount |
Andy Stein |
Seismic Isolation
Final Design
|
11 May 2009 |
Q2000005-v1 |
TMS shroud Post-coating Inspection |
Kyle Baric et al. |
Incoming Inspection
|
30 Nov 2021 |
D071463-v2 |
Asm, Position Sensor Target |
Andy Stein et al. |
Final Design
Seismic Isolation
|
26 Oct 2021 |
D071497-v2 |
Asm, Fixture, Actuator Set-Up |
Andy Stein et al. |
Final Design
Seismic Isolation
|
26 Oct 2021 |
D071424-v2 |
Asm, Keel |
Andy Stein et al. |
Final Design
Seismic Isolation
|
26 Oct 2021 |
D071470-v2 |
Asm, GS-13 with Fixtures |
Andy Stein et al. |
Seismic Isolation
Final Design
|
26 Oct 2021 |
D071464-v2 |
Asm, Position Sensor |
Andy Stein et al. |
Seismic Isolation
Final Design
|
26 Oct 2021 |
D071431-v2 |
Asm, Flexure |
Andy Stein et al. |
Final Design
Seismic Isolation
|
26 Oct 2021 |
D071430-v2 |
Asm, Spring and Flexure |
Andy Stein et al. |
Final Design
Seismic Isolation
|
26 Oct 2021 |
D071427-v2 |
Asm, Outer Wall, Small Panel |
Andy Stein et al. |
Final Design
Seismic Isolation
|
26 Oct 2021 |
D071412-v2 |
Asm, Stage 0 Stiffener |
Andy Stein et al. |
Final Design
Seismic Isolation
|
26 Oct 2021 |
D071442-v2 |
Asm, Actuator |
Andy Stein et al. |
Seismic Isolation
Final Design
|
26 Oct 2021 |
D071450-v2 |
Asm, HAM-ISI Locker |
Andy Stein et al. |
Final Design
Seismic Isolation
|
26 Oct 2021 |
D080177-v4 |
Compensation Plate ESD Pattern Drawing |
Kurt Buckland et al. |
Sensing and Control
Preliminary Design
Core Optics
|
08 Oct 2021 |
D972610-v1 |
HAM Support Tube |
Stephany Foley |
Final Design
Seismic Isolation
|
10 Sep 2009 |
M2100065-v1 |
More Testing |
Melody Araya |
Temporary Test Document
|
06 Oct 2021 |
T070107-v7 |
BOSEM Test Specification |
Stuart Aston et al. |
Commissioning
Suspensions
|
09 Mar 2016 |
D080658-v6 |
aLIGO, COC End Test Mass (ETM) Substrate (D080658_ALIGO COC_ETM_SUBSTRATE) |
Calum Torrie |
Core Optics
Final Design
|
14 Jul 2021 |
D080657-v7 |
aLIGO, COC Input Test Mass (ITM) Substrate (D080657 ALIGO COC ITM SUBSTRATE) |
Calum Torrie |
Core Optics
Final Design
|
14 Jul 2021 |
E080511-v6 |
ITM Polish Specification |
Mick Flanigan |
Final Design
Core Optics
|
14 Jul 2021 |
T1100068-v23 |
Photon Calibrator Preliminary/Final Design Document |
Jonathan Berliner et al. |
Basic R&D
Auxiliary Optics
Conceptual Design
Laser Systems
Assembly
Upgrades
Preliminary Design
Requirements
Detector Characterization
Calibration
|
06 Jul 2021 |
T0900023-v2 |
(OMC) DC (DCPD) readout (Power) Normalization (Linearization) |
Sam Waldman |
Sensing and Control
Commissioning
|
25 Jun 2021 |
D972611-v1 |
LIGO HAM Expansion Bellows |
Stephany Foley |
Seismic Isolation
Final Design
|
01 Sep 2009 |
T0900140-v1 |
AdL Triple Acquisition Driver Board Prototype Test Plan |
Jay Heefner |
Suspensions
System Test
|
19 Aug 2009 |
E1700309-v3 |
Procedure for handling, cleaning and baking DLC coated stray light baffles |
Alena Ananyeva et al. |
System Engineering
Cleaning
|
29 Aug 2018 |
D0902791-v1 |
Viewport Guard Dust Cover |
Michael Meyer |
Preliminary Design
Vacuum
|
19 Jan 2010 |
E1000309-v13 |
aLIGO HAM-ISI Testing Procedure, Phase I: Assembly Validation |
Fabrice Matichard et al. |
Seismic Isolation
Subsystem Test
|
27 Feb 2013 |
E010613-v2 |
Generic Requirements & Standards for Detector Subsystems |
Dennis Coyne |
Fabrication
System Engineering
Final Design
|
24 Feb 2021 |
D080276-v2 |
aLIGO (US, ISC) 4 Channel Satellite Amplifier Circuit Board (Amp, SatAmp) |
Jay Heefner |
Final Design
Suspensions
|
04 Feb 2021 |
D1000669-v5 |
TCS Hartmann Sensor Plate |
Jesper Munch et al. |
Fabrication
Preliminary Design
Conceptual Design
Auxiliary Optics
Final Design
|
01 Feb 2021 |
G1000923-v1 |
Why LIGO's range is limited by ground motion: the likely source of upconversion |
Robert Schofield |
Meeting
Detector Characterization
Suspensions
|
10 Dec 2020 |
D1900281-v9 |
Overview of Frequency-Dependent Squeezing layout for O4: HAM7, HAM8, SQZT0, SQZT7, SQZT8 |
Lee McCuller et al. |
A+
Squeezer
Preliminary Design
|
03 Nov 2020 |
T1300642-v1 |
Sapphire Prism bond test: Results |
GariLynn Billingsley et al. |
System Engineering
Suspensions
Activity
|
23 Sep 2020 |
E0900047-v23 |
LIGO Contamination Control Plan |
Betsy Weaver et al. |
Risk Management
Observatory Facilities
Cleaning
|
17 Sep 2020 |
D970412-v1 |
BSC Overall Assembly, LIGO Vacuum Equipment |
Dennis Coyne |
Fabrication
Vacuum
|
16 Sep 2020 |
E1200266-v2 |
Ground Glass Freon Wipe Cleaning Procedure |
Margot Hennig et al. |
Auxiliary Optics
Cleaning
Input Optics
Core Optics
|
20 Feb 2013 |
E2000429-v2 |
Specification: Filter Cavity Tube Supports |
Dennis Coyne et al. |
Vacuum
Final Design
Requirements
System Engineering
|
10 Sep 2020 |
P2000352-v1 |
[Thesis] Search for Gravitational Waves Associated With Gamma-ray Bursts During LIGO's Second Observing Run |
Jordan Palamos |
Thesis/Dissertation
Data quality / vetoes
Detector Characterization
Astrophysics / Multi-messenger
GW Bursts
|
02 Sep 2020 |
E1000006-v24 |
Advanced LIGO Quad Suspension Metal-Build Assembly Procedure |
Joe ODell et al. |
Assembly
Suspensions
Installation
|
06 Aug 2020 |
E1900149-v3 |
MIRROR POLISH SPECIFICATION, A+ FILTER CAVITY END MIRROR |
GariLynn Billingsley |
A+
Auxiliary Optics
|
04 Aug 2020 |
D1001530-v7 |
aLIGO ISC Whitening Board |
Rich Abbott |
Conceptual Design
Sensing and Control
|
03 Aug 2020 |
T1900279-v2 |
Filter Cavity Optics Substrates |
Lee McCuller et al. |
Core Optics
A+
|
03 Aug 2020 |
D1900066-v3 |
A+ HAM8 84in Cover |
Don Griffith |
A+
|
16 Aug 2019 |
D1900059-v3 |
A+ HAM7 84in Cover |
Don Griffith |
A+
|
16 Aug 2019 |
P2000198-v1 |
Precision Mechanical Rotation Sensors for Terrestrial Gravitational Wave Observatories |
Michael Ross |
Thesis/Dissertation
|
10 Jul 2020 |
T1200518-v1 |
Leak localization of the Y arm beamtube at LLO |
Michael Meyer et al. |
Vacuum
System Test
|
06 Jul 2020 |
E1900237-v4 |
In vacuum active elements and electronics for frequency-dependent squeezing |
Lee McCuller et al. |
A+
Squeezer
|
14 Nov 2019 |
E1700080-x0 |
AERM08 Characterization |
GariLynn Billingsley |
Core Optics
Incoming Inspection
|
16 Jun 2020 |
E1700079-x0 |
AERM07 Characterization |
GariLynn Billingsley |
Incoming Inspection
Core Optics
|
16 Jun 2020 |
E1700078-x0 |
AERM06 Characterization |
GariLynn Billingsley |
Incoming Inspection
Core Optics
|
16 Jun 2020 |
E1700077-x0 |
AERM05 Characterization |
GariLynn Billingsley |
Core Optics
Incoming Inspection
|
16 Jun 2020 |
P2000185-v3 |
A Data Mining Approach to Signal Processing in Laser Interferometer Gravitational-Wave Observatory (LIGO) Fscan Data |
Thomas Harris et al. |
Thesis/Dissertation
Detector Characterization
|
08 Jun 2020 |
E080177-v2 |
RGA Test Qualification of components for the LIGO UHV |
Dennis Coyne |
Fabrication
System Engineering
Vacuum
|
15 Apr 2020 |
P2000141-v1 |
[Thesis] High-Power Operation of Interferometric Gravitational-Wave Detectors |
Aaron Buikema |
Basic R&D
Thesis/Dissertation
|
12 Apr 2020 |
P1800233-v2 |
[Thesis] Characterization and Reduction of Noise in Gravitational Wave Detectors |
Nikhil Mukund |
Thesis/Dissertation
|
07 Apr 2020 |
D080117-v1 |
Penultimate Mass, ETM Quad |
Russell Jones |
Final Design
Suspensions
Fabrication
|
14 Feb 2020 |
P1600161-v16 |
The basic physics of the binary black hole merger GW150914 |
Alan Wiseman et al. |
Education, Outreach
Astrophysics / Multi-messenger
Compact Binaries
Data Analysis
|
19 Jan 2020 |
D1001036-v3 |
64 Channel Binary Input Printed Circuit Board |
Rich Abbott |
Fabrication
|
18 Mar 2011 |
D1001266-v3 |
64 Channel Binary Output Printed Circuit Board |
Rich Abbott |
Fabrication
System Engineering
|
18 Feb 2015 |
D1002062-v2 |
Front Panel for 64 Channel Binary Output Module |
Charles Osthelder |
Fabrication
|
27 Sep 2010 |
D1002055-v2 |
Front Panel for 64 Channel Binary Input Module |
Charles Osthelder |
Fabrication
|
27 Sep 2010 |
E1100159-v2 |
aLIGO Music Wire Specification |
Jeffrey Lewis |
Requirements
|
02 Mar 2011 |
E1900223-v1 |
Review Report Design Requirements and Concept for the A+ ISC Filter Cavity and Relay Optics |
Daniel Sigg et al. |
A+
Sensing and Control
|
15 Nov 2019 |
P1800271-v2 |
Multimessenger Astronomy with Gravitational Waves from Core-Collapse Supernovae |
Marek Szczepanczyk |
Astrophysics / Multi-messenger
Thesis/Dissertation
|
02 Nov 2019 |
E1900148-v2 |
MIRROR POLISH SPECIFICATION, A+ FILTER CAVITY INPUT MIRROR |
GariLynn Billingsley |
Auxiliary Optics
A+
|
21 Oct 2019 |
D1500308-v1 |
Common Mode Servo Card, 40m Revisions |
Rana Adhikari et al. |
Commissioning
Sensing and Control
|
11 Dec 2015 |
P1900316-v1 |
Cosmic Explorer: The U.S. Contribution to Gravitational-Wave Astronomy beyond LIGO |
David Reitze et al. |
Detector
Basic R&D
Activity
|
11 Oct 2019 |
D0900906-v1 |
Earthquake Stop Adjuster and Mount, 2 Inch |
Derek Bridges |
Suspensions
Preliminary Design
|
03 Oct 2019 |
E1900300-v1 |
FTIR - aLIGO, PCAL-VIDEO CAM, PERISCOPE SHIELD (OUTER PANEL) |
Adam Branch et al. |
System Engineering
Cleaning
|
25 Sep 2019 |
P1700451-v1 |
[Thesis] Extending the scientific reach of Advanced LIGO by compensating for temporal variations in the calibration of the detectors |
Darkhan Tuyenbayev |
Calibration
Thesis/Dissertation
|
16 Sep 2019 |
G1901510-v1 |
A+ Beamsplitter material long lead review |
GariLynn Billingsley |
A+
Requirements
Core Optics
|
20 Aug 2019 |
G1901469-v1 |
A+ ISC review: DRD and conceptual design |
Lee McCuller et al. |
A+
|
15 Aug 2019 |
T1900395-v1 |
Incoming Test of Spare SQZ Mephisto 1000NE Laser System |
Jason Oberling |
Laser Systems
Incoming Inspection
|
06 Aug 2019 |
G0900436-v1 |
eLIGO: So how's it turning out? |
Michael Zucker et al. |
Upgrades
Meeting
Commissioning
Integration
Detector
System Test
Installation
|
30 Jul 2019 |
E1900147-v1 |
MIRROR BLANK SPECIFICATION, A+ FILTER CAVITY INPUT MIRROR |
GariLynn Billingsley et al. |
A+
Auxiliary Optics
|
07 Jun 2019 |
E1900146-v1 |
MIRROR BLANK SPECIFICATION, A+ FILTER CAVITY END MIRROR |
GariLynn Billingsley et al. |
Auxiliary Optics
A+
|
07 Jun 2019 |
D1900146-v1 |
MIRROR BLANK DRAWING, A+ FILTER CAVITY, END MIRROR |
GariLynn Billingsley et al. |
A+
Auxiliary Optics
|
07 Jun 2019 |
D1900147-v1 |
MIRROR BLANK DRAWING, A+ FILTER CAVITY, INPUT MIRROR |
GariLynn Billingsley et al. |
A+
Auxiliary Optics
|
07 Jun 2019 |
E0900007-v1 |
Air Bake Oven |
John Worden et al. |
Requirements
|
22 May 2019 |
E0900089-v4 |
Substrate, ALIGO Signal Recycling Mirror (SRM) for L1 and H1 interferometers - unfolded |
Rodica Martin |
Core Optics
Input Optics
Final Design
|
17 May 2019 |
E0900087-v4 |
Substrate, ALIGO Power Recycling Mirror (PRM) for L1 and H1 interferometers - unfolded |
Rodica Martin |
Input Optics
Core Optics
Final Design
|
17 May 2019 |
E0900093-v4 |
Substrate, ALIGO Signal Recycling Mirror 2 (SR2) for L1 and H1 interferometers - unfolded |
Rodica Martin |
Final Design
Core Optics
Input Optics
|
17 May 2019 |
E0900091-v4 |
Substrate, ALIGO Power Recycling Mirror 2 (PR2) for L1 and H1 interferometers - unfolded |
Rodica Martin |
Core Optics
Input Optics
Final Design
|
17 May 2019 |
D1900133-v2 |
A+, LAND USE PERMIT BOUNDARY MAP |
Eduardo Sanchez |
A+
System Engineering
|
08 May 2019 |
E950083-x0 |
Science Requirements for the LIGO Beam Tube Baffles |
Albert Lazzarini |
Vacuum
Requirements
Modelling
|
30 Apr 2019 |
D047813-v3 |
D047813-- Baseplate, GS-13 Horizontal & Vertical |
Andy Stein |
Final Design
Seismic Isolation
|
11 Apr 2019 |
D1900069-v6 |
A+, GENERAL ARRANGEMENT DRAWING (H1) |
Eduardo Sanchez |
A+
|
10 Apr 2019 |
G1900666-v1 |
A+ for LIGO |
GariLynn Billingsley |
A+
Core Optics
Meeting
|
06 Apr 2019 |
P1500068-v1 |
[Thesis] Gravitational-wave Science with the Laser Interferometer Gravitational-wave Observatory |
Madeline Wade |
Thesis/Dissertation
Data Analysis
|
18 Mar 2019 |
T0810012-v3 |
High Reliability Electronics for LIGO |
Rich Abbott |
Requirements
System Engineering
Risk Management
|
14 Mar 2019 |
T040027-v2 |
Conceptual Design of Beamsplitter Suspension for aLIGO |
Norna Robertson et al. |
Suspensions
Conceptual Design
|
14 Mar 2019 |
D080373-v3 |
Clamp Asm, HAM Support Tube |
Andy Stein |
Final Design
Seismic Isolation
|
11 Jan 2011 |
T1000543-v2 |
Effect of the end mirror curvature error to the contrast of a Fabry-Perot based Michelson interferometer |
Koji Arai |
Core Optics
Modelling
|
09 Jan 2019 |
T1500188-v5 |
Active Wavefront Control Roadmap |
Aidan Brooks et al. |
Requirements
State Control and Monitoring
Core Optics
Conceptual Design
Preliminary Design
Auxiliary Optics
Basic R&D
Sensing and Control
|
30 Nov 2018 |
E1800107-v2 |
Particle Count Procedure for Compression Packs |
Regina Lee |
Cleaning
|
13 Nov 2018 |
S1800574-v4 |
Compression Pack Inspection |
Regina Lee |
Cleaning
Public relations
Quality Assurance
|
13 Nov 2018 |
S1800596-v2 |
Mini Compression Pack ADE |
Regina Lee |
Cleaning
|
13 Nov 2018 |
E1800096-v1 |
CVD Silicon Carbide Beam Dump Inspection |
Regina Lee |
Incoming Inspection
|
08 Nov 2018 |
E1800039-v3 |
Baffle Inspection D1003301-v9 |
Regina Lee |
System Engineering
Incoming Inspection
|
08 Nov 2018 |
T0900144-v7 |
Adv. LIGO Arm Length Stabilization Design |
Sam Waldman et al. |
Final Design
Sensing and Control
|
08 Nov 2018 |
E1600165-v1 |
VOPO Suspension - Conceptual Design Study |
Alvaro Fernandez-Galiana et al. |
Squeezer
Thesis/Dissertation
|
24 Oct 2018 |
T0900083-v1 |
Modeling Cable Noise in LIGO |
Julian Earl Freed-Brown et al. |
Final Design
Modelling
Suspensions
|
16 Oct 2018 |
T0900291-v1 |
PUM Driver Board Test Plan |
Ron Cutler |
System Test
|
12 Oct 2018 |
T1800042-v5 |
The A+ design curve |
Lisa Barsotti et al. |
A+
Conceptual Design
|
11 Oct 2018 |
D070270-v2 |
Locker Sleeve |
Andy Stein |
Seismic Isolation
Final Design
|
11 May 2009 |
P1800001-v2 |
[Thesis] Gravitational-wave detection beyond the quantum shot-noise limit: The integration of squeezed light in GEO 600 |
Emil Schreiber |
Squeezer
Thesis/Dissertation
|
08 Oct 2018 |
G1801680-v1 |
Can you get there from here? |
David McClelland et al. |
Upgrades
Proposals
A+
|
31 Aug 2018 |
G1601435-v3 |
Getting an A+: Enhancing Advanced LIGO |
Michael Zucker et al. |
A+
Basic R&D
Seismic Isolation
Sensing and Control
Squeezer
Observatory Facilities
Proposals
Vacuum
Collaboration
Conceptual Design
System Engineering
Suspensions
Core Optics
|
24 Aug 2018 |
T1000489-v9 |
Specification for LIGO Installation Cleanrooms |
John Worden et al. |
Installation
Procurements
|
01 Aug 2018 |
G1801310-v1 |
Experimental Search for Avalanches of Entangled Dislocations as a Source of Dissipation and Mechanical Noise |
Morgan Shaner |
Thesis/Dissertation
Suspensions
|
19 Jul 2018 |
T1300756-v2 |
Status of UF Ring Heater Prototype development and testing |
Giacomo Ciani et al. |
Auxiliary Optics
Basic R&D
Upgrades
|
28 Jun 2018 |
T070082-v1 |
LIGO I mirror scattering loss by microroughness |
Hiro Yamamoto |
Commissioning
Core Optics
|
06 Apr 2009 |
P1800114-v1 |
Experimental Search for Avalanches of Entangled Dislocations as a Source of Dissipation and Mechanical Noise |
Morgan Shaner et al. |
Seismic Isolation
Thesis/Dissertation
|
20 Jun 2018 |
E1200702-v1 |
ITM04 Transmission |
Liyuan Zhang et al. |
Core Optics
System Test
|
12 Jun 2018 |
T0900288-v3 |
Advanced LIGO anticipated sensitivity curves OBSOLETE |
David Shoemaker |
Detector
Modelling
|
12 Jun 2018 |
E1700190-v1 |
ITM01 Integrated Scatter |
Liyuan Zhang et al. |
Core Optics
System Test
|
12 Jun 2018 |
M1500313-v2 |
Process Flow for Engineering Operations of the LIGO Detector Systems |
Dennis Coyne et al. |
Integration
Commissioning
System Engineering
Subsystem Test
Fabrication
Requirements
Conceptual Design
Installation
System Test
Operations
Detector
Policies
Final Design
|
07 Jun 2018 |
P1700260-v13 |
Improving astrophysical parameter estimation via offline noise subtraction for Advanced LIGO |
Jenne Driggers et al. |
Detector
Cleaning
|
25 May 2018 |
G1800831-v1 |
Speculations on the future of the LIGO detectors |
Brian Lantz |
Basic R&D
Requirements
|
14 May 2018 |
T1500202-v1 |
Optimization of beamtube pumping to mitigate acquired water vapor |
Michael Zucker |
Vacuum
Requirements
|
29 Mar 2018 |
T020059-v3 |
Are Reaction Chains Needed for aLIGO HAM Optics? |
Norna Robertson et al. |
Sensing and Control
Seismic Isolation
Modelling
Requirements
Suspensions
Document Migration
|
13 Feb 2018 |
D020214-x0 |
Hydraulic External Pre-Isolation (HEPI): Piping and Instrumentation Diagram |
Dennis Coyne |
Document Migration
|
11 Apr 2003 |
T1600251-v1 |
Cleaning Optics for LDF Vacuum System |
Madeleine Kerr |
Basic R&D
Cleaning
|
25 Jan 2018 |
E070078-v2 |
SUBSTRATE, ALIGO MODE CLEANER FLAT MIRROR |
Rodica Martin et al. |
Final Design
Input Optics
|
23 Jan 2018 |
E0900420-v1 |
Coated Substrate, ALIGO INPUT MODE CLEANER FLAT MIRROR (IMCF) for H2 interferometer - folded |
Rodica Martin |
Input Optics
Activity
|
23 Jan 2018 |
G1800030-v1 |
LIGO: The Instruments that Launched Gravitational-wave Astronomy |
Peter Fritschel |
Requirements
|
23 Jan 2018 |
D0900615-v5 |
Faraday Isolator Prism Mounting Assy-RH |
Niem Nguyen et al. |
Auxiliary Optics
Assembly
|
15 Nov 2012 |
D0900614-v4 |
Faraday Isolator Prism Mounting Assy-LH |
Niem Nguyen |
Auxiliary Optics
Assembly
|
15 Nov 2012 |
T1700533-v1 |
Collection of contamination flakes scraped off of LHO XMB |
Chandra Romel |
Cleaning
Vacuum
Quality Assurance
|
05 Dec 2017 |
D1101821-v2 |
aLIGO, PESDESTAL,2IN MIRROR MOUNT |
Ayodele Cole et al. |
Final Design
Cleaning
Auxiliary Optics
Vacuum
Assembly
Fabrication
|
05 Nov 2012 |
T1600204-v2 |
Mirror loss estimates for aLIGO pre-modecleaners |
Liyuan Zhang et al. |
Operations
Incoming Inspection
Laser Systems
|
30 Jul 2016 |
D1000971-v1 |
ISC TRANSMON BEAM DUMP - SMALL |
Jason Fishner |
Conceptual Design
Sensing and Control
|
15 Nov 2017 |
E1000617-v6 |
(QUAD) Quadruple Suspension Controls Arrangement Poster |
Derek Bridges |
Assembly
Suspensions
Subsystem Test
|
13 Nov 2017 |
P1500136-v4 |
[Thesis] Gravitational Wave Astrophysics: Instrumentation, Detector Characterization, and a Search for Gravitational Signals from Gamma-ray Bursts |
Daniel Hoak |
Data quality / vetoes
Thesis/Dissertation
Detector Characterization
GW Bursts
Astrophysics / Multi-messenger
Detector
|
30 Oct 2017 |
L1700110-v1 |
Public File Permission Test Document |
Phil Ehrens et al. |
Temporary Test Document
|
18 Oct 2017 |
D1001049-v1 |
SLC FM ELLIPTICAL BAFFLE STANDOFF ADAPTER #8-32 |
Niem Nguyen |
Auxiliary Optics
Modelling
|
26 Oct 2011 |
D1300020-v3 |
ALIGO, SUS, HSTS STRUCTURE, FC SPRAY GUARD ASSY. |
Eduardo Sanchez |
Fabrication
Integration
System Engineering
Installation
|
04 Sep 2014 |
E1700072-v6 |
Timeline for the aLIGO squeezing upgrade at LLO |
Lisa Barsotti et al. |
Upgrades
|
26 Sep 2017 |
S1700276-v5 |
Diamond-Like Carbon Coating Sample 4 |
Ellie Parisi et al. |
Cleaning
|
17 Aug 2017 |
G1701405-v1 |
Introduction to GW detectors |
Gabriele Vajente et al. |
Education, Outreach
|
27 Jul 2017 |
G1701153-v1 |
Introduction to GW detectors |
Gabriele Vajente |
Education, Outreach
Detector
|
26 Jul 2017 |
G1501204-x0 |
Bringing LIGO Outreach into the Formal Education Setting |
Amber Stuver |
Education, Outreach
Meeting
|
11 Sep 2015 |
G1701204-v4 |
Overview of Education and Public Outreach Activities of the LSC |
Marc Favata |
Education, Outreach
|
10 Jul 2017 |
G1701274-v1 |
Selected technical challenges for Cosmic Explorer |
Evan Hall |
Modelling
Conceptual Design
Upgrades
Basic R&D
|
06 Jul 2017 |
G1701266-v2 |
Squeezing highlights |
Lisa Barsotti |
Upgrades
|
06 Jul 2017 |
G1701271-v1 |
Update from GWIC at DAWN III |
Sheila Rowan |
Education, Outreach
|
06 Jul 2017 |
G1701205-v2 |
Welcome to the Third Dawn Workshop |
Albert Lazzarini |
Upgrades
Public relations
Organizational Relations
|
06 Jul 2017 |
E1700016-v9 |
Specification : 40m dichroic RC folding mirrors |
Gautam Venugopalan et al. |
Basic R&D
Upgrades
|
28 Jun 2017 |
G1700809-v1 |
What Does Low Frequency Control Look Like in the 2G+ and 3G Era? |
Jeffrey Kissel |
Conceptual Design
Upgrades
State Control and Monitoring
System Engineering
Integration
Suspensions
Seismic Isolation
Basic R&D
Sensing and Control
Squeezer
|
12 Jun 2017 |
P1600245-v1 |
[Thesis] Squeezed states for advanced gravitational wave detectors |
Eric Oelker et al. |
Thesis/Dissertation
Squeezer
|
02 Jun 2017 |
G1701005-v3 |
Animation comparing GW170104 data to NR |
Andrew Williamson |
Education, Outreach
|
01 Jun 2017 |
G1700966-v7 |
GW170104 Infographic |
Daniel Williams |
Education, Outreach
|
01 Jun 2017 |
G1601316-v1 |
GW151226 sky localization graphics for press release |
Leo Singer et al. |
Public relations
Education, Outreach
Compact Binaries
Public Talk / Colloquium
Data analysis software
GW source predictions
Astrophysics / Multi-messenger
|
05 Jul 2016 |
G1701015-v1 |
Three dimensional embedding diagram |
Aurore Simonnet et al. |
Education, Outreach
|
30 May 2017 |
T0900174-v2 |
Advanced-LIGO Optical Levers Design Requirements |
Eric Black |
Requirements
Auxiliary Optics
|
10 May 2017 |
G1700848-v1 |
LIGO Voyager Update |
Christopher Wipf |
Detector
Basic R&D
Upgrades
|
08 May 2017 |
G1700835-x0 |
Possible KAGRA Upgrades |
Yuta Michimura et al. |
Conceptual Design
Upgrades
|
07 May 2017 |
T1600039-v2 |
How big is Kerry? |
Gernot Heissel et al. |
Education, Outreach
|
12 Feb 2016 |
F030014-v2 |
Clean and Bake Request Form |
John Worden et al. |
Policies
Assembly
|
18 Apr 2011 |
G1400964-v3 |
Brief Introduction to Advanced LIGO Suspensions |
Brett Shapiro |
Education, Outreach
Suspensions
|
17 Apr 2017 |
D1101463-v7 |
CABLE HARNESS ROUTING CONFIGURATION, HAM 3 |
Eduardo Sanchez |
Conceptual Design
Preliminary Design
Integration
Installation
|
10 Apr 2017 |
T1300162-v2 |
Photon Calibrator: Optical Follower Servo Design Requirements |
Gregorio Tellez et al. |
Auxiliary Optics
Requirements
|
07 Mar 2017 |
G1501372-v1 |
O1 DARM Loop Design Comprisons and Critiques |
Jeffrey Kissel |
Sensing and Control
Integration
Calibration
Modelling
Incoming Inspection
|
07 Mar 2017 |
P1700049-v1 |
«VIRGO Evaluation Report» March 31st 1990 |
Riccardo DeSalvo et al. |
Proposals
Education, Outreach
|
07 Mar 2017 |
P1600015-v6 |
Educator's guide |
LIGO Scientific Collaboration et al. |
Education, Outreach
|
15 Feb 2017 |
T1700002-x0 |
Final reports from LIGO SURF program, Summer 2016 |
Alan Weinstein |
Detector
Data Analysis
Education, Outreach
|
11 Jan 2017 |
P1200057-v1 |
[Thesis] Adaptive Modal Damping for Advanced LIGO Suspensions |
Brett Shapiro |
Thesis/Dissertation
|
12 Dec 2016 |
G1602326-v3 |
Gravitational Waves Detected (for Séminaire Poincaré) |
David Shoemaker |
Compact Binaries
Public Talk / Colloquium
Detector
|
03 Dec 2016 |
S1202300-x0 |
L1-SUS-R3 HAM4 Field Rack |
Anna Aitken |
Integration
System Engineering
Installation
|
08 Aug 2012 |
G1602295-v1 |
LIGO: the Dawn of Gravitational Wave Astronomy |
Jameson Graef Rollins |
Astrophysics / Multi-messenger
Data and Computing
Public Talk / Colloquium
Data Acquisition System
Education, Outreach
State Control and Monitoring
|
16 Nov 2016 |
T1600055-v7 |
Real-Time Code Generator (RCG) Version 3.0 Release Notes |
Rolf Bork et al. |
Upgrades
Data Acquisition System
|
09 Nov 2016 |
T1400570-v7 |
RCG Version 2.9 Release Notes |
Rolf Bork et al. |
Data Acquisition System
Upgrades
|
09 Nov 2016 |
T1600290-v10 |
Modeling Loss and Thermal Noise in Silicon Gravitational Wave Detector Suspensions |
Nikhil Mathur et al. |
Conceptual Design
Upgrades
Modelling
Suspensions
|
04 Nov 2016 |
P1600095-v2 |
Search for Long-Duration Transient Gravitational Waves Associated with Magnetar Bursts during LIGO's Sixth Science Run |
Ryan Quitzow-James |
GW Bursts
Thesis/Dissertation
|
02 Nov 2016 |
G1602198-v1 |
Little Pre-Mode Cleaner and tilt-free seismometer |
Veronica Leccese et al. |
Activity
Seismic Isolation
Laser Systems
|
30 Oct 2016 |
D000209-v3 |
OSEM Shadow Sensor optical bandpass filter |
Rana Adhikari |
Suspensions
|
27 Oct 2016 |
G1501352-v2 |
Actuating the DARM loop using a Photon Calibrator |
Richard Savage et al. |
Thesis/Dissertation
Basic R&D
|
14 Oct 2016 |
G1600254-v2 |
Gravitational Waves Discovered |
Ryan Lang et al. |
Education, Outreach
|
22 Sep 2016 |
G1600253-v2 |
Gravitational Wave Detectors |
Sinead Walsh et al. |
Education, Outreach
|
22 Sep 2016 |
G1600251-v2 |
History of Gravitational Waves |
Sinead Walsh et al. |
Education, Outreach
|
22 Sep 2016 |
G1600252-v2 |
Sources of Gravitational Waves |
Sinead Walsh et al. |
Education, Outreach
|
21 Sep 2016 |
G1601915-v1 |
Spacetime Symphony: APOD and Gravitational Waves |
Lynn Cominsky |
Education, Outreach
|
13 Sep 2016 |
P1600275-v1 |
Spacetime Symphony: APOD and Gravitational Waves |
Lynn Cominsky et al. |
Education, Outreach
|
13 Sep 2016 |
G1601897-v1 |
Einstein, Black Holes, Gravitational Wave Detection, and Art |
Gregg Harry |
Public Talk / Colloquium
Education, Outreach
|
09 Sep 2016 |
G1601640-v2 |
Intro to Controls and the new Controls Working Group |
Brett Shapiro |
Education, Outreach
Sensing and Control
|
30 Aug 2016 |
G1400001-v3 |
The Status of Advanced LIGO: Light at the End of the Tunnels! |
Jeffrey Kissel et al. |
Input Optics
State Control and Monitoring
Integration
System Engineering
Commissioning
Suspensions
Core Optics
Laser Systems
Data Acquisition System
Auxiliary Optics
Public Talk / Colloquium
Seismic Isolation
Sensing and Control
|
17 Aug 2016 |
G1600726-v3 |
Intro to Control Theory for LIGO People |
Brett Shapiro |
Education, Outreach
|
16 Aug 2016 |
G1601604-v1 |
Seismic Isolation and Alignment - the road ahead |
Brian Lantz |
Integration
Commissioning
Seismic Isolation
|
16 Aug 2016 |
G1601582-v3 |
Cries from the Cosmos:LIGO Observes the Most Extreme Phenomena in Our Universe |
Fred Raab |
Public Talk / Colloquium
Education, Outreach
|
05 Aug 2016 |
T1600118-v6 |
The LSC White Paper on Education and Public Outreach 2016-2017 |
Joey Key et al. |
Education, Outreach
|
02 Aug 2016 |
E1600204-v1 |
ECR: PSL frontend should handle a binary output ON/OFF request as true binary, not a 16 bit integer |
Keita Kawabe |
Laser Systems
Integration
|
12 Jul 2016 |
G1601479-v1 |
DAWN Workshop - Introduction to the Session B Panel on coordinated R&D |
Giovanni Losurdo |
Upgrades
Detector
|
08 Jul 2016 |
G1601483-v1 |
Contribution to the Session B Panel on coordinated R&D |
Pedro Marronetti |
Upgrades
NSF
|
08 Jul 2016 |
G1601499-v1 |
Elements in the strategy for the future of ground based gravitational wave research |
Rainer Weiss |
Detector
Conceptual Design
|
08 Jul 2016 |
G1601484-v1 |
Lessons to be learned from the ET design study |
Michele Punturo et al. |
Conceptual Design
|
08 Jul 2016 |
G1600769-v5 |
Projected sensitivities towards aLIGO+ |
Lisa Barsotti et al. |
Upgrades
|
07 Jul 2016 |
P1600010-v2 |
LIGO Magazine issue 8 2/2016 |
Andreas Freise |
Education, Outreach
|
07 Jul 2016 |
G1601461-v3 |
LIGO Voyager: a 3G interferometer in a 1G facility |
Rana Adhikari et al. |
Upgrades
|
07 Jul 2016 |
G1601288-v4 |
GW151226 Infographic |
Daniel Williams |
Education, Outreach
|
15 Jun 2016 |
D1101429-v4 |
ALIGO, BSC FLOORING ORIENTATION DETAILS |
Eduardo Sanchez |
Installation
Integration
|
14 Jun 2016 |
D1200111-v2 |
CABLE HARNESS ROUTING CONFIGURATION, LBSC5 / WBSC10 |
Eduardo Sanchez |
Preliminary Design
Integration
System Engineering
|
14 Jun 2016 |
G1601325-v1 |
GW150914 Infographic |
Daniel Williams |
Education, Outreach
|
14 Jun 2016 |
P080073-v1 |
Requirements for a Ground Rotation Sensor to Improve Advanced LIGO |
Robert Schofield et al. |
Requirements
Seismic Isolation
Basic R&D
|
13 Jun 2016 |
G1601300-v2 |
Teacher Leadership Summit presentation on the detection of gravitational waves |
William Katzman |
Education, Outreach
|
08 Jun 2016 |
T1400555-v1 |
How to Use Anti-Fog Cloths |
Sabrina Waller et al. |
System Engineering
Cleaning
|
07 Jun 2016 |
D1300225-v2 |
Upper, Flashlight Holder |
Jeffrey Lewis |
Cleaning
|
03 Jun 2016 |
D1300224-v2 |
Base, Flashlight Holder |
Jeffrey Lewis |
Cleaning
|
03 Jun 2016 |
M1600168-v1 |
Hipot testing procedure for Withstand testing of HV coax cabling using the Vitrek 955i Electrical Safety Analyzer: |
Carl Adams et al. |
System Test
|
01 Jun 2016 |
G1601228-v1 |
colliding black holes, giant laser measurement systems, and ripples in the fabric of space-time |
Brian Lantz |
Education, Outreach
|
31 May 2016 |
G1600979-v3 |
Gravitational Waves - The Sound of Black Holes Colliding |
Brian Lantz |
Education, Outreach
|
27 May 2016 |
T1500120-v1 |
Suggested Improvements to SEI / SUS Designs for aLIGO Upgrades |
Jeffrey Kissel et al. |
Suspensions
Core Optics
System Engineering
Commissioning
Conceptual Design
Upgrades
Auxiliary Optics
Sensing and Control
Seismic Isolation
|
26 May 2016 |
G1401291-v3 |
aLIGO HSTS Damping Loop Design Comparison |
Jeffrey Kissel et al. |
Sensing and Control
Suspensions
Integration
Commissioning
Modelling
|
25 May 2016 |
G1401290-v1 |
aLIGO HSTS "Level 2" Damping Loop Design |
Betsy Weaver et al. |
Seismic Isolation
Sensing and Control
Commissioning
Integration
Suspensions
Modelling
|
25 May 2016 |
G1400151-x0 |
aLIGO HLTS "Level 2" Damping Loop Design |
Jeffrey Kissel |
Sensing and Control
Modelling
Suspensions
Commissioning
|
25 May 2016 |
G1600447-v3 |
FINESSE - Numerical Simulations for Optical Design and Commissioning |
Daniel Toyra et al. |
Commissioning
Modelling
|
17 May 2016 |
G1601077-v2 |
The dawn of gravitational-wave astronomy |
Graham Woan |
Astrophysics / Multi-messenger
Education, Outreach
|
16 May 2016 |
G1101114-v3 |
The LIGO Science Education Center and its partnership |
Joe Giaime et al. |
Education, Outreach
|
12 May 2016 |
D1300031-v3 |
ALIGO, SUS, BS STRUCTURE, FC SPRAY GUARD ASSY. |
Eduardo Sanchez |
Fabrication
System Engineering
Integration
Final Design
|
02 May 2016 |
G1600910-v2 |
Historical Context for LIGO’s Detection of Gravitational Waves |
Stan Whitcomb |
Basic R&D
Proposals
Conceptual Design
|
02 May 2016 |
P1600131-v1 |
Optomechanics for Gravitational Wave Detection --- from resonant bars to next generation laser interferometers |
David Blair et al. |
Detector
Activity
|
18 Apr 2016 |
G1600210-v1 |
P150914 Figure 2 |
LIGO Scientific Collaboration et al. |
Compact Binaries
Education, Outreach
|
29 Feb 2016 |
G1600204-v6 |
P150914 Figure 1 |
LIGO Scientific Collaboration et al. |
Compact Binaries
Education, Outreach
|
29 Feb 2016 |
P1600122-v2 |
General relativity and the detection of gravitational waves by LIGO |
Hiro Yamamoto |
Education, Outreach
|
11 Apr 2016 |
P1500237-v11 |
GW150914: The Advanced LIGO Detectors in the Era of First Discoveries |
LIGO Scientific Collaboration et al. |
Commissioning
|
04 Apr 2016 |
P1600061-v1 |
Exploring Gravitational Waves in the Classroom |
Lynn Cominsky |
Education, Outreach
|
29 Mar 2016 |
P1600112-v1 |
Evaluating the efficacy of educational games in promoting interest and understanding of gravitational wave physics |
Jonathan Wheeler |
Thesis/Dissertation
|
28 Mar 2016 |
P1600111-v1 |
Parameterization of BayesWave for Analysis of Gravitational Waves Caused by Inspiraling Black Holes |
Isabel Stafford |
GW Bursts
Thesis/Dissertation
|
28 Mar 2016 |
T1000091-v2 |
Semiconductor Cleaning for In-vacuum Applications |
Rich Abbott et al. |
Assembly
Sensing and Control
|
22 Mar 2016 |
P1600107-v1 |
Observe! A gravitational wave detection board game |
Jameson Graef Rollins |
Education, Outreach
|
22 Mar 2016 |
G1600721-v2 |
509 Salsa LIGO Tour |
Corey Gray |
Education, Outreach
|
19 Mar 2016 |
P1600100-v1 |
The Century Quest for Gravitational Waves |
David Blair et al. |
Education, Outreach
|
15 Mar 2016 |
G1600507-v1 |
The LIGO detection and opportunities for NASA in Gravitational Wave Astronomy |
Neil Cornish |
Education, Outreach
|
11 Mar 2016 |
E1000752-v5 |
Preparation of a thermal compensation plate (TCP) or end reaction mass (ERM) (Gluing wire break-off prisms and earthquake stops) |
Margot Hennig et al. |
Installation
Suspensions
|
08 Mar 2016 |
G1600397-v1 |
GW150914: Beginning A New Era For LIGO & Gravitational Wave Astronomy |
Corey Gray |
Education, Outreach
Compact Binaries
Public Talk / Colloquium
Detector
|
03 Mar 2016 |
P1600070-v2 |
Double Bonanza at the LIGO Gravitational Wave Detectors |
CS Unnikrishnan |
Education, Outreach
|
03 Mar 2016 |
D1201327-v1 |
Rotate dual suspended seismometer short osc platform iso, Rotate dual suspended seismometer short osc platform iso |
Philipp Knothe et al. |
Conceptual Design
Seismic Isolation
|
02 Mar 2016 |
D1201269-v1 |
Dual suspended seismometer short osc platform iso, Dual suspended seismometer short osc platform iso |
Philipp Knothe et al. |
Conceptual Design
Seismic Isolation
|
02 Mar 2016 |
G0900456-v2 |
Listening to the Universe |
Stan Whitcomb et al. |
Education, Outreach
|
02 Mar 2016 |
G1600275-v1 |
LIGO's First Measurement of Gravitational Waves |
Tiffany Summerscales |
Education, Outreach
|
01 Mar 2016 |
G1600367-v1 |
P150914 Cover Figure for PRL |
LIGO Scientific Collaboration et al. |
Education, Outreach
|
29 Feb 2016 |
G1600209-v1 |
P150914 Figure 3 |
LIGO Scientific Collaboration et al. |
Education, Outreach
Detector
|
25 Feb 2016 |
G1600276-v1 |
Automation of the ISS second loop: issues and mitigations |
Kiwamu Izumi |
Commissioning
|
15 Feb 2016 |
G1600274-v1 |
American University Detection Talk |
Gregg Harry |
Education, Outreach
|
15 Feb 2016 |
P1500001-v1 |
[Thesis] Noise Cancellation for Gravitational Wave Detectors |
Jenne Driggers |
Thesis/Dissertation
Detector
|
14 Feb 2016 |
G1600225-v3 |
GW150914 size comparisons |
Chris North et al. |
Education, Outreach
|
12 Feb 2016 |
G1600263-v1 |
LIGO detects BBH Merger (video) |
Simon Barke |
Education, Outreach
|
12 Feb 2016 |
G1600262-v1 |
Searching for gravitational waves |
Gabriela Gonzalez et al. |
Public Talk / Colloquium
Data Analysis
Detector
Collaboration
|
11 Feb 2016 |
G1600258-v1 |
GW150914: Observation of Gravitational Waves from a Black Hole Binary Merger |
Michael Landry et al. |
Education, Outreach
Public Talk / Colloquium
Compact Binaries
Detector
|
11 Feb 2016 |
G1600201-v2 |
One Little Victory - Music Video for Detection Outreach |
Gregg Harry |
Education, Outreach
|
10 Feb 2016 |
L1400164-v2 |
Initial, Enhanced, and Advanced LIGO brief chronology |
David Shoemaker |
Detector
Upgrades
|
31 May 2015 |
P1600011-v4 |
Opinion/Editorial for release with Detection Announcement |
Gregg Harry et al. |
Education, Outreach
|
08 Feb 2016 |
G1501570-v2 |
Einstein's Messengers Movie Clips: H264 (MPEG-4 AVC) |
Dale Ingram |
Education, Outreach
|
04 Feb 2016 |
G1501572-v1 |
Einstein's Messengers Movie Clips: High Res (Prores 422) |
Dale Ingram |
Education, Outreach
|
04 Feb 2016 |
G1600194-v1 |
LIGO Roadmap Musing For Joint ET/LIGO future Meeting, February 2016 |
David Shoemaker |
Meeting
Upgrades
Detector
|
02 Feb 2016 |
T1400443-v3 |
Waves and Their Applications in Technologies for Information Transfer: Fourth Grade |
Dale Ingram |
Education, Outreach
|
31 Jan 2016 |
G1501546-v3 |
aLIGO OFI Summary of the requirements, specifications, and test results |
Koji Arai |
Fabrication
Requirements
Auxiliary Optics
System Test
Installation
|
28 Jan 2016 |
G1401179-v3 |
Estimate of force coupling between charged optic face and optic cage |
Brian Lantz |
Basic R&D
Seismic Isolation
Modelling
Suspensions
Core Optics
|
25 Jan 2016 |
G1600165-v1 |
Next Generation STEM preparation through LIGO science education at Southern University |
Stephen C McGuire |
Education, Outreach
|
22 Jan 2016 |
T1000526-v3 |
HAM Auxiliary Suspensions Design Requirements |
Giacomo Ciani et al. |
Suspensions
Input Optics
Requirements
|
19 Jan 2016 |
G1600150-v1 |
H1 Calibrated Sensitivity Spectra Oct 24 2015 (Representative for O1) |
Daniel Sigg |
Calibration
Commissioning
Detector Characterization
Sensing and Control
|
18 Jan 2016 |
G1600151-v1 |
L1 Calibrated Sensitivity Spectra Oct 24 2015 (Representative for O1) |
Daniel Sigg |
Sensing and Control
Commissioning
Calibration
Detector Characterization
|
18 Jan 2016 |
P1400074-v5 |
Self Amplified Lock of a Ultra-narrow Linewidth Optical Cavity |
Kiwamu Izumi et al. |
Commissioning
Integration
Modelling
Basic R&D
|
08 Jan 2016 |
T1600002-v1 |
Math Science Partnership Program External Evaluation Report |
Dale Ingram |
Education, Outreach
|
05 Jan 2016 |
G1501330-v2 |
The Search for Gravitational Waves with Advanced LIGO |
Tiffany Summerscales |
Public Talk / Colloquium
|
01 Jan 2016 |
G1501581-v1 |
Remember that time we decided to measure colliding super-dense stars with a laser, ripples in the fabric of space, tumbleweeds and an alligator? - public |
Aidan Brooks |
Public Talk / Colloquium
|
30 Dec 2015 |
P1500273-v1 |
[Thesis] Locking the Advanced LIGO Gravitational Wave Detector: with a focus on the Arm Length Stabilization Technique |
Alexa N Staley |
Basic R&D
Thesis/Dissertation
|
17 Dec 2015 |
G1501275-v2 |
Gravitational Wave Experiments |
Keita Kawabe et al. |
Public Talk / Colloquium
|
16 Dec 2015 |
G1501451-v2 |
Qualifying Exam: Calibration and control of second generation interferometric gravitational wave detectors using photon radiation pressure |
Darkhan Tuyenbayev |
Thesis/Dissertation
|
07 Dec 2015 |
T1500543-v1 |
Advanced LIGO 4-page Handout |
Dale Ingram |
Education, Outreach
|
24 Nov 2015 |
P1500114-v3 |
Testing The Strong Field Dynamics of General Relativity Using Compact Binary Systems |
Carl Fields et al. |
Management
Compact Binaries
Activity
|
22 Nov 2015 |
T1400590-v3 |
Waves and Their Applications in Technologies for Information Transfer: Middle School |
Dale Ingram |
Education, Outreach
|
18 Nov 2015 |
P1500233-v1 |
Interferometer Techniques for Gravitational-Wave Detection |
Andreas Freise et al. |
Education, Outreach
Conceptual Design
Input Optics
Modelling
Core Optics
Basic R&D
Sensing and Control
Auxiliary Optics
|
18 Nov 2015 |
L1500161-v1 |
Letter of Agreement Between LHO and Mid-Columbia STEM Education Collaboratory |
Dale Ingram |
Education, Outreach
|
16 Nov 2015 |
D1200895-v1 |
DC Power Supply Rack VDC-C6 |
David Kinzel |
Integration
System Engineering
Installation
|
16 Nov 2015 |
G1501377-v1 |
Photos from LLO control room of Neil deGrasse Tyson visit |
Matthew Heintze |
Education, Outreach
|
14 Nov 2015 |
G1501380-v1 |
Ideas for RF Glictch Identification / Mitigation |
Koji Arai |
Sensing and Control
Commissioning
|
12 Nov 2015 |
D1200893-v1 |
DC Power Supply Rack VDC-C4 |
David Kinzel |
Installation
Integration
System Engineering
|
10 Nov 2015 |
E080035-v1 |
Specification: Mirror Blank Material, Adv. LIGO Beamsplitter (BS) Mirror |
GariLynn Billingsley et al. |
Final Design
Core Optics
Fabrication
|
06 Nov 2015 |
G1300176-v1 |
The LIGO Vacuum Equipment and Beam Tubes: Retrospective and Prospective |
Michael Zucker |
LIGO-India
Public Talk / Colloquium
Vacuum
|
03 Nov 2015 |
T1500291-v6 |
The LSC White Paper on Education and Public Outreach 2015-2016 |
Joey Key et al. |
Education, Outreach
|
30 Oct 2015 |
G1501256-v1 |
aLIGO Design Considerations |
Guido Mueller |
Education, Outreach
Input Optics
|
29 Oct 2015 |
E1101149-v19 |
HEPI Pier Components - LHO |
Eric Allwine et al. |
Seismic Isolation
Commissioning
|
21 Oct 2015 |
G1501274-v4 |
Status of the Advanced LIGO Project |
Jameson Graef Rollins |
Data Acquisition System
Computing/archiving
State Control and Monitoring
Data and Computing
Public Talk / Colloquium
|
19 Oct 2015 |
G1501223-v3 |
H1 Calibrated Sensitivity Spectra Oct 1 2015 (Representative for Start of O1) |
Jeffrey Kissel |
Sensing and Control
Detector Characterization
Calibration
Commissioning
|
19 Oct 2015 |
T1400520-v3 |
Energy, Vibrations and Waves: Kindergarten and First Grade |
Dale Ingram |
Education, Outreach
|
16 Oct 2015 |
G1501281-x0 |
Evaluating the efficacy of Black Hole Pong and its successors in arousing interest and promoting understanding of graviational wave research |
Jonathan Wheeler |
Public Talk / Colloquium
|
14 Oct 2015 |
T1200178-v3 |
Temperature dependent dissipation in silicon mechanical resonators |
Valery Mitrofanov |
Conceptual Design
|
02 Oct 2015 |
P1500072-v3 |
The impact of terrestrial noise on the detectability and reconstruction of gravitational wave signals from core-collapse supernovae |
Jess McIver |
Thesis/Dissertation
Detector Characterization
GW Bursts
Seismic Isolation
Data Analysis
|
30 Sep 2015 |
G1401213-v1 |
Update on the charging issues at aLIGO |
Borja Sorazu |
Suspensions
Commissioning
Meeting
|
29 Sep 2015 |
T1400535-v2 |
Experience with discharging the ETMY test mass at LHO in August 2014 |
Gerardo Moreno et al. |
Commissioning
Suspensions
Vacuum
|
29 Sep 2015 |
T1400182-v1 |
Simulations of effects of LLO mode-mismatches on PRFPMI error signals |
Charlotte Bond et al. |
Commissioning
|
28 Sep 2015 |
G1501234-v1 |
Input Optics |
David Tanner et al. |
Input Optics
Education, Outreach
|
28 Sep 2015 |
T1100518-v2 |
Hartmann sensor noise to displacement noise coupling in aLIGO |
Aidan Brooks |
Core Optics
Requirements
Final Design
|
22 Sep 2015 |
T000092-v4 |
Auxiliary Optics Support System Design Requirements Document, Vol. 1: Thermal Compensation System |
Michael Smith et al. |
Auxiliary Optics
Reviews
Requirements
|
22 Sep 2015 |
D1500263-v1 |
LLO Staging Building Bathroom Upgrade Floorplans |
Timothy Nelson |
Upgrades
Observatory Facilities
|
10 Sep 2015 |
G1501193-v1 |
UF-Presentation: aLIGO overview and the Pre-stabilized Laser system |
Guido Mueller |
Laser Systems
Education, Outreach
|
07 Sep 2015 |
E0900113-v3 |
Compensation Plate Electro Static Drive gold coating specification |
GariLynn Billingsley |
Core Optics
Final Design
|
02 Sep 2015 |
E0900112-v3 |
Compensation Plate Barrel gold coating specification |
GariLynn Billingsley |
Final Design
Core Optics
|
02 Sep 2015 |
D080116-v2 |
End Reaction Mass (ERM) |
Russell Jones |
Final Design
Suspensions
|
02 Sep 2015 |
E1500002-v2 |
MSR and END Station Fiber Patches Spreadsheet |
David Kinzel |
Observatory Facilities
Integration
|
28 Aug 2015 |
T1200221-v5 |
aLIGO PEM System Upgrade |
Robert Schofield et al. |
Upgrades
|
18 Aug 2015 |
F1500005-v1 |
Cosmography and Black Hole Spectroscopy by Coherent Synthesis of the Terrestrial and Space GW Antennae Network: Orbit Optimization |
Elvira Kinzina |
Conceptual Design
|
12 Aug 2015 |
T1500406-v3 |
SEI watchdog update - saturation history update |
Hugo Paris et al. |
Integration
Seismic Isolation
|
12 Aug 2015 |
D0900502-v5 |
AdvLIGO Systems, BSC5-H2 Top Level Chamber Assembly |
Jose Eduardo Chavez |
Final Design
System Engineering
|
19 Oct 2009 |
D0900512-v11 |
aLIGO Systems, WBSC6-H2 Top Level Chamber Assembly |
Jose Eduardo Chavez et al. |
Final Design
System Engineering
|
03 Aug 2015 |
T060075-v1 |
HAM Seismic Isolation Requirements |
Peter Fritschel |
Seismic Isolation
Suspensions
Requirements
Modelling
|
02 Aug 2015 |
E1500325-v1 |
ECR - Update SEI watchdogs with better handling of saturation history |
Brian Lantz |
Seismic Isolation
Integration
|
30 Jul 2015 |
T1400515-v9 |
User Manual and MATLAB Code for Detecting Particles |
Sabrina Waller |
Cleaning
|
27 Jul 2015 |
G1400756-v1 |
Example GW lecture with interactives |
Joshua Smith et al. |
Education, Outreach
|
23 Jul 2015 |
G1500951-v1 |
Status of KAGRA |
Seiji Kawamura |
Public Talk / Colloquium
|
20 Jul 2015 |
G1500931-v1 |
Gravitational Wave Detection and the AU Optics Olympiad |
Gregg Harry |
Education, Outreach
|
15 Jul 2015 |
P1500119-x0 |
Bayesian Model Selection and Parameter Estimation for Gravitational Wave Signals from Binary Black Hole Coalescences |
Alexander Lombardi |
Compact Binaries
Data Analysis
Thesis/Dissertation
|
12 Jul 2015 |
G1500823-v4 |
H1 Calibrated Sensitivity Spectra Jun 9 2015 (Best for ER7) |
Jeffrey Kissel |
Sensing and Control
Detector Characterization
Commissioning
Calibration
|
09 Jul 2015 |
T1500316-v1 |
Magnetic noise from lead glass recoil mass |
Rainer Weiss |
Core Optics
Conceptual Design
|
01 Jul 2015 |
T1400012-v1 |
Jan 2014 ISI update |
Brian Lantz et al. |
Integration
Seismic Isolation
|
24 Jun 2015 |
G1500817-v1 |
Linear systems |
Koji Arai |
Education, Outreach
|
24 Jun 2015 |
G1500677-v1 |
Einstein Telescope, interferometer design |
Andreas Freise |
Conceptual Design
|
22 Jun 2015 |
G1500711-v1 |
Status of LIGO |
Daniel Sigg |
Commissioning
|
17 Jun 2015 |
G1500720-v2 |
Technical Progress-3IFO for NSF Review 2015 |
Jodi Fauver |
NSF
Reports
Activity
|
03 Jun 2015 |
G1500734-v1 |
Squeezing for Advanced LIGO |
Lisa Barsotti |
Basic R&D
Public Talk / Colloquium
|
12 Jun 2015 |
G1500764-v1 |
Undreamt by Einstein: Prospects and Challenges in Gravitational-Wave Astronomy |
B Sathyaprakash |
Public Talk / Colloquium
|
12 Jun 2015 |
G1500751-v3 |
Detecting Gravitational Waves |
Gabriela Gonzalez |
Public Talk / Colloquium
|
12 Jun 2015 |
G1500652-v2 |
LIGO/VIRGO earthquake studies and controls configurations |
Sebastien Biscans |
Activity
Sensing and Control
|
05 Jun 2015 |
G1500645-v3 |
Sensing and control problems in low finesse cavities, or "how (not) to hop" |
Paul Fulda et al. |
Sensing and Control
Commissioning
|
02 Jun 2015 |
G1500733-v1 |
Ponderomotive squeezing and opto-mechanics |
Thomas Corbitt et al. |
Basic R&D
Public Talk / Colloquium
|
02 Jun 2015 |
G1500732-v1 |
Output filtering |
Jan Harms |
Public Talk / Colloquium
Basic R&D
|
02 Jun 2015 |
G1500731-v1 |
Output Squeezing |
Giancarlo Cella |
Public Talk / Colloquium
Basic R&D
|
02 Jun 2015 |
G1500730-v1 |
White Light Cavity Ideas and General Sensitivity Limits |
Haixing Miao |
Basic R&D
Public Talk / Colloquium
|
02 Jun 2015 |
G1500728-v1 |
Intracavity squeezing |
Somiya Kentaro |
Public Talk / Colloquium
Basic R&D
|
02 Jun 2015 |
G1500727-v1 |
Frequency dependent squeezing: roadmap toward 10 dB |
Tomoki Isogai |
Basic R&D
Public Talk / Colloquium
|
02 Jun 2015 |
G1500726-v1 |
Advanced Virgo short term upgrades |
Matteo Barsuglia et al. |
Detector
Upgrades
|
02 Jun 2015 |
G1500725-v1 |
Topologies and Squeezing Workshop @ GWADW2015 |
Lisa Barsotti et al. |
Public Talk / Colloquium
|
02 Jun 2015 |
G1500454-v1 |
Controls Workshop at the GWADW 2015 |
Dennis Coyne et al. |
Public Talk / Colloquium
Detector
|
01 Jun 2015 |
G1500668-v1 |
Squeezing now and in the future: the road to 10 dB |
Katherine Dooley et al. |
Squeezer
Basic R&D
Sensing and Control
Commissioning
Integration
Requirements
Meeting
|
01 Jun 2015 |
G1500709-v3 |
Gravitational Waves: Einstein's astrophysical messengers |
Gabriela Gonzalez |
Public Talk / Colloquium
|
30 May 2015 |
T080194-v1 |
Dynamic Vibration Absorber |
Dennis Coyne |
Basic R&D
System Engineering
|
28 May 2015 |
G1500712-v1 |
Topologies and squeezing workshop summary |
Hartmut Grote et al. |
Upgrades
Basic R&D
|
28 May 2015 |
P1500065-v4 |
Phase-coherent mapping of gravitational-wave backgrounds using ground-based laser interferometers |
Joseph Romano et al. |
Stochastic
Activity
|
27 May 2015 |
G1500694-x0 |
Keeping a good lock |
Keita Kawabe |
Meeting
Integration
Commissioning
|
20 May 2015 |
G1500693-v1 |
aLIGO Control System - Pros and Cons |
Rolf Bork |
Data Acquisition System
Public Talk / Colloquium
|
20 May 2015 |
G1500655-v3 |
Einstein’s GR @ 100: LIGO-enabled Science |
Gabriela Gonzalez |
Public Talk / Colloquium
|
18 May 2015 |
T1300552-v3 |
OMC DCPD characterization for aLIGO transition |
William Korth et al. |
Sensing and Control
Commissioning
|
16 May 2015 |
G1500643-v1 |
Lessons learned from commissioning of Advanced Detectors |
Daniel Sigg |
Commissioning
|
16 May 2015 |
G1500654-v2 |
Experimental highlights and challenges in Advanced LIGO |
Kiwamu Izumi et al. |
Public Talk / Colloquium
|
16 May 2015 |
G1500608-v3 |
What's next for LIGO? |
Gabriela Gonzalez |
Public Talk / Colloquium
|
07 May 2015 |
G1500518-v2 |
Status of Advanced Detectors |
Gabriela Gonzalez et al. |
Public Talk / Colloquium
|
23 Apr 2015 |
G1500024-v2 |
Gravitational Wave Detection: A Historical Perspective |
Peter Saulson |
Public Talk / Colloquium
|
22 Apr 2015 |
G1500426-v2 |
Listening in on Black Holes: What Advanced LIGO is about to hear |
Peter Saulson |
Public Talk / Colloquium
|
22 Apr 2015 |
G1400110-v1 |
Coming soon: Advanced LIGO |
Marco Cavaglia et al. |
Public Talk / Colloquium
|
21 Apr 2015 |
E1200914-v130 |
aLIGO AOS SLC and TMS Inventory |
Lisa Austin et al. |
Assembly
Cleaning
Installation
Auxiliary Optics
|
17 Apr 2015 |
G1500414-v4 |
aLIGO commissioning update |
Lisa Barsotti |
Commissioning
|
16 Apr 2015 |
G1500041-v5 |
The LIGO Scientific Collaboration |
Gabriela Gonzalez et al. |
Public Talk / Colloquium
|
13 Apr 2015 |
G1500472-v4 |
LIGO and the network of terrestrial gravitational wave detectors |
David Shoemaker |
Detector
Public Talk / Colloquium
Data Analysis
|
13 Apr 2015 |
T1400474-v2 |
LIGO SURF Progress Report 1: Particle Imaging and Analysis for Advanced LIGO |
Sabrina Waller |
Cleaning
Risk Management
|
10 Apr 2015 |
T1400506-v2 |
LIGO SURF Progress Report 2: Particle Imaging and Analysis for Advanced LIGO |
Sabrina Waller |
Cleaning
|
10 Apr 2015 |
T1400467-v1 |
Test of Nikon D7100's Particle Resolution Capabilites |
Sabrina Waller |
Cleaning
Risk Management
|
10 Apr 2015 |
T1400491-v1 |
Test of Nikon D7100 with 2x Teleconverter's Particle Resolution Capabilites |
Sabrina Waller |
Cleaning
Risk Management
|
10 Apr 2015 |
T1400494-v1 |
Comparison of MATLAB's and Toupview's Abilities to Measure Particles in Images |
Sabrina Waller |
Risk Management
Cleaning
|
10 Apr 2015 |
G1400866-v3 |
Presentation of Process for Imaging and Measuring Particulates using Nikon D7100 and Matlab |
Sabrina Waller |
Cleaning
|
10 Apr 2015 |
E1000722-x0 |
PSL Testing: High-Power-Laser (HPL) |
Benno Willke |
Laser Systems
System Test
|
08 Apr 2015 |
D1200881-x0 |
Rack Dnumbers |
David Kinzel |
Installation
Integration
System Engineering
|
07 Apr 2015 |
T0900301-v1 |
PSI Actuator Test Plan |
Fabrice Matichard |
System Test
|
03 Apr 2015 |
G1500158-v1 |
An overview of gravitational waves and Advanced LIGO |
Aidan Brooks |
Public Talk / Colloquium
Detector
|
01 Apr 2015 |
E990303-v1 |
Seismic Isolation Subsystem Design Requirements Document |
Dennis Coyne et al. |
Modelling
Requirements
Conceptual Design
Seismic Isolation
|
31 Mar 2015 |
G1500419-v2 |
Advanced LIGO : Aiming for the detection of the gravitational wave signal, and beyond |
Hiro Yamamoto |
Public Talk / Colloquium
|
27 Mar 2015 |
T1000216-v1 |
Revised HAM-ISI Performance Targets for Advanced LIGO SRM Chambers |
Brian Lantz |
Sensing and Control
Seismic Isolation
Suspensions
Requirements
|
25 Mar 2015 |
P1300051-v1 |
[Thesis] Optical Read-out Techniques for the Control of Test-masses in Gravitational Wave Observatories |
Stuart Aston |
Suspensions
Thesis/Dissertation
|
23 Mar 2015 |
D1001459-v13 |
ISC End Station Remote Rack Layout |
Rich Abbott et al. |
Conceptual Design
Sensing and Control
|
19 Mar 2015 |
T1100291-v2 |
aLIGO ISC Whitening Chassis Test Procedure |
Rich Abbott et al. |
System Test
Sensing and Control
|
16 Mar 2015 |
T1300354-v3 |
Scattered light noise due to the ETM coating ripple |
Peter Fritschel et al. |
System Engineering
Modelling
|
11 Mar 2015 |
T1200295-v2 |
LMA coating on ITM04 and ITM08 |
Hiro Yamamoto |
Modelling
Core Optics
|
11 Mar 2015 |
G1500216-v1 |
pnp test G doc 3/11/15 #2 |
Nichole Washington |
Temporary Test Document
|
11 Mar 2015 |
P1500045-v1 |
pnp test P doc 3/11/15 |
Nichole Washington |
Temporary Test Document
|
11 Mar 2015 |
P1500044-v1 |
pnp test doc 3/11/15 |
Nichole Washington |
Temporary Test Document
|
11 Mar 2015 |
G1100466-v2 |
LMA Coating non uniformity on aLIGO optics |
Hiro Yamamoto |
Core Optics
Modelling
|
11 Mar 2015 |
G1500212-v1 |
pnp G test doc 3/11/15 |
Nichole Washington |
Temporary Test Document
|
11 Mar 2015 |
G1500170-v2 |
Current status of advanced LIGO |
Kiwamu Izumi et al. |
Public Talk / Colloquium
|
11 Mar 2015 |
D1102385-v2 |
ETM: Hartmann Sensor Power Supply - PCB |
Stephen O'Connor |
Fabrication
Conceptual Design
Auxiliary Optics
|
10 Mar 2015 |
E0900426-v5 |
HEPI Kaman Sensor Receiving Analysis |
Hugh Radkins et al. |
Seismic Isolation
Incoming Inspection
|
10 Mar 2015 |
E1101087-v3 |
aLIGO OMC Mounting Prisms |
Sam Waldman et al. |
Sensing and Control
Requirements
|
08 Mar 2015 |
M1100192-v1 |
RODA: Accuracy of height of mirrors in HSTS and HLTS |
Guido Mueller |
Suspensions
Requirements
|
08 Mar 2015 |
T000053-v1 |
aLIGO Universal Suspension Subsystem Design Requirements |
Dennis Coyne |
Suspensions
Conceptual Design
|
08 Mar 2015 |
G1200070-v2 |
Ideal Order/Contents of aLIGO Triple SUS Testing / Commissioning |
Jeffrey Kissel |
System Test
Installation
Requirements
Suspensions
Integration
Subsystem Test
Commissioning
Assembly
|
08 Mar 2015 |
G1301007-v1 |
Advanced LIGO OMC Operation and Characterization |
William Korth |
Sensing and Control
Integration
|
08 Mar 2015 |
L1300207-v1 |
aLIGO OMC installation/commissioning notes |
William Korth |
Commissioning
Sensing and Control
Installation
|
06 Mar 2015 |
P1400105-v5 |
Achieving Resonance in the Advanced LIGO Gravitational-Wave Interferometer |
Alexa N Staley et al. |
Integration
Sensing and Control
Basic R&D
|
05 Mar 2015 |
D1300606-v2 |
ALS Faraday Isolator Fixed Base |
Bram Slagmolen et al. |
Sensing and Control
Commissioning
|
05 Mar 2015 |
D1300611-v1 |
ALS Faraday Isolator Adjustable Spacer |
Bram Slagmolen |
Commissioning
Sensing and Control
|
05 Mar 2015 |
D1300610-v1 |
ALS Faraday Isolator Adjustable Base |
Bram Slagmolen |
Commissioning
Sensing and Control
|
05 Mar 2015 |
D1201234-v1 |
ALS Baseline Top Level Diagram |
Bram Slagmolen |
Conceptual Design
Sensing and Control
|
04 Mar 2015 |
T1200429-v1 |
Arm Length Stabilisation - FIBRE Phase-Locked-Loop |
Bram Slagmolen et al. |
Sensing and Control
Commissioning
|
04 Mar 2015 |
T0900095-v2 |
Adv. LIGO Arm Length Stabilisation Requirements - OBSOLETE |
Bram Slagmolen |
Requirements
Sensing and Control
Basic R&D
|
03 Mar 2015 |
D1101728-v1 |
PSL Environmental Sensor Concentrator Rear Panel |
Tiana Steckler |
Conceptual Design
|
02 Mar 2015 |
D1101719-v1 |
PSL Environmental Sensor Concentrator Front Panel |
Tiana Steckler |
Conceptual Design
|
02 Mar 2015 |
D1101722-v3 |
PSL Environmental Sensor Concentrator D-sub25 Mount |
Tiana Steckler |
Conceptual Design
|
02 Mar 2015 |
L1500028-v1 |
Documentation of Two Hour Lock Milestone for H1 |
Peter Fritschel et al. |
Integration
|
02 Mar 2015 |
E1100822-v33 |
aLIGO BSC-ISI, Cables inventory and Installation Location |
Vincent Lhuillier |
Seismic Isolation
Commissioning
|
26 Feb 2015 |
G1500157-v1 |
LIGO and Gravitational Wave Detection Workshop - National Society of Black Physicists |
Gregg Harry |
Public Talk / Colloquium
|
25 Feb 2015 |
P1300043-v1 |
[Thesis] Control of Differential Motion Between Adjacent Advanced LIGO Seismic Isolation Platforms |
Daniel Clark |
Thesis/Dissertation
|
20 Feb 2015 |
T1100570-v5 |
Thermal Compensation System (TCS): CO2 Laser Projection System (CO2P) Final Design Document |
Aidan Brooks et al. |
Auxiliary Optics
Vacuum
Final Design
Requirements
|
12 Feb 2015 |
D1500062-v1 |
CARM handoff signal diagram |
Eleanor King |
Sensing and Control
Commissioning
|
11 Feb 2015 |
P1500026-v1 |
Plans for a Large Gravitational Wave Antenna in Germany. August 1985 |
Walter Winkler et al. |
Detector
Public Talk / Colloquium
Reports
|
11 Feb 2015 |
P1400234-v3 |
In-situ Characterization of the Thermal State of Resonant Optical Interferometers via Tracking of their Higher Order Mode Resonances |
Chris Mueller et al. |
Commissioning
Sensing and Control
|
09 Feb 2015 |
E1400335-x0 |
DCN, REVISED END STATION SYSTEM LAYOUT |
Eduardo Sanchez |
Installation
Integration
System Engineering
|
09 Feb 2015 |
D1300777-v1 |
aLIGO Pcal Tooling, Viewport Beam Target Assembly |
Craig Conley |
Auxiliary Optics
Installation
Commissioning
|
05 Feb 2015 |
T1100044-v19 |
Advanced LIGO Photon Calibrator Design Requirements |
Jonathan Berliner et al. |
Calibration
System Engineering
Detector Characterization
Requirements
Input Optics
Upgrades
Laser Systems
Vacuum
Auxiliary Optics
Basic R&D
|
05 Feb 2015 |
T1500043-x0 |
Mirror Profiles and Arm cavity loss |
Hiro Yamamoto |
Core Optics
Modelling
|
03 Feb 2015 |
E0900074-v3 |
Advanced LIGO Compensation Plate (CP) Coating Specification |
Rand Dannenberg |
Final Design
Core Optics
|
02 Feb 2015 |
E1400104-x0 |
ECR: Replacing the Cart-Bias custom ramp parts with cdsFiltCrtl2 blocks |
Brian Lantz et al. |
Integration
State Control and Monitoring
Seismic Isolation
|
29 Jan 2015 |
D1001615-v2 |
aLIGO, BSC INSTALLATION ARM, FLANGE BRACE |
Scott Shankle |
Conceptual Design
Auxiliary Optics
|
28 Jan 2015 |
P1500016-v1 |
Jumping in to research - the LIGO perspective |
Jess McIver |
Education, Outreach
|
27 Jan 2015 |
P1400113-v2 |
LIGO Magazine issue 5 9/2014 |
Andreas Freise |
Education, Outreach
|
27 Jan 2015 |
D1001423-v19 |
ISC End Station Field Rack Layout |
Rich Abbott et al. |
Final Design
Sensing and Control
|
23 Jan 2015 |
T1500016-v2 |
Design overview for the new test mass electro-static driver |
Peter Fritschel et al. |
Suspensions
Requirements
Sensing and Control
|
23 Jan 2015 |
T1400717-v5 |
Profiles of ETM11 and ETM14, latest ETM coating by LMA |
Hiro Yamamoto |
Core Optics
Modelling
|
22 Jan 2015 |
D1100785-v5 |
SUS Nitronic Flat Washers |
Eduardo Sanchez et al. |
Suspensions
Preliminary Design
Conceptual Design
|
22 Jan 2015 |
D1002042-v1 |
ISC QPD Sled Assembly |
Jason Fishner |
Sensing and Control
Conceptual Design
|
22 Jan 2015 |
P1500011-v1 |
Mechanical losses of oscillators fabricated in silicon wafers |
Leonid Prokhorov et al. |
Conceptual Design
Upgrades
|
22 Jan 2015 |
T1200040-v3 |
L1 HAM3 Gouy Telescope Preparation |
Valery Frolov et al. |
Installation
Sensing and Control
Fabrication
Integration
Subsystem Test
|
21 Jan 2015 |
G1400710-v1 |
L1 TransMonEY Telescope Focal Tuning Results |
Adam Mullavey et al. |
Commissioning
Auxiliary Optics
|
21 Jan 2015 |
D1100257-v2 |
ISC TransMon Compound Angled Mirror Mount Assembly |
Jason Fishner |
Sensing and Control
Conceptual Design
|
21 Jan 2015 |
D1100658-v2 |
ISC Rotary Beam Diverter - REED Plate |
Sam Waldman et al. |
Sensing and Control
Conceptual Design
|
21 Jan 2015 |
D1100656-v2 |
ISC Rotary Beam Diverter - Counter Weight |
Jason Fishner et al. |
Conceptual Design
Sensing and Control
|
21 Jan 2015 |
D1100646-v1 |
ISC Rotary Beam Diverter - Base Plate |
Jason Fishner et al. |
Sensing and Control
Conceptual Design
|
21 Jan 2015 |
D1100645-v5 |
ISC Rotary Beam Diverter - Magnet Keeper |
Jason Fishner et al. |
Conceptual Design
Sensing and Control
|
21 Jan 2015 |
D1100643-v5 |
ISC Rotary Beam Diverter - Rotary Holder |
Jason Fishner et al. |
Conceptual Design
Sensing and Control
|
21 Jan 2015 |
T1500001-v2 |
Noise requirement for the test mass electro-static driver |
Peter Fritschel |
Sensing and Control
Suspensions
Requirements
|
20 Jan 2015 |
D1300548-v1 |
Beam Dump, Fast Shutter, HAM6, aLIGO |
Sam Barnum |
Conceptual Design
Sensing and Control
|
19 Jan 2015 |
G1100873-v4 |
aLIGO TCS HWS Reference Dimensions to ETM Telescope (H2 ETMY) |
Aidan Brooks et al. |
Integration
System Engineering
Fabrication
Final Design
Auxiliary Optics
Installation
Vacuum
|
19 Jan 2015 |
D1001797-v2 |
aLIGO Installation, LHO Y-End Station, Cartridge & Cleanroom, Layout |
Dennis Coyne |
Installation
|
14 Jan 2015 |
D1002834-v2 |
aLIGO Installation, LLO Y-End Station, Cartridge & Cleanroom, Layout |
Brian O'Reilly et al. |
Installation
Observatory Facilities
Conceptual Design
|
14 Jan 2015 |
G1401169-v1 |
LIGO Science Education Center: Building an Informal Education Center on Collaborations |
Amber Stuver |
Education, Outreach
|
13 Jan 2015 |
G1500034-x0 |
A cross-correlation search for intermediate-duration gravitational waves from GRB magnetars |
Robert Coyne et al. |
Public Talk / Colloquium
GW Bursts
|
09 Jan 2015 |
G1500033-x0 |
LIGO and the network of terrestrial gravitational wave detectors |
David Shoemaker |
Public Talk / Colloquium
|
08 Jan 2015 |
G1401271-v1 |
Optical lever Laser Diode Laser glitches and repairs |
Suresh Doravari |
Commissioning
Suspensions
|
07 Jan 2015 |
T1400766-v1 |
Build and Use a SImple Spectroscope |
Dale Ingram |
Education, Outreach
|
19 Dec 2014 |
T1400765-v1 |
Swing into the Scientific Method |
Dale Ingram |
Education, Outreach
|
19 Dec 2014 |
T1400764-v1 |
Powers of Two |
Dale Ingram |
Education, Outreach
|
19 Dec 2014 |
T1400763-v1 |
LIGO Star Chart |
Dale Ingram |
Education, Outreach
|
19 Dec 2014 |
T1400762-v1 |
Build Your Own Michelson Interferometer |
Dale Ingram |
Education, Outreach
|
19 Dec 2014 |
D1002563-v2 |
SLC DAMPING 8 DIA TUBE ASSY |
Niem Nguyen |
Auxiliary Optics
Modelling
|
18 Dec 2014 |
G1401401-v1 |
What Advanced LIGO is about to see |
Peter Saulson |
Public Talk / Colloquium
|
18 Dec 2014 |
G1401380-v1 |
Control system: modeling |
Koji Arai |
Education, Outreach
Meeting
|
16 Dec 2014 |
G1401146-v2 |
Control system in Gravitational Wave Detectors |
Koji Arai et al. |
Meeting
Education, Outreach
|
16 Dec 2014 |
G1401147-v2 |
Quantum noise in Gravitational Wave Detectors |
Koji Arai et al. |
Education, Outreach
Meeting
|
16 Dec 2014 |
G1401145-v2 |
Noises in Gravitational Wave Detectors |
Koji Arai et al. |
Education, Outreach
Meeting
|
16 Dec 2014 |
G1401144-v2 |
Interferometer configurations for Gravitational Wave Detectors |
Koji Arai et al. |
Meeting
Education, Outreach
|
16 Dec 2014 |
G1401365-v1 |
LIGO-India Detector Master Class Introduction |
Koji Arai |
Education, Outreach
Meeting
|
16 Dec 2014 |
G1401386-v1 |
Interferometer Length Sensing in Gravitational Wave Detectors |
Koji Arai |
Meeting
Education, Outreach
|
16 Dec 2014 |
G1401391-v1 |
Higher order laser modes in gravitational wave detectors |
Koji Arai |
Meeting
Education, Outreach
|
16 Dec 2014 |
P1400223-v10 |
Ph.D. Thesis: The needle in the hundred square degree haystack / The hunt for binary neutron star mergers with LIGO and Palomar Transient Factory |
Leo Singer |
Astrophysics / Multi-messenger
Data analysis software
Compact Binaries
External Collaboration
Thesis/Dissertation
|
15 Dec 2014 |
T1400028-v2 |
HLTS/HSTS Status update |
Harrison Miller |
Conceptual Design
Suspensions
Basic R&D
|
15 Dec 2014 |
G1401362-v1 |
HEPI update, bias hold and watchdog |
Brian Lantz et al. |
Installation
Seismic Isolation
Integration
|
08 Dec 2014 |
E1300632-x0 |
aLIGO, Integration Testing, Full Interferometer Test |
Daniel Sigg |
Integration
|
06 Dec 2014 |
G1401205-v3 |
Noise Analysis of OSEM Actuator to Sensor Coupling |
Brett Shapiro |
Modelling
|
03 Dec 2014 |
T0900495-v4 |
HAM Auxiliary Suspensions Electronics Requirements |
Giacomo Ciani et al. |
Requirements
Input Optics
Suspensions
|
03 Dec 2014 |
P1400249-v1 |
What Advanced LIGO is about to see |
Peter Saulson |
Public Talk / Colloquium
|
02 Dec 2014 |
G1401350-v4 |
Parts of the path to today’s Interferometric Gravitational-Wave detectors |
David Shoemaker |
Detector
Public Talk / Colloquium
|
01 Dec 2014 |
T1300433-v3 |
Instrument Science White Paper |
Rana Adhikari et al. |
Sensing and Control
Seismic Isolation
Basic R&D
Detector
Auxiliary Optics
Laser Systems
Upgrades
Input Optics
Core Optics
Suspensions
System Engineering
|
01 Dec 2014 |
G1401342-v1 |
History and status of LIGO - Laser Interferometer Gravitational Wave Observatory |
Hiro Yamamoto |
Public Talk / Colloquium
|
27 Nov 2014 |
E1400218-v2 |
HTTS Test Reports |
Bram Slagmolen |
Commissioning
Sensing and Control
|
27 Nov 2014 |
E1000496-x0 |
aLIGO SUS BSFM Testing and Commissioning Documentation |
Derek Bridges et al. |
Assembly
Suspensions
Subsystem Test
Commissioning
|
25 Nov 2014 |
G1401339-v1 |
Advanced LIGO status - with introduction to interferometer |
Hiro Yamamoto |
Public Talk / Colloquium
|
25 Nov 2014 |
G1401340-v1 |
simulation study for the hopping issue in LHO DRMI |
Kiwamu Izumi |
Modelling
|
21 Nov 2014 |
G1401313-v1 |
Interferometry and Optics in Advanced LIGO |
David Shoemaker |
Public Talk / Colloquium
Detector
|
19 Nov 2014 |
T1400721-v1 |
The LSC White Paper on Education and Public Outreach 2014-2015 - Public Document |
Szabolcs Marka et al. |
Education, Outreach
|
17 Nov 2014 |
G1401161-v4 |
Gravitational Waves: Celestial Soundtrack |
Sergei Klimenko et al. |
Astrophysics / Multi-messenger
Public Talk / Colloquium
|
14 Nov 2014 |
G1400397-v2 |
Advanced LIGO Integration: timeline scenario for 2014 |
Peter Fritschel |
Integration
|
12 Nov 2014 |
G1100905-v1 |
What's Up with LIGO |
Fred Raab et al. |
Education, Outreach
|
10 Nov 2014 |
T1400622-v2 |
Dynamics and Electromagnetic Wave Signatures of Magnetized Neutron Stars near Black Holes |
Farzan Vafa et al. |
Modelling
|
10 Nov 2014 |
T1400650-v1 |
Implementing Frequency Offset Locking of the Auxiliary lasers in the 40m Prototype Arm Length Stabilization System |
Andrew Hall et al. |
Auxiliary Optics
Upgrades
|
08 Nov 2014 |
P1400197-v1 |
Modeling of Optical Scattering in Advanced LIGO |
Hunter Rew et al. |
Auxiliary Optics
Calibration
Detector Characterization
Modelling
|
03 Nov 2014 |
T1400658-v1 |
Summary of LIGO SEC Impact on Graduate Students |
William Katzman |
Education, Outreach
|
28 Oct 2014 |
G1401257-v1 |
Initial alignment at LHO: status and plans |
Kiwamu Izumi et al. |
Commissioning
|
28 Oct 2014 |
G1401253-v1 |
LHO Interferometer locking status (Commissioning F2F meeting) |
Alexa N Staley et al. |
Commissioning
|
28 Oct 2014 |
G1401261-v1 |
A Multi-Partner Summer STEM Career Academy for High School Seniors |
Dale Ingram |
Education, Outreach
|
28 Oct 2014 |
T1400688-v1 |
LIGO-SEC Summative Evaluation 2008 |
William Katzman |
Education, Outreach
|
27 Oct 2014 |
T1400672-x0 |
Report from the Commissioning Workshop on Suspensions at Virgo |
Jeffrey Kissel et al. |
Basic R&D
Seismic Isolation
Installation
Meeting
Suspensions
Integration
Commissioning
Modelling
|
21 Oct 2014 |
G1401248-v1 |
Photos From Oct 2014 SEI & SUS Commissioning Workshop @ VIRGO |
Jeffrey Kissel et al. |
Commissioning
Suspensions
Vacuum
Seismic Isolation
|
21 Oct 2014 |
E1400312-x0 |
Electronics and Optics Change Request from the HIFO-XY Test |
Daniel Sigg |
Commissioning
|
19 Oct 2014 |
L1400083-v1 |
LIGO SEC II Site visit memo Dec 2012 |
William Katzman |
Education, Outreach
|
18 Oct 2014 |
Q1400004-v1 |
LIGO SEC II External Evaluation Report, Inverness Research Oct. 2011 |
William Katzman |
Education, Outreach
|
16 Oct 2014 |
G1401237-v1 |
Advanced LIGO Commissioning Overview |
Daniel Sigg |
Integration
|
15 Oct 2014 |
D1002060-v2 |
ISC Mounting Base - Single |
Jason Fishner |
Sensing and Control
Conceptual Design
|
15 Oct 2014 |
T1300359-v1 |
How to Handle Small Optics |
Daniel Sigg |
Commissioning
|
14 Oct 2014 |
T1400659-v1 |
Hyunju Lee Research Report Draft 2014 |
William Katzman |
Education, Outreach
|
14 Oct 2014 |
G1401232-v1 |
Students' attitudes and Understandings about Science in their Field Trip to LIGO poster |
William Katzman |
Education, Outreach
|
14 Oct 2014 |
G1401196-v1 |
Gravitational Waves: On the Brink of a New Astronomy |
Tiffany Summerscales |
Public Talk / Colloquium
|
07 Oct 2014 |
E1300626-x0 |
aLIGO, Integration Testing |
Daniel Sigg |
Integration
|
06 Oct 2014 |
G1401182-v3 |
LIGO and its Scientific Collaboration |
Gabriela Gonzalez et al. |
Public Talk / Colloquium
|
03 Oct 2014 |
T1400627-v1 |
Direct signature of the large angle scattering by the spiral pattern in LMA coating |
Hiro Yamamoto et al. |
Core Optics
Modelling
Operations
|
29 Sep 2014 |
T1400633-x0 |
Designing a frequency offset locking loop for 40m prototype Arm Length Stabilization System |
Akhil Reddy et al. |
Sensing and Control
Commissioning
|
29 Sep 2014 |
P1400195-v1 |
Education and Public Outreach on Gravitational-Wave Astronomy |
Martin Hendry et al. |
Public Talk / Colloquium
|
26 Sep 2014 |
P1400194-v2 |
Summary of session C6: Q&A - Everything you wanted to know about Gravitational Waves but were afraid to ask |
Viviana Fafone et al. |
Public Talk / Colloquium
|
26 Sep 2014 |
P1400189-v1 |
Correlated Noise in LIGO Detectors from Schumann Resonance |
Ryan Horton et al. |
Education, Outreach
Project Controls
Calibration
|
25 Sep 2014 |
G1401160-v1 |
Toward Quantum Opto-Mechanics in a Gram-Scale Suspended Mirror Interferometer |
Christopher Wipf |
Thesis/Dissertation
Public Talk / Colloquium
|
24 Sep 2014 |
T1300130-v3 |
Longitudinal-to-Angle Coupling in Optical Levers |
Thomas Vo et al. |
Auxiliary Optics
Modelling
|
23 Sep 2014 |
T1400612-v1 |
LMA coating effect on HOM in aLIGO arm |
Hiro Yamamoto |
Modelling
Core Optics
|
21 Sep 2014 |
T1400513-v1 |
Mechanical Quality Factor of Cryogenic Silicon |
Marie Lu et al. |
Sensing and Control
Detector Characterization
Conceptual Design
|
19 Sep 2014 |
T1400603-v2 |
ITM transmission map and contrast defect |
Hiro Yamamoto |
Modelling
Core Optics
|
16 Sep 2014 |
G1401121-v1 |
Advanced LIGO talk for SPRC meeting |
Brian Lantz |
Education, Outreach
|
16 Sep 2014 |
E1000304-v3 |
aLIGO SEI Testing and Commissioning Documentation |
Fabrice Matichard et al. |
Seismic Isolation
Subsystem Test
|
16 Sep 2014 |
G1401117-v1 |
H1 and model by FFT+COC |
Hiro Yamamoto |
Modelling
Core Optics
|
12 Sep 2014 |
T1300926-v2 |
HLTS Violin Mode Q |
Mark Barton |
Subsystem Test
Suspensions
Modelling
|
09 Sep 2014 |
T1200418-v4 |
LLO MC2 Violin Mode Q |
Mark Barton et al. |
Subsystem Test
Integration
Suspensions
Modelling
|
09 Sep 2014 |
G1300869-v1 |
Dynamics and Gravitational Wave SIgnatures of Charged Black Hole Binaries SURF Summer Seminar Day Presentation |
Zachary Mark et al. |
Modelling
Public Talk / Colloquium
|
09 Sep 2014 |
P1000018-v1 |
[Thesis] Length Sensing and Control of an Advanced Prototype Interferometric Gravitational Wave Detector |
Robert Ward |
Sensing and Control
System Test
Stochastic
|
09 Sep 2014 |
T1400585-v1 |
Matrix calculations for the angular control of H1 OMC |
Koji Arai et al. |
Sensing and Control
Commissioning
|
04 Sep 2014 |
E1200326-v2 |
First Contact cleaning of water spots or water soluble contamination |
GariLynn Billingsley et al. |
Core Optics
Cleaning
|
04 Sep 2014 |
D1300223-v3 |
Flashlight Holder Assembly (Flashlight Array) |
Jeffrey Lewis |
Cleaning
|
03 Sep 2014 |
T1400532-v1 |
SURF 2014 LIGO Livingston Observatory Trip and SURF Summer Seminar Days |
Alan Weinstein |
Detector
Data Analysis
Education, Outreach
|
31 Aug 2014 |
G1400834-v4 |
Kalman filter SURF presentation |
Reetika Dudi |
Modelling
|
31 Aug 2014 |
G1400934-v1 |
Numerical Simulations of Superkick Binary Black Holes |
Lydia Nevin |
Compact Binaries
Modelling
|
31 Aug 2014 |
G1400913-v1 |
Optimization of Michelson Interferometer Signals in Crackle Noise Detection |
Horng Chia et al. |
Public Talk / Colloquium
|
31 Aug 2014 |
G1400962-v2 |
LSC Political Outreach |
Gregg Harry |
Education, Outreach
|
29 Aug 2014 |
G1401078-v1 |
Advanced LIGO Commissioning Overview |
Peter Fritschel |
Commissioning
|
27 Aug 2014 |
G1400944-v2 |
Optical Simulation vs reality at LLO |
Hiro Yamamoto |
Core Optics
Modelling
|
25 Aug 2014 |
G1400970-v2 |
Student/Postdoc Retreat Welcome |
Tobin Fricke |
Education, Outreach
|
24 Aug 2014 |
G1100693-v5 |
Ideal Order/Contents of aLIGO QUAD Testing / Commissioning |
Jeffrey Kissel |
Installation
System Test
Assembly
Subsystem Test
Commissioning
Integration
Suspensions
Requirements
|
22 Aug 2014 |
Q1300010-v1 |
dcc Release 3.1.0 test doc |
Cleveland Mak et al. |
System Test
Upgrades
Temporary Test Document
|
22 Aug 2014 |
G1400899-v1 |
Frequency Offset Locking |
Andrew Hall et al. |
Auxiliary Optics
Upgrades
|
21 Aug 2014 |
T050036-v4 |
Pre-Stabilized Laser Design Requirements |
Richard Savage et al. |
Requirements
Laser Systems
|
20 Aug 2014 |
T1200149-v1 |
Cleaning Procedure for Optics Lens Caps |
Calum Torrie et al. |
Cleaning
|
19 Aug 2014 |
T1300155-v2 |
Alignment sensing control signals of DRMI |
Keiko Kokeyama et al. |
Commissioning
Squeezer
|
15 Aug 2014 |
P1100133-v3 |
Searching for Gravitational Waves from Compact Binary Coalescence using LIGO and Virgo Data |
Collin Capano |
Compact Binaries
Thesis/Dissertation
|
15 Aug 2014 |
T010061-x0 |
ISC Electrooptic Shutter: Angle and Temperature Tolerance |
Jameson Graef Rollins et al. |
Commissioning
Sensing and Control
|
14 Aug 2014 |
E1300846-v1 |
aLIGO Tip-Tilt (HTTS) Suspension Blade calculations |
Bram Slagmolen |
Modelling
Sensing and Control
|
12 Aug 2014 |
G1400721-v3 |
Second Generation Gravitational-Wave Observatories |
Chris Pankow |
Astrophysics / Multi-messenger
Public Talk / Colloquium
Data Analysis
|
07 Aug 2014 |
P1400148-v1 |
Techniques for Resonant Optical Interferometry with Applications to the Advanced LIGO Gravitaional Wave Detectors. |
Chris Mueller |
Final Design
Sensing and Control
Laser Systems
State Control and Monitoring
Input Optics
Commissioning
|
04 Aug 2014 |
T1400495-x0 |
Effects of the figure structure by aLIGO ETM coating |
Hiro Yamamoto |
Modelling
Core Optics
|
31 Jul 2014 |
G1400785-v1 |
Notes on DRMI locking at LLO |
Kiwamu Izumi |
Commissioning
|
31 Jul 2014 |
L1400119-v1 |
Documentation of Two Hour Lock Milestone for L1 |
Peter Fritschel et al. |
Integration
|
30 Jul 2014 |
G1400760-v1 |
Constructing Paper Spacetimes |
Jocelyn Read |
Public Talk / Colloquium
|
10 Jul 2014 |
D1000339-v4 |
ISC HAM3 Assembly |
Sam Waldman et al. |
Conceptual Design
Sensing and Control
|
10 Jul 2014 |
T1200482-v2 |
aLIGO SEI / SUS Watchdog Design |
Jeffrey Kissel et al. |
Data Acquisition System
Suspensions
System Engineering
Integration
Final Design
Seismic Isolation
System Test
Installation
|
10 Jul 2014 |
D000406-x0 |
Staging Building for Livingston, Issued for Construction - Second Level Floor Plan, Rev. 01 |
John Desmond |
Document Migration
|
09 Jul 2014 |
D000306-x0 |
Staging Building for Livingston Observatory - Panels |
John Desmond |
Document Migration
|
09 Jul 2014 |
D000305-x0 |
Staging Building for Livingston Observatory - Details |
John Desmond |
Document Migration
|
09 Jul 2014 |
D000304-x0 |
Staging Building for Livingston Observatory - Electrical |
John Desmond |
Document Migration
|
09 Jul 2014 |
D000303-x0 |
Staging Building for Livingston Observatory - Lighting |
John Desmond |
Document Migration
|
09 Jul 2014 |
D000302-x0 |
Staging Building for Livingston Observatory - Electrical |
John Desmond |
Document Migration
|
09 Jul 2014 |
D000301-x0 |
Staging Building for Livingston Observatory - Lighting |
John Desmond |
Document Migration
|
09 Jul 2014 |
D000300-x0 |
Staging Building for Livingston Observatory - Site |
John Desmond |
Document Migration
|
09 Jul 2014 |
D000299-x0 |
Staging Building for Livingston Observatory - Plumbing Riser Diagram and Details |
John Desmond |
Document Migration
|
09 Jul 2014 |
D000298-x0 |
Staging Building for Livingston Observatory - Second Level Floor Plan |
John Desmond |
Document Migration
|
09 Jul 2014 |
D000297-x0 |
Staging Building for Livingston Observatory - First Floor Plan |
John Desmond |
Document Migration
|
09 Jul 2014 |
D000296-x0 |
Staging Building for Livingston Observatory - Schedules and Details |
John Desmond |
Document Migration
|
09 Jul 2014 |
D000295-x0 |
Staging Building for Livingston Observatory - Second Level Floor Plan |
John Desmond |
Document Migration
|
09 Jul 2014 |
D000294-x0 |
Staging Building for Livingston Observatory - First Floor Plan |
John Desmond |
Document Migration
|
09 Jul 2014 |
D000293-x0 |
Staging Building for Livingston Observatory - Details, Rev. 01 |
John Desmond |
Document Migration
|
09 Jul 2014 |
D000292-x0 |
Staging Building for Livingston Observatory - Details, Rev. 01 |
John Desmond |
Document Migration
|
09 Jul 2014 |
D000291-x0 |
Staging Building for Livingston Observatory - Roof Framing Plan, Rev. 01 |
John Desmond |
Document Migration
|
09 Jul 2014 |
D000289-x0 |
Staging Building for Livingston Observatory - Slab, Column Plan, Rev. 01 |
John Desmond |
Document Migration
|
09 Jul 2014 |
D000288-x0 |
Staging Building for Livingston Observatory - Grade Beam, Shafts Plan, Rev. 01 |
John Desmond |
Document Migration
|
09 Jul 2014 |
D000287-x0 |
Staging Building for Livingston Observatory - Second Floor Reflected Ceiling Plan |
John Desmond |
Document Migration
|
09 Jul 2014 |
D000286-x0 |
Staging Building for Livingston Observatory - First Floor Reflected Ceiling Plan |
John Desmond |
Document Migration
|
09 Jul 2014 |
D000285-x0 |
Staging Building for Livingston Observatory - Stair Sections, Details |
John Desmond |
Document Migration
|
09 Jul 2014 |
D000284-x0 |
Staging Building for Livingston Observatory - Stair Plans, Sections |
John Desmond |
Document Migration
|
09 Jul 2014 |
D000283-x0 |
Staging Building for Livingston Observatory - Interior Elevations, Detail |
John Desmond |
Document Migration
|
09 Jul 2014 |
D000282-x0 |
Staging Building for Livingston Observatory - Partial Floor Plans |
John Desmond |
Document Migration
|
09 Jul 2014 |
D000281-x0 |
Staging Building for Livingston Observatory - Wall Sections, Details |
John Desmond |
Document Migration
|
09 Jul 2014 |
D000280-x0 |
Staging Building for Livingston Observatory - Building Sections, Details |
John Desmond |
Document Migration
|
09 Jul 2014 |
D000279-x0 |
Staging Building for Livingston Observatory - Building Section, Details |
John Desmond |
Document Migration
|
09 Jul 2014 |
D000278-x0 |
Staging Building for Livingston Observatory - Building Section, Details |
John Desmond |
Document Migration
|
09 Jul 2014 |
D000277-x0 |
Staging Building for Livingston Observatory - Door Schedule |
John Desmond |
Document Migration
|
09 Jul 2014 |
D000276-x0 |
Staging Building for Livingston Observatory - Exterior Elevations, Finish Schedule |
John Desmond |
Document Migration
|
09 Jul 2014 |
D000275-x0 |
Staging Building for Livingston Observatory - Exterior Elevations |
John Desmond |
Document Migration
|
09 Jul 2014 |
D000274-x0 |
Staging Building for Livingston Observatory - Second Level Floor Plan |
John Desmond |
Document Migration
|
09 Jul 2014 |
D000273-x0 |
Staging Building for Livingston Observatory - First Floor Plan |
John Desmond |
Document Migration
|
09 Jul 2014 |
D000272-x0 |
Staging Building for Livingston Observatory - Handicapped Standard Details |
John Desmond |
Document Migration
|
09 Jul 2014 |
D000271-x0 |
Staging Building for Livingston Observatory - Existing Site and Building Demolision |
John Desmond |
Document Migration
|
09 Jul 2014 |
D000270-x0 |
Staging Building for Livingston Observatory - Site Plans and Details |
John Desmond |
Document Migration
|
09 Jul 2014 |
D000269-x0 |
Staging Building for Livingston Observatory - Title Sheet and General Notes, Rev. 01 |
John Desmond |
Document Migration
|
09 Jul 2014 |
G1400749-v1 |
Gravitational Wave Detection with Initial and Advanced LIGO |
Gregg Harry |
Public Talk / Colloquium
|
08 Jul 2014 |
E1300630-x0 |
aLIGO, Integration Testing, HIFO-XY Test |
Daniel Sigg |
Integration
|
08 Jul 2014 |
L1400110-x0 |
Executive Summary of the LHO HIFO-XY Test |
Daniel Sigg et al. |
Integration
|
08 Jul 2014 |
D1300608-v1 |
ALS Mad-City Labs Spacer |
Bram Slagmolen |
Sensing and Control
Commissioning
|
08 Jul 2014 |
D1300607-v1 |
ALS Mad-City Labs Base |
John Miller et al. |
Sensing and Control
Commissioning
|
08 Jul 2014 |
T1400448-v1 |
Single Pendulum Parameter Descriptions and Naming Conventions |
Jeffrey Kissel et al. |
Modelling
Suspensions
|
07 Jul 2014 |
D1101941-v2 |
ETM HWS EtherCAT breakout box |
Aidan Brooks et al. |
Auxiliary Optics
Incoming Inspection
|
25 Jun 2014 |
G1400715-v1 |
Joe Weber and the "original sin" of gravitational wave detection |
Peter Saulson |
Public Talk / Colloquium
|
25 Jun 2014 |
E1300627-x0 |
aLIGO, Integration Testing, One Arm Test |
Daniel Sigg |
Integration
|
24 Jun 2014 |
P040032-x0 |
Sensitivity and Noise Analysis of 4 km Laser Interferometric Gravitational Wave Antennae |
Rana Adhikari |
Thesis/Dissertation
Detector
|
21 Jun 2014 |
E1400213-x0 |
DCN, Initial release of aLIGO, SUS, BS WIRE SHIELDING BAFFLE ASSY. AND ASSOCIATED DOCS. |
Eduardo Sanchez |
Installation
Fabrication
Suspensions
Integration
System Engineering
|
20 Jun 2014 |
E1300803-x0 |
Changes Resulting from the L1 DRMI Testing |
Peter Fritschel et al. |
Commissioning
Integration
|
20 Jun 2014 |
E1300763-v2 |
ECR - RCG Code Change Request - RCG Version 2.8 |
Rolf Bork |
Data Acquisition System
Upgrades
|
19 Jun 2014 |
E1400300-x0 |
Changes Resulting from Input Mode Cleaner Testing |
Dennis Coyne |
Integration
Commissioning
|
19 Jun 2014 |
E1300628-x0 |
aLIGO, Integration Testing, Input Mode Cleaner Test |
Daniel Sigg et al. |
Integration
|
19 Jun 2014 |
E1300534-v1 |
ECR - CDS Code Release RCG V2.7 |
Rolf Bork |
Data Acquisition System
Upgrades
Change Control
|
19 Jun 2014 |
E1201027-v1 |
ECR: Replacement of the coil-series resistors in the HAM-A coil drivers |
David Feldbaum |
Upgrades
Input Optics
Requirements
Suspensions
Commissioning
Final Design
Sensing and Control
|
19 Jun 2014 |
E1300671-v1 |
ECR - RCG Code Change Request - RCG Version 2.7.2 |
Rolf Bork |
Data Acquisition System
Upgrades
|
19 Jun 2014 |
E1200930-v2 |
ECR, End Station EtherCAT Chassis Modification for TCS |
Aidan Brooks et al. |
Integration
Requirements
Data Acquisition System
Auxiliary Optics
Installation
|
19 Jun 2014 |
E1300631-x0 |
aLIGO, Integration Testing, Dual Recycled Michelson Test |
Daniel Sigg |
Integration
|
19 Jun 2014 |
E1300789-v2 |
ECR for 135MHz signal chain (REFLAIR-B on ISCT6) |
Rich Abbott |
Sensing and Control
System Test
|
19 Jun 2014 |
G1301192-v3 |
Simulink/Front Model & MEDM Screen Mods from ECR E1300578 |
Jeffrey Kissel |
Sensing and Control
Commissioning
Suspensions
|
19 Jun 2014 |
E1300809-v1 |
ECR - remove the IPC links in ISI which come from SUS |
Brian Lantz |
Suspensions
Integration
Seismic Isolation
|
19 Jun 2014 |
E1300788-v1 |
ECR: add baffle to PR3 Suspensions to prevent wire heating |
Dennis Coyne |
Suspensions
Auxiliary Optics
System Test
Change Control
|
19 Jun 2014 |
G1300138-v1 |
Noise Budget Infrastructure |
Christopher Wipf |
Commissioning
|
19 Jun 2014 |
G1301269-v1 |
DRMI Noise Budget |
Denis Martynov |
Commissioning
|
19 Jun 2014 |
G1400651-v1 |
DRFPMI NB snapshot |
Christopher Wipf |
Commissioning
|
19 Jun 2014 |
E1200044-x0 |
aLIGO BSC-HEPI, LHO BSC6: Phase I Testing Report |
Vincent Lhuillier |
Commissioning
Seismic Isolation
|
18 Jun 2014 |
E1200043-x0 |
aLIGO BSC-HEPI, LHO BSC8: Phase I Testing Report |
Vincent Lhuillier |
Commissioning
Seismic Isolation
|
18 Jun 2014 |
E1100991-x0 |
aLIGO BSC-ISI, Phase III Testing Reports (Control Commissioning) |
Fabrice Matichard |
System Test
Seismic Isolation
|
18 Jun 2014 |
E1100740-v7 |
aLIGO BSC-ISI, Seismometers Installation Location |
Vincent Lhuillier |
Seismic Isolation
Commissioning
|
18 Jun 2014 |
Q1100073-v32 |
Seismometer and Pod Issue Tracking |
Michael Vargas et al. |
Requirements
Subsystem Test
Assembly
Seismic Isolation
|
18 Jun 2014 |
F0900070-v6 |
GS-13 Inspection Checklist |
Joe Hanson et al. |
Incoming Inspection
Subsystem Test
Seismic Isolation
Installation
|
18 Jun 2014 |
E1100741-v1 |
aLIGO BSC-ISI, Actuators Installation Location |
Vincent Lhuillier |
Seismic Isolation
Commissioning
|
18 Jun 2014 |
T0900564-v2 |
aLIGO Large Actuator Test Results from Qinetiq |
Brian O'Reilly |
Incoming Inspection
Seismic Isolation
|
18 Jun 2014 |
T1300126-v1 |
IMC Autolocker |
Adam Mullavey et al. |
Sensing and Control
Commissioning
|
18 Jun 2014 |
E1300495-v3 |
LLO DRMI In-air Check List |
Valery Frolov |
Commissioning
Integration
|
18 Jun 2014 |
T1400011-v1 |
Integration Testing: Systems meeting discussion, 15 Jan 2014 |
Peter Fritschel |
Integration
Commissioning
|
18 Jun 2014 |
G1300602-v2 |
LLO ISC Software Overview (for DRMI test) |
Anamaria Effler et al. |
Integration
Sensing and Control
|
18 Jun 2014 |
T1300991-v1 |
PRMI Locking Procedure |
Ryan DeRosa et al. |
Integration
Commissioning
|
18 Jun 2014 |
T1300507-v1 |
aLIGO L1 DRMI Test Noise Budget |
Anamaria Effler et al. |
Sensing and Control
Modelling
|
18 Jun 2014 |
T1300174-v2 |
Commissioning Advanced LIGO’s HIFO-Y |
Daniel Sigg et al. |
Commissioning
System Engineering
Integration
|
18 Jun 2014 |
L1300176-v1 |
Executive Summary of the LHO HIFO-Y Test |
Daniel Sigg et al. |
Integration
|
18 Jun 2014 |
L1300219-v1 |
Summary of the H1 Input Mode Cleaner Testing |
Paul Fulda et al. |
Integration
|
18 Jun 2014 |
T1100201-v4 |
Commissioning the Advanced LIGO L1 Input Mode Cleaner |
Peter Fritschel et al. |
Input Optics
Integration
|
18 Jun 2014 |
D1400191-x0 |
FI2 635S Micro Laser Fermion II |
Michael Vargas |
Commissioning
Subsystem Test
|
18 Jun 2014 |
G1400667-v2 |
Opening the Gravitational Wave Window |
Gabriela Gonzalez et al. |
Detector
Data Analysis
Public Talk / Colloquium
|
18 Jun 2014 |
E1400002-v1 |
ECR - Acquisition of FSS RFPD DC signal |
Kiwamu Izumi |
Integration
Commissioning
|
16 Jun 2014 |
G1400671-v1 |
DAQ Acceptance Testing |
Rolf Bork |
Data Acquisition System
System Test
|
16 Jun 2014 |
D1001954-v1 |
aLIGO, ASSEMBLY, BSC ARM |
Scott Shankle et al. |
Conceptual Design
Auxiliary Optics
|
13 Jun 2014 |
T1400403-v1 |
Scatter measurement of small aLIGO Lenses |
GariLynn Billingsley et al. |
Input Optics
System Test
|
13 Jun 2014 |
D1301036-v1 |
aLIGO, SYS, 1" DIA WITNESS OPTIC |
Eduardo Sanchez |
Installation
System Engineering
Integration
|
13 Jun 2014 |
G1400193-v2 |
Initial alignment plan |
Sheila Dwyer et al. |
Integration
Meeting
|
12 Jun 2014 |
G1400629-v2 |
Overview of Mathematica and Matlab suspension modeling assets |
Mark Barton |
Suspensions
Modelling
|
11 Jun 2014 |
T1400368-v1 |
Advanced LIGO Operations Commissioning Plan |
Peter Fritschel et al. |
Commissioning
|
11 Jun 2014 |
P1300001-v1 |
[Thesis] Multi-Color Interferometry for Lock Acquisition of Laser Interferometric Gravitational-wave Detectors |
Kiwamu Izumi et al. |
Thesis/Dissertation
Commissioning
|
10 Jun 2014 |
E1100071-v11 |
Obsolete |
Stephen O'Connor et al. |
Conceptual Design
|
10 Jun 2014 |
G1400580-v1 |
Finesse 2: Radiation pressure and the quantum kat |
Daniel Brown et al. |
Modelling
|
05 Jun 2014 |
T1400185-x0 |
aLIGO Resonances |
Mark Barton |
Subsystem Test
Modelling
|
03 Jun 2014 |
D080660-v3 |
D080660_ALIGO COC_BS_SUBSTRATE |
Calum Torrie |
Core Optics
Final Design
|
03 Jun 2014 |
D0902346-v3 |
AdLIGO IQ Demodulator Cell |
Rich Abbott |
Basic R&D
Sensing and Control
|
03 Jun 2014 |
G1400602-v1 |
Advanced LIGO Slide Show, assembled May 2014 |
David Shoemaker |
Detector
Education, Outreach
|
31 May 2014 |
D0902796-v4 |
Quad IQ Demodulator Chassis |
Rich Abbott et al. |
Fabrication
|
30 May 2014 |
G1400551-v1 |
System Integration Status and Challenges, Post Project Commissioning Plans to Meet Science Goals |
Daniel Sigg |
Integration
|
27 May 2014 |
T080214-v1 |
Simple Calculations for Charge Noise for Advanced LIGO |
Brian Lantz |
Requirements
Core Optics
Suspensions
Seismic Isolation
Basic R&D
|
27 May 2014 |
G1400529-v2 |
Commissioning of Advanced LIGO |
Kiwamu Izumi |
Commissioning
Integration
|
25 May 2014 |
G1400560-v2 |
Simulation Study for aLIGO lock acquisition |
Kiwamu Izumi et al. |
Modelling
Integration
|
24 May 2014 |
G1400572-v1 |
A modular FFT-based Interferometer Simulation Package |
Hiro Yamamoto |
Modelling
Core Optics
|
22 May 2014 |
T1400053-v2 |
Integration testing report for the L1 DRMI |
Peter Fritschel et al. |
Integration
|
19 May 2014 |
T010007-v5 |
Cavity Optics Suspension Subsystem Design Requirements |
Mark Barton et al. |
Suspensions
Requirements
|
17 May 2014 |
G1400537-v1 |
ESD Force Noise and Range for Various Modes of Operation |
Brett Shapiro |
Modelling
|
14 May 2014 |
D020078-x0 |
ETMX Table Cover, 40M Lab |
Larry Jones |
Document Migration
|
07 May 2014 |
D020055-x0 |
Reservior Tank Nut Plate |
Ken Mailand |
Document Migration
|
07 May 2014 |
D000225-x0 |
Electro-Optic Modulator (EOM) Spacer |
Nathan Hindman et al. |
Document Migration
|
07 May 2014 |
D000107-x0 |
LIGO Staging Building, Livingston - Building Elevation, Section |
John Desmond |
Document Migration
|
07 May 2014 |
D000106-x0 |
LIGO Staging Building, Livingston - Second Level |
John Desmond |
Document Migration
|
07 May 2014 |
D000105-x0 |
LIGO Staging Building, Livingston - Schematic Design |
John Desmond |
Document Migration
|
07 May 2014 |
D000055-x0 |
LLO ETMY Telescope BSC5 |
Ken Mailand |
Document Migration
|
07 May 2014 |
D000002-x0 |
Z Pivot Shim, Rev. A |
Larry Jones |
Document Migration
|
07 May 2014 |
G1400511-v1 |
LIGO Status Report |
Gregg Harry |
Public Talk / Colloquium
|
06 May 2014 |
D060416-v4 |
Magnet and Flag Assembly |
Derek Bridges et al. |
Suspensions
Preliminary Design
|
05 May 2014 |
T1400298-v1 |
Simulation study for aLIGO lock acquisition |
Kiwamu Izumi et al. |
Modelling
Commissioning
Integration
Meeting
|
03 May 2014 |
G1400495-v1 |
ALS Noise Budget and Model Status Report |
Alexa N Staley |
Modelling
|
02 May 2014 |
G1400447-v1 |
ALS HIFO-X Noise Budget and Model Status Report |
Alexa N Staley |
Modelling
|
23 Apr 2014 |
T1400293-x0 |
Suspension Alignment Offsets and Gains |
Mark Barton et al. |
Suspensions
Modelling
|
21 Apr 2014 |
T1400284-v2 |
Glitches in the Blend Switch - Origin and Fix |
Brian Lantz |
Seismic Isolation
State Control and Monitoring
Suspensions
Integration
|
17 Apr 2014 |
G1400443-v1 |
Status update of aLIGO lock acquisition simulation (20140411) |
Kiwamu Izumi |
Meeting
Modelling
|
11 Apr 2014 |
E1400193-x0 |
aLIGO, ISC, lock acquisition |
Kiwamu Izumi |
Modelling
|
11 Apr 2014 |
G1400385-v3 |
Cryogenic behavior of LEDs for use in third generation LIGO position sensors and actuators |
Ryan Goetz |
Public Talk / Colloquium
Sensing and Control
|
08 Apr 2014 |
T1200031-v3 |
LIGO III Strawman Design Workshop Report |
Rana Adhikari et al. |
Conceptual Design
Upgrades
Basic R&D
Detector
|
07 Apr 2014 |
G1400419-v1 |
Status update of aLIGO lock acquisition simulation (20140404) |
Kiwamu Izumi |
Meeting
Modelling
|
04 Apr 2014 |
G1400418-v1 |
Gravitational Waves, Inflation, and the Big Bang: BICEP-2 Result and LIGO |
Gregg Harry |
Public Talk / Colloquium
|
04 Apr 2014 |
G1400162-v4 |
Core Optics related loss hierarchy of aLIGO |
Hiro Yamamoto |
Core Optics
Modelling
|
03 Apr 2014 |
D0902505-v9 |
Fiber Guard Assembly (Installation Instructions) |
Marielle van Veggel et al. |
Preliminary Design
Suspensions
|
02 Apr 2014 |
D1003255-v1 |
ISC Broadband Photo-Detector Enclosure |
Jason Fishner |
Sensing and Control
Conceptual Design
|
01 Apr 2014 |
D1002969-v9 |
Broadband Photodetector (BBPD) Schematic |
Matthew Evans |
Commissioning
Preliminary Design
Sensing and Control
|
01 Apr 2014 |
D1101879-v1 |
QPD storage cage |
Koji Arai |
Sensing and Control
Installation
Cleaning
Assembly
Input Optics
|
01 Apr 2014 |
T1300014-v5 |
Aligo, BSC Flooring + HAM ISI, Witness Sample Placement Requirements |
Eduardo Sanchez |
Installation
System Engineering
Integration
|
28 Mar 2014 |
T0900485-v3 |
FET vs. Diode-ring Demodulator Noise Comparison |
Rich Abbott |
Sensing and Control
Basic R&D
|
27 Mar 2014 |
E1200030-x0 |
aLIGO Optical Levers Final Design Documents |
Eric James |
Integration
|
25 Mar 2014 |
P1000010-v1 |
[Thesis] Homodyne detection for laser-interferometric gravitational wave detectors |
Tobin Fricke |
Thesis/Dissertation
Detector
|
25 Mar 2014 |
P1100125-v1 |
[Thesis] Design and Performance of High Laser Power Interferometers for Gravitational-wave Detection |
Katherine Dooley |
Input Optics
Thesis/Dissertation
Basic R&D
Sensing and Control
|
25 Mar 2014 |
T1000321-v5 |
aLIGO ISC Whitening/VGA Module Description |
Rich Abbott |
Conceptual Design
Sensing and Control
|
25 Mar 2014 |
P0900255-v5 |
Advanced LIGO: The next generation of gravitational wave detectors |
Gregg Harry et al. |
Detector
Meeting
|
22 Mar 2014 |
G1400379-v1 |
Status update of aLIGO lock acquisition simulation (20140321) |
Kiwamu Izumi |
Modelling
|
21 Mar 2014 |
D1000658-v5 |
TCS Hartmann Sensor Plate Clamp for aLIGO |
Jesper Munch et al. |
Final Design
Auxiliary Optics
Preliminary Design
|
18 Mar 2014 |
D1000657-v7 |
TCS Hartmann Sensor Assembly |
Mindy Jacobson et al. |
Auxiliary Optics
Assembly
|
18 Mar 2014 |
G1400227-v1 |
Gravitational waves and the antenna pattern (Poster) |
Tobin Fricke |
Education, Outreach
|
15 Mar 2014 |
G1400198-v2 |
Core Optics related loss hierarchy of aLIGO - LVC2014 |
Hiro Yamamoto |
Core Optics
Modelling
|
15 Mar 2014 |
G1100046-v1 |
LIGO Poster |
Tobin Fricke et al. |
Education, Outreach
Public Talk / Colloquium
Detector
|
13 Mar 2014 |
T1400209-v1 |
optocad analysis of beam parameters at the ISS PD array |
Benno Willke |
Laser Systems
Modelling
Final Design
|
12 Mar 2014 |
D1300749-v1 |
testing the public view setting bug |
Cleveland Mak |
Temporary Test Document
Upgrades
System Test
|
11 Mar 2014 |
T1200306-v2 |
Suspension Hardware Watchdog Requirements |
Rolf Bork et al. |
Suspensions
Requirements
|
03 Mar 2014 |
T1200415-v1 |
aLIGO LHO Resonances |
Mark Barton |
Subsystem Test
System Test
|
03 Mar 2014 |
G1301138-v1 |
American University LIGO Poster |
Gregg Harry et al. |
Education, Outreach
|
28 Feb 2014 |
G1400137-v1 |
ISI tuning vs interferometer states and seismic input |
Lisa Barsotti |
Commissioning
|
25 Feb 2014 |
T980121-v1 |
Preliminary results from Livingston VE vibration & acoustic testing |
Michael Zucker |
System Test
Vacuum
|
19 Feb 2014 |
T1400055-v1 |
Core Optics related loss hierarchy of aLIGO |
Hiro Yamamoto |
Modelling
Core Optics
|
18 Feb 2014 |
T1400056-x0 |
3IFO Viewport Requirements by Chamber (LTS) |
Calum Torrie et al. |
Requirements
|
13 Feb 2014 |
D0902513-v4 |
Fibre guard angle section 5 |
Marielle van Veggel et al. |
Preliminary Design
Suspensions
|
12 Feb 2014 |
D0902511-v4 |
Fibre guard angle section 3 |
Marielle van Veggel et al. |
Suspensions
Preliminary Design
|
12 Feb 2014 |
P1400015-v3 |
Gravitational Wave Detection with Advanced Ground Based Detectors |
Lisa Barsotti et al. |
Public Talk / Colloquium
|
08 Feb 2014 |
T070189-v3 |
Design Specifications for the OMC Suspension |
Norna Robertson et al. |
Requirements
Suspensions
|
07 Feb 2014 |
D080659-v3 |
D080659_ALIGO COC_CP_SUBSTRATE |
Calum Torrie |
Core Optics
Final Design
|
07 Feb 2014 |
T1400047-v1 |
Power Recycling Probe Experiment Proposal |
Chris Mueller |
Sensing and Control
Commissioning
|
06 Feb 2014 |
D1400044-x0 |
ALIGO IO PSL ISS RELOCATION CASE 5 |
Luke Williams |
Conceptual Design
Input Optics
|
06 Feb 2014 |
D1400043-x0 |
ALIGO IO PSL ISS RELOCATION CASE 3 |
Luke Williams |
Conceptual Design
Input Optics
|
06 Feb 2014 |
D1400042-x0 |
ALIGO IO PSL ISS RELOCATION CASE 2 |
Luke Williams |
Conceptual Design
Input Optics
|
06 Feb 2014 |
G1400092-v3 |
LLO PRMI Contrast Defect : Simulation is larger than data |
Hiro Yamamoto |
Core Optics
Modelling
|
03 Feb 2014 |
E1300939-v3 |
Procedure For Attachment Of The Pcal Periscope Alignment Target To ETM Quad Frame |
Craig Conley et al. |
Integration
Auxiliary Optics
|
31 Jan 2014 |
G1301210-v1 |
Software Watchdogs for SUS + ISI + HEPI |
Brian Lantz et al. |
Integration
Suspensions
Seismic Isolation
Data and Computing
|
29 Jan 2014 |
T1400023-v1 |
Math Trick for Velocity in state-space models |
Brian Lantz et al. |
Modelling
Seismic Isolation
|
24 Jan 2014 |
T1400022-v1 |
Pico Motor Cable Resistance Analysis |
Rich Abbott |
Conceptual Design
Sensing and Control
|
23 Jan 2014 |
E1300966-v1 |
aLIGO IO H1 EOM in-situ characterization |
Kiwamu Izumi et al. |
Commissioning
|
20 Jan 2014 |
G1300769-v2 |
HAM-ISI Guardian State Evolution |
Brian Lantz et al. |
State Control and Monitoring
Conceptual Design
Seismic Isolation
|
20 Jan 2014 |
T1300629-x0 |
SEI Guardians |
Brian Lantz |
State Control and Monitoring
Commissioning
Seismic Isolation
|
20 Jan 2014 |
T1300435-v1 |
Suspension Module Guardian Design |
Jeffrey Kissel et al. |
State Control and Monitoring
Commissioning
Suspensions
Preliminary Design
|
20 Jan 2014 |
T1300884-v3 |
Advanced LIGO Automation Requirements |
Jameson Graef Rollins |
Requirements
State Control and Monitoring
|
20 Jan 2014 |
G1300403-v1 |
LSC Brochure for graduate programs and REUs - MURF Version |
Marco Cavaglia |
Education, Outreach
|
18 Jan 2014 |
G1400012-v2 |
Adding ECD to Matlab/Mathematica SUS models |
Mark Barton |
Modelling
Suspensions
|
15 Jan 2014 |
D1000708-v7 |
aLIGO TCS Hartmann Sensor Camera Spacer Plate |
Mindy Jacobson et al. |
Auxiliary Optics
Final Design
Fabrication
|
15 Jan 2014 |
T1200307-v4 |
Early aLIGO Configurations: example scenarios toward design sensitivity |
Lisa Barsotti et al. |
Commissioning
|
15 Jan 2014 |
G1400032-v1 |
Advanced LIGO Seismic Isolation Brochure |
Fabrice Matichard |
Seismic Isolation
Education, Outreach
|
12 Jan 2014 |
P1100013-v1 |
Characterization of the Photon Calibrator data from LIGO's sixth Science Run |
Alberto Sottile |
Thesis/Dissertation
Calibration
|
12 Jan 2014 |
P1000093-v1 |
Open issues in the search for gravitational-wave transients |
Lindy Blackburn |
Thesis/Dissertation
GW Bursts
|
12 Jan 2014 |
R1300028-v2 |
Change Request for Secondary Power feed to LHO |
Richard McCarthy |
Operations
Change Control
Operations Liens List
|
07 Jan 2014 |
G1301287-v2 |
Advanced LIGO and the bright future of gravitational wave observation |
Lisa Barsotti |
Public Talk / Colloquium
|
06 Jan 2014 |
R1300030-v1 |
Vacuum Control System Upgrade Change Request |
Richard McCarthy et al. |
Upgrades
Vacuum
Operations
Operations Liens List
|
18 Dec 2013 |
T0900555-v6 |
Error Estimation of the LIGO Response Function |
Jeffrey Kissel |
Sensing and Control
Calibration
Modelling
|
18 Dec 2013 |
T1301001-v2 |
Modeling LLO PRMI using FFT simulation package, FOGPrime13 |
Hiro Yamamoto |
Core Optics
Modelling
|
16 Dec 2013 |
T1300954-v2 |
Investigation of beam clipping in the Power Recycling Cavity of Advanced LIGO using FINESSE |
Charlotte Bond et al. |
Commissioning
Core Optics
|
16 Dec 2013 |
T1300986-v2 |
Revisting Sidebands of Sidebands in Finesse |
Jordan Clarke et al. |
Modelling
|
13 Dec 2013 |
T1300998-v2 |
Reasons to Integrate Control System Design with Mechanical Design for Seismic Isolation and Alignment Systems |
Brett Shapiro et al. |
Conceptual Design
|
12 Dec 2013 |
S1202956-v1 |
L1-DAQ-YC1 |
David Kinzel et al. |
Operations
System Engineering
|
12 Dec 2013 |
S1202949-v4 |
L1-DAQ-XC1 |
David Kinzel et al. |
Operations
Data Acquisition System
|
12 Dec 2013 |
T1200437-v3 |
Advanced LIGO Interferometer Integration |
Peter Fritschel et al. |
Integration
Commissioning
|
11 Dec 2013 |
G1200632-v3 |
Towards Applied Heirarchical Control |
Jeffrey Kissel |
Preliminary Design
Suspensions
Commissioning
Sensing and Control
Seismic Isolation
|
11 Dec 2013 |
G1300530-v2 |
The aLIGO Guardian |
Jeffrey Kissel |
State Control and Monitoring
Commissioning
Preliminary Design
|
11 Dec 2013 |
E1200844-v2 |
aLIGO SUS Acceptance Criteria and Deliverables |
Jeffrey Kissel et al. |
System Test
Suspensions
|
11 Dec 2013 |
G1300561-v1 |
aLIGO BSFM "Level 2" Damping Loop Design |
Jeffrey Kissel |
Suspensions
Commissioning
|
11 Dec 2013 |
G1300537-v3 |
aLIGO QUAD "Level 2" Damping Loop Design |
Jeffrey Kissel |
Commissioning
Suspensions
|
11 Dec 2013 |
G1300808-v1 |
Operations Sparing Plan Approach |
Dennis Coyne |
System Engineering
Operations
|
11 Dec 2013 |
D1002153-v3 |
aLIGO BS/FM Prism holder |
Marielle van Veggel et al. |
Suspensions
Installation
|
11 Dec 2013 |
T1300936-v1 |
HEPI model updates Nov 2013 |
Brian Lantz et al. |
Seismic Isolation
Installation
Integration
|
09 Dec 2013 |
E1300872-v1 |
ECR - HEPI model updates Nov 2013 |
Brian Lantz et al. |
Seismic Isolation
Integration
|
09 Dec 2013 |
E1300906-v1 |
HEPI script updates Nov 2013 |
Brian Lantz |
Integration
Seismic Isolation
|
09 Dec 2013 |
E1300907-v1 |
update to SEI watchdog data rate in the science frames |
Brian Lantz |
Integration
Data Acquisition System
Seismic Isolation
|
09 Dec 2013 |
T0900423-v4 |
ISC Quadrant Photodetector Design |
Rich Abbott et al. |
Basic R&D
Sensing and Control
|
09 Dec 2013 |
T1200416-v2 |
First Contact and its Effect on Pitch of Optics |
Mark Barton |
Modelling
Core Optics
Suspensions
Installation
|
09 Dec 2013 |
D1300778-v2 |
aLIGO Pcal Tooling, Viewport Beam Target |
Craig Conley |
Commissioning
Installation
Auxiliary Optics
|
07 Dec 2013 |
G1301190-v3 |
aLIGO general talk for London IOP Violent Universe |
David Shoemaker |
Detector
Public Talk / Colloquium
|
06 Dec 2013 |
T1300464-v1 |
Sidebands on Sidebands in Finesse |
Keita Kawabe |
Sensing and Control
Modelling
|
06 Dec 2013 |
T1300887-v1 |
The LSC White Paper on Education and Public Outreach 2013-2014 - Public Document |
Szabolcs Marka et al. |
Education, Outreach
|
06 Dec 2013 |
D1003325-v2 |
ISC Fast Shutter Hardstop |
Jason Fishner et al. |
Conceptual Design
Sensing and Control
|
03 Dec 2013 |
G1301213-v2 |
The Explosive Death of Stars & The Birth of a New Astronomy |
Christian David Ott et al. |
Public Talk / Colloquium
GW source predictions
Astrophysics / Multi-messenger
GW Bursts
Education, Outreach
|
29 Nov 2013 |
G1300687-v1 |
Modelling mirror surface distortion effects in low-loss, near-unstable Fabry-Perot cavities |
Daniel Brown et al. |
Modelling
|
27 Nov 2013 |
G1200723-v1 |
Adaptive Modal Damping of Advanced LIGO Suspensions |
Brett Shapiro |
Thesis/Dissertation
|
23 Nov 2013 |
D1200105-v2 |
Breadboard OMC aLIGO |
Sam Barnum et al. |
Conceptual Design
Sensing and Control
|
22 Nov 2013 |
E1200639-v1 |
aLIGO, AOS, TCS, Acceptance of CO2 Laser Projection System |
Aidan Brooks et al. |
Auxiliary Optics
Installation
System Test
Subsystem Test
System Engineering
Integration
|
22 Nov 2013 |
L1300208-v4 |
the testing of BUGS 339, 340 and 341 and now 347 & 348 too! |
Cleveland Mak |
System Test
Temporary Test Document
|
20 Nov 2013 |
D1200782-v2 |
aLIGO TCS CO2 Laser and Shutter Assembly |
Mindy Jacobson et al. |
Assembly
Subsystem Test
Installation
Auxiliary Optics
Operations
|
19 Nov 2013 |
E1300766-v3 |
the testing of BuGS 339, 340 and 341 plus other items on IE |
Cleveland Mak et al. |
Temporary Test Document
Upgrades
System Test
|
12 Nov 2013 |
P1300183-v1 |
A directed search for continuous gravitational waves from unknown isolated neutron stars at the Galactic center |
Berit Behnke et al. |
Thesis/Dissertation
|
11 Nov 2013 |
T000134-x0 |
Dynamical Properties of LIGO Single-Loop Suspended Mirrors |
Malik Rakhmanov et al. |
Modelling
Input Optics
Core Optics
Suspensions
Basic R&D
|
31 Oct 2013 |
E1300819-v2 |
ISC HAM6 Fast Shutter Hardware Chain |
Rich Abbott et al. |
Conceptual Design
Sensing and Control
|
30 Oct 2013 |
T1300683-v1 |
Tidal Prediction for Advanced LIGO: Final Report |
Noah Kurinsky et al. |
Modelling
State Control and Monitoring
|
27 Oct 2013 |
E1000295-v8 |
aLIGO TCS Ring Heater Assembies, Formal Drawing Tree & BOM Reference |
Guido Mueller et al. |
Fabrication
Incoming Inspection
Auxiliary Optics
Vacuum
|
25 Oct 2013 |
G1301181-x0 |
Next Generation Science Standards on Wave Behavior: LIGO's Resources for Elementary and Middle School Classrooms |
Dale Ingram |
Education, Outreach
|
24 Oct 2013 |
T1300688-v2 |
ALS Noise Measurements and Model for HIFO-Y |
Alexa N Staley et al. |
Modelling
|
21 Oct 2013 |
T1200385-v2 |
LLO BS Prism Gluing Issue and Resolution |
Janeen Romie et al. |
Installation
Suspensions
Modelling
|
18 Oct 2013 |
S1202954-x0 |
L1-SUS-YC2 |
David Kinzel |
System Engineering
Operations
|
16 Oct 2013 |
G1301146-v2 |
the testing of BUGS 339, 340 and 341 plus other items on chrome |
Cleveland Mak |
Temporary Test Document
System Test
|
14 Oct 2013 |
G1301148-v1 |
Celebrating 10 Years of CGWA |
Peter Saulson |
Public Talk / Colloquium
|
11 Oct 2013 |
T1300854-v2 |
3.1.0 patch test document abc |
Cleveland Mak et al. |
System Test
Temporary Test Document
|
11 Oct 2013 |
G1301136-v1 |
News from LIGO Hanford Observatory |
Kiwamu Izumi |
Public Talk / Colloquium
|
10 Oct 2013 |
E1300746-v2 |
3.1.0 patch test doc for IE |
Cleveland Mak |
Temporary Test Document
System Test
|
07 Oct 2013 |
P1300173-v1 |
Gravitational Wave Astronomy with LIGO: from Data to Science |
Tiffany Summerscales |
Thesis/Dissertation
Data Analysis
|
06 Oct 2013 |
E1300480-v2 |
Software Manual for the Vacuum System Toolbox |
Derek Bridges |
Vacuum
Modelling
|
04 Oct 2013 |
G1300955-x0 |
dcc 3.1.0 release test document number three |
Cleveland Mak et al. |
Temporary Test Document
Quality Assurance
System Test
|
02 Oct 2013 |
G1301123-v2 |
3.1.0 patch test doc for chrome |
Cleveland Mak |
Temporary Test Document
System Test
|
02 Oct 2013 |
L1300202-x0 |
another test |
Melody Araya |
Temporary Test Document
|
01 Oct 2013 |
L1300201-v1 |
my test |
Melody Araya |
Temporary Test Document
|
01 Oct 2013 |
P1300170-v1 |
Toward Quantum Opto-Mechanics in a Gram-Scale Suspended Mirror Interferometer |
Christopher Wipf |
Thesis/Dissertation
|
01 Oct 2013 |
G1300864-v1 |
Working Towards Finding an Upper Limit for Crackle in LIGO’s Maraging Steel Blade Springs |
Benjamin Levy et al. |
Suspensions
Public Talk / Colloquium
|
26 Sep 2013 |
G1301110-v1 |
Looking forward, looking back |
Peter Saulson |
Public Talk / Colloquium
|
26 Sep 2013 |
P1300098-v2 |
LIGO Magazine, issue 3 9/2013 |
Andreas Freise |
Laser Systems
Education, Outreach
|
25 Sep 2013 |
E1300719-v3 |
DCC release 3.1.0 test doc #2 |
Cleveland Mak et al. |
System Test
Temporary Test Document
|
21 Sep 2013 |
T1300833-v1 |
Prototype Fast Shutter Measurements |
Rich Abbott |
Sensing and Control
Conceptual Design
|
20 Sep 2013 |
M1300504-v1 |
dcc release 3.1.0 test document #4 |
Cleveland Mak |
Temporary Test Document
System Test
|
18 Sep 2013 |
T080062-v2 |
UK Satellite Amplifier Test Plan |
Jay Heefner et al. |
Suspensions
System Test
|
18 Sep 2013 |
E1300336-x0 |
Repository for Signal Recycling Cavity Baffle Supporting Analyses/models |
Michael Smith |
Auxiliary Optics
Modelling
|
18 Sep 2013 |
E1300342-x0 |
Repository for Manifold/Cryopump & Mode Cleaner Baffles Supporting Analyses/models |
Michael Smith |
Modelling
|
18 Sep 2013 |
E1300343-x0 |
Repository for ITM Elliptical Baffle Supporting Analyses/models |
Michael Smith |
Modelling
Auxiliary Optics
|
18 Sep 2013 |
E1300344-x0 |
Repository for BS Elliptical Baffle Supporting Analyses/models |
Michael Smith |
Modelling
|
18 Sep 2013 |
D1201014-v1 |
aLIGO_AOS_ACB, Ninety Thous Magnets Gauge |
Tim Nguyen |
Auxiliary Optics
Modelling
|
18 Sep 2013 |
T1300831-v1 |
SR2 Scraper Baffle sketch |
Michael Smith |
Conceptual Design
Auxiliary Optics
|
18 Sep 2013 |
T1300830-v1 |
MC tube baffle beam clearance |
Michael Smith |
Modelling
Auxiliary Optics
|
18 Sep 2013 |
T1300829-v1 |
ACB ETM wide angle scatter power summary |
Michael Smith |
Modelling
Auxiliary Optics
|
18 Sep 2013 |
T1300828-v1 |
ALS-photodetector on ACB |
Michael Smith |
Modelling
Auxiliary Optics
|
17 Sep 2013 |
T1300827-v1 |
ACB shift with target |
Michael Smith |
Modelling
Auxiliary Optics
|
17 Sep 2013 |
T1300824-v1 |
wide angle scatter_ETMX_H1_power |
Michael Smith |
Auxiliary Optics
Modelling
|
17 Sep 2013 |
T1300823-v1 |
wide angle scatter_ITMX_H1_power |
Michael Smith |
Auxiliary Optics
Modelling
|
17 Sep 2013 |
T1300821-v1 |
BS elliptical baffle-3 Model |
Michael Smith |
Modelling
Auxiliary Optics
|
17 Sep 2013 |
T1300816-v1 |
ITM Elllip Baf scatter overlap integral |
Michael Smith |
Modelling
Auxiliary Optics
|
17 Sep 2013 |
T1300820-x0 |
Riley_mrs_10-31-07 - BRDF SURF doc |
Michael Smith |
Education, Outreach
Auxiliary Optics
|
17 Sep 2013 |
T1300819-v1 |
Dan Riley BRDF measurement - final1 |
Michael Smith |
Auxiliary Optics
Modelling
|
17 Sep 2013 |
T1300818-v1 |
Riley-Smith BRDF measurement - final1_mrs |
Michael Smith |
Auxiliary Optics
Modelling
|
17 Sep 2013 |
T1300817-v1 |
aLIGO TCS CO2P BSC2 BAFFLE ASSEMBLY_Three Concepts |
Michael Smith |
Modelling
Auxiliary Optics
|
17 Sep 2013 |
T1300812-v1 |
Manifold-cryo-baf_Blades_Weight_Req |
Michael Smith |
Incoming Inspection
Auxiliary Optics
|
17 Sep 2013 |
T1300811-v1 |
Manifold-Cryo_baffle scatter ETM-annulus |
Michael Smith |
Auxiliary Optics
Modelling
|
17 Sep 2013 |
T1300810-v1 |
MC Tube Baffle Scatter |
Michael Smith |
Modelling
Auxiliary Optics
|
17 Sep 2013 |
T1300808-v1 |
SR2 AR Baf_Hartmann Scraper Baf_revised sketch |
Michael Smith |
Auxiliary Optics
Modelling
|
17 Sep 2013 |
T1300807-v1 |
HAM-BD heights |
Michael Smith |
Modelling
Auxiliary Optics
|
17 Sep 2013 |
T1300806-v1 |
SR Cavity Baf scatter overlap_integral |
Michael Smith |
Auxiliary Optics
Modelling
|
17 Sep 2013 |
T1300805-v1 |
Scattering from SRM AR Baf1_overlap integral |
Michael Smith |
Modelling
Auxiliary Optics
|
17 Sep 2013 |
T1300804-v1 |
SR Cavity Size Summary |
Michael Smith |
Auxiliary Optics
Modelling
|
17 Sep 2013 |
T1300803-v1 |
Signal recycling cavity beam parameters |
Michael Smith |
Auxiliary Optics
Modelling
|
17 Sep 2013 |
T1300801-v1 |
SRM AR BAF SPACER HEIGHT |
Michael Smith |
Modelling
Auxiliary Optics
|
16 Sep 2013 |
T1300800-v1 |
HAM SCRAPER BAF SPACER HEIGHT |
Michael Smith |
Modelling
Auxiliary Optics
|
16 Sep 2013 |
T1300798-v1 |
beam size at SR2 baffle |
Michael Smith |
Modelling
Auxiliary Optics
|
16 Sep 2013 |
T1300789-v1 |
OFI Wedge Prism Reflectance Data |
Michael Smith |
Auxiliary Optics
Incoming Inspection
|
16 Sep 2013 |
T1300699-v1 |
ACB scatter various materials |
Michael Smith |
Upgrades
Auxiliary Optics
|
16 Sep 2013 |
T1300700-v1 |
ACB DLC coating on SS |
Michael Smith |
Auxiliary Optics
Upgrades
|
16 Sep 2013 |
G1300935-v2 |
Status update of aLIGO lock acquisition simulation (20130913) |
Kiwamu Izumi |
Modelling
|
13 Sep 2013 |
T1300731-v1 |
Low-scatter Coating for SS Baffles |
Michael Smith |
Upgrades
Auxiliary Optics
|
13 Sep 2013 |
T1300772-v1 |
CASI BRDF Data, #2 porcelain steel 57 deg inc |
Michael Smith |
Auxiliary Optics
Upgrades
|
13 Sep 2013 |
T1300771-v1 |
Rai Weiss_porcelainized-steel_backscatter_4 |
Michael Smith |
Auxiliary Optics
Upgrades
|
13 Sep 2013 |
T1300770-v1 |
CASI BRDF Data, #4 oxidized steel 3 deg inc |
Michael Smith |
Auxiliary Optics
Upgrades
|
13 Sep 2013 |
T1300762-v1 |
CASI BRDF Data, #4 oxidized steel 57 deg inc |
Michael Smith |
Upgrades
Auxiliary Optics
|
13 Sep 2013 |
T1300764-v1 |
CASI BRDF Data, DLC 57 deg inc |
Michael Smith |
Upgrades
Auxiliary Optics
|
13 Sep 2013 |
T1300767-v1 |
CASI BRDF Data, DLC 15 deg inc |
Michael Smith |
Auxiliary Optics
Upgrades
|
13 Sep 2013 |
T1300768-v1 |
CASI BRDF Data, DLC 5 deg inc |
Michael Smith |
Auxiliary Optics
Upgrades
|
13 Sep 2013 |
T1300765-v1 |
BRDF Multi-AR SS 30 deg inc |
Michael Smith |
Upgrades
Auxiliary Optics
|
13 Sep 2013 |
T1300766-v1 |
BRDF Multi-AR SS 10 deg inc |
Michael Smith |
Auxiliary Optics
Upgrades
|
13 Sep 2013 |
E1300424-v1 |
Thickness Inspection D0902817–v4 Blade Manifold/Cryo Baf |
Michael Smith |
Auxiliary Optics
Incoming Inspection
|
13 Sep 2013 |
E1100583-v1 |
SEM Examination of Spotted and Rusted Cantilever Blades |
Jeffrey Lewis |
Incoming Inspection
|
13 Sep 2013 |
D1001011-v3 |
SLC ARM CAVITY BAFFLE SUSPENSION ASSY |
Niem Nguyen et al. |
Modelling
Fabrication
Auxiliary Optics
|
12 Sep 2013 |
D1300227-x0 |
aLIGO Pcal Development Layout |
Craig Conley |
Integration
Auxiliary Optics
Installation
|
11 Sep 2013 |
G1300915-v1 |
The Advanced LIGO GW detector |
Volker Quetschke |
Public Talk / Colloquium
Detector
|
09 Sep 2013 |
T0900080-v1 |
OMC Suspension Advanced LIGO Test Plan |
Norna Robertson et al. |
Suspensions
System Test
|
06 Sep 2013 |
G1300909-v1 |
Mode matching investigations at LLO |
Lisa Barsotti et al. |
Commissioning
Sensing and Control
|
06 Sep 2013 |
E1200535-v45 |
TMS WORK TO DO LIST GOING FORWARD |
Ken Mailand |
Upgrades
Auxiliary Optics
|
03 Sep 2013 |
E1300656-v1 |
Electronics and Optics Change Request from the HIFO-Y Test |
Daniel Sigg |
Commissioning
|
03 Sep 2013 |
T1100160-v9 |
aLIGO ISC QPD Transimpedance Amplifier Test Procedure |
Rich Abbott et al. |
Sensing and Control
System Test
|
27 Aug 2013 |
T1300719-v1 |
BRDF Multi-AR SS 57 deg inc |
Michael Smith |
Upgrades
Auxiliary Optics
|
27 Aug 2013 |
T1300718-v1 |
BRDF Multi-AR SS 15 deg inc |
Michael Smith |
Upgrades
Auxiliary Optics
|
27 Aug 2013 |
T1300717-v1 |
BRDF Multi-AR SS 3 deg inc |
Michael Smith |
Auxiliary Optics
Upgrades
|
27 Aug 2013 |
T1300716-v1 |
ACB Multi-AR coating on SS |
Michael Smith |
Auxiliary Optics
Upgrades
|
27 Aug 2013 |
E1300629-x0 |
aLIGO, Integration Testing, HIFO-Y Test |
Daniel Sigg |
Integration
|
27 Aug 2013 |
G1300834-v1 |
Tidal Prediction for Advanced LIGO: Final Presentation |
Noah Kurinsky |
Modelling
State Control and Monitoring
|
26 Aug 2013 |
T1300713-v1 |
OFI Balance Weights for heavy table D0900015-v5 |
Michael Smith |
Auxiliary Optics
Upgrades
|
26 Aug 2013 |
D1000549-v6 |
aLIGO TMS UPPER INTERMEDIATE MASS TOP ASSEMBLY |
Craig Conley et al. |
Auxiliary Optics
Installation
Final Design
Integration
|
23 Aug 2013 |
G1300868-v1 |
Controlling Transient Thermal Effects in High-Power Gravitational-Wave Detectors |
Arnaldo Rodriguez et al. |
Public Talk / Colloquium
Auxiliary Optics
|
22 Aug 2013 |
G1300863-x0 |
Working Towards Finding an Upper Limit for Crackle in LIGO’s Maraging Steel Blade Springs |
Benjamin Levy et al. |
Public Talk / Colloquium
Suspensions
|
22 Aug 2013 |
D1201420-v1 |
ZnSe Viewport Beam Block, Long, aLIGO TCS CO2P, H1-L1 |
Mindy Jacobson et al. |
Assembly
Requirements
Vacuum
Installation
Auxiliary Optics
|
20 Aug 2013 |
D1201421-v2 |
ZnSe Viewport Beam Block, Short, aLIGO TCS CO2P, H1-L1 |
Mindy Jacobson et al. |
Vacuum
Installation
Auxiliary Optics
Requirements
Assembly
|
20 Aug 2013 |
L1200261-v2 |
Executive Summary of the One Arm Test |
Daniel Sigg et al. |
Integration
|
16 Aug 2013 |
D1003295-x0 |
ISC TransMon Periscope Lens Assembly |
Jason Fishner |
Conceptual Design
Sensing and Control
|
16 Aug 2013 |
T1300695-v1 |
BS Elliptical Baffle--Black Glass Design Scattering Analysis |
Michael Smith |
Upgrades
Auxiliary Optics
|
15 Aug 2013 |
T1300692-v1 |
BS Elliptical Baffle Scatter_Black Glass Design |
Michael Smith |
Upgrades
|
15 Aug 2013 |
T1300591-v2 |
ITM Elliptical Baffle--Black Glass Hybrid Design Scattering Analysis |
Michael Smith |
Upgrades
Auxiliary Optics
|
15 Aug 2013 |
T1300691-v1 |
ACB upgrade SS with black glass |
Michael Smith |
Upgrades
Auxiliary Optics
|
15 Aug 2013 |
T1300689-v2 |
ITM Elliptical Baffle Scatter_Black Glass Hybrid |
Michael Smith |
Upgrades
Auxiliary Optics
|
15 Aug 2013 |
E0900301-v3 |
IOO Faraday Isolator Assembly and Certification Procedures |
David Tanner et al. |
Input Optics
Fabrication
Detector
|
13 Dec 2011 |
G1300835-v1 |
Status update of aLIGO lock acquisition simulation (20130814) |
Kiwamu Izumi |
Modelling
|
14 Aug 2013 |
T1300685-v1 |
ITM Elliptical Baffle Scattered Light Interference Effects |
Michael Smith |
Upgrades
Auxiliary Optics
|
14 Aug 2013 |
G1300830-v1 |
sustools.py, a Python module for SUS |
Mark Barton |
Commissioning
Suspensions
|
12 Aug 2013 |
G1300827-v1 |
Looking for Black Holes with Lasers |
Andreas Freise |
Public Talk / Colloquium
|
10 Aug 2013 |
G1200393-v2 |
Black Holes And LIGO 2012 |
Gregory Mendell et al. |
Public Talk / Colloquium
|
09 Aug 2013 |
C1302350-v2 |
RFP No. LP-11a LIGO Hanford Insulation Removal |
Rudy Arvizu |
Procurements
Operations Liens List
|
01 Aug 2013 |
T1300657-v1 |
Analysis of DLC and Semiconductor AR Coatings for Stainless Steel Baffles |
Michael Smith |
Upgrades
Auxiliary Optics
|
30 Jul 2013 |
T070039-v8 |
SIS (Stationary Interferometer Simulation) manual |
Hiro Yamamoto |
Modelling
|
30 Jul 2013 |
E1000886-v2 |
DCN-Revision of TMS Mirror Clamps |
Ken Mailand |
Auxiliary Optics
Upgrades
|
18 Jul 2013 |
D1000128-v3 |
Penultimate mass prism holder for D0901592 bonding jig |
Marielle van Veggel et al. |
Suspensions
Preliminary Design
|
18 Jul 2013 |
D1000441-v2 |
aLIGO INTERMEDIATE WIRE CLAMP ASSY MIDDLE WIRE |
Ignacio Romero |
Auxiliary Optics
Conceptual Design
|
13 Jul 2013 |
T1300622-v1 |
Vibration / Shake Tables FOR SUSPENSION AND STRUCTURE TESTING |
Ken Mailand et al. |
Operations
Core Optics
|
12 Jul 2013 |
G1300751-v1 |
Advanced LIGO - Colloquium for U. Washington, 11 July 2013 |
David Shoemaker |
Public Talk / Colloquium
Detector
|
10 Jul 2013 |
G1300741-v3 |
Towards the Quantum Limit: An Update from the AEI 10-meter Prototype Facility |
Tobin Fricke |
Public Talk / Colloquium
|
09 Jul 2013 |
G1300524-v1 |
The Arm Length Stabilisation System for Advanced LIGO Lock Acquisition |
Adam Mullavey et al. |
Commissioning
Sensing and Control
|
09 Jul 2013 |
G1300719-v3 |
Performance of the Advanced LIGO Input Optics |
Chris Mueller |
Integration
Subsystem Test
Commissioning
Input Optics
Public Talk / Colloquium
|
09 Jul 2013 |
G1300708-v2 |
Status of Advanced LIGO |
Lisa Barsotti |
Public Talk / Colloquium
|
08 Jul 2013 |
G1300724-v1 |
Measuring the quality factor of a resonator with a lock-in |
Jonathan Newport |
Education, Outreach
|
05 Jul 2013 |
E0900140-v3 |
Advanced LIGO End Reaction Mass Coating Specification |
Margot Hennig |
Core Optics
Final Design
|
04 Jul 2013 |
D1001005-v7 |
SLC ARM CAVITY BAFFLE BLADE ASSY |
Niem Nguyen et al. |
Modelling
Auxiliary Optics
|
03 Jul 2013 |
E1300578-v1 |
ECR: Topology Changes to SUS models as a result of ISC Informed Interaction |
Jeffrey Kissel |
Suspensions
Commissioning
Change Control
|
02 Jul 2013 |
L1300131-v1 |
Addendum No. 3 to LHO Reroof Project 6/3/13 |
Rudy Arvizu |
Procurements
Operations Liens List
|
02 Jul 2013 |
L1300129-v1 |
Addendum No. 2 to LHO Reroof Project 5/31/13 |
Rudy Arvizu |
Procurements
Operations Liens List
|
02 Jul 2013 |
L1300125-v1 |
Addendum No. 1 to LHO Reroof Project 5/23/13 |
Rudy Arvizu |
Procurements
Operations Liens List
|
02 Jul 2013 |
D1002431-v2 |
aLIGO TCS CO2 Laser In-Vacuum Steering Optics Assembly, H2, BSC8 |
Mindy Jacobson |
Auxiliary Optics
Vacuum
Preliminary Design
|
09 Feb 2011 |
G1300654-v1 |
SHADOW-SENSING OF VIOLIN-MODES ON AN ADVANCED LIGO SUSPENSION |
Nick Lockerbie et al. |
Public Talk / Colloquium
Suspensions
|
28 Jun 2013 |
G1300655-v1 |
A LOW-NOISE AMPLIFIER FOR SHADOW-SENSING OF VIOLIN-MODES IN AN ADVANCED LIGO SUSPENSION |
Nick Lockerbie et al. |
Sensing and Control
Public Talk / Colloquium
Suspensions
|
28 Jun 2013 |
P1300088-v1 |
A Targeted LIGO-Virgo Search for Gravitational Waves Associated with Gamma-Ray Bursts Using Low-Threshold Swift GRB Triggers |
Emelie Harstad |
GW Bursts
Thesis/Dissertation
|
27 Jun 2013 |
T1300589-x0 |
ACB--Black Glass Hybrid Baffle Design Scattering Analysis |
Michael Smith |
Auxiliary Optics
Upgrades
|
27 Jun 2013 |
D1000715-v4 |
TCS Hartmann Sensor Camera Mount |
Mindy Jacobson et al. |
Fabrication
Preliminary Design
Auxiliary Optics
Final Design
|
25 Jun 2013 |
D1300588-v1 |
ACB 1Hole with Black Glass |
Michael Smith |
Upgrades
Auxiliary Optics
|
21 Jun 2013 |
T1300218-v1 |
Creep of SLC Maraging Steel Suspension Blades |
Michael Smith |
Modelling
Auxiliary Optics
Installation
|
19 Jun 2013 |
T1300414-v2 |
Output Faraday Isolator Blade Creep |
Michael Smith |
Modelling
Auxiliary Optics
|
19 Jun 2013 |
E1300411-v1 |
ECR for PEM upgrade |
Robert Schofield |
Upgrades
|
19 Jun 2013 |
T1300558-v1 |
L1 DRMI Measurements: a checklist |
Peter Fritschel et al. |
System Test
Commissioning
|
18 Jun 2013 |
T1300539-v2 |
BS wide-angle Scatter Displacement Noise Summary |
Michael Smith |
Modelling
Auxiliary Optics
|
14 Jun 2013 |
T1300538-v1 |
BS_wide-angle_scatter_ZEMAX |
Michael Smith |
Auxiliary Optics
Modelling
|
13 Jun 2013 |
T1300534-v1 |
Exploration of the best way of applying longitudinal force at the quad test mass using the top mass actuators |
Mark Barton |
Modelling
Suspensions
|
13 Jun 2013 |
D1300555-x0 |
Square bottom plate for POD for regular T240 |
Alix Carbajo et al. |
Seismic Isolation
Conceptual Design
|
13 Jun 2013 |
D1300554-x0 |
Square tubing for POD for regular T240 |
Alix Carbajo et al. |
Seismic Isolation
Conceptual Design
|
13 Jun 2013 |
D1300553-x0 |
Square top plate for POD for regular T240 |
Alix Carbajo et al. |
Seismic Isolation
Conceptual Design
|
13 Jun 2013 |
D1300552-x0 |
Square POD for regular T240 |
Alix Carbajo et al. |
Conceptual Design
Seismic Isolation
|
13 Jun 2013 |
T1300431-v1 |
Finesse 1.0 Manual |
Andreas Freise |
Sensing and Control
Core Optics
Modelling
|
12 Jun 2013 |
D070107-v2 |
HAM6 Septum Plate for ELIGO |
Jim Warner |
Vacuum
Final Design
|
10 Jun 2013 |
G1300624-v1 |
Identifying and mitigating scattered light noise in LIGO - GEO scattering workshop |
Robert Schofield |
Commissioning
|
10 Jun 2013 |
G1300531-v3 |
Advanced LIGO |
Keita Kawabe |
Public Talk / Colloquium
|
06 Jun 2013 |
D0900541-v5 |
Faraday Isolator Upper Blade |
Niem Nguyen |
Auxiliary Optics
Modelling
|
06 Jun 2013 |
D1300513-v1 |
HIFO-Y(Half Interferomter Y) expected power budget for initial alignment |
Kiwamu Izumi |
Commissioning
|
06 Jun 2013 |
E1300449-v2 |
RFPD Clean and Bake Procedure |
Rich Abbott |
Sensing and Control
Cleaning
|
03 Jun 2013 |
G1300598-v1 |
Outreach poster on timing |
Zsuzsanna Marka |
Education, Outreach
|
30 May 2013 |
G1300597-v1 |
Advance LIGO Outreach Poster |
Zsuzsanna Marka |
Education, Outreach
|
30 May 2013 |
D020133-v1 |
Lower Blade Wire Clamp Plate (OMCS) |
Derek Bridges |
Suspensions
Final Design
|
28 May 2013 |
D020132-v2 |
Lower Blade Wire Clamp (HSTS/OMCS) |
Bobby Moore |
Suspensions
Final Design
|
28 May 2013 |
D1200035-v1 |
Upper Add-on Mass, 100g (HSTS/OMCS) |
Bobby Moore |
Conceptual Design
Suspensions
|
28 May 2013 |
D1200040-v1 |
Upper Add-on Mass, 50g (HSTS/OMCS) |
Bobby Moore |
Suspensions
Conceptual Design
|
28 May 2013 |
D1200043-v1 |
Upper Add-on Mass, 20g (HSTS/OMCS) |
Bobby Moore |
Suspensions
Conceptual Design
|
28 May 2013 |
D070020-v2 |
Magnet Holder (OMCS) |
Derek Bridges |
Suspensions
Preliminary Design
|
28 May 2013 |
D060491-v2 |
Main Section, Upper Mass (OMCS) |
Derek Bridges |
Suspensions
Final Design
|
28 May 2013 |
D070022-v1 |
Wire Clamp, Top Blade (OMCS) |
Michael Meyer |
Final Design
Suspensions
|
28 May 2013 |
D020139-v1 |
Wire Clamp Plate, Upper Mass (OMCS) |
Michael Meyer |
Suspensions
Final Design
|
28 May 2013 |
D020309-v1 |
Wire Clamp Plate with Groove, Upper Mass (OMCS) |
Michael Meyer |
Final Design
Suspensions
|
28 May 2013 |
D070030-v1 |
C-Clamp for Top Wire (OMCS) |
Michael Meyer |
Suspensions
Final Design
|
28 May 2013 |
D030042-v1 |
Wire Clamp Plate, Upper Blade (OMCS) |
Michael Meyer |
Suspensions
Final Design
|
28 May 2013 |
D030450-v2 |
Pull Plate, Rotational Adjuster (HSTS/OMCS) |
Bobby Moore |
Suspensions
Final Design
|
28 May 2013 |
D030449-v2 |
Push Plate, Rotational Adjuster (HSTS/OMCS) |
Bobby Moore |
Suspensions
Final Design
|
28 May 2013 |
D030447-v2 |
Rotating Plate, Rotational Adjuster (HSTS/OMCS) |
Bobby Moore |
Suspensions
Final Design
|
28 May 2013 |
G1300588-v1 |
Postcard Design for LIGO Magazine - 4x6 - with traceable QR codes |
Szabolcs Marka et al. |
Education, Outreach
|
27 May 2013 |
T080186-v1 |
Modeling of Alignment Sensing and Control for Enhanced LIGO |
Lisa Barsotti et al. |
Sensing and Control
Modelling
|
23 May 2013 |
D020336-v2 |
Lower Blade Clamp, Lower Side, 2.5 Degree (HSTS/OMCS) |
Bobby Moore |
Suspensions
Final Design
|
22 May 2013 |
D020313-v2 |
Lower Blade Clamp, Lower Side, 2.0 Degree (HSTS/OMCS) |
Bobby Moore |
Final Design
Suspensions
|
22 May 2013 |
D020335-v2 |
Lower Blade Clamp, Lower Side, 1.5 Degree (HSTS/OMCS) |
Bobby Moore |
Final Design
Suspensions
|
22 May 2013 |
D020334-v2 |
Lower Blade Clamp, Lower Side, 1.0 Degree (HSTS/OMCS) |
Bobby Moore |
Final Design
Suspensions
|
22 May 2013 |
D020333-v2 |
Lower Blade Clamp, Lower Side, 0.5 Degree (HSTS/OMCS) |
Bobby Moore |
Suspensions
Final Design
|
22 May 2013 |
D020308-v2 |
Lower Blade Clamp, Lower Side, 0.0 Degree (HSTS/OMCS) |
Derek Bridges |
Final Design
Suspensions
|
22 May 2013 |
D1300289-v2 |
Adapter Plate, HAM Storage Container Conversion, 3rd IFO |
Sam Barnum et al. |
Auxiliary Optics
Conceptual Design
LIGO-India
Suspensions
|
22 May 2013 |
D020340-v2 |
Lower Blade Clamp, Upper Side, 2.5 Degree (HSTS/OMCS) |
Bobby Moore |
Suspensions
Final Design
|
22 May 2013 |
D020314-v2 |
Lower Blade Clamp, Upper Side, 2.0 Degree (HSTS/OMCS) |
Bobby Moore |
Suspensions
Final Design
|
22 May 2013 |
D020339-v2 |
Lower Blade Clamp, Upper Side, 1.5 Degree (HSTS/OMCS) |
Bobby Moore |
Final Design
Suspensions
|
22 May 2013 |
D020338-v2 |
Lower Blade Clamp, Upper Side, 1.0 Degree (HSTS/OMCS) |
Bobby Moore |
Final Design
Suspensions
|
22 May 2013 |
D020337-v2 |
Lower Blade Clamp, Upper Side, 0.5 Degree (HSTS/OMCS) |
Bobby Moore |
Final Design
Suspensions
|
22 May 2013 |
D020119-v2 |
Lower Blade Clamp, Upper Side, 0.0 Degree (HSTS/OMCS) |
Bobby Moore |
Suspensions
Final Design
|
22 May 2013 |
D020680-v2 |
Upper Blade Clamp Shim, 2mm (HSTS/OMCS) |
Bobby Moore |
Suspensions
Final Design
|
22 May 2013 |
D020679-v2 |
Upper Blade Clamp Shim, 1mm (HSTS/OMCS) |
Bobby Moore |
Final Design
Suspensions
|
22 May 2013 |
D030466-v2 |
Upper Blade Clamp, Lower Side, 3.5 Degree (HSTS/OMCS) |
Bobby Moore |
Final Design
Suspensions
|
22 May 2013 |
D030465-v2 |
Upper Blade Clamp, Lower Side, 3.0 Degree (HSTS/OMCS) |
Bobby Moore |
Final Design
Suspensions
|
22 May 2013 |
D030463-v2 |
Upper Blade Clamp, Lower Side, 2.0 Degree (HSTS/OMCS) |
Bobby Moore |
Final Design
Suspensions
|
22 May 2013 |
D030462-v2 |
Upper Blade Clamp, Lower Side, 1.5 Degree (HSTS/OMCS) |
Bobby Moore |
Suspensions
Final Design
|
22 May 2013 |
D030461-v2 |
Upper Blade Clamp, Lower Side, 1.0 Degree (HSTS/OMCS) |
Bobby Moore |
Final Design
Suspensions
|
22 May 2013 |
D030460-v2 |
Upper Blade Clamp, Lower Side, 0.5 Degree (HSTS/OMCS) |
Bobby Moore |
Final Design
Suspensions
|
22 May 2013 |
D030459-v3 |
Upper Blade Clamp, Lower Side, 0.0 Degree (HSTS/OMCS) |
Bobby Moore |
Suspensions
Final Design
|
22 May 2013 |
D030464-v2 |
Upper Blade Clamp, Lower Side, 2.5 Degree (HSTS/OMCS) |
Bobby Moore |
Final Design
Suspensions
|
22 May 2013 |
D020690-v2 |
Upper Blade Clamp, Upper Side, 3.5 Degree (HSTS/OMCS) |
Bobby Moore |
Suspensions
Final Design
|
21 May 2013 |
D020689-v2 |
Upper Blade Clamp, Upper Side, 3.0 Degree (HSTS/OMCS) |
Bobby Moore |
Suspensions
Final Design
|
21 May 2013 |
D020328-v2 |
Upper Blade Clamp, Upper Side, 2.5 Degree (HSTS/OMCS) |
Bobby Moore |
Final Design
Suspensions
|
21 May 2013 |
D020312-v2 |
Upper Blade Clamp, Upper Side, 2.0 Degree (HSTS/OMCS) |
Bobby Moore |
Suspensions
Final Design
|
21 May 2013 |
D020327-v2 |
Upper Blade Clamp, Upper Side, 1.5 Degree (HSTS/OMCS) |
Bobby Moore |
Suspensions
Final Design
|
21 May 2013 |
D020326-v2 |
Upper Blade Clamp, Upper Side, 1.0 Degree (HSTS/OMCS) |
Bobby Moore |
Suspensions
Final Design
|
21 May 2013 |
D020325-v2 |
Upper Blade Clamp, Upper Side, 0.5 Degree (HSTS/OMCS) |
Michael Meyer |
Final Design
Suspensions
|
21 May 2013 |
D020116-v2 |
Upper Blade Clamp, Upper Side, 0.0 Degree (HSTS/OMCS) |
Bobby Moore |
Final Design
Suspensions
|
21 May 2013 |
D1201454-v2 |
ACB_Stage Zero-BSC3_ Endclamp, End |
Tim Nguyen et al. |
Auxiliary Optics
Modelling
Fabrication
|
21 May 2013 |
D1101622-v2 |
ACB_Stage Zero-BSC1_ Endclamp, End |
Tim Nguyen et al. |
Auxiliary Optics
Fabrication
|
21 May 2013 |
D1200604-v1 |
aLIGO_ITM Elliptical XY_Interface fixture Slider |
Tim Nguyen |
Auxiliary Optics
Modelling
|
21 Dec 2012 |
G1300578-v1 |
Experiences and lessons learned from interferometer simulations at GEO |
Andreas Freise |
Modelling
Sensing and Control
|
21 May 2013 |
G1300576-x0 |
Building up a commissioning network |
Lisa Barsotti |
Commissioning
|
20 May 2013 |
G1300554-v1 |
First Lessons from the Advanced LIGO Integration Testing |
Daniel Sigg |
Commissioning
|
16 May 2013 |
E1300368-v1 |
Install BS Elliptical Baffle LLO BSC2 X&Y Test |
Michael Smith |
Incoming Inspection
Auxiliary Optics
|
15 May 2013 |
T1300475-v1 |
OFI scattering |
Michael Smith |
Modelling
Auxiliary Optics
|
14 May 2013 |
C1301598-v2 |
Invitation To Bid for the LIGO Hanford Re-roof |
Rudy Arvizu et al. |
Operations
Procurements
|
10 May 2013 |
E1300249-v2 |
ECR - Change Locating Dimensions of Oplev/Pcal Receiver Installations in all End VEAs |
Craig Conley |
Integration
Change Control
Auxiliary Optics
Installation
|
10 May 2013 |
D1300438-x0 |
aLIGO TCS HWS Pedestal Dog Clamps |
Mindy Jacobson |
System Engineering
Cleaning
Installation
Auxiliary Optics
Vacuum
|
07 May 2013 |
G1100114-v1 |
LIGO REU Brochure |
Dale Ingram |
Education, Outreach
|
03 May 2013 |
E1101086-v6 |
OMC Optical Prisms |
Sam Waldman et al. |
Requirements
Sensing and Control
|
03 May 2013 |
G1300533-v1 |
Status update of aLIGO lock acquisition simulation (20130503) |
Kiwamu Izumi |
Commissioning
|
03 May 2013 |
G1300532-v2 |
FFT Simulation using FOG : LIGO seminar on May 3rd, 2013 |
Richard Day |
Modelling
Core Optics
|
03 May 2013 |
G1201071-v3 |
Complexities in Operating Large-scale Gravitational Wave Interferometers |
Corey Gray |
Public Talk / Colloquium
|
29 Apr 2013 |
G1300508-x0 |
Education and Public Outreach: Skills and Media |
Amber Stuver |
Meeting
Education, Outreach
|
28 Apr 2013 |
G1300500-v1 |
Detecting gravitational waves with Advanced LIGO: how, when, and what will come next |
Lisa Barsotti |
Public Talk / Colloquium
|
26 Apr 2013 |
T1300419-v1 |
OFI 1st Article Data_hanford iLog |
Keita Kawabe |
Auxiliary Optics
System Test
|
25 Apr 2013 |
T1300401-v1 |
wide angle scatter_BS_L1_power |
Michael Smith |
Auxiliary Optics
Modelling
|
25 Apr 2013 |
E1300293-x0 |
SLC & VP Requirements documentation |
Michael Smith |
Auxiliary Optics
Requirements
|
23 Apr 2013 |
E1300299-x0 |
SLC & VP Test documents |
Michael Smith |
Auxiliary Optics
System Test
|
22 Apr 2013 |
G1300480-v2 |
Beyond Advanced Gravitational Wave Detectors: beating the quantum limit with squeezed states of light |
Lisa Barsotti |
Public Talk / Colloquium
|
22 Apr 2013 |
G1300455-v3 |
Advanced LIGO for McGill 2013-04-17 |
David Shoemaker |
Detector
Public Talk / Colloquium
|
21 Apr 2013 |
T1200008-v3 |
Comparison of Quantum Noise in 3G Interferometer Configurations |
Haixing Miao et al. |
Sensing and Control
Basic R&D
Modelling
|
18 Apr 2013 |
D1300353-x0 |
Square mass 0.166 kilograms |
Alix Carbajo et al. |
Seismic Isolation
Conceptual Design
|
18 Apr 2013 |
D1300351-v1 |
Wire clamp on the frame |
Alix Carbajo et al. |
Seismic Isolation
Conceptual Design
|
18 Apr 2013 |
D1300301-v1 |
Wire clamp on the frame part 2 |
Alix Carbajo et al. |
Conceptual Design
Seismic Isolation
|
18 Apr 2013 |
D1300352-v2 |
Wire clamp on the frame steel part |
Alix Carbajo et al. |
Conceptual Design
Seismic Isolation
|
18 Apr 2013 |
D1300299-v1 |
Wire clamp on the frame part 1 |
Alix Carbajo et al. |
Conceptual Design
Seismic Isolation
|
18 Apr 2013 |
D1300316-v1 |
Wire clamp on the suspension steel part |
Alix Carbajo et al. |
Conceptual Design
Seismic Isolation
|
18 Apr 2013 |
D1300298-v1 |
Wire clamp on the suspension part 2 |
Alix Carbajo et al. |
Conceptual Design
Seismic Isolation
|
18 Apr 2013 |
D1300297-v1 |
Wire clamp on the suspension part 1 |
Alix Carbajo et al. |
Conceptual Design
Seismic Isolation
|
18 Apr 2013 |
D1300315-v1 |
Wire clamp on the suspension |
Alix Carbajo et al. |
Conceptual Design
Seismic Isolation
|
18 Apr 2013 |
D070250-v4 |
Base Plate, Lower Wire Jig (OMCS) |
Derek Bridges |
Final Design
Suspensions
|
17 Apr 2013 |
D020677-v3 |
Library of Clamps (HSTS/OMCS) |
Michael Meyer |
Suspensions
Final Design
|
17 Apr 2013 |
D070139-v1 |
Upper Wire Jig Assembly (OMCS) |
Michael Meyer |
Final Design
Suspensions
|
17 Apr 2013 |
D0900308-v4 |
Structural Weldment (OMCS) |
Michael Meyer et al. |
Final Design
Suspensions
|
16 Apr 2013 |
G1300452-v2 |
Enhancing the astrophysical reach of LIGO with squeezed states |
Lisa Barsotti |
Public Talk / Colloquium
|
13 Apr 2013 |
G1300119-v2 |
Friendly Power Shutdown for LLO Corner Buildings |
David Kinzel |
Policies
Data and Computing
Sensing and Control
Seismic Isolation
Observatory Facilities
Vacuum
Auxiliary Optics
Data Acquisition System
Laser Systems
Core Optics
Suspensions
System Engineering
Commissioning
Input Optics
|
11 Apr 2013 |
G1300437-v1 |
aLIGO Installed A-1 Adapter Measurements, Oplev/Pcal Receiver Side (LHO, LLO) |
Craig Conley |
Integration
Auxiliary Optics
Installation
|
09 Apr 2013 |
G1300440-v1 |
Environmentors Poster Presentation |
Corey Gray |
Education, Outreach
|
09 Apr 2013 |
G1300434-v1 |
Update from the AEI 10m Prototype |
Tobin Fricke |
Commissioning
Installation
Public Talk / Colloquium
|
07 Apr 2013 |
D1100911-v3 |
aLIGO TCS URS50 MOUNT |
Mindy Jacobson |
Preliminary Design
Input Optics
Auxiliary Optics
|
04 Apr 2013 |
D1300318-v1 |
Square mass 0.628 kilograms |
Alix Carbajo et al. |
Seismic Isolation
Conceptual Design
|
04 Apr 2013 |
D1300317-v1 |
Plate for CG |
Alix Carbajo et al. |
Conceptual Design
Seismic Isolation
|
04 Apr 2013 |
D1300307-v1 |
Round mass for the picomotor 0.104 kilograms |
Alix Carbajo et al. |
Conceptual Design
Seismic Isolation
|
04 Apr 2013 |
D1300293-v1 |
Suspended seismometer platform |
Alix Carbajo et al. |
Seismic Isolation
Conceptual Design
|
04 Apr 2013 |
D1300304-v1 |
Stop for rotation of the suspension |
Alix Carbajo et al. |
Seismic Isolation
Conceptual Design
|
04 Apr 2013 |
D1300303-v1 |
Foot supporting the frame |
Alix Carbajo et al. |
Conceptual Design
Seismic Isolation
|
04 Apr 2013 |
D1300296-v1 |
POD attachment |
Alix Carbajo et al. |
Conceptual Design
Seismic Isolation
|
04 Apr 2013 |
D1300295-v1 |
Picomotor attachment |
Alix Carbajo et al. |
Seismic Isolation
Conceptual Design
|
04 Apr 2013 |
D1300313-x0 |
Wire for suspension |
Alix Carbajo et al. |
Seismic Isolation
Conceptual Design
|
03 Apr 2013 |
G1300420-v1 |
Beyond Advanced Gravitational Wave Detectors: beating the quantum limit with squeezed states of light |
Lisa Barsotti |
Public Talk / Colloquium
|
03 Apr 2013 |
D1300312-x0 |
Bar to attach the POD - Aluminum Inch T-Slotted Framing System Four-Slot Single, 1-1/2" Hollow Extrusion, 2.25'' Length |
Alix Carbajo et al. |
Seismic Isolation
Conceptual Design
|
03 Apr 2013 |
D1300311-x0 |
External horizontal bar for left and right - Aluminum Inch T-Slotted Framing System Four-Slot Single, 1-1/2" Hollow Extrusion, 13'' Length |
Alix Carbajo et al. |
Conceptual Design
Seismic Isolation
|
03 Apr 2013 |
D1300310-x0 |
Vertical bar - Aluminum Inch T-Slotted Framing System Four-Slot Single, 1-1/2" Hollow Extrusion, 9.5'' Length |
Alix Carbajo et al. |
Conceptual Design
Seismic Isolation
|
03 Apr 2013 |
D1300309-x0 |
Horizontal bar for front and back - Aluminum Inch T-Slotted Framing System Four-Slot Single, 1-1/2" Hollow Extrusion, 12.5'' Length |
Alix Carbajo et al. |
Conceptual Design
Seismic Isolation
|
03 Apr 2013 |
D1300308-x0 |
Internal horizontal bar for left and right - Aluminum Inch T-Slotted Framing System Four-Slot Single, 1-1/2" Hollow Extrusion, 9'' Length |
Alix Carbajo et al. |
Conceptual Design
Seismic Isolation
|
03 Apr 2013 |
D1300306-v1 |
Round mass 0.333 kilograms |
Alix Carbajo et al. |
Seismic Isolation
Conceptual Design
|
03 Apr 2013 |
D1300305-v1 |
Round mass 0.778 kilograms |
Alix Carbajo et al. |
Conceptual Design
Seismic Isolation
|
03 Apr 2013 |
D1300288-x0 |
Adapter Plate, HAM Storage Container Conversion, 3rd IFO |
Sam Barnum |
Seismic Isolation
Conceptual Design
LIGO-India
|
28 Mar 2013 |
D1300263-v1 |
ALIGO, AOS, VIEWPORT LEAK TEST FIXTURE, PROOF TEST CAP ASSY. FOR [H1/L1] CO2P V.P. |
Eduardo Sanchez |
Installation
Integration
Fabrication
|
28 Mar 2013 |
G1100769-v2 |
QUAD Testing Outline, Phase 2B |
Jeffrey Kissel et al. |
System Engineering
Subsystem Test
Commissioning
Core Optics
Suspensions
Fabrication
Basic R&D
System Test
Auxiliary Optics
|
25 Mar 2013 |
P1300029-v2 |
LIGO Magazine, issue 2 3/2013 |
Andreas Freise |
Other data analysis
Education, Outreach
|
19 Mar 2013 |
T1300158-v2 |
Arm cavity geometry for H1 ALS test with X and Y arm |
Keita Kawabe |
Sensing and Control
Commissioning
Core Optics
|
18 Mar 2013 |
G1200508-v2 |
LLO Power Monitoring Requirements |
David Kinzel |
Procurements
Requirements
|
18 Mar 2013 |
G1300258-v1 |
Arm Length Stabilization at LHO |
Daniel Sigg |
Integration
|
17 Mar 2013 |
T1100080-v3 |
Commissioning Advanced LIGO's First Arm Cavity |
Daniel Sigg et al. |
Commissioning
System Engineering
Integration
|
17 Mar 2013 |
D1201160-v2 |
AdLIGO_AOS_SLC_ACB Upper Right Mouse Hole Cover |
Tim Nguyen |
Modelling
Auxiliary Optics
|
14 Mar 2013 |
E1200254-v3 |
Tolerances for Height Measurements of the HAM Suspensions During Assembly |
Derek Bridges |
Assembly
Suspensions
Modelling
|
12 Mar 2013 |
F1100002-v4 |
Winding Template, aLIGO TCS Ring Heater Elements |
Mindy Jacobson et al. |
Auxiliary Optics
Vacuum
Incoming Inspection
Fabrication
|
07 Mar 2013 |
G1300120-v2 |
Mirror quality and interferometer performance |
Hiro Yamamoto |
Core Optics
Modelling
|
06 Mar 2013 |
G1300087-v1 |
Stabilization Techniques at LIGO |
Koji Arai |
Public Talk / Colloquium
|
06 Mar 2013 |
T1100073-v3 |
List of Suspensions in Chambers |
Norna Robertson |
Installation
Suspensions
|
07 Feb 2011 |
T010076-v2 |
Advanced LIGO Optical Layout Overview |
Dennis Coyne |
System Engineering
Preliminary Design
|
28 Feb 2013 |
D1201163-v2 |
AdLIGO_AOS_SLC_ACB Upper Left Mouse Hole Cover |
Tim Nguyen |
Auxiliary Optics
Modelling
|
25 Feb 2013 |
D1201328-v1 |
Dual suspended seismometer platform iso, Dual suspended seismometer platform iso |
Philipp Knothe et al. |
Conceptual Design
Seismic Isolation
|
24 Feb 2013 |
D1201326-v1 |
Upper insulation assembly, Rotate dual suspended seismometer short osc platform iso |
Philipp Knothe et al. |
Conceptual Design
Seismic Isolation
|
24 Feb 2013 |
D1201325-v1 |
Upper insulation top, Rotate dual suspended seismometer short osc platform iso |
Philipp Knothe et al. |
Conceptual Design
Seismic Isolation
|
24 Feb 2013 |
D1201324-v1 |
Upper insulation narrow, Rotate dual suspended seismometer short osc platform iso |
Philipp Knothe et al. |
Seismic Isolation
Conceptual Design
|
24 Feb 2013 |
D1201323-v1 |
Upper insulation wide, Rotate dual suspended seismometer short osc platform iso |
Philipp Knothe et al. |
Seismic Isolation
Conceptual Design
|
24 Feb 2013 |
D1201322-v1 |
Lower insulation narrow, Rotate dual suspended seismometer short osc platform iso |
Philipp Knothe et al. |
Conceptual Design
Seismic Isolation
|
24 Feb 2013 |
D1201321-v1 |
Lower insulation wide, Rotate dual suspended seismometer short osc platform iso |
Philipp Knothe et al. |
Seismic Isolation
Conceptual Design
|
24 Feb 2013 |
D1201302-v1 |
Bumper Plate, Rotate dual suspended seismometer short osc platform |
Philipp Knothe et al. |
Conceptual Design
Seismic Isolation
|
24 Feb 2013 |
D1201270-v1 |
Internal platform, Dual suspended seismometer platform |
Philipp Knothe et al. |
Seismic Isolation
Conceptual Design
|
24 Feb 2013 |
D1201268-v1 |
Dual suspended seismometer platform, Dual suspended seismometer platform |
Philipp Knothe et al. |
Conceptual Design
Seismic Isolation
|
24 Feb 2013 |
D1201265-v1 |
Base plate, Dual suspended seismometer short osc platform |
Philipp Knothe et al. |
Seismic Isolation
Conceptual Design
|
24 Feb 2013 |
D1201264-v1 |
Moving plate, Dual suspended seismometer short osc platform |
Philipp Knothe et al. |
Conceptual Design
Seismic Isolation
|
24 Feb 2013 |
D1201257-v1 |
Rotate dual suspended seismometer short osc platform, Rotate dual suspended seismometer short osc platform |
Philipp Knothe et al. |
Conceptual Design
Seismic Isolation
|
24 Feb 2013 |
D1201256-v1 |
External top plate, Dual suspended seismometer platform |
Philipp Knothe et al. |
Conceptual Design
Seismic Isolation
|
24 Feb 2013 |
D1201255-v1 |
Supporting structure, Rotate dual suspended seismometer short osc platform |
Philipp Knothe et al. |
Seismic Isolation
Conceptual Design
|
24 Feb 2013 |
D1201254-v1 |
Moving top, Rotate dual suspended seismometer short osc platform |
Philipp Knothe et al. |
Conceptual Design
Seismic Isolation
|
24 Feb 2013 |
D1201253-v1 |
Base, Rotate dual suspended seismometer short osc platform |
Philipp Knothe et al. |
Seismic Isolation
Conceptual Design
|
24 Feb 2013 |
D1201241-v1 |
Base plate reinforcing plate, Dual suspended seismometer short osc platform |
Philipp Knothe et al. |
Conceptual Design
Seismic Isolation
|
24 Feb 2013 |
D1201240-v1 |
Split shaft, Dual suspended seismometer short osc platform |
Philipp Knothe et al. |
Conceptual Design
Seismic Isolation
|
24 Feb 2013 |
D1201239-v1 |
Side clamp element, Dual suspended seismometer platform |
Philipp Knothe et al. |
Conceptual Design
Seismic Isolation
|
24 Feb 2013 |
D1201238-v1 |
Bottom clamp, Dual suspended seismometer platform |
Philipp Knothe et al. |
Conceptual Design
Seismic Isolation
|
24 Feb 2013 |
D1201237-v1 |
Top clamp, Dual suspended seismometer platform |
Philipp Knothe et al. |
Conceptual Design
Seismic Isolation
|
24 Feb 2013 |
D1201125-v2 |
aLIGO_Manifold_Cryo_Baffle_ETM X_Radial Segment Right |
Tim Nguyen |
Modelling
Auxiliary Optics
|
22 Feb 2013 |
E070079-v2 |
SUBSTRATE, ALIGO INPUT MODE CLEANER CURVED MIRROR (IMCC) |
Rodica Martin et al. |
Input Optics
Final Design
|
19 Feb 2013 |
L1300018-v2 |
Summary of the L1 Input Mode Cleaner Testing |
Peter Fritschel et al. |
Integration
|
16 Feb 2013 |
E1300136-v1 |
aLigo TMS Telescope Mirrors & Packaging for Delivery to Local Coater |
Ken Mailand et al. |
Requirements
Auxiliary Optics
|
14 Feb 2013 |
D1200763-v2 |
Handle Gusset, aLIGO TCS Steering Mirror 2, H1-L1 |
Mindy Jacobson et al. |
Assembly
Cleaning
Vacuum
Auxiliary Optics
Installation
|
14 Feb 2013 |
D1002355-v2 |
SLC ACB 1 HOLE FINAL ASSY |
Niem Nguyen |
Auxiliary Optics
Modelling
|
13 Feb 2013 |
G1200075-v2 |
Relativity The Fun Stuff |
Gregory Mendell |
Public Talk / Colloquium
|
08 Feb 2013 |
T1200037-v1 |
Loss function for characterizing cavities |
Hiro Yamamoto |
Modelling
Core Optics
|
08 Feb 2013 |
G1300064-v1 |
Hunting for Black Holes in India |
Fred Raab |
Education, Outreach
|
06 Feb 2013 |
G1200501-v2 |
Multiwavelength Astronomy: Examples of Astronomy Observations Made with Different Kinds of Light |
Amber Stuver |
Education, Outreach
Astrophysics / Multi-messenger
|
05 Feb 2013 |
G1300055-v1 |
HankelIFO, simulations based on the Hankel transform |
Hiro Yamamoto |
Modelling
Core Optics
|
01 Feb 2013 |
D1000653-v4 |
TOP LEVEL ISC Equipment Block Diagram |
Rich Abbott et al. |
Sensing and Control
Conceptual Design
|
31 Jan 2013 |
G1300054-v2 |
Example and experience using SIS for aLIGO designing and commissioning |
Hiro Yamamoto |
Core Optics
Modelling
|
30 Jan 2013 |
G1300050-v3 |
Output Mode Cleaners |
Keita Kawabe et al. |
Commissioning
|
28 Jan 2013 |
G1300047-v1 |
LIGO Hanford Outreach Opportunities for Rural Schools |
Dale Ingram |
Education, Outreach
|
24 Jan 2013 |
D1002608-v5 |
SLC ACB SUSPENSION BLADE |
Norris Kilpatrick et al. |
Auxiliary Optics
Modelling
|
18 Jan 2013 |
G1300030-v1 |
GEO 600 Status |
Hartmut Grote et al. |
Public Talk / Colloquium
|
14 Jan 2013 |
G1300031-v1 |
Squeezed Light Techniques for Gravitational Wave Detection |
Daniel Sigg |
Public Talk / Colloquium
|
14 Jan 2013 |
G1300027-v1 |
Advanced LIGO, for GWs: New Frontier, Seoul, 2013 |
David Shoemaker |
Detector
Public Talk / Colloquium
|
11 Jan 2013 |
D1201511-v2 |
aLIGO Pcal Tooling, Periscope Video Target Plate |
Craig Conley |
Auxiliary Optics
System Test
|
10 Jan 2013 |
G1300013-v1 |
LIGO Laboratory Distance Learning Opportunities for Schools |
Dale Ingram |
Education, Outreach
|
07 Jan 2013 |
D1100539-v2 |
aLIGO TCS .25'' Thick Optical Window |
Alexander Lynch et al. |
Preliminary Design
Fabrication
Final Design
Vacuum
Auxiliary Optics
|
07 Jan 2013 |
G1201295-v2 |
Magnetic coupling to test mass suspensions. |
Peter Fritschel |
Suspensions
Subsystem Test
Integration
|
02 Jan 2013 |
P1100166-v4 |
Controlling calibration errors in gravitational-wave detectors by precise location of calibration forces |
Hernan Daveloza et al. |
Calibration
Core Optics
Modelling
Collaboration
|
24 Dec 2012 |
D1100208-v5 |
ALIGO AOS Output Faraday Isolator Spacer (HAM5-L1) |
Manuel Ruiz |
Auxiliary Optics
Assembly
|
19 Dec 2012 |
D1100171-v5 |
ALIGO AOS Output Faraday Isolator Spacer (HAM5-H1) |
Manuel Ruiz |
Auxiliary Optics
Assembly
|
19 Dec 2012 |
G1201267-v1 |
Capitalizing on GW polarization bias for a pair of interferometric detectors to increase parameter estimation speed and the potential implications for cosmological models. |
Amber Stuver et al. |
Other data analysis
GW source predictions
Modelling
|
19 Dec 2012 |
D1100359-v4 |
SLC ACB ADJUSTABLE EXTENDER ASSY |
Niem Nguyen et al. |
Auxiliary Optics
Modelling
|
14 Dec 2012 |
G1201266-v1 |
Smoke, Mirrors, Big Bangs And Big Scientific Payoffs: An outline for using an interferometer network to conduct astronomy. |
Cristina Torres et al. |
Education, Outreach
Commissioning
Detector
Basic R&D
Data Analysis
Public Talk / Colloquium
|
13 Dec 2012 |
G1201279-v1 |
Searching for Gravitational Waves with LIGO |
Fred Raab |
Education, Outreach
|
10 Dec 2012 |
G1201272-v1 |
Introduction to State Space techniques |
Tobin Fricke |
Public Talk / Colloquium
|
06 Dec 2012 |
T1200450-v2 |
Cavity alignment fluctuations in the H2 One Arm Test |
Lisa Barsotti |
Commissioning
|
03 Dec 2012 |
G1200753-v1 |
aLIGO H2 One Arm Test Update |
Keita Kawabe et al. |
Commissioning
Detector
|
03 Dec 2012 |
D1101288-v4 |
AdLIGO Alignment Fixture, Tube-up Assembly |
Manuel Ruiz |
Auxiliary Optics
Assembly
|
29 Nov 2012 |
G1201211-v1 |
Flow diagrams for HEPI actuators, bleed and operate mode |
Brian Lantz et al. |
Seismic Isolation
Assembly
Commissioning
|
26 Nov 2012 |
G1200442-v1 |
Wideband, 3rd Generation, Gravitational-wave Antenna |
Rana Adhikari |
Basic R&D
Upgrades
|
26 Nov 2012 |
G1200573-v1 |
LIGO III Blue Concept |
Rana Adhikari |
Detector
Basic R&D
Upgrades
|
26 Nov 2012 |
T1200510-v1 |
MATH SCIENCE PARTNERSHIP EXTERNAL EVALUATION REPORT |
Dale Ingram |
Education, Outreach
|
21 Nov 2012 |
D1200586-v2 |
aLIGO_ITM Elliptical Lift Stand Extension Tube |
Tim Nguyen |
Modelling
Auxiliary Optics
|
21 Nov 2012 |
D1100247-v3 |
AdLIGO_AOS_Output Faraday Isolator Baffle |
Manuel Ruiz |
Auxiliary Optics
Assembly
|
13 Nov 2012 |
D1201460-v1 |
aLIGO AOS Oplev & Pcal Installation Layout, Y-END Stations |
Craig Conley |
Integration
Commissioning
Installation
Auxiliary Optics
|
12 Nov 2012 |
D1201459-v1 |
aLIGO AOS Oplev & Pcal Installation Layout, X-END Stations |
Craig Conley |
Auxiliary Optics
Installation
Integration
Commissioning
|
12 Nov 2012 |
T1200498-v1 |
Elementary Poster Teacher's Guide |
Dale Ingram |
Education, Outreach
|
09 Nov 2012 |
G1201180-v1 |
Elementary Classroom Poster |
Dale Ingram |
Education, Outreach
|
09 Nov 2012 |
D1201252-v1 |
aLIGO_SLC_ITM Elliptical BSC2 Variable Height Gauge |
Tim Nguyen |
Auxiliary Optics
Modelling
|
09 Nov 2012 |
D1201445-v1 |
OFI_1/2-20 Locked Nut |
Tim Nguyen |
Modelling
Auxiliary Optics
|
05 Nov 2012 |
T1200491-v1 |
Analysis of Rosin Core Solder for UHV Applications |
Rich Abbott et al. |
System Engineering
Cleaning
|
01 Nov 2012 |
T1200490-v2 |
LIGO Mailing List Group Configuration |
Warren Anderson |
Conceptual Design
|
01 Nov 2012 |
D1201250-v1 |
aLIGO_SLC_ACB-ITM Elliptical_Suspension Rod Gauge |
Tim Nguyen |
Modelling
Auxiliary Optics
|
01 Nov 2012 |
T1200489-v1 |
Thermal effects of aLIGO BS |
Hiro Yamamoto |
Core Optics
Modelling
|
01 Nov 2012 |
D1101404-v3 |
Stiffener, Tube Up |
Manuel Ruiz et al. |
Auxiliary Optics
Assembly
|
01 Nov 2012 |
D1201442-v1 |
Air Bake Fixture, aLIGO TCS CO2P UHV Steering Mirror 1 |
Mindy Jacobson et al. |
Assembly
Vacuum
Auxiliary Optics
Cleaning
|
31 Oct 2012 |
D1201251-v1 |
aLIGO_SLC_ACB_ Variable Height Bracket, 9 Degree |
Jeffrey Lewis et al. |
Auxiliary Optics
Modelling
|
30 Oct 2012 |
D1201165-v1 |
AdLIGO_AOS_SLC_ACB Lower Left Mouse Hole Cover |
Tim Nguyen |
Modelling
Auxiliary Optics
|
26 Oct 2012 |
D1201164-v1 |
AdLIGO_AOS_SLC_ACB Lower Right Mouse Hole Cover |
Tim Nguyen |
Modelling
Auxiliary Optics
|
26 Oct 2012 |
D1200313-v5 |
ACB 1 HOLE LEFT QPD SKIN (w PD) |
Manuel Ruiz et al. |
Auxiliary Optics
Modelling
|
24 Oct 2012 |
D1200296-v5 |
ACB 1 HOLE RIGHT QPD SKIN (w PD) |
Manuel Ruiz et al. |
Modelling
Auxiliary Optics
|
24 Oct 2012 |
D1002225-v4 |
ESD Connector Flex Circuit |
Jack Davis et al. |
Conceptual Design
Auxiliary Optics
|
23 Oct 2012 |
T1200484-v1 |
The LSC White Paper on Education and Public Outreach 2012 - Public Release |
LSC |
Education, Outreach
|
21 Oct 2012 |
E0900073-v3 |
Advanced LIGO Beam Splitter (BS) Coating Specification |
Rand Dannenberg |
Final Design
Core Optics
|
20 Oct 2012 |
E1200908-v1 |
Electronics and Optics Change Request from the One Arm Test |
Daniel Sigg |
Integration
|
19 Oct 2012 |
S1203493-v1 |
L1-MSR-07 IFO Front End Computers |
David Kinzel |
Operations
System Engineering
|
10 Oct 2012 |
S1203497-v1 |
L1-MSR-11 General Computing |
David Kinzel |
Operations
System Engineering
|
10 Oct 2012 |
S1203499-v1 |
L1-MSR-13 UPS for IFO and CDS Computers Rack |
David Kinzel |
System Engineering
Operations
|
10 Oct 2012 |
D070337-v8 |
Bottom Mass Assembly, HLTS |
Derek Bridges |
Suspensions
Final Design
|
09 Oct 2012 |
T1200472-v1 |
BS02 reflection and transmission maps' profile and effects |
Hiro Yamamoto |
Core Optics
Modelling
|
07 Oct 2012 |
G1201058-v1 |
Cavity Error Calibration Notes for a Damped Triple Pendulum |
LVC |
Basic R&D
Commissioning
|
02 Oct 2012 |
D1001990-v3 |
Platform Walkway, BSC Installation |
Sam Barnum |
Seismic Isolation
Installation
|
01 Oct 2012 |
D1001700-v2 |
SLC INTERFACE MOUNTING CLAMP |
Niem Nguyen |
Auxiliary Optics
Modelling
Fabrication
|
27 Sep 2012 |
D1201109-v1 |
aLIGO ITM Elliptical Baffle Tooling_Baffle Box Prop |
Tim Nguyen |
Auxiliary Optics
Modelling
|
27 Sep 2012 |
D1201030-v1 |
ACB Tooling, Adjustable Post |
Tim Nguyen |
Modelling
Auxiliary Optics
|
27 Sep 2012 |
D1201080-v1 |
ACB Tooling, Extended Joint |
Tim Nguyen |
Auxiliary Optics
Modelling
|
27 Sep 2012 |
D1002098-v2 |
aLIGO_TMS_TEST_MASS_PLATE |
Ken Mailand |
Auxiliary Optics
Final Design
|
25 Sep 2012 |
T1100343-v3 |
ISC 4 channel differential to single ended converter chassis test procedure |
Rich Abbott |
Sensing and Control
Subsystem Test
|
24 Sep 2012 |
D0900359-v3 |
Wedged Prism Assy |
Niem Nguyen et al. |
Modelling
Auxiliary Optics
|
21 Sep 2012 |
D1002100-v2 |
aLIGO_TMS_TEST_MASS_SHORTBAR |
Ken Mailand |
Final Design
Auxiliary Optics
|
20 Sep 2012 |
D1002099-v1 |
aLIGO_TMS_ TEST_MASS_LONGBAR |
Ken Mailand |
Preliminary Design
Auxiliary Optics
|
19 Sep 2012 |
D1101427-v4 |
BRACE, LIFTING, ARM CAVITY BAFFLE |
Manuel Ruiz |
Auxiliary Optics
Assembly
|
19 Sep 2012 |
D1201230-v1 |
aLIGO_SLC_Half Pound Balance Weight |
Tim Nguyen |
Modelling
Auxiliary Optics
|
19 Sep 2012 |
P1200119-v1 |
LIGO Magazine, issue 1/2012 |
Andreas Freise |
Education, Outreach
Suspensions
Other data analysis
Installation
|
19 Sep 2012 |
E1200841-x0 |
Rotate dual suspended seismometer short osc platform, Rotate dual suspended seismometer short osc platform |
Philipp Knothe et al. |
Seismic Isolation
Conceptual Design
|
18 Sep 2012 |
D1201154-v1 |
SLC INTERFACE MOUNTING CLAMP_SMALL |
Tim Nguyen |
Auxiliary Optics
Modelling
|
14 Sep 2012 |
D1201271-x0 |
Supporting structure, Dual suspended seismometer platform |
Philipp Knothe et al. |
Conceptual Design
Seismic Isolation
|
13 Sep 2012 |
D1201267-x0 |
Moving top, Dual suspended seismometer short osc platform |
Philipp Knothe et al. |
Conceptual Design
Seismic Isolation
|
12 Sep 2012 |
D1201266-x0 |
Base, Dual suspended seismometer short osc platform |
Philipp Knothe et al. |
Seismic Isolation
Conceptual Design
|
12 Sep 2012 |
D1201262-x0 |
Bottom clamp assembly, Dual Suspended seismometer platform |
Philipp Knothe et al. |
Conceptual Design
Seismic Isolation
|
12 Sep 2012 |
D1201261-x0 |
Top clamp assembly, Dual Suspended seismometer platform |
Philipp Knothe et al. |
Seismic Isolation
Conceptual Design
|
12 Sep 2012 |
D1001621-v5 |
SLC ARM CAVITY BAFFLE UPPER MTG HINGE |
Niem Nguyen et al. |
Fabrication
Modelling
Auxiliary Optics
|
12 Sep 2012 |
G1200937-v2 |
Composite mirror suspensionsdevelopment status |
Riccardo DeSalvo et al. |
Suspensions
Conceptual Design
|
09 Sep 2012 |
D030025-v1 |
Screw, Socket Head Cap, #8-32 UNC-2A X 1 Long, Fully Threaded, Rounded End, Ag-Plated |
Derek Bridges |
System Engineering
Fabrication
|
09 Sep 2012 |
D1000909-v3 |
SLC COPPER PLATE |
Niem Nguyen et al. |
Modelling
Auxiliary Optics
|
07 Sep 2012 |
T1200199-v2 |
Instrument Science White Paper |
LSC |
Suspensions
Core Optics
Input Optics
Upgrades
Laser Systems
Auxiliary Optics
Detector
Basic R&D
Seismic Isolation
Sensing and Control
|
30 Aug 2012 |
T1200424-v1 |
Setting up the Physical Environment Monitoring System for Advanced LIGO |
Maggie Tse |
Commissioning
|
29 Aug 2012 |
E1200786-x0 |
DCN for BSC-ISI Stage1 Add Dampers and remove Trim mass |
Sam Barnum |
Sensing and Control
Upgrades
|
28 Aug 2012 |
G1200826-v1 |
ISC Modeling Meeting - Aug 24, 2012 |
Lisa Barsotti |
Modelling
|
24 Aug 2012 |
D1200681-v4 |
aLIGO Photon Calibrator Laser Mounting Block |
Jonathan Berliner |
Auxiliary Optics
|
21 Aug 2012 |
D1200873-v1 |
aLIGO_High Power viewport Guard |
Tim Nguyen |
Modelling
Auxiliary Optics
|
21 Aug 2012 |
T1200400-x0 |
Magnetic Modeling in ANSYS Workbench (version 13.0) |
Jeffrey Kissel |
Modelling
Suspensions
|
20 Aug 2012 |
D1200920-v1 |
AdLIGO_AOS_SLC ACB BSC3 H1-L1, INTERFACE MOUNTING PLATE |
Tim Nguyen |
Auxiliary Optics
Modelling
|
14 Aug 2012 |
D1200903-v1 |
SLC ARM CAVITY BAFFLE_BSC1 H1-L1 INTERFACE MOUNTING PLATE |
Tim Nguyen |
Modelling
Auxiliary Optics
|
14 Aug 2012 |
D1102073-v1 |
aLIGO ITM Elliptical Baffle_ ALIGNMENT CROSSHAIR TARGET |
Tim Nguyen |
Auxiliary Optics
Modelling
|
13 Aug 2012 |
G1200797-v1 |
The "Sound" of Redshift |
Amber Stuver |
Education, Outreach
Astrophysics / Multi-messenger
|
10 Aug 2012 |
D1100075-v3 |
SLC ACB ENAMEL HANGING FIXTURE ASSY |
Niem Nguyen et al. |
Basic R&D
Auxiliary Optics
|
10 Aug 2012 |
T070304-v1 |
Vibration Transmission to OMC Bench via Cabling |
Norna Robertson |
Modelling
Suspensions
|
08 Aug 2012 |
S1202957-x0 |
L1-FAC-YC1 |
David Kinzel |
Operations
System Engineering
|
08 Aug 2012 |
S1202950-x0 |
L1-FAC-XC1 |
David Kinzel |
Operations
System Engineering
|
08 Aug 2012 |
D1201128-x0 |
aLIGO ITM Elliptical Tooling_Lower tube Height Gauge |
Tim Nguyen |
Modelling
Auxiliary Optics
|
07 Aug 2012 |
G1200778-v1 |
Einstein's Messengers Classroom Poster |
Dale Ingram |
Education, Outreach
|
01 Aug 2012 |
G1200779-v1 |
Einstein's Messengers Promotional Flyer |
Dale Ingram |
Education, Outreach
|
01 Aug 2012 |
G1200777-v1 |
LHO Field Trip Brochure |
Dale Ingram |
Education, Outreach
|
01 Aug 2012 |
D1200423-v1 |
ALIGO, Table Extension, Scraper Baffle, HAM4 |
Scott Shankle |
Conceptual Design
|
31 Jul 2012 |
G1200769-v1 |
Squeezing in Gravitational Wave Detectors |
Lisa Barsotti |
Public Talk / Colloquium
|
30 Jul 2012 |
G1200743-v1 |
An Overview of Advanced LIGO Interferometry |
Luca Matone et al. |
Education, Outreach
Detector Characterization
Sensing and Control
|
18 Jul 2012 |
D1100833-v1 |
ALIGO, OPLEV, PERISCOPE, BSC2-L1 LAYOUT |
Eduardo Sanchez et al. |
Auxiliary Optics
Conceptual Design
|
18 Jul 2012 |
D1101823-v1 |
aLIGO OPTICAL LEVERS GIRAFFE BASE PLATE |
Ignacio Romero |
Auxiliary Optics
Conceptual Design
|
18 Jul 2012 |
D1200795-v1 |
Breakout Board - DB9 |
Tobin Fricke |
System Test
Subsystem Test
|
18 Jul 2012 |
D0900357-v2 |
Faraday Isolator Wedged Prism Holder |
Niem Nguyen |
Auxiliary Optics
Final Design
|
17 Jul 2012 |
T1200351-v1 |
Correction to the inspiral range calculation in GWINC |
Peter Fritschel et al. |
GW source predictions
Compact Binaries
Modelling
|
16 Jul 2012 |
D1200835-v1 |
aLIGO_AOS_SLC_ACB, Two Pound Weight |
Tim Nguyen |
Modelling
Auxiliary Optics
|
06 Jul 2012 |
G1200709-v3 |
Advanced LIGO, for MG13 Stockholm |
David Shoemaker |
Public Talk / Colloquium
Detector
|
05 Jul 2012 |
G1200689-v1 |
Squeezed Light Techniques for Gravitational Wave Detection |
Daniel Sigg |
Public Talk / Colloquium
|
03 Jul 2012 |
G1200688-v1 |
Squeezed Light Techniques for Gravitational Wave Detection |
Daniel Sigg |
Public Talk / Colloquium
|
02 Jul 2012 |
G1200687-v1 |
Status of Ground-Based Gravitational-Wave Interferometers |
Daniel Sigg |
Public Talk / Colloquium
|
02 Jul 2012 |
T080230-v3 |
Quad Pendulum Structure Pushers |
Calum Torrie et al. |
Installation
|
02 Jul 2012 |
D1100352-v5 |
SLC ACB LO CAPTURED PLATE |
Niem Nguyen |
Modelling
Auxiliary Optics
|
26 Jun 2012 |
D1100347-v6 |
SLC ACB UPPER CAPTURED PLATE |
Niem Nguyen |
Modelling
Auxiliary Optics
|
25 Jun 2012 |
G1200695-v1 |
Pre-tour Introduction to LIGO(technical edition) |
Fred Raab |
Education, Outreach
|
22 Jun 2012 |
D030078-v2 |
Add-on Mass, 20g |
Michael Meyer |
Suspensions
Final Design
|
21 Jun 2012 |
D020351-v2 |
Add-on Mass, 50g |
Michael Meyer |
Suspensions
Final Design
|
21 Jun 2012 |
D020350-v3 |
Add-on Mass, 100g |
Michael Meyer |
Suspensions
Final Design
|
21 Jun 2012 |
E1000065-v6 |
aLIGO TCS CO2 Laser Specification |
Mindy Jacobson et al. |
Auxiliary Optics
Final Design
Preliminary Design
|
20 Jun 2012 |
G1200697-v1 |
SolidWorks summit presentation |
Bobby Moore |
Education, Outreach
|
20 Jun 2012 |
P1200071-v1 |
Optical System Design of Laser Interferometer for Gravitational Wave Detection |
Hiro Yamamoto |
Public Talk / Colloquium
Core Optics
|
19 Jun 2012 |
D1200108-v1 |
Lower Wire Clamp Base, HSTS |
Bobby Moore |
Suspensions
Conceptual Design
|
18 Jun 2012 |
D1200422-v1 |
ALIGO, Assy,Table Extension, Scraper Baffle, HAM4 |
Scott Shankle |
Conceptual Design
|
15 Jun 2012 |
D1200424-v1 |
ALIGO, Table Ext, Support Arm HAM4 |
Scott Shankle |
Conceptual Design
|
15 Jun 2012 |
D1200425-v1 |
ALIGO, Table Extension, Adapter Plate |
Scott Shankle |
Conceptual Design
|
15 Jun 2012 |
D1200882-v1 |
Septum Viewport Protector for back of vacuum sealing surface |
Gerardo Moreno et al. |
Vacuum
Conceptual Design
|
14 Jun 2012 |
E1200621-x0 |
BOM and Formal Drawing Tree, aLIGO TCS HWS Table Assembly, HAM4 |
Mindy Jacobson |
Installation
Auxiliary Optics
Integration
System Engineering
Fabrication
Assembly
|
13 Jun 2012 |
D1200878-v1 |
aLIGO Pcal Laser Shutter Hex Post |
Jonathan Berliner |
Auxiliary Optics
Fabrication
Modelling
Calibration
Laser Systems
Assembly
|
12 Jun 2012 |
D1200900-x0 |
DC Power Supply Rack VDC-YC2 |
David Kinzel |
Installation
System Engineering
Integration
|
12 Jun 2012 |
D1200898-x0 |
DC Power Supply Rack VDC-XC2 |
David Kinzel |
Installation
System Engineering
Integration
|
12 Jun 2012 |
D1200896-x0 |
DC Power Supply Rack VDC-C7 |
David Kinzel |
Installation
System Engineering
Integration
|
12 Jun 2012 |
D1200894-x0 |
DC Power Supply Rack VDC-C5 |
David Kinzel |
Integration
System Engineering
Installation
|
12 Jun 2012 |
D1200891-x0 |
DC Power Supply Rack VDC-C2 |
David Kinzel |
System Engineering
Integration
Installation
|
12 Jun 2012 |
D1200892-x0 |
DC Power Supply Rack VDC-C3 |
David Kinzel |
System Engineering
Integration
Installation
|
12 Jun 2012 |
D1200890-x0 |
DC Power Supply Rack VDC-C1 |
David Kinzel |
System Engineering
Integration
Installation
|
12 Jun 2012 |
D1002582-v3 |
SLC BAFFLE TUBE UP ASSY |
Niem Nguyen et al. |
Modelling
Auxiliary Optics
|
11 Jun 2012 |
G1200580-v2 |
Laser Interferometers for Gravitational-Wave Detection |
Fred Raab |
Detector
Education, Outreach
|
11 Jun 2012 |
D1002561-v3 |
SLC DAMPING 8 INCHES DIA TUBE |
Niem Nguyen |
Auxiliary Optics
Modelling
|
11 Jun 2012 |
T1200285-v1 |
Description of the Sensor Correction FIR & IIR Filter Components |
Brian Lantz |
Commissioning
Seismic Isolation
|
06 Jun 2012 |
D0902025-v3 |
Upper AOSEM Mounting Bracket, Intermediate Mass, HLTS |
Derek Bridges |
Suspensions
Preliminary Design
|
04 Jun 2012 |
D0901493-v3 |
Lower AOSEM Mounting Bracket, Intermediate Mass, HLTS |
Derek Bridges |
Suspensions
Final Design
|
04 Jun 2012 |
E1100688-v1 |
OBSOLETE: aLIGO PRM and SRM TIlt Angles |
Michael Smith |
System Engineering
Modelling
|
31 May 2012 |
D1200765-v1 |
Handle, aLIGO TCS Steering Mirror 2, H1-L1 |
Mindy Jacobson |
Assembly
Cleaning
Vacuum
Auxiliary Optics
Installation
|
31 May 2012 |
D1200764-v1 |
Support Web, aLIGO TCS Steering Mirror 2, H1-L1 |
Mindy Jacobson |
Auxiliary Optics
Installation
Vacuum
Cleaning
Assembly
|
31 May 2012 |
G1200565-v1 |
All about Optics |
GariLynn Billingsley et al. |
Core Optics
Modelling
Cleaning
Basic R&D
|
29 May 2012 |
D070442-v7 |
Structural Weldment, HLTS |
Derek Bridges et al. |
Suspensions
Final Design
|
29 May 2012 |
E1000312-v5 |
aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #3 |
Hugo Paris et al. |
Seismic Isolation
Subsystem Test
|
24 May 2012 |
G1200558-v1 |
GWADW 2012: Setting the Stage |
David Reitze |
Public Talk / Colloquium
Basic R&D
Detector
|
24 May 2012 |
G1200548-v1 |
Optical simulations within and beyond the paraxial limit |
Daniel Brown et al. |
Modelling
|
24 May 2012 |
G1200547-v2 |
The Study of Evanescent-Wave Heat Transfer in a Parallel Plane Geometry |
Richard Ottens et al. |
Public Talk / Colloquium
|
24 May 2012 |
D1200762-v1 |
TCS H1-L1 SM2 SPLASH COVER |
Mindy Jacobson |
Assembly
Cleaning
Installation
Auxiliary Optics
Vacuum
|
24 May 2012 |
G1200588-v1 |
aLIGO Integration status for 23 May 2012 meeting |
Peter Fritschel |
Integration
|
23 May 2012 |
D1000974-v6 |
SLC ARM CAVITY BAFFLE TOP SKIN |
Niem Nguyen |
Auxiliary Optics
Fabrication
Modelling
|
18 May 2012 |
E0900349-v12 |
ETM Telescope Secondary Parabolic Mirror, ADLIGO |
Michael Smith et al. |
Final Design
Auxiliary Optics
|
15 May 2012 |
T1200200-v1 |
H2 One Arm Test Beam Geometry |
Keita Kawabe et al. |
Commissioning
|
07 May 2012 |
D1101849-v1 |
aLIGO TCS HWS OPTICS ASSY In Vac, L1 HAM5 |
Aidan Brooks et al. |
Vacuum
Auxiliary Optics
Final Design
Fabrication
Integration
System Engineering
Preliminary Design
|
04 May 2012 |
T080096-v1 |
Wire Attachment Points and Flexure Corrections |
Norna Robertson et al. |
Subsystem Test
Suspensions
Modelling
|
04 May 2012 |
D1000395-v2 |
aLIGO INTERMEDIATE TOP MASS SPACER |
Ignacio Romero |
Conceptual Design
Auxiliary Optics
|
01 May 2012 |
D0902722-v4 |
Sapphire Prism Holder Extension |
Derek Bridges |
Final Design
Suspensions
|
30 Apr 2012 |
G1200499-v1 |
Multi-messenger Astronomy: Expanding Astronomy's "Senses" |
Amber Stuver |
Public Talk / Colloquium
Astrophysics / Multi-messenger
Education, Outreach
|
30 Apr 2012 |
D0902664-v3 |
Sapphire Prism Holder, HLTS |
Derek Bridges |
Final Design
Suspensions
|
30 Apr 2012 |
D0902663-v3 |
Sapphire Prism Holder Assembly, HLTS |
Derek Bridges |
Final Design
Suspensions
|
30 Apr 2012 |
D0902666-v3 |
Bonding Template Side, Sapphire Prism, HLTS |
Derek Bridges |
Suspensions
Final Design
|
30 Apr 2012 |
G1200488-v1 |
LHO Outreach Presentation to WSU GEAR UP |
Dale Ingram |
Education, Outreach
|
27 Apr 2012 |
T1200188-v1 |
ETM Transmission Monitor Telescope Performance |
Michael Smith |
Conceptual Design
Auxiliary Optics
|
26 Apr 2012 |
T1000075-v2 |
Advanced Interferometer Configurations White Paper |
Rana Adhikari et al. |
Sensing and Control
Basic R&D
System Engineering
Integration
Upgrades
|
26 Apr 2012 |
T1000090-v5 |
advanced LIGO baffle design using SIS |
Hiro Yamamoto |
Modelling
Core Optics
|
25 Apr 2012 |
G1100863-v1 |
An Overview of Control Theory and Digital Signal Processing |
Luca Matone |
Education, Outreach
Detector
|
24 Apr 2012 |
T080144-v1 |
The Enhanced LIGO Output Mode Cleaners |
Sam Waldman |
Commissioning
Sensing and Control
|
24 Apr 2012 |
D1101289-v3 |
AdLIGO Support, Tube-up |
Manuel Ruiz |
Assembly
Auxiliary Optics
|
19 Apr 2012 |
D1100427-v2 |
ALIGO SRM AR BAFFLE PLATE |
Carrie Wilkerson et al. |
Modelling
|
19 Apr 2012 |
T1200175-v1 |
bLCGT TM Wide Angle Baffle, Manifold Baffle, and Beam Tube Baffle Conceptual Design |
Michael Smith |
Auxiliary Optics
Conceptual Design
|
18 Apr 2012 |
D1101290-v2 |
AdLIGO Brace, Tube-up |
Manuel Ruiz |
Assembly
Auxiliary Optics
|
18 Apr 2012 |
T1200176-v1 |
bLCGT Recycling Cavity Baffles Conceptual Design |
Michael Smith |
Conceptual Design
Auxiliary Optics
|
18 Apr 2012 |
E1200391-v1 |
bLCGT Cavity Lengths |
Michael Smith |
Auxiliary Optics
Conceptual Design
|
18 Apr 2012 |
T1100286-v2 |
Methanol Spray Optic Cleaning Procedure |
Margot Hennig |
Input Optics
Auxiliary Optics
Cleaning
|
17 Apr 2012 |
T1200083-v1 |
aLIGO Kepco DC Power Supply Acceptance Testing Scripts |
Carl Adams |
Incoming Inspection
|
16 Apr 2012 |
T1200172-v2 |
Installation and testing of L1 PSL table legs |
Riccardo DeSalvo et al. |
Laser Systems
Commissioning
|
15 Apr 2012 |
T1200171-v1 |
Status of acoustic isolation of the H2 PSL enclosure |
Robert Schofield |
System Test
|
13 Apr 2012 |
D1000410-v3 |
aLIGO_BOSEMS_INTERMIDIATE_SUPPORT_LEFT_SIDE_TRAY |
Craig Conley |
Auxiliary Optics
Suspensions
|
12 Apr 2012 |
D1100425-v2 |
aLIGO SRM AR BAFFLE, TOP SUPPORT BAR |
Carrie Wilkerson et al. |
Modelling
|
11 Apr 2012 |
E1200364-v1 |
Shutter Controller Specifications |
Daniel Sigg |
Sensing and Control
Operations
|
10 Apr 2012 |
E1200360-v1 |
Picomotor Controller Specifications |
Daniel Sigg |
Operations
Sensing and Control
|
10 Apr 2012 |
E1200354-x0 |
aLIGO, Slow Controls, Concentrators, Serial Ports |
Daniel Sigg |
Sensing and Control
Operations
|
10 Apr 2012 |
T080266-v1 |
Suspending optics on steel wire loops |
Norna Robertson et al. |
Suspensions
Basic R&D
|
02 Mar 2009 |
G1200204-v2 |
Network-enabled access to globally distributed data: LIGO-India |
Roy Williams |
LIGO-India
Public Talk / Colloquium
|
09 Apr 2012 |
D0902444-v2 |
HLTS Positioning Standoff, Intermediate Magnet Placement Fixture |
Derek Bridges |
Suspensions
Final Design
|
03 Apr 2012 |
D070321-v2 |
Earthquake Stop Bridge Crossbar, HLTS |
Derek Bridges |
Final Design
Suspensions
|
02 Apr 2012 |
D0901875-v1 |
Breakout Board - SCSI 68 |
David Kinzel |
System Test
Subsystem Test
|
02 Apr 2012 |
E080462-v1 |
Infrasonic Microphone and PEM++ |
Gabor Szeifert et al. |
Computing/archiving
Fabrication
Requirements
Calibration
Integration
Conceptual Design
Upgrades
Data quality / vetoes
Data Acquisition System
Preliminary Design
System Test
Other data analysis
Observatory Facilities
Data and Computing
Sensing and Control
Basic R&D
|
01 Apr 2012 |
E080228-v1 |
L1 HAM6 ISI Mass Layout (As-Leveled) |
Michael Meyer |
Seismic Isolation
Commissioning
|
01 Apr 2012 |
E070085-v2 |
Coated Substrate, ALIGO INPUT MODE CLEANER FLAT MIRROR (IMCF) |
Rodica Martin |
Input Optics
Activity
|
01 Apr 2012 |
D1001973-v3 |
aLIGO TMS FOCUS SCREW |
Michael Miller et al. |
Auxiliary Optics
Final Design
Fabrication
|
29 Mar 2012 |
D0901419-v2 |
Lower Loop Wire Jig Assembly (HLTS) |
Derek Bridges |
Final Design
Suspensions
|
27 Mar 2012 |
D0900630-v2 |
Intermediate Wire Jig Assembly, HLTS |
Derek Bridges et al. |
Suspensions
Final Design
|
27 Mar 2012 |
D0900594-v2 |
Upper Wire Jig Assembly, HLTS |
Michael Meyer |
Final Design
Suspensions
|
24 Mar 2012 |
D0900689-v2 |
Base Plate, Library of Clamps, Lower Blade, HLTS |
Derek Bridges |
Preliminary Design
Suspensions
|
24 Mar 2012 |
D0900680-v2 |
Blade Clamp (3.5 Degree), Upper Blade, Outside, HLTS |
Derek Bridges |
Preliminary Design
Suspensions
|
22 Mar 2012 |
D0900679-v2 |
Blade Clamp (3.0 Degree), Upper Blade, Outside, HLTS |
Derek Bridges |
Preliminary Design
Suspensions
|
22 Mar 2012 |
D0900678-v2 |
Blade Clamp (2.5 Degree), Upper Blade, Outside, HLTS |
Derek Bridges |
Preliminary Design
Suspensions
|
22 Mar 2012 |
D0900677-v2 |
Blade Clamp (2.0 Degree), Upper Blade, Outside, HLTS |
Derek Bridges |
Preliminary Design
Suspensions
|
22 Mar 2012 |
D0900676-v2 |
Blade Clamp (1.5 Degree), Upper Blade, Outside, HLTS |
Derek Bridges |
Suspensions
Preliminary Design
|
22 Mar 2012 |
D0900675-v2 |
Blade Clamp (1.0 Degree), Upper Blade, Outside, HLTS |
Derek Bridges |
Suspensions
Preliminary Design
|
22 Mar 2012 |
D0900674-v2 |
Blade Clamp (0.5 Degree), Upper Blade, Outside, HLTS |
Derek Bridges |
Preliminary Design
Suspensions
|
22 Mar 2012 |
D0900673-v3 |
Blade Clamp (3.5 Degree), Upper Blade, Inside, HLTS |
Derek Bridges |
Final Design
Suspensions
|
22 Mar 2012 |
D0900672-v3 |
Blade Clamp (3.0 Degree), Upper Blade, Inside, HLTS |
Derek Bridges |
Suspensions
Final Design
|
22 Mar 2012 |
D0900671-v3 |
Blade Clamp (2.5 Degree), Upper Blade, Inside, HLTS |
Derek Bridges |
Final Design
Suspensions
|
22 Mar 2012 |
D0900670-v3 |
Blade Clamp (2.0 Degree), Upper Blade, Inside, HLTS |
Derek Bridges |
Suspensions
Final Design
|
22 Mar 2012 |
D0900669-v3 |
Blade Clamp (1.5 Degree), Upper Blade, Inside, HLTS |
Derek Bridges |
Final Design
Suspensions
|
22 Mar 2012 |
D0900668-v3 |
Blade Clamp (1.0 Degree), Upper Blade, Inside, HLTS |
Derek Bridges |
Final Design
Suspensions
|
22 Mar 2012 |
D0900667-v3 |
Blade Clamp (0.5 Degree), Upper Blade, Inside, HLTS |
Derek Bridges |
Final Design
Suspensions
|
22 Mar 2012 |
D0900665-v3 |
Library of Clamps, Upper Blade, HLTS |
Derek Bridges |
Suspensions
Final Design
|
22 Mar 2012 |
D080267-v2 |
Top Bridge, Upper Blade Bake Fixture, HLTS |
Derek Bridges |
Suspensions
Final Design
|
22 Mar 2012 |
D080268-v2 |
Base Plate, Upper Blade Bake Fixture, HLTS |
Derek Bridges |
Suspensions
Final Design
|
22 Mar 2012 |
D080265-v3 |
Upper Blade Bake Fixture, HLTS |
Derek Bridges et al. |
Suspensions
Final Design
|
22 Mar 2012 |
T1200147-v1 |
IO Chassis Temperature Study |
Rich Abbott et al. |
System Engineering
System Test
|
22 Mar 2012 |
D1200448-v1 |
Septum Viewport Protector |
Michael Meyer |
Vacuum
Conceptual Design
|
21 Mar 2012 |
D0901241-v2 |
Earthquake Stop Mount, Bridge, HLTS |
Derek Bridges |
Final Design
Suspensions
|
19 Mar 2012 |
D070310-v2 |
Top Blade Guard Bar, HLTS |
Derek Bridges |
Final Design
Suspensions
|
19 Mar 2012 |
D070309-v2 |
Top Blade Guard Riser, HLTS |
Derek Bridges |
Suspensions
Final Design
|
19 Mar 2012 |
D0901286-v2 |
Secondary Metal Prism Breakoff, HLTS |
Michael Meyer et al. |
Suspensions
Final Design
|
18 Mar 2012 |
D070338-v4 |
Metal Bottom Mass, HLTS |
Derek Bridges |
Preliminary Design
Suspensions
|
17 Mar 2012 |
D080238-v2 |
Collar, Lower, 900g, Intermediate Mass, HLTS |
Derek Bridges |
Final Design
Suspensions
|
17 Mar 2012 |
D080236-v2 |
Collar, Lower, 700g, Intermediate Mass, HLTS |
Derek Bridges |
Suspensions
Final Design
|
17 Mar 2012 |
D080234-v2 |
Collar, Lower, 500g, Intermediate Mass, HLTS |
Derek Bridges |
Suspensions
Final Design
|
17 Mar 2012 |
D080232-v2 |
Collar, Lower, 300g, Intermediate Mass, HLTS |
Derek Bridges |
Suspensions
Final Design
|
17 Mar 2012 |
D080183-v2 |
Collar, Lower, 100g, Intermediate Mass, HLTS |
Derek Bridges |
Final Design
Suspensions
|
17 Mar 2012 |
D080229-v2 |
Collar, Upper, 900g, Intermediate Mass, HLTS |
Derek Bridges |
Final Design
Suspensions
|
17 Mar 2012 |
D080227-v2 |
Collar, Upper, 700g, Intermediate Mass, HLTS |
Derek Bridges |
Final Design
Suspensions
|
17 Mar 2012 |
D080225-v2 |
Collar, Upper, 500g, Intermediate Mass, HLTS |
Derek Bridges |
Suspensions
Final Design
|
17 Mar 2012 |
D080223-v2 |
Collar, Upper, 300g, Intermediate Mass, HLTS |
Derek Bridges |
Final Design
Suspensions
|
17 Mar 2012 |
D080182-v2 |
Collar, Upper, 100g, Intermediate Mass, HLTS |
Derek Bridges |
Suspensions
Final Design
|
17 Mar 2012 |
D030155-v2 |
Center Offset, Intermediate Mass, HLTS |
Derek Bridges |
Final Design
Suspensions
|
17 Mar 2012 |
D970075-v2 |
Dumbbell Standoff |
Calum Torrie |
Final Design
Suspensions
|
17 Mar 2012 |
D070336-v3 |
Main Section, Intermediate Mass, HLTS |
Derek Bridges |
Suspensions
Preliminary Design
|
17 Mar 2012 |
D070585-v4 |
Upper Clamp, Intermediate Wire, Inside, HLTS |
Derek Bridges |
Suspensions
Final Design
|
17 Mar 2012 |
D070394-v3 |
Upper Clamp, Intermediate Wire, Outside, HLTS |
Michael Meyer |
Suspensions
Final Design
|
17 Mar 2012 |
D030149-v2 |
Intermediate Wire Breakoff, Intermediate Mass, HLTS |
Derek Bridges |
Final Design
Suspensions
|
17 Mar 2012 |
D070405-v3 |
Lower Clamp, Intermediate Wire, Inside, HLTS |
Derek Bridges |
Suspensions
Final Design
|
17 Mar 2012 |
D070406-v3 |
Lower Clamp, Intermediate Wire, Outside, HLTS |
Derek Bridges |
Final Design
Suspensions
|
17 Mar 2012 |
D080263-v2 |
Additional Mass Disk, 150g |
Derek Bridges |
Preliminary Design
Suspensions
|
17 Mar 2012 |
D070333-v2 |
Additional Mass Disk, 100g |
Derek Bridges |
Suspensions
Preliminary Design
|
17 Mar 2012 |
D0901405-v2 |
Additional Mass Disk, 50g |
Derek Bridges |
Preliminary Design
Suspensions
|
17 Mar 2012 |
D030139-v2 |
Roll Offset, T-Piece, Upper Mass, HLTS |
Derek Bridges |
Suspensions
Final Design
|
17 Mar 2012 |
D020652-v2 |
C-Clamp, Upper Mass, HLTS |
Derek Bridges |
Final Design
Suspensions
|
16 Mar 2012 |
D070341-v3 |
Upper Clamp, Upper Wire, Outside, HLTS |
Derek Bridges |
Final Design
Suspensions
|
16 Mar 2012 |
D020601-v2 |
Blade Clamp (0.0 Degree), Upper Blade, Outside, HLTS |
Michael Meyer et al. |
Preliminary Design
Suspensions
|
16 Mar 2012 |
D020617-v2 |
Upper Blade, HLTS |
Calum Torrie et al. |
Suspensions
Final Design
|
16 Mar 2012 |
D020622-v3 |
Blade Clamp (0.0 Degree), Upper Blade, Inside, HLTS |
Michael Meyer et al. |
Final Design
Suspensions
|
16 Mar 2012 |
D070331-v3 |
Shim, 1.0mm, Upper Blade, HLTS |
Derek Bridges |
Final Design
Suspensions
|
16 Mar 2012 |
D070460-v2 |
Earthquake Stop Mount, Long, HLTS |
Derek Bridges |
Final Design
Suspensions
|
14 Mar 2012 |
D070322-v2 |
Earthquake Stop Bracket, Long, HLTS |
Derek Bridges |
Suspensions
Final Design
|
14 Mar 2012 |
D070319-v2 |
Earthquake Stop Assembly, Bridge, HLTS |
Derek Bridges |
Suspensions
Final Design
|
14 Mar 2012 |
D0901553-v4 |
Lower AOSEM Alignment Assembly, Bottom Mass, HLTS |
Bobby Moore et al. |
Final Design
Suspensions
|
14 Mar 2012 |
D0901552-v4 |
Upper AOSEM Alignment Assembly, Bottom Mass, HLTS |
Bobby Moore et al. |
Suspensions
Final Design
|
14 Mar 2012 |
D080677-v4 |
Coil Holder Assembly, HLTS |
Derek Bridges |
Preliminary Design
Suspensions
|
13 Mar 2012 |
D1000409-v3 |
aLIGO_BOSEMS_INTERMIDIATE_SUPPORT_RIGHT_SIDE_TRAY |
Craig Conley |
Auxiliary Optics
Suspensions
|
13 Mar 2012 |
D1000408-v3 |
aLIGO_BOSEMS_INTERMIDIATE_SUPPORT_LEFT_SIDE_BRACKET |
Craig Conley |
Auxiliary Optics
|
13 Mar 2012 |
D1000407-v3 |
aLIGO_OSEMS_INTERMIDIATE_SUPPORT_RIGHT_SIDE_BRACKET |
Craig Conley |
Auxiliary Optics
|
13 Mar 2012 |
D070436-v4 |
Lower Loop Wire Assembly, HLTS |
Derek Bridges |
Final Design
Suspensions
|
12 Mar 2012 |
D070393-v3 |
Intermediate Wire Assembly, HLTS |
Derek Bridges |
Final Design
Suspensions
|
12 Mar 2012 |
D070335-v6 |
Upper Mass Assembly, HLTS |
Derek Bridges |
Preliminary Design
Suspensions
|
12 Mar 2012 |
D070334-v4 |
Intermediate Mass Assembly, HLTS |
Derek Bridges |
Suspensions
Final Design
|
12 Mar 2012 |
D070340-v3 |
Upper Wire Assembly, HLTS |
Derek Bridges |
Suspensions
Final Design
|
12 Mar 2012 |
D070328-v2 |
Rotating Plate, Rotational Adjuster, HLTS |
Derek Bridges |
Final Design
Suspensions
|
12 Mar 2012 |
D070326-v4 |
Rotational Adjuster, HLTS |
Derek Bridges |
Final Design
Suspensions
|
12 Mar 2012 |
D070374-v2 |
Mounting Pad Body, HLTS |
Derek Bridges |
Suspensions
Final Design
|
12 Mar 2012 |
D1000973-v8 |
SLC ARM CAVITY BAFFLE SKIN |
Niem Nguyen |
Auxiliary Optics
Fabrication
Modelling
|
12 Mar 2012 |
D1100074-v4 |
SLC ACB INNER SKIN PORCELAIN HANGING FIXTURE |
Niem Nguyen |
Auxiliary Optics
Modelling
|
12 Mar 2012 |
T0900285-v2 |
L1 HAM6 ISI eLIGO Final Performance Measurements (March 24 2010) |
Jeffrey Kissel |
Seismic Isolation
Final Design
Requirements
Commissioning
|
12 Mar 2012 |
D1001365-v6 |
SLC ARM CAVITY BAFFLE MIDDLE REINFORCING PLATE |
Niem Nguyen |
Modelling
Fabrication
Auxiliary Optics
|
12 Mar 2012 |
G1200064-v1 |
Squeezed Light Techniques for Gravitational Wave Detection |
Daniel Sigg |
Public Talk / Colloquium
|
01 Mar 2012 |
D1100288-v4 |
SLC ACB TOP EXTENDER |
Niem Nguyen |
Modelling
Auxiliary Optics
|
29 Feb 2012 |
D1001363-v4 |
SLC ARM CAVITY BAFFLE SIDE REINFORCING HATSECTION |
Niem Nguyen |
Modelling
Auxiliary Optics
|
29 Feb 2012 |
D1001027-v5 |
SLC ARM CAVITY BAFFLE LOWER LEAF |
Niem Nguyen |
Modelling
Fabrication
Auxiliary Optics
|
29 Feb 2012 |
D1001026-v5 |
SLC ARM CAVITY BAFFLE UPPER LEAF |
Niem Nguyen |
Modelling
Fabrication
Auxiliary Optics
|
29 Feb 2012 |
D1000976-v4 |
SLC ARM CAVITY BAFFLE CENTER SKIN |
Niem Nguyen |
Auxiliary Optics
Fabrication
Modelling
|
29 Feb 2012 |
D1000975-v4 |
SLC ARM CAVITY BAFFLE BOTTOM SKIN |
Niem Nguyen |
Auxiliary Optics
Fabrication
Modelling
|
29 Feb 2012 |
T1200062-v1 |
Characteristics of ETM05 with LMA coating |
Hiro Yamamoto |
Core Optics
Modelling
|
29 Feb 2012 |
D080727-v3 |
Earthquake Stop Assembly, Long Bracket, HLTS |
Derek Bridges |
Suspensions
Final Design
|
29 Feb 2012 |
D080726-v3 |
Earthquake Stop Assembly, Long Mount, HLTS |
Derek Bridges |
Preliminary Design
Suspensions
|
29 Feb 2012 |
D070308-v3 |
Top Blade Guard Assembly, HLTS |
Derek Bridges |
Suspensions
Final Design
|
28 Feb 2012 |
P1200020-x0 |
Design, Control, and Performance of a Prototype Advanced LIGO Single-Stage Seismic Isolation Platform |
Jeffrey Kissel et al. |
Commissioning
Subsystem Test
Requirements
Seismic Isolation
Final Design
|
27 Feb 2012 |
D070327-v2 |
Base Plate, Rotational Adjuster, HLTS |
Derek Bridges |
Suspensions
Preliminary Design
|
23 Feb 2012 |
T0900508-v1 |
LLO OMC Mode Matching |
Katherine Dooley |
Auxiliary Optics
Modelling
Commissioning
Conceptual Design
|
23 Feb 2012 |
T1200082-v1 |
Beckhoff Breakout Box |
Stephen O'Connor |
Auxiliary Optics
Requirements
Fabrication
|
23 Feb 2012 |
D070332-v6 |
HLTS Suspension Assembly |
Derek Bridges |
Preliminary Design
Suspensions
|
21 Feb 2012 |
T1100455-v2 |
Analysis of position/voltage data on a BOSEM |
Mark Barton et al. |
Suspensions
Subsystem Test
|
21 Feb 2012 |
T0900325-v2 |
H1 Squeezer Noise Model |
Daniel Sigg et al. |
Basic R&D
Sensing and Control
|
16 Feb 2012 |
G1100937-v2 |
Advanced LIGO Thermal Compensation System (TCS) - Sept 2011 LVC Meeting |
Aidan Brooks |
Meeting
Auxiliary Optics
|
15 Feb 2012 |
D0902507-v6 |
Fibre guard Main Body |
Marielle van Veggel et al. |
Final Design
Suspensions
|
13 Feb 2012 |
D0902519-v4 |
aLIGO SUS, Fibre guard angle section 11 |
Marielle van Veggel et al. |
Final Design
Suspensions
|
13 Feb 2012 |
D0902518-v4 |
aLIGO SUS, Fibre guard angle section 10 |
Marielle van Veggel et al. |
Final Design
Suspensions
|
13 Feb 2012 |
D0902517-v4 |
aLIGO SUS,Fibre guard angle section 9 |
Marielle van Veggel et al. |
Final Design
Suspensions
|
13 Feb 2012 |
D0902508-v5 |
aLIGO SUSFibre guard Separator |
Marielle van Veggel et al. |
Final Design
Suspensions
|
13 Feb 2012 |
D0902516-v4 |
aLIGO SUS,Fibre guard angle section 8 |
Marielle van Veggel et al. |
Suspensions
Final Design
|
13 Feb 2012 |
T1200079-x0 |
LLO Beam Tube Enclosure Inspection Report |
Michael Meyer |
Operations
Vacuum
|
10 Feb 2012 |
T1200076-x0 |
ETM HWS EtherCAT breakout box |
Stephen O'Connor |
Requirements
Fabrication
Auxiliary Optics
|
09 Feb 2012 |
D0902515-v3 |
Fibre guard angle section 7 |
Marielle van Veggel et al. |
Suspensions
Preliminary Design
|
09 Feb 2012 |
D0902514-v3 |
Fibre guard angle section 6 |
Marielle van Veggel et al. |
Preliminary Design
Suspensions
|
09 Feb 2012 |
D0902512-v6 |
Fibre guard angle section 4 |
Marielle van Veggel et al. |
Suspensions
Preliminary Design
|
09 Feb 2012 |
D0902510-v3 |
Fibre guard angle section 2 |
Marielle van Veggel et al. |
Suspensions
Preliminary Design
|
09 Feb 2012 |
D0902509-v3 |
Fibre guard angle section 1 |
Marielle van Veggel et al. |
Suspensions
Preliminary Design
|
09 Feb 2012 |
D0901461-v2 |
HLTS Magnet Placement Fixture, Intermediate Mass |
Derek Bridges |
Suspensions
Final Design
|
09 Feb 2012 |
T1200072-v1 |
Test Proceedure ETM: Hartman Sensor Power Supply |
Stephen O'Connor |
Auxiliary Optics
Requirements
Fabrication
|
08 Feb 2012 |
D0901058-v1 |
AdLIGO AOS SLC Fold Mirror Beam Dump Final Assy |
Ken Mailand |
Conceptual Design
Auxiliary Optics
|
08 Feb 2012 |
D1000444-v1 |
aLIGO INTERMEDIATE MASS TOP ASSY WITH ADDED MASS(22kg), FIRST ARTICLE |
Ignacio Romero |
Auxiliary Optics
Conceptual Design
|
08 Feb 2012 |
G050239-v1 |
Suspension Modeling in Mathematica™ |
Mark Barton |
Suspensions
Modelling
|
06 Feb 2012 |
G1200067-v1 |
LIGO 2.5 straw man design : given at LCGT f2f |
Hiro Yamamoto |
Meeting
|
02 Feb 2012 |
D1002030-v3 |
Front Panel for Quad I&Q Demodulator Module |
Charles Osthelder |
Fabrication
|
01 Feb 2012 |
D1000883-v2 |
SLC FOLD MIRROR ELLIPTICAL BAFFLE PLATE |
Niem Nguyen |
Modelling
Auxiliary Optics
|
31 Jan 2012 |
E1101095-v4 |
Advanced LIGO Output Mode Cleaner Coating Specifications |
Sam Waldman et al. |
Conceptual Design
Sensing and Control
|
31 Jan 2012 |
T1200036-x0 |
Aliasing effect in FFT simulation |
Hiro Yamamoto |
Core Optics
Modelling
|
26 Jan 2012 |
D1001727-v3 |
aLIGO TCS CO2 Laser In-Vacuum Steering Mirror |
Mindy Jacobson |
Preliminary Design
Vacuum
Auxiliary Optics
|
24 Jan 2012 |
D1200122-v1 |
Handle for Cleaning the H2 UHV 12" Steering Mirror |
Mindy Jacobson et al. |
Cleaning
Auxiliary Optics
Vacuum
|
24 Jan 2012 |
D1100327-v4 |
SLC ACB LEFT SIDE SHELF |
Niem Nguyen |
Modelling
Auxiliary Optics
|
23 Jan 2012 |
T1200013-v2 |
Mode mixing and beam size in a FP cavity with imperfect surface |
Hiro Yamamoto |
Core Optics
Modelling
|
11 Jan 2012 |
D1200057-v1 |
aLIGO High Quality 6in, Non wedged Viewport Mockup |
Tim Nguyen |
Auxiliary Optics
Modelling
|
09 Jan 2012 |
T1100062-v6 |
aLIGO I&Q Demodulator Test Procedure |
Rich Abbott et al. |
Sensing and Control
Subsystem Test
|
09 Jan 2012 |
D1003209-v2 |
aLIGO TCS Clamping Flange, CO2 Laser Projection Viewport Enclosure |
Mindy Jacobson et al. |
Final Design
Auxiliary Optics
Vacuum
Preliminary Design
|
09 Jan 2012 |
C1107670-v3 |
Statement of Work - Cleaning of LHO Mode Cleaner Tube Baffles parts |
Lisa Austin |
Cleaning
Auxiliary Optics
|
04 Jan 2012 |
D1000429-v1 |
SLC FM ELLIPTICAL BAFFLE ASSY |
Calum Torrie |
Auxiliary Optics
Modelling
|
30 Dec 2011 |
D0901079-v2 |
HLTS Upper Wire Lower Clamp Assembly |
Derek Bridges |
Preliminary Design
Suspensions
|
23 Dec 2011 |
D1003206-v3 |
aLIGO TCS Viewports Enclosure Front Wall, CO2 Laser Projection |
Mindy Jacobson et al. |
Auxiliary Optics
Vacuum
Final Design
Preliminary Design
|
19 Dec 2011 |
D0902661-v3 |
Sapphire Prism Bonding Jig, HLTS |
Derek Bridges |
Final Design
Suspensions
|
19 Dec 2011 |
D0902662-v3 |
Sapphire Prism Bonding Fixture, HLTS |
Derek Bridges |
Final Design
Suspensions
|
19 Dec 2011 |
D1001133-v2 |
HAM Suspension Testing Cover |
Derek Bridges |
Final Design
Subsystem Test
Suspensions
|
19 Dec 2011 |
D1000977-v5 |
aLIGO AOS, SLC ARM CAVITY BAFFLE BOX ASSY |
Niem Nguyen |
Auxiliary Optics
Fabrication
Modelling
|
19 Dec 2011 |
D0901376-v4 |
SLC 2 HOLE ARM CAVITY BAFFLE FINAL ASSY |
Niem Nguyen et al. |
Modelling
Fabrication
Auxiliary Optics
|
16 Dec 2011 |
E1101200-v1 |
6in VP Type 1 Run Numbers-Serial Numbers |
Michael Smith |
Incoming Inspection
|
15 Dec 2011 |
E1101199-v1 |
6in VP Type 1 AR data |
Michael Smith |
Incoming Inspection
|
15 Dec 2011 |
D0902665-v3 |
Bonding Template Front, Sapphire Prism, HLTS |
Derek Bridges |
Final Design
Suspensions
|
15 Dec 2011 |
P060036-x0 |
Burst Gravitational Wave Data Analysis Methods: Design, Development and Comparison |
Amber Stuver |
Thesis/Dissertation
Document Migration
Data analysis software
GW Bursts
|
13 Dec 2011 |
D0901460-v3 |
HLTS Magnet Placement Fixture, Bottom Mass |
Derek Bridges |
Final Design
Suspensions
|
12 Dec 2011 |
D1001007-v2 |
SLC ARM CAVITY BAFFLE LO TUBE ASSY |
Niem Nguyen et al. |
Auxiliary Optics
Fabrication
Modelling
|
09 Dec 2011 |
T1100610-v4 |
Mode change in PRC when ETM is used for ITM |
Hiro Yamamoto |
Core Optics
Modelling
|
09 Dec 2011 |
E1101088-v4 |
aLIGO OMC Curved Optics Specification |
Sam Waldman et al. |
Sensing and Control
Requirements
|
06 Dec 2011 |
D070125-v3 |
LHO CDS Lans and Gateways |
David Barker |
Observatory Facilities
Installation
|
29 Nov 2011 |
D1002581-v2 |
SLC SUSPENSION ROD SUPPORT |
Niem Nguyen |
Auxiliary Optics
Modelling
|
23 Nov 2011 |
D1000930-v1 |
SLC MAGNET HOLDER STEEL PLATE |
Niem Nguyen |
Auxiliary Optics
Modelling
|
23 Nov 2011 |
D1000684-v2 |
SLC TUBE LOWER MTG PLATE |
Niem Nguyen et al. |
Modelling
Auxiliary Optics
|
23 Nov 2011 |
D1002844-v4 |
SLC ACB BLADE CLAMP |
Niem Nguyen |
Auxiliary Optics
Modelling
Fabrication
|
23 Nov 2011 |
D1002609-v2 |
SLC BLADE MOUNTING BRACKET |
Niem Nguyen |
Auxiliary Optics
Modelling
|
23 Nov 2011 |
D1002340-v3 |
SLC WIRE SUSPENSION ROD |
Niem Nguyen |
Modelling
Auxiliary Optics
|
23 Nov 2011 |
D1001138-v3 |
SLC ARM CAVITY BAFFLE INTERFACE MOUNTING PLATE |
Niem Nguyen |
Modelling
Auxiliary Optics
|
23 Nov 2011 |
D1100372-v3 |
SLC ACB Counter Weight |
Niem Nguyen |
Modelling
Auxiliary Optics
|
23 Nov 2011 |
D1100407-v3 |
SLC ACB ADJUSTABLE COUNTER WEIGHT |
Norris Kilpatrick |
Auxiliary Optics
Modelling
|
23 Nov 2011 |
D1100340-v4 |
SLC ACB RIGHT SIDE PANEL |
Niem Nguyen |
Auxiliary Optics
Modelling
|
23 Nov 2011 |
D1100391-v2 |
aLIGO AOS, SLC ACB SHELF ASSY |
Niem Nguyen |
Modelling
Auxiliary Optics
|
23 Nov 2011 |
D1100458-v4 |
SLC ACB BOTTOM EXTENDER |
Niem Nguyen |
Auxiliary Optics
Modelling
|
23 Nov 2011 |
D1100354-v5 |
SLC ACB RIGHT SIDE EXTENDER |
Niem Nguyen |
Auxiliary Optics
Modelling
|
23 Nov 2011 |
D1100353-v5 |
SLC ACB LEFT SIDE EXTENDER |
Niem Nguyen |
Modelling
Auxiliary Optics
|
23 Nov 2011 |
D1003025-v4 |
SLC PHOTODETECTOR HOUSING |
Niem Nguyen |
Assembly
Auxiliary Optics
|
23 Nov 2011 |
D1001120-v2 |
SLC EARTHQUAKE STOP RING |
Niem Nguyen |
Auxiliary Optics
Modelling
|
23 Nov 2011 |
D1002617-v2 |
SLC DAMPING TUBE LOWER PLATE |
Niem Nguyen |
Modelling
Auxiliary Optics
|
23 Nov 2011 |
D1002560-v2 |
SLC DAMPING TUBE TOP PLATE |
Niem Nguyen |
Auxiliary Optics
Modelling
|
23 Nov 2011 |
D1100243-v2 |
SLC ACB 3 DEGREE SHIM |
Niem Nguyen |
Auxiliary Optics
Modelling
|
23 Nov 2011 |
D020682-v2 |
HSTS/OMC Lower Blade Clamp, Shim, 1mm |
Bobby Moore |
Suspensions
Final Design
|
22 Nov 2011 |
P1100131-v3 |
Gravitational Wave Detection: Principles and Practice |
Peter Saulson |
Education, Outreach
|
21 Nov 2011 |
G0900912-v1 |
Stationary Interferometer Simulation |
Hiro Yamamoto |
Modelling
Core Optics
|
10 Nov 2011 |
D1002357-v4 |
SLC ACB SKIN 1 HOLE SKIN |
Niem Nguyen |
Modelling
Auxiliary Optics
|
03 Nov 2011 |
D1102113-v1 |
aLIGO Linear Motor Top Plate |
Sam Waldman |
Sensing and Control
Conceptual Design
|
31 Oct 2011 |
G0900196-v3 |
Gravitational Waves and LIGO |
Tiffany Summerscales |
Education, Outreach
|
31 Oct 2011 |
G1101201-v1 |
Catching Einstein's waves |
Gabriela Gonzalez |
Public Talk / Colloquium
|
29 Oct 2011 |
G1101200-v2 |
Towards Advanced LIGO |
David Reitze |
Public Talk / Colloquium
Data Analysis
Detector
|
28 Oct 2011 |
G1101190-v1 |
CDS Meeting: Daily News |
Rana Adhikari et al. |
Commissioning
Data Acquisition System
|
27 Oct 2011 |
G1101195-v1 |
Front End (FE) Diagnostics |
Rana Adhikari et al. |
Meeting
|
27 Oct 2011 |
D1001061-v1 |
SLC FM ELLIPTICAL BAFFLE SPACER |
Niem Nguyen |
Modelling
Auxiliary Optics
|
26 Oct 2011 |
D1001755-v2 |
aLIGO TCS RH, Lower Custom 25D Connector Bracket |
Mindy Jacobson |
Final Design
Vacuum
Auxiliary Optics
Preliminary Design
|
25 Oct 2011 |
G1101178-v1 |
Research activities at the Caltech 40m prototype |
Koji Arai |
Commissioning
System Test
Sensing and Control
Basic R&D
|
24 Oct 2011 |
G1101173-v1 |
Gravitational Wave Detection |
Rana Adhikari |
Detector
Public Talk / Colloquium
|
22 Oct 2011 |
D1102052-x0 |
HSTS Suspended Mass Assembly |
Michael Meyer |
Suspensions
Modelling
|
20 Oct 2011 |
G1100984-v2 |
Advanced LIGO Update for LVC, Sept 2011 |
David Shoemaker |
Meeting
Collaboration
Detector
|
14 Oct 2011 |
G1101153-v2 |
DC Readout in Enhanced LIGO (defense) |
Tobin Fricke |
Public Talk / Colloquium
|
14 Oct 2011 |
G1101145-v1 |
LIGO Sources Detectors And Computing |
Gregory Mendell et al. |
Public Talk / Colloquium
Data Analysis
|
13 Oct 2011 |
D0902087-v3 |
Positioning Standoff, Magnet Placement Fixture, Bottom Mass, HLTS |
Derek Bridges |
Final Design
Suspensions
|
11 Oct 2011 |
T1100519-v1 |
The LSC White Paper on Education and Public Outreach 2011 - Public version |
Marco Cavaglia et al. |
Education, Outreach
|
10 Oct 2011 |
T1000460-v1 |
The 2010 LSC White Paper on Education and Public Outreach - Public version |
Marco Cavaglia et al. |
Education, Outreach
|
10 Oct 2011 |
D0900681-v2 |
Library of Clamps, Lower Blade, HLTS |
Derek Bridges |
Preliminary Design
Suspensions
|
08 Oct 2011 |
D0902452-v2 |
Standoff Side Plate, Short, Magnet Placement Fixture, Intermediate Mass, HLTS |
Derek Bridges |
Suspensions
Final Design
|
08 Oct 2011 |
D0902445-v2 |
Standoff Plate, Magnet Placement Fixture, Intermediate Mass, HLTS |
Derek Bridges |
Final Design
Suspensions
|
08 Oct 2011 |
D0901551-v4 |
Lower AOSEM Alignment Assembly, Intermediate Mass, HLTS |
Bobby Moore et al. |
Suspensions
Final Design
|
08 Oct 2011 |
D0902024-v4 |
Upper AOSEM Alignment Assembly, Intermediate Mass, HLTS |
Bobby Moore et al. |
Preliminary Design
Suspensions
|
08 Oct 2011 |
D0901436-v2 |
Wire Clamp Mount, Lower Loop Wire Jig, HLTS |
Derek Bridges |
Final Design
Suspensions
|
08 Oct 2011 |
D0901435-v3 |
Wire Start Clamp, Inside, Lower Loop Wire Jig, HLTS |
Derek Bridges |
Suspensions
Final Design
|
08 Oct 2011 |
D0901135-v2 |
Mounting Block, Lower Clamp, Upper Wire, HLTS |
Derek Bridges |
Suspensions
Preliminary Design
|
08 Oct 2011 |
D070449-v2 |
Coil Holder (Tablecloth), HLTS |
Derek Bridges |
Final Design
Suspensions
|
08 Oct 2011 |
D0900688-v2 |
Blade Clamp (3.5 Degree), Lower Blade, Inside, HLTS |
Derek Bridges |
Preliminary Design
Suspensions
|
08 Oct 2011 |
D0900687-v2 |
Blade Clamp (3.0 Degree), Lower Blade, Inside, HLTS |
Derek Bridges |
Suspensions
Preliminary Design
|
08 Oct 2011 |
D0900686-v2 |
Blade Clamp (2.5 Degree), Lower Blade, Inside, HLTS |
Derek Bridges |
Preliminary Design
Suspensions
|
08 Oct 2011 |
D0900685-v2 |
Blade Clamp (2.0 Degree), Lower Blade, Inside, HLTS |
Derek Bridges |
Preliminary Design
Suspensions
|
08 Oct 2011 |
D0900684-v2 |
Blade Clamp (1.5 Degree), Lower Blade, Inside, HLTS |
Derek Bridges |
Suspensions
Preliminary Design
|
08 Oct 2011 |
D0900683-v2 |
Blade Clamp (1.0 Degree), Lower Blade, Inside, HLTS |
Derek Bridges |
Suspensions
Preliminary Design
|
08 Oct 2011 |
D0900682-v2 |
Blade Clamp (0.5 Degree), Lower Blade, Inside, HLTS |
Derek Bridges |
Suspensions
Preliminary Design
|
08 Oct 2011 |
D0900696-v2 |
Blade Clamp (3.5 Degree), Lower Blade, Outside, HLTS |
Derek Bridges |
Suspensions
Preliminary Design
|
08 Oct 2011 |
D0900695-v2 |
Blade Clamp (3.0 Degree), Lower Blade, Outside, HLTS |
Derek Bridges |
Suspensions
Preliminary Design
|
08 Oct 2011 |
D0900694-v2 |
Blade Clamp (2.5 Degree), Lower Blade, Outside, HLTS |
Derek Bridges |
Suspensions
Preliminary Design
|
08 Oct 2011 |
D0900693-v2 |
Blade Clamp (2.0 Degree), Lower Blade, Outside, HLTS |
Derek Bridges |
Preliminary Design
Suspensions
|
08 Oct 2011 |
D0900692-v2 |
Blade Clamp (1.5 Degree), Lower Blade, Outside, HLTS |
Derek Bridges |
Preliminary Design
Suspensions
|
08 Oct 2011 |
D0900691-v2 |
Blade Clamp (1.0 Degree), Lower Blade, Outside, HLTS |
Derek Bridges |
Suspensions
Preliminary Design
|
08 Oct 2011 |
D0900690-v2 |
Blade Clamp (0.5 Degree), Lower Blade, Outside, HLTS |
Derek Bridges |
Suspensions
Preliminary Design
|
08 Oct 2011 |
D070320-v2 |
Mounting Bracket, Coil Holder, HLTS |
Derek Bridges |
Preliminary Design
Suspensions
|
08 Oct 2011 |
G1101133-v1 |
Advanced LIGO - Talk for ICATPP |
David Shoemaker |
Detector
Public Talk / Colloquium
|
07 Oct 2011 |
D1002618-v2 |
SLC TUBE LOWER CONNECTOR PLATE |
Niem Nguyen |
Modelling
Auxiliary Optics
|
07 Oct 2011 |
D1001186-v2 |
SLC SCREW HEX HD #3/4-10 X 4.00 MODIFIED |
Niem Nguyen |
Auxiliary Optics
Modelling
Fabrication
|
07 Oct 2011 |
D1000393-v2 |
aLIGO INTERMEDIATE MASS TOP PLATE |
Ignacio Romero |
Auxiliary Optics
Conceptual Design
|
06 Oct 2011 |
E1000306-x0 |
aLIGO BSC-ISI Testing and Commissioning Documentation |
Fabrice Matichard et al. |
Subsystem Test
Seismic Isolation
|
06 Oct 2011 |
E1100983-x0 |
DCN, Custom Parts, aLIGO TCS VIEWPORT ENCLOSURE ASSEMBLY, H2 CO2 LASER PROJECTION |
Mindy Jacobson |
Fabrication
Auxiliary Optics
Operations
Vacuum
Final Design
|
04 Oct 2011 |
D1101272-v2 |
aLIGO TCS H2 UHV Mirror Splash Cover |
Mindy Jacobson |
Cleaning
Vacuum
Auxiliary Optics
System Engineering
Fabrication
|
29 Sep 2011 |
D1001617-v1 |
aLIGO, BSC REPAIR ARM, ASSEMBLY, FLANGE MOUNT |
Scott Shankle |
Conceptual Design
Auxiliary Optics
|
28 Sep 2011 |
E1100216-v1 |
DCN -REVISED SLC ARM CAVITY BAFFLE |
Norris Kilpatrick et al. |
Auxiliary Optics
Requirements
Fabrication
|
26 Sep 2011 |
T1100353-v1 |
1D PSD of mirror maps |
Hiro Yamamoto |
Modelling
Core Optics
|
23 Sep 2011 |
D0900999-v3 |
Screw, Socket Head Cap, 1/4-20 UNC-3A X 2 Long, Fully Threaded, Rounded End |
Derek Bridges |
Final Design
System Engineering
|
19 Sep 2011 |
D0900616-v2 |
FARADAY ISOLATOR PRISM MOUNT BASE LH |
Niem Nguyen |
Auxiliary Optics
Modelling
|
16 Sep 2011 |
D1100231-v3 |
ALIGO AOS Output Faraday Isolator Spacer (HAM11-H2) |
Manuel Ruiz |
Assembly
Auxiliary Optics
|
15 Sep 2011 |
D0902461-v2 |
Optic Rest Wedge, Optic Holder, HAM Triple Suspension |
Derek Bridges |
Final Design
Suspensions
|
15 Sep 2011 |
D0902460-v2 |
Base Plate, Optic Holder, HAM Triple Suspension |
Derek Bridges |
Suspensions
Final Design
|
15 Sep 2011 |
G1100929-v3 |
Astronomy in a 4-D Universe Gravitational Waves: What Are They and How Do We Find Them? |
Cristina Torres |
Education, Outreach
Public relations
Detector
Data Analysis
|
13 Sep 2011 |
D1101800-x0 |
HWS Opto Mechanical Layout, ITMy, HAM10 |
Mindy Jacobson et al. |
Preliminary Design
Fabrication
Subsystem Test
System Engineering
Final Design
Auxiliary Optics
Vacuum
|
12 Sep 2011 |
D1101799-x0 |
HWS Opto Mechanical Layout, ITMx, HAM10 |
Mindy Jacobson et al. |
Preliminary Design
Fabrication
System Engineering
Subsystem Test
Final Design
Auxiliary Optics
Vacuum
|
12 Sep 2011 |
D1101798-x0 |
aLIGO TCS HWS Optics Assy, HAM10 |
Mindy Jacobson et al. |
Auxiliary Optics
Vacuum
Final Design
System Engineering
Subsystem Test
Fabrication
Preliminary Design
|
12 Sep 2011 |
D0902721-v2 |
Sapphire Prism Holder Guide, HAM Triple Suspension |
Derek Bridges |
Suspensions
Fabrication
|
09 Sep 2011 |
D080409-v2 |
Alignment Guide, Bonding Template |
Michael Meyer |
Final Design
Suspensions
|
09 Sep 2011 |
D0902658-v2 |
Optic Holder, HAM Triple Suspension |
Derek Bridges |
Suspensions
Preliminary Design
|
09 Sep 2011 |
D1001834-v3 |
aLIGO TMS HOLDER SEC. FOCUS |
Michael Miller |
Auxiliary Optics
Conceptual Design
|
08 Sep 2011 |
D0902669-v2 |
Support Cylinder, Sapphire Prism Bonding Fixture, HLTS |
Derek Bridges |
Final Design
Suspensions
|
06 Sep 2011 |
D080124-v3 |
Prism Breakoff, Lower Wire, Bottom Mass, HLTS |
Derek Bridges |
Final Design
Suspensions
|
05 Sep 2011 |
D070438-v4 |
Clamp, Lower Loop Wire, HLTS |
Derek Bridges |
Suspensions
Final Design
|
05 Sep 2011 |
D030148-v2 |
Lower Wire Breakoff, Intermediate Mass, HLTS |
Derek Bridges |
Suspensions
Final Design
|
05 Sep 2011 |
D030156-v2 |
Side Offset, Intermediate Mass, HLTS |
Derek Bridges |
Final Design
Suspensions
|
05 Sep 2011 |
D080181-v2 |
Intermediate Mass Changer Assembly, HLTS |
Derek Bridges |
Final Design
Suspensions
|
05 Sep 2011 |
D020623-v2 |
Blade Clamp (0.0 Degree), Lower Blade, Outside, HLTS |
Derek Bridges |
Suspensions
Preliminary Design
|
05 Sep 2011 |
D020602-v2 |
Blade Clamp (0.0 Degree), Lower Blade, Inside, HLTS |
Michael Meyer |
Suspensions
Preliminary Design
|
05 Sep 2011 |
D020624-v3 |
Lower Clamp, Upper Wire, Outside, HLTS |
Derek Bridges |
Final Design
Suspensions
|
05 Sep 2011 |
D020610-v3 |
Lower Clamp, Upper Wire, Inside, HLTS |
Derek Bridges |
Final Design
Suspensions
|
05 Sep 2011 |
D020611-v4 |
Upper Clamp, Upper Wire, Inside, HLTS |
Derek Bridges |
Suspensions
Final Design
|
05 Sep 2011 |
D070329-v2 |
Pull Plate, Rotational Adjuster, HLTS |
Derek Bridges |
Suspensions
Final Design
|
05 Sep 2011 |
D070330-v2 |
Push Plate, Rotational Adjuster, HLTS |
Derek Bridges |
Final Design
Suspensions
|
05 Sep 2011 |
E1100771-v1 |
DCN, Post-Machined Vent Holes, aLIGO TCS H2 In-Vac Mirror |
Mindy Jacobson |
Fabrication
Vacuum
Auxiliary Optics
Cleaning
|
02 Sep 2011 |
D1000632-v2 |
aLIGO TOP ADD MASS BAR |
Ignacio Romero |
Conceptual Design
Auxiliary Optics
|
01 Sep 2011 |
G1100911-v1 |
Laser Interferometer Gravitational-wave Detectors: Advancing toward a Global Network |
Stan Whitcomb |
Public Talk / Colloquium
|
31 Aug 2011 |
G1100913-v1 |
Gravitational wave astronomy: status and plans |
Matthew Pitkin et al. |
Public Talk / Colloquium
Data Analysis
|
27 Aug 2011 |
D0900628-v2 |
Side Bracket, Mounting Pad, HLTS |
Derek Bridges |
Suspensions
Final Design
|
26 Aug 2011 |
D0900626-v2 |
Mounting Pad Assembly, HLTS |
Derek Bridges |
Suspensions
Final Design
|
26 Aug 2011 |
D070537-v2 |
Structure, HLTS |
Derek Bridges |
Suspensions
Final Design
|
26 Aug 2011 |
D1003204-v3 |
aLIGO TCS Viewports Enclosure Front Cover Assembly, CO2 Laser Projection |
Mindy Jacobson et al. |
Auxiliary Optics
Vacuum
Final Design
Preliminary Design
|
23 Aug 2011 |
D1101656-x0 |
Base, Handle, Suspension, ACB |
Manuel Ruiz |
Assembly
Auxiliary Optics
|
22 Aug 2011 |
D0900627-v2 |
Front Bracket, Mounting Pad, HLTS |
Derek Bridges |
Suspensions
Final Design
|
19 Aug 2011 |
D1101443-v2 |
WIRE, LIFTING, ARM CAVITY BAFFLE |
Manuel Ruiz |
Assembly
Auxiliary Optics
|
19 Aug 2011 |
E1000083-v6 |
Specification for Enameled Steel to be used in the LIGO Ultra-High Vacuum System |
Heidy Kelman et al. |
Fabrication
Auxiliary Optics
|
19 Aug 2011 |
D1101647-x0 |
Handle, Suspension, ACB |
Manuel Ruiz |
Auxiliary Optics
Assembly
|
19 Aug 2011 |
D1101646-x0 |
Handle, Suspension, ACB |
Manuel Ruiz |
Assembly
Auxiliary Optics
|
19 Aug 2011 |
D1101645-x0 |
Rod, Handle, Suspension, ACB |
Manuel Ruiz |
Assembly
Auxiliary Optics
|
19 Aug 2011 |
D1001600-v3 |
aLIGO_TMS_Tele._Sec._Mirror_Mt._Assem. |
Ken Mailand |
Conceptual Design
Auxiliary Optics
|
18 Aug 2011 |
T1100444-v1 |
Vibration Absorber Modal Testing |
Jeffrey Bartlett et al. |
Suspensions
Subsystem Test
Fabrication
|
17 Aug 2011 |
C1105429-v3 |
SOW: Pilot Test, Vacuum Component Bakeout and Residual Gas Assay |
Richard Bagley et al. |
Fabrication
Integration
Vacuum
Cleaning
Procurements
|
17 Aug 2011 |
G1100883-v1 |
Advanced LIGO, nouvelle génération d’interféromètres pour la détection d’ondes gravitationnelles. |
Fabrice Matichard |
Seismic Isolation
Education, Outreach
|
15 Aug 2011 |
T1100443-v1 |
H1 HAM6 vent plan for cleaning eLIGO OMC |
Keita Kawabe |
Commissioning
|
15 Aug 2011 |
D1000656-v2 |
aLIGO TOP ADD MASS SIDE SLOTTED BAR |
Ignacio Romero |
Conceptual Design
Auxiliary Optics
|
12 Aug 2011 |
D1000655-v2 |
aLIGO TOP ADD MASS TOP SLOTTED BAR |
Ignacio Romero |
Conceptual Design
Auxiliary Optics
|
12 Aug 2011 |
D1101590-x0 |
ACB RIGHT SIDE PANEL |
Manuel Ruiz |
Assembly
Auxiliary Optics
|
11 Aug 2011 |
D1101589-x0 |
ACB LEFT SIDE PANEL |
Manuel Ruiz |
Assembly
Auxiliary Optics
|
11 Aug 2011 |
D1101588-x0 |
ARM CAVITY BAFFLE LOWER LEAF |
Manuel Ruiz |
Auxiliary Optics
Assembly
|
11 Aug 2011 |
D1101587-x0 |
ARM CAVITY BAFFLE UPPER LEAF |
Manuel Ruiz |
Auxiliary Optics
Assembly
|
11 Aug 2011 |
G1100869-x0 |
SIS : Physics and Application |
Hiro Yamamoto |
Modelling
Core Optics
|
07 Aug 2011 |
D1101361-v1 |
TMS Tooling Telescope I-P Alignment Mirror Assembly |
Craig Conley |
Auxiliary Optics
Operations
|
05 Aug 2011 |
G1100857-v2 |
Optics, Cavity and Loss : What we learned in aLIGO |
Hiro Yamamoto |
Core Optics
Modelling
|
02 Aug 2011 |
D1001987-v3 |
aLIGO TMS VERT.-HOR. SCREW |
Michael Miller |
Conceptual Design
Auxiliary Optics
|
02 Aug 2011 |
M990034-v2 |
OBSOLETE |
Richard Savage et al. |
Policies
Observatory Facilities
Operations
|
01 Aug 2011 |
G1100859-v1 |
Gravitational Waves from the Ground Up |
Kathy Holt et al. |
Meeting
Education, Outreach
|
31 Jul 2011 |
D1101528-v1 |
Flat Washer Natural Beige Color, #10 Screw |
Lisa Austin |
Auxiliary Optics
Assembly
|
28 Jul 2011 |
D1101529-v1 |
Flat Washer Natural Beige Color, 1/4 Screw |
Lisa Austin |
Auxiliary Optics
Assembly
|
28 Jul 2011 |
D1000633-v3 |
aLIGO TOP ADD MASS TEE |
Ignacio Romero |
Auxiliary Optics
Conceptual Design
|
28 Jul 2011 |
D1101362-v1 |
TMS Tooling Fixture Clamp |
Craig Conley |
Auxiliary Optics
Operations
|
27 Jul 2011 |
D1100494-v2 |
aLigo TCS .25'' Thick Optical Window Clam Shell Assy |
Alexander Lynch et al. |
Preliminary Design
Auxiliary Optics
Vacuum
Final Design
|
26 Jul 2011 |
G1100839-v1 |
LIGO Educational Outreach: The Science Education Center and the Education and Public Outreach Group |
Amber Stuver et al. |
Education, Outreach
Meeting
|
26 Jul 2011 |
T060123-v4 |
Standard LIGO Electrical Interfaces |
Rich Abbott |
Basic R&D
|
20 Jul 2011 |
E1100659-v1 |
DCN, aLIGO TCS Ring Heater Replacement Fixture |
Mindy Jacobson |
Auxiliary Optics
Installation
Vacuum
Upgrades
Fabrication
System Engineering
|
20 Jul 2011 |
G1100827-v1 |
Squeezing in Gravitational Wave Detectors |
Lisa Barsotti |
Meeting
|
20 Jul 2011 |
E1100684-v1 |
Figure measurement ETM04 |
GariLynn Billingsley |
Subsystem Test
Core Optics
|
20 Jul 2011 |
E1100683-x0 |
DCN to Release Arm Cavity Baffle Revisions |
Manuel Ruiz |
Auxiliary Optics
Assembly
|
19 Jul 2011 |
T1000482-v2 |
BOSEMs for Transmon suspension tests |
Norna Robertson |
Subsystem Test
Suspensions
Auxiliary Optics
|
18 Jul 2011 |
G1100750-v2 |
Actuator Sizing of a Quad Pendulum for Gravitational Wave Detectors |
Brett Shapiro |
Public Talk / Colloquium
|
18 Jul 2011 |
D1000394-v2 |
aLIGO INTERMEDIATE MASS BOTTOM PLATE |
Ignacio Romero |
Auxiliary Optics
Conceptual Design
|
13 Jul 2011 |
G1100831-v1 |
eTraveler Overview |
Rich Abbott |
System Engineering
System Test
|
13 Jul 2011 |
G1100490-v1 |
LIGO: illuminating gravity |
Grant Meadors et al. |
Public Talk / Colloquium
|
12 Jul 2011 |
E1100660-v1 |
BOM, aLIGO TCS Ring Heater Replacement Fixture Assembly |
Mindy Jacobson |
System Engineering
Upgrades
Vacuum
Auxiliary Optics
Installation
Final Design
|
12 Jul 2011 |
D080180-v1 |
AdL SUS LASTI Noise Prototype Controls Wiring |
Jay Heefner |
Installation
Suspensions
|
11 Jul 2011 |
D060294-v1 |
LASTI AdL SUS Triple Controls Wiring |
Jay Heefner |
Installation
Suspensions
|
11 Jul 2011 |
G1100805-v1 |
Overview of the projects at Caltech 40-m prototype |
Koji Arai et al. |
Meeting
Sensing and Control
|
09 Jul 2011 |
D1100953-v3 |
SLC ARM CAVITY BAFFLE SKIN-RIGHT |
Manuel Ruiz |
Auxiliary Optics
Assembly
|
08 Jul 2011 |
G1100147-v1 |
HLTS Kickoff Presentation |
Derek Bridges et al. |
Meeting
Assembly
Incoming Inspection
Subsystem Test
Suspensions
|
06 Jul 2011 |
T0900511-v4 |
Modeling of Alignment Sensing and Control for Advanced LIGO |
Matthew Evans et al. |
Modelling
Sensing and Control
|
06 Jul 2011 |
T0900384-v1 |
Astigmatism by the stable Michelson cavity |
Hiro Yamamoto |
Modelling
Core Optics
|
06 Jul 2011 |
D1000631-v3 |
aLIGO TOP ADD MASS TOWER |
Ignacio Romero |
Auxiliary Optics
Conceptual Design
|
30 Jun 2011 |
D1100923-v1 |
Unified Plate Flipper Extension, D0902273, BSC-ISI, aLIGO |
Sam Barnum |
Assembly
Seismic Isolation
|
30 Jun 2011 |
D1101245-v1 |
Stud, Threaded 10in Lg,,Lock, Arm Cavity Baffle |
Manuel Ruiz |
Auxiliary Optics
Assembly
|
29 Jun 2011 |
D1100952-v4 |
SLC ARM CAVITY BAFFLE SKIN-LEFT |
Manuel Ruiz |
Auxiliary Optics
Assembly
|
28 Jun 2011 |
E1000186-v15 |
LHO QUAD-2 Assembly Process Traveler |
Travis Sadecki et al. |
Assembly
Suspensions
|
23 Jun 2011 |
D1100995-v1 |
Lock, Arm Cavity |
Manuel Ruiz |
Auxiliary Optics
Assembly
|
22 Jun 2011 |
D1101133-v1 |
Optical Prism Aluminum |
Norris Kilpatrick |
Assembly
Auxiliary Optics
|
22 Jun 2011 |
D1101182-x0 |
Cradle Lift, Interface Mounting Plate |
Manuel Ruiz |
Assembly
Auxiliary Optics
|
21 Jun 2011 |
G1100755-v1 |
Modal Damping Notes |
Brett Shapiro |
Modelling
Basic R&D
|
21 Jun 2011 |
D1002446-v1 |
SLC FM ELLIPTICAL BAFFLE ENGRAVE LINE TEMPLATE |
Niem Nguyen |
Modelling
Auxiliary Optics
|
20 Jun 2011 |
C1000270-v7 |
aLIGO TCS CO2 Laser Provision SOW |
Mindy Jacobson |
Procurements
Auxiliary Optics
Fabrication
|
15 Jun 2011 |
D1002926-v2 |
Module-E, BSC Cartridge installation, aLIGO |
Sam Barnum et al. |
Installation
Observatory Facilities
|
15 Jun 2011 |
D1101137-x0 |
SHCS, #8-32 X 1.5 Long, Fully Threaded |
Derek Bridges |
Assembly
System Engineering
|
15 Jun 2011 |
D1101136-x0 |
SHCS, 1/4-20 X 3 Long, Fully Threaded |
Derek Bridges |
System Engineering
Assembly
|
15 Jun 2011 |
D1101135-x0 |
SHCS, 1/4-20 X 2 Long, Fully Threaded |
Derek Bridges |
Assembly
System Engineering
|
15 Jun 2011 |
D1101134-x0 |
SHCS, 1/4-20 X 1.5 Long, Fully Threaded |
Derek Bridges |
System Engineering
Assembly
|
15 Jun 2011 |
G1100727-v1 |
Gravitational wave detection |
Sam Waldman |
Public Talk / Colloquium
|
14 Jun 2011 |
D070575-v3 |
Base Plate, Structural Weldment, HLTS |
Derek Bridges |
Final Design
Suspensions
|
11 Jun 2011 |
T010103-v1 |
aLIGO Suspension System Conceptual Design |
Russell Jones et al. |
Conceptual Design
Suspensions
|
09 Jun 2011 |
G1100555-v2 |
LIGO detectors: past, present and future |
Gabriela Gonzalez |
Public Talk / Colloquium
|
07 Jun 2011 |
G050111-v1 |
Summary of recent measurements of g factor changes induced by thermal loading in the H1 interferometer |
Joseph Betzwieser et al. |
Cleaning
Auxiliary Optics
Commissioning
Core Optics
|
07 Jun 2011 |
T050074-x0 |
Optical Absorption in Initial LIGO Interferometers |
Stefan Ballmer et al. |
Commissioning
Core Optics
Cleaning
Auxiliary Optics
|
05 Jun 2011 |
D1100934-v1 |
Unified Plate Flipper Extension, D0902279, BSC-ISI, aLIGO |
Sam Barnum |
Assembly
Seismic Isolation
|
02 Jun 2011 |
D1100932-v1 |
Unified Plate Flipper Extension, D0901518-19, BSC-ISI, aLIGO |
Sam Barnum |
Assembly
Seismic Isolation
|
02 Jun 2011 |
D1100922-v1 |
Unified Plate Flipper Extension, D0901520 , BSC-ISI, aLIGO |
Sam Barnum |
Assembly
Seismic Isolation
|
02 Jun 2011 |
D070586-v1 |
HAM ISI, INSTALLATION FIXTURE, aLIGO |
Sam Barnum et al. |
Installation
Seismic Isolation
Upgrades
Document Migration
|
31 May 2011 |
D1001941-v1 |
aLIGO EARTHQUAKE STOP ROD |
Ken Mailand |
Auxiliary Optics
Preliminary Design
|
27 May 2011 |
D1100992-x0 |
25 conductor DSUB Ribbon Cable With Mirror Adapters |
Charles Osthelder |
Subsystem Test
|
25 May 2011 |
D0901351-v2 |
Universal PDH Servo |
Rich Abbott et al. |
System Test
|
23 May 2011 |
G1100568-v1 |
Building a Global Gravitational Wave Telescope |
Stan Whitcomb |
Public Talk / Colloquium
|
20 May 2011 |
G1100557-v1 |
LIGO Science Spoken Daily |
Fred Raab |
Education, Outreach
|
16 May 2011 |
D1100902-x0 |
ARM CAVITY BAFFLE FETM BOTTOM SKIN |
Manuel Ruiz |
Auxiliary Optics
Assembly
|
13 May 2011 |
M1100096-v1 |
Memorandum of Understanding between the LIGO Scientific Collaboration and Science Central |
Marco Cavaglia et al. |
MOU
Education, Outreach
|
12 May 2011 |
D1003014-v1 |
SLC PHOTODETECTOR BACK PEEK |
Niem Nguyen |
Modelling
Auxiliary Optics
|
10 May 2011 |
D1003024-v1 |
SLC PHOTODETECTOR FRONT PEEK INSULATOR |
Niem Nguyen |
Auxiliary Optics
Modelling
|
10 May 2011 |
M060056-v2 |
Advanced LIGO Reference Design |
David Shoemaker |
Conceptual Design
Reports
Detector
|
08 May 2011 |
E0900124-x0 |
AFWFS parts for HAM6 Traveler |
Sam Waldman |
Vacuum
Installation
|
07 May 2011 |
G1100452-v5 |
PSL Tech Status |
Benno Willke |
Reviews
Meeting
Laser Systems
|
05 May 2011 |
G1100430-v5 |
AOS - IAS Techincal Review - NSF 2011 |
Douglas Cook |
NSF
Meeting
|
05 May 2011 |
G1100458-v3 |
DAQ Technical Status - NSF Review April 25-27, 2011 |
Rolf Bork |
Data Acquisition System
Meeting
|
05 May 2011 |
G1100451-v3 |
AOS SLC Technical Talk aLIGO NSF Review SLC and VP 25-27 April 2011 |
Michael Smith |
Meeting
Detector
|
05 May 2011 |
G1100439-v4 |
AOS TMS Technical Presentation for aLIGO NSF Review April 2011 |
Eric Gustafson |
System Test
Auxiliary Optics
Management
|
05 May 2011 |
G1100525-v1 |
aLIGO Team Meeting April 2011 |
David Shoemaker |
Detector
Meeting
|
05 May 2011 |
E1000678-v2 |
Optical Lever Heights above the Floor |
Dennis Coyne |
System Engineering
Final Design
Installation
Auxiliary Optics
|
04 May 2011 |
T1100246-v1 |
iLIGO L1, H1 and H2 Interferometer Resonances |
Dennis Coyne |
Seismic Isolation
Auxiliary Optics
Input Optics
System Engineering
Commissioning
Suspensions
Core Optics
|
04 May 2011 |
L0900118-v8 |
Advanced LIGO Preliminary Design Review of the BSC ISI system |
Fabrice Matichard et al. |
Preliminary Design
Reviews
Seismic Isolation
|
04 May 2011 |
G1100460-v5 |
AOS TCS Technical Presentation for 2011 NSF Review |
Phil Willems et al. |
Auxiliary Optics
Meeting
Reviews
|
03 May 2011 |
D1100825-x0 |
ARM CAVITY FETM BAFFLE SKIN |
Manuel Ruiz |
Auxiliary Optics
Assembly
|
03 May 2011 |
D1100824-x0 |
ARM CAVITY FETM BAFFLE BOX ASSY |
Manuel Ruiz |
Auxiliary Optics
Assembly
|
03 May 2011 |
D1100790-v2 |
Stop, Shack-Hartman Pedestal |
Manuel Ruiz |
Assembly
Auxiliary Optics
|
02 May 2011 |
G1100447-v3 |
SEI Technical Status - NSF 2011 |
Fabrice Matichard |
Meeting
Seismic Isolation
|
01 May 2011 |
D1100812-x0 |
Arm Cavity FETM Baffle Final Assembly |
Manuel Ruiz |
Auxiliary Optics
Assembly
|
28 Apr 2011 |
T1100220-v1 |
Reduction of degenerate modes excitation in a imperfect FP cavity for LG33 beam |
Hiro Yamamoto |
Modelling
Core Optics
|
25 Apr 2011 |
D1100769-v1 |
Shack-Hartman Pedestal Assembly |
Manuel Ruiz |
Assembly
Auxiliary Optics
|
25 Apr 2011 |
D1100771-v1 |
Base, Shack-Hartman Pedestal |
Manuel Ruiz |
Assembly
Auxiliary Optics
|
25 Apr 2011 |
D1100773-v1 |
Side, Shack-Hartman Pedestal |
Manuel Ruiz |
Auxiliary Optics
Assembly
|
22 Apr 2011 |
D1100775-v1 |
Tube, 6.0 Mirror Pedestal |
Manuel Ruiz |
Assembly
Auxiliary Optics
|
22 Apr 2011 |
D1100772-v1 |
Top, Shack-Hartman Pedestal |
Manuel Ruiz |
Assembly
Auxiliary Optics
|
22 Apr 2011 |
D1100770-v1 |
Support, Shack-Hartman Pedestal |
Manuel Ruiz |
Auxiliary Optics
Assembly
|
22 Apr 2011 |
E1100389-x0 |
DCN-Release of Shank-Hartman Pedestal Assembly |
Manuel Ruiz |
Auxiliary Optics
Assembly
|
22 Apr 2011 |
D1100776-x0 |
Tube, 6.0 Mirror Pedestal Assembly |
Manuel Ruiz |
Assembly
Auxiliary Optics
|
21 Apr 2011 |
D080389-v5 |
aLIGO SUS ETM ITM Monolithic Assembly Tooling_Welding Scaffold_Bearing holder |
Russell Jones et al. |
Preliminary Design
Assembly
Suspensions
Fabrication
|
21 Apr 2011 |
F1000025-v1 |
Quad Suspension Metal Build Test Report Template |
Mark Barton et al. |
Assembly
Suspensions
Reports
Subsystem Test
|
19 Apr 2011 |
D1003276-v1 |
AdLIGO AOS ITM Elliptical Baffle Right Assy |
Manuel Ruiz |
Assembly
Auxiliary Optics
|
18 Apr 2011 |
D0902062-v2 |
Vertical Locating Block, Magnet Placement Fixture, Intermediate Mass, HLTS |
Derek Bridges |
Suspensions
Final Design
|
18 Apr 2011 |
D0902060-v2 |
Base Plate, Magnet Placement Fixture, Intermediate Mass, HLTS |
Derek Bridges |
Final Design
Suspensions
|
18 Apr 2011 |
D1100710-x0 |
aLIGO TCS H2 Top Periscope Mount Support |
Mindy Jacobson |
Vacuum
Auxiliary Optics
Preliminary Design
|
18 Apr 2011 |
D1100709-x0 |
aLIGO TCS H2 Top Periscope Support Fixture |
Mindy Jacobson |
Vacuum
Auxiliary Optics
Preliminary Design
|
18 Apr 2011 |
D1100708-x0 |
aLIGO TCS H2 CO2P Top Periscope Mount Assembly |
Mindy Jacobson |
Vacuum
Auxiliary Optics
Preliminary Design
|
18 Apr 2011 |
D0902068-v2 |
Standoff Ring, Magnet Placement Fixture, Bottom Mass, HLTS |
Derek Bridges |
Final Design
Suspensions
|
16 Apr 2011 |
D030320-v4 |
HEPI SPRING ASSEMBLY, aLIGO BSC |
Andy Stein |
Seismic Isolation
Final Design
|
15 Apr 2011 |
T080021-v3 |
UK UIM Driver Pre-Production Prototype Test Plan |
Jay Heefner |
Suspensions
System Test
|
11 Apr 2011 |
E1000711-v3 |
ALIGO LA Corner Station VE Installation Specification |
John Worden et al. |
Installation
|
11 Apr 2011 |
E1100346-v1 |
BSC ISI HARDWARE REPLAECMENT MATRIX |
Michael Hillard |
Preliminary Design
Seismic Isolation
|
11 Apr 2011 |
D1002612-v2 |
SLC UPPER TUBE |
Niem Nguyen |
Auxiliary Optics
Modelling
|
08 Apr 2011 |
D1003028-v1 |
SLC PHOTODETECTOR PCB SUPPORT |
Niem Nguyen |
Auxiliary Optics
Modelling
|
07 Apr 2011 |
D1002356-v2 |
SLC L1 ACB BOX ASSY |
Niem Nguyen |
Modelling
Auxiliary Optics
|
07 Apr 2011 |
D1002610-v2 |
SLC TUBE UP CONNECTOR PLATE |
Niem Nguyen |
Modelling
Auxiliary Optics
|
06 Apr 2011 |
D1001009-v2 |
SLC ARM CAVITY BAFFLE LO TUBE |
Niem Nguyen |
Auxiliary Optics
Modelling
Fabrication
|
06 Apr 2011 |
D1000929-v1 |
SLC COPPER SUPPORT PLATE |
Niem Nguyen |
Modelling
Auxiliary Optics
|
06 Apr 2011 |
E1000712-v3 |
Anchor Bolt Installation |
John Worden et al. |
Installation
|
06 Apr 2011 |
D1001996-v1 |
aLIGO, HAM INSTALLATION ARM, FLANGE MOUNT |
Scott Shankle |
Auxiliary Optics
Conceptual Design
|
04 Apr 2011 |
D1001997-v1 |
aLIGO, HAM INSTALLATION, STRIKE PLATE |
Scott Shankle |
Auxiliary Optics
Conceptual Design
|
04 Apr 2011 |
D1100555-v1 |
Metrology baseplate for ear and prism position measurements |
Gerardo Moreno et al. |
Suspensions
Installation
|
31 Mar 2011 |
E1100285-x0 |
HLTS Metal Build Test Reports |
Derek Bridges |
Suspensions
Reports
Subsystem Test
|
30 Mar 2011 |
D1100477-v1 |
aLIGO TCS Viewports Spherical Bearing Periscope Assembly, CO2 Laser Projection |
Austin Langley |
Final Design
Vacuum
Auxiliary Optics
Preliminary Design
|
30 Mar 2011 |
D1100511-v1 |
SLC ENAMEL SLOT MASKING MAGNET |
Niem Nguyen |
Auxiliary Optics
Modelling
|
30 Mar 2011 |
D080378-v2 |
Clamp Sleeve, HAM Support Tube |
Andy Stein |
Final Design
Seismic Isolation
|
30 Mar 2011 |
D080377-v3 |
Clamp Washer Plate, HAM Support Tube |
Andy Stein |
Final Design
Seismic Isolation
|
30 Mar 2011 |
D080376-v3 |
Clamp Preload, HAM Support Tube |
Michael Hillard |
Seismic Isolation
Final Design
|
30 Mar 2011 |
D080375-v2 |
Clamp Cap, HAM Support Tube |
Andy Stein |
Final Design
Seismic Isolation
|
30 Mar 2011 |
D080374-v2 |
Clamp Base, HAM Support Tube |
Andy Stein |
Seismic Isolation
Final Design
|
30 Mar 2011 |
D080459-v2 |
HAM Crossbeam Connector HEPI Plate |
Andy Stein |
Final Design
Seismic Isolation
|
30 Mar 2011 |
D080458-v2 |
HAM Crossbeam Connector Tube |
Andy Stein |
Final Design
Seismic Isolation
|
30 Mar 2011 |
D080460-v2 |
HAM Crossbeam Connector Mount Plate |
Andy Stein |
Seismic Isolation
Final Design
|
30 Mar 2011 |
D080461-v2 |
HAM Crossbeam Connector Gusset |
Andy Stein |
Seismic Isolation
Final Design
|
30 Mar 2011 |
D080453-v2 |
HAM Straight Crossbeam Tube |
Andy Stein |
Seismic Isolation
Final Design
|
30 Mar 2011 |
D080454-v2 |
HAM Crossbeam Clamp Plate |
Andy Stein |
Final Design
Seismic Isolation
|
30 Mar 2011 |
D080455-v2 |
HAM Crossbeam Mounting Flange |
Andy Stein |
Seismic Isolation
Final Design
|
30 Mar 2011 |
T0900290-v2 |
PUM Driver Unit Users’ Guide |
Ron Cutler |
Final Design
|
30 Mar 2011 |
E970130-v4 |
Material, Process, Handling and Shipping Specification for Fluorel Parts |
Dennis Coyne |
System Engineering
Fabrication
Vacuum
|
29 Mar 2011 |
E1000708-v1 |
WA Corner Station Installation |
Jodi Fauver et al. |
Installation
|
29 Mar 2011 |
D020002-v4 |
Spring Mounting Plate, Pre-Isolator |
Andy Stein et al. |
Final Design
Seismic Isolation
|
29 Mar 2011 |
D020408-v3 |
Double Start Counterwound Spring Asm |
Andy Stein |
Seismic Isolation
Final Design
|
29 Mar 2011 |
D0900441-v1 |
Faraday Isolator TFP Mirror Clip |
Niem Nguyen |
Modelling
Auxiliary Optics
|
29 Mar 2011 |
G1100216-v2 |
Core Optics LVC subsystem talk 2011 |
GariLynn Billingsley |
Meeting
Core Optics
|
29 Mar 2011 |
T0900322-v1 |
Satellite Box Test Plan |
Ron Cutler |
System Test
|
29 Mar 2011 |
D020016-v2 |
Horizontal Angle Mount, Hydraulic Isolator, aLIGO HEPI |
Ken Mason et al. |
Document Migration
Seismic Isolation
|
29 Mar 2011 |
D020195-v3 |
HEPI CROSSBEAM FOOT |
Andy Stein et al. |
Final Design
Seismic Isolation
|
29 Mar 2011 |
T0900229-v2 |
Quad Monitor Board Test Plan |
Ron Cutler |
System Test
|
29 Mar 2011 |
D020126-v1 |
SUPPORT PIER RIGHT, aLIGO HAM HEPI |
Ken Mason |
Document Migration
Seismic Isolation
|
28 Mar 2011 |
D080699-v2 |
Crossbeam Washer Plate #2 |
Andy Stein et al. |
Seismic Isolation
Final Design
|
28 Mar 2011 |
D080698-v2 |
Crossbeam Washer Plate #1 |
Andy Stein et al. |
Seismic Isolation
Final Design
|
28 Mar 2011 |
D080700-v2 |
Crossbeam Washer Disc |
Andy Stein et al. |
Seismic Isolation
Final Design
|
28 Mar 2011 |
D080465-v2 |
HAM Crossbeam HEPI Adapter |
Andy Stein et al. |
Seismic Isolation
Final Design
|
28 Mar 2011 |
D1002312-v3 |
aLIGO TCS UHV AZ Fine Adjust Pivot Plate, BSC7 |
Mindy Jacobson et al. |
Preliminary Design
Auxiliary Optics
Vacuum
|
28 Mar 2011 |
D1002455-v3 |
aLIGO TCS UHV AZ Fine Adjust Pivot Plate, BSC8 |
Mindy Jacobson |
Preliminary Design
Vacuum
Auxiliary Optics
|
28 Mar 2011 |
T1000568-v1 |
OMC Coil Driver Unit Test Plan |
Ron Cutler |
Subsystem Test
|
28 Mar 2011 |
T0900230-v2 |
Quad Top Driver Unit Test Plan |
Ron Cutler |
System Test
|
28 Mar 2011 |
T0900237-v1 |
UIM Driver Board Test Plan |
Ron Cutler |
System Test
|
28 Mar 2011 |
T0900292-v1 |
PUM Driver Unit Test Plan |
Ron Cutler |
System Test
|
28 Mar 2011 |
T1000572-v1 |
Transmon Coil Driver Board Test Plan |
Ron Cutler |
Subsystem Test
|
28 Mar 2011 |
T1000571-v1 |
Transmon Coil Driver Unit Test Plan |
Ron Cutler |
Subsystem Test
|
28 Mar 2011 |
T1000567-v1 |
OMC Coil Driver Board Test Plan |
Ron Cutler |
Subsystem Test
|
28 Mar 2011 |
D1100497-v1 |
Convert HAM Storage Container for BSC-ISI |
Sam Barnum |
Seismic Isolation
Assembly
|
24 Mar 2011 |
D080036-v4 |
aLIGO SUS_Monolithic Assembly_CO2 Laser Welding_Welding Shelf |
Russell Jones |
Suspensions
Fabrication
Assembly
|
24 Mar 2011 |
T0900231-v3 |
TOP Driver Board Test Plan |
Ron Cutler |
System Test
|
24 Mar 2011 |
T0900236-v3 |
UIM Driver Unit Test Plan |
Ron Cutler |
System Test
|
24 Mar 2011 |
D1100492-x0 |
SLC ACB BENDED BLADE BASE |
Niem Nguyen |
Auxiliary Optics
Modelling
|
23 Mar 2011 |
D1100505-x0 |
SLC ACB BENDING BLADE FIXTURE ASSY |
Niem Nguyen |
Modelling
Auxiliary Optics
|
23 Mar 2011 |
D1100504-x0 |
SLC ACB BENDING BLADE HANDLE FIXTURE |
Niem Nguyen |
Modelling
Auxiliary Optics
|
23 Mar 2011 |
D1100503-x0 |
SLC ACB BENDED BLADE ARM FIXTURE |
Niem Nguyen |
Auxiliary Optics
Modelling
|
23 Mar 2011 |
G1100330-v1 |
Environmental noise - related lessons from S6 |
Robert Schofield et al. |
Meeting
|
22 Mar 2011 |
D1100519-x0 |
SLC ACB BLADE SLIDING ROD |
Niem Nguyen |
Auxiliary Optics
Modelling
|
22 Mar 2011 |
D1100518-v1 |
SLC ENAMEL SLOT MASKING ROD |
Niem Nguyen |
Modelling
Auxiliary Optics
|
22 Mar 2011 |
T1000022-v4 |
Viewports Subsystem Requirements Document |
Michael Smith |
Requirements
Auxiliary Optics
|
21 Mar 2011 |
G1000922-x0 |
. |
Robert Schofield |
Meeting
Detector Characterization
Suspensions
|
21 Mar 2011 |
D1100500-v1 |
SLC ENAMEL ROUND MASKING MAGNET |
Niem Nguyen |
Auxiliary Optics
Modelling
|
21 Mar 2011 |
D1000017-v3 |
Fibre storage rack - inner cross rib |
Marielle van Veggel et al. |
Preliminary Design
Suspensions
|
21 Mar 2011 |
D1000018-v3 |
Fibre storage rack - horizontal tie bar |
Marielle van Veggel et al. |
Preliminary Design
Suspensions
|
21 Mar 2011 |
D1000016-v3 |
Fibre storage rack - inner rib |
Marielle van Veggel et al. |
Suspensions
Preliminary Design
|
21 Mar 2011 |
D1000015-v3 |
Fibre storage rack - long side rib |
Marielle van Veggel et al. |
Suspensions
Preliminary Design
|
21 Mar 2011 |
D1000014-v3 |
Fibre storage rack - Cross rib |
Marielle van Veggel et al. |
Preliminary Design
Suspensions
|
21 Mar 2011 |
D1000012-v3 |
Fibre storage rack - horizontal rail side 2 |
Marielle van Veggel et al. |
Suspensions
Preliminary Design
|
21 Mar 2011 |
D1000011-v3 |
Fibre storage rack - horizontal rail side 1 |
Marielle van Veggel et al. |
Suspensions
Preliminary Design
|
21 Mar 2011 |
D1000009-v3 |
Fibre storage rack - baseplate |
Marielle van Veggel et al. |
Suspensions
Preliminary Design
|
21 Mar 2011 |
G1000705-v1 |
Sharing Large-Project Science Data with Students via the Web |
Fred Raab et al. |
Education, Outreach
|
17 Mar 2011 |
E1000465-v4 |
LLO QUAD-14 Assembly Process Traveler |
Michael Fyffe et al. |
Assembly
Suspensions
|
17 Mar 2011 |
G1100384-v1 |
Building Interferometer Exhibits |
Keith Riles |
Education, Outreach
|
17 Mar 2011 |
D1100496-x0 |
aLIGO TCS Viewport Thermocouple |
Austin Langley |
Final Design
Vacuum
Auxiliary Optics
Preliminary Design
|
16 Mar 2011 |
G1100166-v3 |
Hydroxide catalysis bonding for aLIGO, eaLIGO and beyond |
Marielle van Veggel |
Suspensions
Meeting
|
16 Mar 2011 |
D0900956-v1 |
UIM Circuits |
Ron Cutler |
Final Design
|
16 Mar 2011 |
D1100480-x0 |
AdLIGO AOS SR2 Scraper, Table Base Support Bracket |
Manuel Ruiz |
Auxiliary Optics
Assembly
|
15 Mar 2011 |
D1100479-x0 |
AdLIGO AOS SR2 Scraper, Table Base Support Assy |
Manuel Ruiz |
Auxiliary Optics
Assembly
|
15 Mar 2011 |
D1100478-x0 |
AdLIGO AOS SR2 Scraper, Table Base Support Plate |
Manuel Ruiz |
Auxiliary Optics
Assembly
|
15 Mar 2011 |
D1001678-v1 |
6.0 inch Vacuum Viewport |
Michael Smith |
Preliminary Design
Auxiliary Optics
|
12 Mar 2011 |
D080496-v2 |
HAM HEPI CAGING ASSEMBLY |
Andy Stein et al. |
Final Design
Seismic Isolation
|
11 Mar 2011 |
D080495-v2 |
HAM HEPI CAGING SIDE CAP |
Andy Stein et al. |
Seismic Isolation
Final Design
|
11 Mar 2011 |
D020004-v1 |
HOUSING, HYDRAULIC ASSEMBLY |
Ken Mason et al. |
Final Design
Seismic Isolation
|
10 Mar 2011 |
D080548-v2 |
HAM HEPI Horz Actuator Adapter 2 |
Andy Stein et al. |
Seismic Isolation
Final Design
|
10 Mar 2011 |
D080547-v2 |
HAM HEPI Horz Actuator Adapter 1 |
Andy Stein et al. |
Final Design
Seismic Isolation
|
10 Mar 2011 |
D1100452-x0 |
aLigo TCS Mirror Mount Base Support, CO2 Laser Projection |
Austin Langley et al. |
Final Design
Vacuum
Auxiliary Optics
Preliminary Design
|
10 Mar 2011 |
D1100451-x0 |
aLigo TCS Mirror Mount Horizontal Support, CO2 Laser Projection |
Austin Langley et al. |
Preliminary Design
Final Design
Vacuum
Auxiliary Optics
|
10 Mar 2011 |
D0901492-v3 |
AOSEM Alignment Bracket, Intermediate Mass, HLTS |
Derek Bridges |
Suspensions
Final Design
|
10 Mar 2011 |
D0901549-v3 |
AOSEM Alignment Bracket, Bottom Mass, HLTS |
Derek Bridges |
Final Design
Suspensions
|
10 Mar 2011 |
D1002314-v2 |
BSC ISI Stage 0 Plate Flip Bracket |
Hugh Radkins et al. |
Assembly
Seismic Isolation
|
10 Mar 2011 |
D1100444-x0 |
aLigo TCS Rear rubber shim, CO2 Laser Projection |
Austin Langley |
Final Design
Vacuum
Auxiliary Optics
Preliminary Design
|
09 Mar 2011 |
G1100195-v1 |
Einstein’s Dual Legacy:Thermal Noise and Gravitational Waves |
Gregg Harry |
Public Talk / Colloquium
|
09 Mar 2011 |
D1002152-v1 |
aLIGO BS/FM Prism holder assembly |
Marielle van Veggel et al. |
Suspensions
Installation
|
09 Mar 2011 |
D1002150-x0 |
aLIGO BS/FM Prism bonding alignment guide |
Marielle van Veggel et al. |
Installation
Suspensions
|
09 Mar 2011 |
M1100058-v1 |
Memorandum of Understanding between the LSC and Shawnee State University |
Marco Cavaglia et al. |
Education, Outreach
MOU
Management
|
09 Mar 2011 |
D1002146-v1 |
aLIGO TCP/ERM Prism holder |
Marielle van Veggel et al. |
Suspensions
Installation
|
09 Mar 2011 |
D1002142-v2 |
aLIGO TCP Prism bonding baseplate |
Marielle van Veggel et al. |
Installation
Suspensions
|
09 Mar 2011 |
D1002141-v2 |
aLIGO TCP Prism bonding fixture |
Marielle van Veggel et al. |
Suspensions
Installation
|
09 Mar 2011 |
D1002144-v1 |
aLIGO TCP Prism bonding support cylinder |
Marielle van Veggel et al. |
Suspensions
Installation
|
09 Mar 2011 |
D1002143-v1 |
aLIGO TCP Prism bonding alignment guide |
Marielle van Veggel et al. |
Installation
Suspensions
|
09 Mar 2011 |
D1002140-v2 |
aLIGO TCP Prism bonding jig |
Marielle van Veggel et al. |
Installation
Suspensions
|
09 Mar 2011 |
D1002203-v2 |
aLIGO ERM Prism bonding baseplate |
Marielle van Veggel et al. |
Installation
Suspensions
|
09 Mar 2011 |
D1002145-v1 |
aLIGO TCP/ERM Prism holder assembly |
Marielle van Veggel et al. |
Suspensions
Installation
|
09 Mar 2011 |
D1002202-v2 |
aLIGO ERM Prism bonding fixture |
Marielle van Veggel et al. |
Installation
Suspensions
|
09 Mar 2011 |
D1002201-v2 |
aLIGO ERM Prism bonding jig |
Marielle van Veggel et al. |
Suspensions
Installation
|
09 Mar 2011 |
T1000242-v2 |
Hierarchical Control Theory for Advanced LIGO |
Brett Shapiro |
Commissioning
|
08 Mar 2011 |
D0900373-v2 |
ALIGO SUS ETM/ITM Monolithic Assembly_Advanced Welding Hub |
Giles Hammond et al. |
Installation
Basic R&D
Suspensions
|
08 Mar 2011 |
D1002327-v3 |
aLIGO TCS UHV Short Support, BSC7 & BSC8 |
Mindy Jacobson |
Auxiliary Optics
Vacuum
Preliminary Design
|
07 Mar 2011 |
D1002315-v3 |
aLIGO TCS UHV Bracket, Short Side, BSC7 |
Mindy Jacobson et al. |
Preliminary Design
Vacuum
Auxiliary Optics
|
07 Mar 2011 |
D1002287-v3 |
aLIGO TCS UHV Bracket, Long Side, BSC7 |
Mindy Jacobson et al. |
System Engineering
Preliminary Design
Vacuum
Auxiliary Optics
|
07 Mar 2011 |
D1002334-v2 |
aLIGO TCS UHV Coarse Adjust Pivot Rod, BSC7 & BSC8 |
Mindy Jacobson |
Auxiliary Optics
Vacuum
Preliminary Design
|
07 Mar 2011 |
D1002333-v3 |
aLIGO TCS UHV Back Brace, BSC7 & BSC8 |
Mindy Jacobson |
Vacuum
Auxiliary Optics
Preliminary Design
|
07 Mar 2011 |
D1002317-v3 |
aLIGO TCS UHV Long Support, BSC7 & BSC8 |
Mindy Jacobson |
Preliminary Design
Auxiliary Optics
Vacuum
|
07 Mar 2011 |
D1002311-v2 |
aLIGO TCS UHV EL Fine Adjust Pivot Plate, BSC7 & BSC8 |
Mindy Jacobson et al. |
Preliminary Design
Vacuum
Auxiliary Optics
|
07 Mar 2011 |
D1002454-v2 |
aLIGO TCS UHV Bracket, Long Side, BSC8 |
Mindy Jacobson |
Preliminary Design
Auxiliary Optics
Vacuum
|
07 Mar 2011 |
D1002313-v2 |
aLIGO TCS UHV Fine Adjust Pivot Rod, BSC7 & BSC8 |
Mindy Jacobson |
Vacuum
Auxiliary Optics
Preliminary Design
|
07 Mar 2011 |
D080390-v4 |
aLIGO SUS ETM ITM Monolithic Assembly Tooling_Welding Scaffold_3-hole Plate |
Russell Jones et al. |
Preliminary Design
Assembly
Suspensions
Fabrication
|
07 Mar 2011 |
D080396-v4 |
aLIGO SUS ETM ITM Monolithic Assembly Tooling_Welding Scaffold_Micrometer Interface Boss |
Russell Jones et al. |
Assembly
Preliminary Design
Suspensions
Fabrication
|
07 Mar 2011 |
D080394-v5 |
aLIGO SUS ETM ITM Monolithic Assembly Tooling_Welding Scaffold_Crossbar |
Russell Jones et al. |
Preliminary Design
Assembly
Fabrication
Suspensions
|
07 Mar 2011 |
D080393-v5 |
aLIGO SUS ETM ITM Monolithic Assembly Tooling_Welding Scaffold_C-section side piece |
Russell Jones et al. |
Suspensions
Fabrication
Assembly
Preliminary Design
|
07 Mar 2011 |
E1000498-x0 |
aLIGO SUS BOSEM Testing Documentation |
Derek Bridges et al. |
Incoming Inspection
Suspensions
Subsystem Test
|
04 Mar 2011 |
D1100416-x0 |
aLIGO TCS Spherical Bearing Ball, CO2 Laser Projection VP Enclosure |
Austin Langley |
Final Design
Vacuum
Auxiliary Optics
Preliminary Design
|
04 Mar 2011 |
E1000718-v1 |
Specification for Vacuum/Clean Air Piping |
John Worden et al. |
Installation
|
03 Mar 2011 |
E1000717-v1 |
Specification for Piping Thermal Insulation |
John Worden et al. |
Installation
|
03 Mar 2011 |
E1000713-v1 |
Specification for Piping Design and Material |
John Worden et al. |
Installation
|
03 Mar 2011 |
E1000715-v1 |
Specification for Pipe Cleaning |
John Worden et al. |
Installation
|
03 Mar 2011 |
D0900617-v1 |
Optical Prism |
Manuel Ruiz |
Assembly
Auxiliary Optics
|
02 Mar 2011 |
D1001344-v2 |
aLIGO, CABLE BRACKET SCREW INSULATOR |
Scott Shankle |
Conceptual Design
Auxiliary Optics
|
02 Mar 2011 |
D1001345-v3 |
aLIGO, CABLE BRACKET, NUTPLATE |
Scott Shankle |
Auxiliary Optics
Conceptual Design
|
02 Mar 2011 |
D070124-v1 |
Rack Input Power Box |
Gary McIntyre |
System Engineering
Installation
|
01 Mar 2011 |
D1000729-v3 |
TCS Hartmann Sensor Camera Heat Spreader |
Mindy Jacobson et al. |
Preliminary Design
Auxiliary Optics
|
28 Feb 2011 |
D1000736-v2 |
TCS Hartmann Sensor Camera Heat Sink |
Mindy Jacobson et al. |
Preliminary Design
Auxiliary Optics
|
28 Feb 2011 |
E1000500-x0 |
aLIGO SUS Test Stand and Electronics Testing and Commissioning Documentation |
Derek Bridges et al. |
Suspensions
Subsystem Test
Commissioning
|
28 Feb 2011 |
D1100373-x0 |
SLC ACB Adjustable Counter Weight |
Niem Nguyen |
Auxiliary Optics
Modelling
|
28 Feb 2011 |
D1003179-v2 |
aLIGO Installation, LHO Corner Station Vacuum Equipment Layout |
John Worden et al. |
Installation
|
28 Feb 2011 |
D0902064-v2 |
Base Plate, Optic Base Assembly, Magnet Placement Fixture |
Derek Bridges |
Suspensions
Final Design
|
25 Feb 2011 |
D0902066-v2 |
Optic Rest Block, Optic Base Assembly, Magnet Placement Fixture |
Derek Bridges |
Suspensions
Final Design
|
25 Feb 2011 |
D080048-v3 |
aLIGO SUS_Monolithic Assembly_CO2 Laser Welding_Galvo box_Articulated Arm_Connector |
Russell Jones |
Suspensions
Fabrication
Assembly
|
25 Feb 2011 |
D080046-v2 |
aLIGO SUS_Monolithic Assembly_CO2 Laser Welding_Galvo box_Side wall |
Russell Jones |
Suspensions
Fabrication
Assembly
|
25 Feb 2011 |
D080047-v2 |
aLIGO SUS_Monolithic Assembly_CO2 Laser Welding_Galvo Box_sunroof |
Russell Jones |
Suspensions
Fabrication
Assembly
|
25 Feb 2011 |
D080045-v1 |
aLIGO SUS_Monolithic Assembly_CO2 Laser Welding_Galvo box_baseplate |
Russell Jones et al. |
Suspensions
Fabrication
Assembly
|
25 Feb 2011 |
D080044-v1 |
aLIGO SUS_Monolithic Assembly_CO2 Laser Welding_Galvo box_Galvo Holder |
Russell Jones |
Assembly
Fabrication
Suspensions
|
25 Feb 2011 |
D080041-v2 |
aLIGO SUS_Monolithic Assembly_CO2 Laser Welding_Galvo box_Mounting bracket |
Russell Jones |
Assembly
Suspensions
Fabrication
|
25 Feb 2011 |
D080669-v2 |
aLIGO 40kg (Mock Silica sized) Aluminium Mass |
Russell Jones |
Basic R&D
Fabrication
Suspensions
Assembly
|
24 Feb 2011 |
G1100159-v1 |
How scientists use math |
Fred Raab |
Education, Outreach
|
24 Feb 2011 |
D1003180-v2 |
aLIGO Installation, LLO Corner Station Vacuum Equipment Layout |
John Worden et al. |
Installation
|
24 Feb 2011 |
D020380-v2 |
Wire Start Clamp, Outside |
Derek Bridges |
Preliminary Design
Suspensions
|
23 Feb 2011 |
D1100330-x0 |
aLIGO TCS Viewports Enclosure Mirror support plate, CO2 Laser Projection |
Austin Langley |
Vacuum
Auxiliary Optics
Final Design
Preliminary Design
|
22 Feb 2011 |
D1100328-v1 |
FM/BS Removal Tool - FM /BS Summit |
Scott Shankle |
Conceptual Design
|
22 Feb 2011 |
G1100131-v1 |
Black Holes, Einstein, and Gravitational Waves |
Peter Saulson |
Education, Outreach
|
22 Feb 2011 |
M1100044-v1 |
Memorandum of Understanding between the LSC and the University of Texas Arlington |
David Reitze et al. |
MOU
Education, Outreach
|
21 Feb 2011 |
G1100149-v2 |
Formal Education for the aLIGO Era |
Lynn Cominsky |
Education, Outreach
|
21 Feb 2011 |
D1100198-x0 |
SLC ACB 3/6" DIA X 26.84" L STAINLESS STEEL LANDYARD, |
Niem Nguyen |
Modelling
Auxiliary Optics
|
19 Feb 2011 |
D0900644-v8 |
Advanced LIGO ISC Component Locations |
Rich Abbott |
System Engineering
Conceptual Design
|
18 Feb 2011 |
D1001343-v3 |
aLIGO, CABLE BRACKET, UPRIGHT |
Scott Shankle |
Auxiliary Optics
Conceptual Design
|
18 Feb 2011 |
D1001826-v1 |
SLC ARM CAVITY BAFFLE BALANCING WEIGHT |
Niem Nguyen |
Auxiliary Optics
Fabrication
Modelling
|
18 Feb 2011 |
D1001742-v3 |
aLIGO TCS CO2 Laser In-Vacuum Steering Optics Assembly, H2, BSC7 |
Mindy Jacobson et al. |
Fabrication
Vacuum
Auxiliary Optics
Final Design
|
17 Feb 2011 |
D1100246-v1 |
Prism Gluing Test Mass, HLTS |
Derek Bridges |
Assembly
Suspensions
|
16 Feb 2011 |
G0900594-v1 |
Controlling radiation pressure instabilities in Enhanced LIGO |
Katherine Dooley et al. |
Meeting
Sensing and Control
|
02 Jul 2009 |
D1100299-x0 |
aLIGO TCS Periscope Tube, CO2 Laser Projection VP Enclosure |
Austin Langley |
Preliminary Design
Final Design
Vacuum
Auxiliary Optics
|
15 Feb 2011 |
T1000256-v2 |
Test Procedure for RF Distribution Amplifier |
Daniel Sigg et al. |
Subsystem Test
|
14 Feb 2011 |
D1000761-x0 |
SLC FOLD MIRROR BEAM DUMP INTERFACE MOUNTING PLATE |
Manuel Ruiz |
Auxiliary Optics
Assembly
|
11 Feb 2011 |
T1100087-v1 |
SR785 Machine Settings File |
Rich Abbott |
Sensing and Control
Subsystem Test
|
10 Feb 2011 |
G1100121-v1 |
Gravitational Waves: A New Kind of Astronomy |
Tiffany Summerscales |
Public Talk / Colloquium
|
10 Feb 2011 |
T1100078-v2 |
ISC Whitening Chassis Misc. Parts BOM |
Rich Abbott |
Assembly
Sensing and Control
|
08 Feb 2011 |
D1100239-x0 |
TCS HWS Optics Table Supports, H2 HAM10 |
Mindy Jacobson |
Preliminary Design
Auxiliary Optics
Final Design
|
08 Feb 2011 |
D1100238-x0 |
TCS HWS Optics Table, H2 HAM10 |
Mindy Jacobson |
Preliminary Design
Auxiliary Optics
Final Design
|
08 Feb 2011 |
D1000637-x0 |
TCS HWS Optics Table, H1_L1 HAM4 |
Mindy Jacobson |
Preliminary Design
Fabrication
Final Design
Auxiliary Optics
|
08 Feb 2011 |
D1100237-x0 |
TCS HWS Table Enclosure, H2 HAM10 |
Mindy Jacobson |
Preliminary Design
Auxiliary Optics
Final Design
|
08 Feb 2011 |
D0900603-v2 |
Wire Start Clamp, Inside, Upper Wire Jig, HLTS |
Derek Bridges |
Final Design
Suspensions
|
07 Feb 2011 |
D0900634-v2 |
Wire Start Clamp, Inside, Intermediate Wire Jig, HLTS |
Derek Bridges et al. |
Suspensions
Final Design
|
07 Feb 2011 |
D0900632-v2 |
Wire Clamp Mount, Intermediate Wire Jig, HLTS |
Derek Bridges et al. |
Final Design
Suspensions
|
07 Feb 2011 |
D980184-v2 |
LOS Clamp, Long |
Derek Bridges |
Final Design
System Engineering
|
07 Feb 2011 |
D1002034-v1 |
CDS Internal Chassis Power Cable C |
Rich Abbott |
Assembly
Sensing and Control
|
04 Feb 2011 |
T1000466-v3 |
4 Channel LSC Quad IQ Demodulator Module Misc. Parts |
Rich Abbott |
Assembly
Sensing and Control
|
04 Feb 2011 |
E1000707-v5 |
WA Mid/End VE Installation |
John Worden et al. |
Installation
|
04 Feb 2011 |
D020406-v2 |
Double Start Counterwound Spring |
Andy Stein |
Seismic Isolation
Final Design
|
04 Feb 2011 |
D1003328-v1 |
aLIGO TCS UHV H2 Assembly Interface Damper |
Mindy Jacobson |
Preliminary Design
Fabrication
Final Design
Vacuum
Auxiliary Optics
|
03 Feb 2011 |
D1001850-v2 |
aLIGO TCS Ring Heater, Lower Copper Plate |
Mindy Jacobson et al. |
Preliminary Design
Auxiliary Optics
Vacuum
Final Design
|
03 Feb 2011 |
D020407-v4 |
Double Start Counterwound Spring Connector |
Andy Stein |
Final Design
Seismic Isolation
|
03 Feb 2011 |
D1100199-x0 |
SLC ACB 3/6" DIA X 46" L STAINLESS STEEL LANDYARD, |
Niem Nguyen |
Auxiliary Optics
Modelling
|
02 Feb 2011 |
D0901433-v2 |
Base Plate, Lower Loop Wire Jig, HLTS |
Derek Bridges |
Suspensions
Final Design
|
01 Feb 2011 |
D1000605-v1 |
Assy, Periscope, 6" Total Station |
Scott Shankle |
Assembly
|
01 Feb 2011 |
G1100073-v1 |
Gravitational-wave physics and astronomy: the next ten years |
Stan Whitcomb |
Public Talk / Colloquium
|
31 Jan 2011 |
D0900631-v2 |
Blade Clamp Mount, Intermediate Wire Jig, HLTS |
Michael Meyer |
Final Design
Suspensions
|
31 Jan 2011 |
D0900595-v2 |
Base Plate, Upper Wire Jig, HLTS |
Derek Bridges |
Suspensions
Final Design
|
30 Jan 2011 |
D0901805-v2 |
Stage0-1, Locker, Base Shim Spacer |
Sam Barnum et al. |
Preliminary Design
Seismic Isolation
|
28 Jan 2011 |
E1100065-x0 |
Stage 0-1 Lockers and Stages inspection, aLIGO BSC-ISI, First Assembly at LASTI |
Fabrice Matichard |
Seismic Isolation
Assembly
|
25 Jan 2011 |
P1100014-v1 |
A LaserFest Teachers’ Day: Outreach to Local Science Teachers at the SESAPS Meeting |
Amber Stuver |
Education, Outreach
|
24 Jan 2011 |
D1100113-v1 |
Mid-Station Spool-LHO |
John Worden et al. |
Installation
|
21 Jan 2011 |
D1100111-v1 |
Adapter A-17 |
John Worden et al. |
Installation
|
21 Jan 2011 |
D0900597-v2 |
Wire Clamp Mount, Upper Wire Jig, HLTS |
Derek Bridges et al. |
Suspensions
Final Design
|
21 Jan 2011 |
D0900596-v2 |
Blade Clamp Mount, Upper Wire Jig, HLTS |
Derek Bridges et al. |
Suspensions
Final Design
|
21 Jan 2011 |
E1000716-v1 |
Component Alignment Procedure |
John Worden et al. |
Installation
|
20 Jan 2011 |
E1000719-v1 |
Contamination Control for Adv. LIGO Vacuum Equipment Installation |
John Worden et al. |
Installation
|
20 Jan 2011 |
D1003175-v2 |
aLIGO Installation, LHO Y (Left) Mid Station Vacuum Equipment Layout |
John Worden et al. |
Installation
|
20 Jan 2011 |
D1003176-v2 |
aLIGO Installation, LHO X (Right) Mid Station Vacuum Equipment Layout |
John Worden et al. |
Installation
|
20 Jan 2011 |
C1001535-v7 |
Statement of Work for LIGO Installation Cleanrooms |
John Worden et al. |
Installation
Procurements
|
20 Jan 2011 |
T080184-v2 |
A Color Coding System for Mechanical Models |
Derek Bridges |
Final Design
Modelling
System Engineering
Conceptual Design
Preliminary Design
|
18 Jan 2011 |
D1001712-v2 |
I/O EXPANSION CHASSIS - FRONT PANEL |
Emery Brown |
Data Acquisition System
Fabrication
|
14 Jan 2011 |
E080426-v1 |
Advanced LIGO ERGO Arm Hazard Analysis |
Gregg Harry et al. |
Core Optics
Installation
|
06 Mar 2009 |
E070341-x0 |
HAM_ISI_Installation_Hazard_Analysis |
Fabrice Matichard et al. |
Installation
Seismic Isolation
Document Migration
|
26 Oct 2010 |
D071008-v2 |
Stage 0 Stiffener End Cap |
Andy Stein et al. |
Final Design
Seismic Isolation
|
14 Jan 2011 |
D071180-v2 |
GS-13 Adapter Plate |
Andy Stein et al. |
Seismic Isolation
Final Design
|
14 Jan 2011 |
D071071-v2 |
Rib, Tan, Flexure Mid |
Andy Stein et al. |
Seismic Isolation
Final Design
|
14 Jan 2011 |
D071070-v2 |
Rib, Tan, Flexure Cen |
Andy Stein et al. |
Seismic Isolation
Final Design
|
14 Jan 2011 |
D071069-v2 |
Rib, Rad, Flexure Out 2 |
Andy Stein et al. |
Final Design
Seismic Isolation
|
14 Jan 2011 |
D071068-v2 |
Rib, Rad, Flexure Out 1 |
Andy Stein et al. |
Final Design
Seismic Isolation
|
14 Jan 2011 |
D071065-v2 |
Keel Base |
Andy Stein et al. |
Seismic Isolation
Final Design
|
14 Jan 2011 |
D071056-v2 |
Rib, Rad, GS-13 Out 2 |
Andy Stein et al. |
Final Design
Seismic Isolation
|
14 Jan 2011 |
D071055-v2 |
Rib, Rad, GS-13 Out 1 |
Andy Stein et al. |
Final Design
Seismic Isolation
|
14 Jan 2011 |
D071054-v2 |
Rib, Rad, GS-13 Mid |
Andy Stein et al. |
Seismic Isolation
Final Design
|
14 Jan 2011 |
D071053-v2 |
Rib, Tan, GS-13 Cen |
Andy Stein et al. |
Seismic Isolation
Final Design
|
14 Jan 2011 |
D071052-v2 |
Rib, Tan, GS-13 Mid |
Andy Stein et al. |
Seismic Isolation
Final Design
|
14 Jan 2011 |
D071006-v2 |
Stage 0 Stiffener Rib |
Andy Stein et al. |
Seismic Isolation
Final Design
|
14 Jan 2011 |
D1100019-v1 |
ALIGO AOS Half Wave Quartz Holder |
Manuel Ruiz |
Auxiliary Optics
Assembly
|
11 Jan 2011 |
D1100035-x0 |
SLC F ETM BAFLE SKIN |
Niem Nguyen |
Auxiliary Optics
Modelling
|
10 Jan 2011 |
D0900618-v1 |
Optical Prism Top Plate |
Niem Nguyen |
Auxiliary Optics
Assembly
|
07 Jan 2011 |
E1100021-v1 |
BOM - ALIGO AOS HALF WAVE QUARTZ ASSY |
Manuel Ruiz |
Auxiliary Optics
Assembly
|
07 Jan 2011 |
C1002236-v8 |
SOW Fabrication of aLIGO SEI Install Test Stands |
John Worden et al. |
Procurements
Installation
|
07 Jan 2011 |
D1100023-x0 |
ALIGO AOS Half Wave Quartz |
Manuel Ruiz |
Assembly
Auxiliary Optics
|
05 Jan 2011 |
E1100012-x0 |
Output Faraday Isolator Parts (Porcelain SSTLl) and Quantities |
Manuel Ruiz |
Auxiliary Optics
Assembly
|
05 Jan 2011 |
D1100009-x0 |
SLC ACB QPD UPPER WIRE |
Niem Nguyen |
Modelling
Auxiliary Optics
|
03 Jan 2011 |
D1003178-v1 |
aLIGO Installation, LHO X (Right) End Station Vacuum Equipment Layout |
John Worden et al. |
Installation
|
03 Jan 2011 |
D1003177-v1 |
aLIGO Installation, LHO Y (Left) End Station Vacuum Equipment Layout |
John Worden et al. |
Installation
|
03 Jan 2011 |
D1100004-x0 |
SLC ACB QPD WIRE 1 |
Niem Nguyen |
Auxiliary Optics
Modelling
|
03 Jan 2011 |
D1100003-x0 |
SLC ACB QPD WIRE 2 |
Niem Nguyen |
Auxiliary Optics
Modelling
|
03 Jan 2011 |
D1100002-x0 |
SLC ACB QPD WIRE 3 |
Niem Nguyen |
Auxiliary Optics
Modelling
|
03 Jan 2011 |
D1100001-x0 |
SLC ACB QPD WIRE 4 |
Niem Nguyen |
Modelling
Auxiliary Optics
|
03 Jan 2011 |
D1003404-x0 |
AdLIGO AOS FM Beam Dump Bottom Left Stiffener |
Manuel Ruiz |
Auxiliary Optics
Assembly
|
28 Dec 2010 |
D1003403-x0 |
AdLIGO AOS FM Beam Dump Top Left Stiffener |
Manuel Ruiz |
Auxiliary Optics
Assembly
|
28 Dec 2010 |
D1003402-x0 |
AdLIGO AOS FM Beam Dump Right Stiffener |
Manuel Ruiz |
Assembly
Auxiliary Optics
|
28 Dec 2010 |
D1003401-x0 |
AdLIGO AOS FM Beam Dump Bottom Hatsection |
Manuel Ruiz |
Auxiliary Optics
Assembly
|
28 Dec 2010 |
D1003400-x0 |
AdLIGO AOS FM Beam Dump Left Hatsection |
Manuel Ruiz |
Assembly
Auxiliary Optics
|
28 Dec 2010 |
D1003399-x0 |
AdLIGO AOS FM Beam Dump Right Hatsection |
Manuel Ruiz |
Assembly
Auxiliary Optics
|
28 Dec 2010 |
T1000023-v1 |
Viewports Subsystem Preliminary Design Document |
Michael Smith |
Preliminary Design
Auxiliary Optics
|
23 Dec 2010 |
D1000609-v1 |
Coupler, Mounting, Total Station Periscope |
Scott Shankle |
Preliminary Design
|
22 Dec 2010 |
D1000608-v1 |
Compression Mount, Total Station Periscope |
Scott Shankle |
Preliminary Design
|
22 Dec 2010 |
D1001976-v1 |
aLIGO, BSC INSTALLATION, STRIKE PLATE |
Scott Shankle |
Auxiliary Optics
Conceptual Design
|
22 Dec 2010 |
D1001616-v1 |
aLIGO, BSC INSTALLATION ARM, FLANGE MOUNT |
Scott Shankle |
Auxiliary Optics
Conceptual Design
|
22 Dec 2010 |
T1000700-v2 |
Transmon Telescope Mirror Test Procedure |
Michael Smith et al. |
Subsystem Test
Incoming Inspection
Auxiliary Optics
Final Design
|
21 Dec 2010 |
D010266-v1 |
Wire Clamp Cylinder, Blade Pulldown Device |
Derek Bridges |
Suspensions
Final Design
|
21 Dec 2010 |
E1000601-v2 |
aLIGO Optical Lever Coordinates, H1 |
Ignacio Romero et al. |
Auxiliary Optics
Final Design
|
16 Dec 2010 |
E1000607-v2 |
aLIGO Optical Lever Coordinates, H2 |
Ignacio Romero et al. |
Final Design
Auxiliary Optics
|
16 Dec 2010 |
D1003313-x0 |
AdLIGO AOS SR2 Scrapper Baffle Center Stiffener |
Manuel Ruiz |
Assembly
Auxiliary Optics
|
15 Dec 2010 |
G1001151-v1 |
Measuring the gravitational wave stochastic background with LIGO |
Tobin Fricke |
Public Talk / Colloquium
Stochastic
|
14 Dec 2010 |
G080405-v1 |
Introduction to DC Readout |
Tobin Fricke |
Commissioning
Sensing and Control
|
14 Dec 2010 |
D1003289-x0 |
SLC ACB 1 HOLE LEFT-QPD SKIN |
Niem Nguyen |
Modelling
Auxiliary Optics
|
14 Dec 2010 |
D1003275-v1 |
AdLIGO AOS ITM Elliptical Baffle Right Final Assy |
Manuel Ruiz |
Assembly
Auxiliary Optics
|
14 Dec 2010 |
E1000857-v1 |
ITM Elliptical Baffle Right Mechanical Parts & Quantities |
Manuel Ruiz |
Auxiliary Optics
Assembly
|
14 Dec 2010 |
E1000856-v1 |
BOM-AdLIGO AOS ITM Elliptical Baffle Right Final Assy |
Manuel Ruiz |
Assembly
Auxiliary Optics
|
13 Dec 2010 |
E1000854-v1 |
BOM-AdLIGO AOS ITM Elliptical Baffle Right Assy |
Manuel Ruiz |
Auxiliary Optics
Assembly
|
13 Dec 2010 |
E1000855-v1 |
DCN-Release of ITM Elliptical Baffle Right |
Manuel Ruiz |
Assembly
Auxiliary Optics
|
13 Dec 2010 |
E1000736-v1 |
DCN - Release of ITM Elliptical Baffle |
Manuel Ruiz |
Assembly
Auxiliary Optics
|
13 Dec 2010 |
D071200-v4 |
Trim Adjustment Mass |
Andy Stein et al. |
Seismic Isolation
Final Design
|
13 Dec 2010 |
E1000842-v1 |
Magnets Test Results |
Jeffrey Bartlett et al. |
Assembly
|
08 Dec 2010 |
D010268-v1 |
Lower Wire Clamp, Blade Pulldown Device |
Derek Bridges |
Suspensions
Final Design
|
08 Dec 2010 |
D1003212-x0 |
SLC PHOTODETECTOR CABLE LOWER 1 HOLE ASSY |
Niem Nguyen |
Modelling
Auxiliary Optics
|
06 Dec 2010 |
E1000833-x0 |
BOM - AdLIGO AOS ITM Elliptical Baffle Assy |
Manuel Ruiz |
Auxiliary Optics
Assembly
|
06 Dec 2010 |
E1000832-x0 |
DCN - Release of ITM Elliptical Baffle Assy |
Manuel Ruiz |
Auxiliary Optics
Assembly
|
06 Dec 2010 |
D010261-v1 |
Lower Wire Clamp Plate, Blade Pulldown Device |
Derek Bridges |
Suspensions
Final Design
|
06 Dec 2010 |
D1003195-x0 |
aLIGO TCS External Clamping Flange Assembly, CO2 Laser Projection |
Cheryl Vorvick et al. |
Preliminary Design
Final Design
Auxiliary Optics
Vacuum
|
03 Dec 2010 |
C1002426-v6 |
Statement of Work for BSC Work Platforms |
John Worden et al. |
Installation
|
02 Dec 2010 |
D1001849-v2 |
aLIGO TCS Ring Heater, Upper Copper Plate |
Mindy Jacobson et al. |
Auxiliary Optics
Vacuum
Final Design
Preliminary Design
|
30 Nov 2010 |
D070591-v1 |
SPACER, HAM-ISI Installation Fixture |
Sam Barnum et al. |
Upgrades
Final Design
Seismic Isolation
|
29 Nov 2010 |
G1001070-v1 |
LIGO “Inspiring Science” Poster |
William Katzman |
Education, Outreach
|
18 Nov 2010 |
M1000384-v1 |
MEMORANDUM OF UNDERSTANDING BETWEEN THE LIGO SCIENTIFIC COLLABORATION AND CATAWBA SCIENCE CENTER |
Marco Cavaglia |
Education, Outreach
Collaboration
MOU
|
17 Nov 2010 |
E1000714-x0 |
Vacuum Valves |
John Worden et al. |
Installation
|
16 Nov 2010 |
D1001756-v2 |
aLIGO TCS RH, Upper Custom 25D Connector Bracket |
Mindy Jacobson |
Fabrication
Auxiliary Optics
Vacuum
Final Design
|
15 Nov 2010 |
D1001841-v3 |
aLIGO TMS FOCUS SLIDE LOCK |
Michael Miller |
Conceptual Design
Auxiliary Optics
|
12 Nov 2010 |
C1002079-v1 |
Specification for De-Installation LA LIGO Site |
LSC |
Requirements
Observatory Facilities
|
11 Nov 2010 |
C1001836-v1 |
Specification for De-Installation - Washington site. |
John Worden et al. |
Installation
Observatory Facilities
Procurements
|
11 Nov 2010 |
G1001048-v1 |
Advanced LIGO: a half-time show |
David Shoemaker |
Public Talk / Colloquium
|
10 Nov 2010 |
D0901550-v2 |
Upper AOSEM Mounting Bracket, Bottom Mass, HLTS |
Bobby Moore et al. |
Final Design
Suspensions
|
08 Nov 2010 |
D0900340-v2 |
Lower AOSEM Mounting Bracket, Bottom Mass, HLTS |
Derek Bridges |
Suspensions
Final Design
|
05 Nov 2010 |
D1002953-x0 |
shackhartmannprimaryinchmirrorpostLONG |
Ken Mailand |
Auxiliary Optics
Preliminary Design
|
03 Nov 2010 |
G1001022-v1 |
Detecting Intermediate-Mass Black Holes by the Quenching of Mass Segregation in Globular Clusters |
Riccardo DeSalvo |
Public Talk / Colloquium
Astrophysics / Multi-messenger
|
03 Nov 2010 |
D1002940-x0 |
shackhartmann6inchmirrorpost WASHER |
Ken Mailand |
Preliminary Design
Auxiliary Optics
|
03 Nov 2010 |
D1002939-x0 |
shackhartmann6inchmirrorpost |
Ken Mailand |
Auxiliary Optics
Preliminary Design
|
03 Nov 2010 |
D1002938-x0 |
SHACKHARTMANN6INCHMIRRORHOLDDOWNMIKEVIRGINIO |
Ken Mailand |
Preliminary Design
Auxiliary Optics
|
03 Nov 2010 |
T1000657-v1 |
DC Power Strip Test Results |
Rich Abbott |
System Engineering
Subsystem Test
|
02 Nov 2010 |
E1000318-v1 |
DCN: Initial Release of 1st Article TMS Secondary Mirror Parts and Assembly |
Michael Miller |
Auxiliary Optics
Conceptual Design
|
01 Nov 2010 |
D1001813-v2 |
aLIGO TMS THREAD MT. SEC. FOCUS |
Michael Miller |
Conceptual Design
Auxiliary Optics
|
01 Nov 2010 |
D1001833-v2 |
a LIGO TMS HOR. SLIDE SEC. |
Michael Miller |
Conceptual Design
Auxiliary Optics
|
01 Nov 2010 |
D1001832-v2 |
aLIGO TMS VERT. SLIDE SEC. BRK. |
Michael Miller |
Auxiliary Optics
Conceptual Design
|
01 Nov 2010 |
D1001839-v2 |
aLIGO TMS HOR. LOCK |
Michael Miller |
Conceptual Design
Auxiliary Optics
|
01 Nov 2010 |
D1001837-v2 |
aLIGO TMS VERTICAL LOCK |
Michael Miller |
Auxiliary Optics
Conceptual Design
|
01 Nov 2010 |
D1001835-v2 |
aLIGO TMS ACROSS THREAD MT. |
Michael Miller |
Conceptual Design
Auxiliary Optics
|
01 Nov 2010 |
D1001137-v1 |
SLC BAFFLE BLADE CLAMP |
Niem Nguyen |
Modelling
Auxiliary Optics
|
27 Oct 2010 |
E1000398-v1 |
Thin Film Polarizer for Advanced LIGO Output Faraday Isolator |
Rodica Martin |
Auxiliary Optics
Conceptual Design
|
26 Oct 2010 |
T1000275-v2 |
Transmon SUS Telescope Alignment Procedure |
Michael Smith |
Auxiliary Optics
Preliminary Design
|
22 Oct 2010 |
D1002802-x0 |
aLIGO_TMS_Tele_Pitch_Shaft_Ring |
Ken Mailand |
Preliminary Design
Auxiliary Optics
|
21 Oct 2010 |
D070587-v1 |
External Stand, HAM-ISI Fixture |
Sam Barnum et al. |
Document Migration
Upgrades
Final Design
Seismic Isolation
|
21 Oct 2010 |
D1002291-v1 |
aLIGO TCP/ERM Prism holder fixing screw |
Marielle van Veggel et al. |
Suspensions
Installation
|
21 Oct 2010 |
D1002290-v1 |
aLIGO TCP/ERM Prism holder alignment bush |
Marielle van Veggel et al. |
Installation
Suspensions
|
21 Oct 2010 |
D1002289-v1 |
aLIGO TCP/ERM Prism holder alignment screw |
Marielle van Veggel et al. |
Installation
Suspensions
|
21 Oct 2010 |
G1001007-v1 |
SIS 2010 |
Hiro Yamamoto |
Modelling
|
20 Oct 2010 |
M1000328-x0 |
LLO TCS LVEA Alignment SOP |
David Kinzel et al. |
Laser Systems
Safety
Operations
|
14 Oct 2010 |
M1000331-x0 |
LLO 100W HPLF Laser Destructive Testing SOP |
Rupal Amin et al. |
Laser Systems
Operations
Safety
|
14 Oct 2010 |
M1000330-x0 |
LLO 100W HPLF High Power Alignment SOP |
David Kinzel et al. |
Laser Systems
Safety
Operations
|
14 Oct 2010 |
D1001858-v3 |
aLIGO TCS Ring Heater Element Retainer, Right |
Mindy Jacobson et al. |
Preliminary Design
Auxiliary Optics
Vacuum
Final Design
|
14 Oct 2010 |
D1001819-v3 |
aLIGO TCS Ring Heater Element Retainer, Left |
Mindy Jacobson |
Final Design
Auxiliary Optics
Vacuum
Preliminary Design
|
14 Oct 2010 |
D1002702-x0 |
SLC ACB Reinforcing Channel |
Niem Nguyen |
Modelling
Auxiliary Optics
|
13 Oct 2010 |
D1002695-x0 |
aLigo_TMS_Telescope_End_Add_Mass |
Ken Mailand |
Preliminary Design
Auxiliary Optics
|
12 Oct 2010 |
T1000016-v1 |
ALIGO NP-type: - Preparations of Ear Bonding at LASTI (February 2010) |
Marielle van Veggel et al. |
Installation
Suspensions
|
12 Oct 2010 |
G1000955-v3 |
Documenting with E-travelers |
Rich Abbott |
Assembly
|
08 Oct 2010 |
D0900537-v2 |
LHO As Built HAM6 optical layout |
Sam Waldman |
Installation
Sensing and Control
|
07 Oct 2010 |
E1000480-v4 |
LLO QUAD-13 Assembly Process Traveler |
Michael Fyffe et al. |
Suspensions
Assembly
|
06 Oct 2010 |
D1001803-v1 |
aLIGO SUS CO2 Laser Machine Welding Galvo Box_Side Wall 2 |
Russell Jones |
Conceptual Design
Suspensions
|
06 Oct 2010 |
E1000516-x0 |
aLIGO SUS Quad Suspension Assembly Process Travelers |
Derek Bridges et al. |
Suspensions
Assembly
|
05 Oct 2010 |
E1000510-x0 |
aLIGO SUS BSC Suspension Test Stand and Electronics Testing and Commissioning Documentation |
Derek Bridges et al. |
Final Design
Assembly
Suspensions
Subsystem Test
Commissioning
|
04 Oct 2010 |
E1000511-x0 |
aLIGO SUS HAM Suspension Test Stand and Electronics Testing and Commissioning Documentation |
Derek Bridges et al. |
Assembly
Suspensions
Commissioning
Subsystem Test
|
04 Oct 2010 |
E1000509-v1 |
LLO QUAD-16 Assembly Process Traveler |
Michael Fyffe et al. |
Assembly
Suspensions
|
04 Oct 2010 |
E1000508-v1 |
LLO QUAD-15 Assembly Process Traveler |
Michael Fyffe et al. |
Assembly
Suspensions
|
04 Oct 2010 |
E1000503-v1 |
LLO QUAD-12 Assembly Process Traveler |
Michael Fyffe et al. |
Suspensions
Assembly
|
04 Oct 2010 |
E1000504-v1 |
LLO QUAD-11 Assembly Process Traveler |
Michael Fyffe et al. |
Assembly
Suspensions
|
04 Oct 2010 |
L1000368-v1 |
LHO Installation Leader responsibilities and authorities |
David Shoemaker |
Installation
Detector
Management
|
04 Oct 2010 |
E1000505-x0 |
LHO QUAD-10 Assembly Process Traveler |
Michael Fyffe et al. |
Suspensions
Assembly
|
04 Oct 2010 |
T0900520-v4 |
Documenting Electronics using the DCC and the E-traveler |
Rich Abbott |
Commissioning
|
01 Oct 2010 |
E1000507-v1 |
aLIGO BSC-ISI, Stage 1 Structural Testing |
Fabrice Matichard |
Seismic Isolation
Subsystem Test
|
01 Oct 2010 |
D1001766-v1 |
SLC ARM CAVITY BAFFLE INTERFACE MTG ASSY-LASTI |
Niem Nguyen |
Auxiliary Optics
Modelling
|
01 Oct 2010 |
F0900053-v2 |
S-Number E-Traveler Template |
Rich Abbott et al. |
Requirements
|
29 Sep 2010 |
D080725-v2 |
Earthquake Stop for Metal or Glass, 2.5 Inch |
Derek Bridges |
Suspensions
Final Design
|
26 Sep 2010 |
D080724-v3 |
Mounting Cap, Earthquake Stop |
Derek Bridges |
Suspensions
Final Design
|
26 Sep 2010 |
G1000911-v1 |
First Einstein@Home Radio Pulsar Discoveries |
Bruce Allen |
Meeting
Continuous Wave
|
24 Sep 2010 |
G1000807-v2 |
Detector Characterization during a time of GEO GLORY! |
Jonathan Leong |
Meeting
Detector Characterization
|
24 Sep 2010 |
G1000912-v1 |
Advanced Virgo INJ: Faraday isolator, Electro-optical modulator, high power beam dump and Input mode-cleaner |
Eric Genin |
Input Optics
Meeting
|
23 Sep 2010 |
C1001195-v5 |
Statement of Work - Quad I&Q RF Demodulator |
Rich Abbott et al. |
Fabrication
|
22 Sep 2010 |
D1001093-v1 |
SLC ARM CAVITY BAFFLE FINAL ASSY DUMMY MASS |
Niem Nguyen |
Modelling
Auxiliary Optics
|
21 Sep 2010 |
D1001685-v1 |
V-block - assembly |
Marielle van Veggel |
Installation
Suspensions
|
21 Sep 2010 |
D1001095-v1 |
SLC ARM CAVITY BAFFLE LO TUBE ASSY FOR DUMMY MASS |
Niem Nguyen |
Modelling
Auxiliary Optics
|
21 Sep 2010 |
D1000900-v1 |
SLC BAFFLE TUBE UP ASSY |
Niem Nguyen |
Modelling
Auxiliary Optics
|
21 Sep 2010 |
D1000865-v1 |
SLC DAMPING TUBE ASSY |
Niem Nguyen |
Modelling
Auxiliary Optics
|
21 Sep 2010 |
D1000863-v1 |
SLC EDDY CURRENT DAMPING ASSY |
Niem Nguyen |
Auxiliary Optics
Modelling
|
21 Sep 2010 |
D1001094-v1 |
SLC ARM CAVITY BAFFLE ASSY DUMMY MASS |
Niem Nguyen |
Auxiliary Optics
Modelling
|
21 Sep 2010 |
D1000868-v1 |
SLC DAMPING TUBE BOTTOM PLATE |
Niem Nguyen |
Auxiliary Optics
Modelling
|
21 Sep 2010 |
D1000864-v1 |
SLC DAMPING TUBE |
Niem Nguyen |
Modelling
Auxiliary Optics
|
21 Sep 2010 |
D1000867-v1 |
SLC DAMPING TUBE MOUNTING PLATE |
Niem Nguyen |
Auxiliary Optics
Modelling
|
21 Sep 2010 |
G1000839-v1 |
LIGO and LCGT collaboration |
Hiro Yamamoto |
Collaboration
Meeting
|
20 Sep 2010 |
D1001097-v1 |
SLC ARM CAVITY BAFFLE DUMMY MASS |
Niem Nguyen |
Modelling
Auxiliary Optics
|
20 Sep 2010 |
D1000701-v1 |
SLC TUBE WIRE CLAMP |
Niem Nguyen |
Auxiliary Optics
Modelling
|
20 Sep 2010 |
D1001657-v1 |
SLC ARM CAVITY BAFFLE SHCS # .75-16 X 3.75 MODIFIED |
Niem Nguyen |
Auxiliary Optics
Modelling
|
20 Sep 2010 |
D1000904-v1 |
SLC BAFFLE TUBE LO FLANGE |
Niem Nguyen |
Modelling
Auxiliary Optics
|
20 Sep 2010 |
D1001096-v1 |
SLC ARM CAVITY BAFFLE LO TUBE FOR DUMMY MASS |
Niem Nguyen |
Modelling
Auxiliary Optics
|
20 Sep 2010 |
D1000905-v1 |
SLC BAFFLE TUBE UP FLANGE |
Niem Nguyen |
Auxiliary Optics
Modelling
|
20 Sep 2010 |
D1000903-v1 |
SLC BAFFLE TUBE UP |
Niem Nguyen |
Auxiliary Optics
Modelling
|
20 Sep 2010 |
D1001765-v1 |
SLC ARM CAVITY BAFFLE INTERFACE MTG PLATE-LASTI |
Niem Nguyen |
Modelling
Auxiliary Optics
|
20 Sep 2010 |
D1001048-v1 |
SLC FOLD MIRROR ELLIPSE BAFFLE ASSY FOR INSTALLATION |
Niem Nguyen |
Auxiliary Optics
Modelling
|
20 Sep 2010 |
G1000869-v1 |
Demonstration of a squeezed zero-area Sagnac interferometer for future gravitational wave detectors |
Tobias Eberle |
Meeting
|
20 Sep 2010 |
T1000493-v1 |
Initial Alignment of PR3, ITM, and ETM prior to 1st Light Down the Arms |
Michael Smith |
Auxiliary Optics
Installation
|
14 Sep 2010 |
T990081-v2 |
Time Domain Modal Model in End-to-End simulation package |
Hiro Yamamoto |
Core Optics
Modelling
|
13 Sep 2010 |
T990091-x0 |
Time Domain Modal Model in End-to-End simulation package |
Hiro Yamamoto |
Core Optics
Modelling
|
13 Sep 2010 |
G1000800-v2 |
Preparing for Life After High School |
Fred Raab |
Education, Outreach
|
13 Sep 2010 |
E1000399-v1 |
BSC-ISI passive damping experiments |
Fabrice Matichard |
Subsystem Test
Seismic Isolation
|
08 Sep 2010 |
E1000400-v1 |
Quad Local resonances |
Fabrice Matichard |
Subsystem Test
Seismic Isolation
|
08 Sep 2010 |
D070579-v2 |
Upper Front Gusset, Structural Weldment, HLTS |
Derek Bridges |
Suspensions
Final Design
|
08 Sep 2010 |
T1000525-x0 |
Loss budget by optics analysis using SIS |
Hiro Yamamoto |
Modelling
Core Optics
|
06 Sep 2010 |
T0900289-v4 |
LIGO Instrument Science Priority Matrix |
David Shoemaker |
Collaboration
Upgrades
Detector
Basic R&D
|
02 Sep 2010 |
G1000733-v2 |
Testing GR with Gravitational Wave Observations |
B Sathyaprakash |
Public Talk / Colloquium
|
02 Sep 2010 |
E1000376-v1 |
RGA Test Results: A-OSEM Circuit Board Sub-Assembly (223 units) |
Dennis Coyne et al. |
Suspensions
System Engineering
Incoming Inspection
Vacuum
|
01 Sep 2010 |
C1001188-v1 |
Statement of Work Fabrication and Assembly of IO Expansion Chassis for Advanced LIGO Controls |
Jay Heefner |
Fabrication
Data Acquisition System
|
20 Jul 2010 |
D1000013-v3 |
Fibre storage rack - fibre support crossbar |
Marielle van Veggel et al. |
Preliminary Design
Suspensions
|
01 Sep 2010 |
D1000019-v3 |
Fibre storage rack - fibre support peg |
Marielle van Veggel et al. |
Suspensions
Preliminary Design
|
01 Sep 2010 |
D070576-v2 |
Lower Front Gusset, Structural Weldment, HLTS |
Derek Bridges |
Suspensions
Final Design
|
31 Aug 2010 |
D070577-v2 |
Side Gusset, Structural Weldment, HLTS |
Derek Bridges |
Final Design
Suspensions
|
31 Aug 2010 |
D070578-v2 |
Side Strut, Structural Weldment, HLTS |
Derek Bridges |
Suspensions
Final Design
|
31 Aug 2010 |
D070580-v2 |
Top Gusset, Structural Weldment, HLTS |
Derek Bridges |
Suspensions
Final Design
|
31 Aug 2010 |
E1000370-v1 |
GPIB Control Software |
Rich Abbott |
Subsystem Test
System Engineering
|
27 Aug 2010 |
T1000452-v2 |
Update on the Production Redesign of the HAM Large Triple Suspension Structure |
Derek Bridges et al. |
Final Design
Reports
Suspensions
Modelling
|
27 Aug 2010 |
D1002302-x0 |
SLC ACB FINAL ENVELOPE ASSY |
Niem Nguyen |
Modelling
Auxiliary Optics
|
27 Aug 2010 |
T1000508-v1 |
Comparison of the Scientific Cases for Two Networks: HHJLV and AHJLV |
Rainer Weiss et al. |
Modelling
Astrophysics / Multi-messenger
Data and Computing
|
26 Aug 2010 |
T1000472-v1 |
Technical Design Document of the fibre guard in the aLIGO ETM/ITM quad suspension |
Marielle van Veggel et al. |
Suspensions
Installation
|
26 Aug 2010 |
D030021-v2 |
Screw, Socket Head Cap, 1/4-20 UNC-3A X 2.5 Long, Fully Threaded, Rounded End |
Derek Bridges |
System Engineering
Fabrication
Final Design
|
26 Aug 2010 |
T960127-v1 |
Physics Environment Monitoring Design Requirements Document |
David Shoemaker et al. |
Requirements
Detector
|
24 Aug 2010 |
D1002253-v1 |
BSC REPAIR ARM MATERIAL CUT LIST |
Scott Shankle |
Fabrication
|
23 Aug 2010 |
P0900304-v8 |
Gravitational wave detector derived error signals for the LIGO thermal compensation system |
Joe Giaime et al. |
Core Optics
Modelling
Basic R&D
Sensing and Control
|
23 Aug 2010 |
G1000741-v1 |
The Search for Gravitational Waves |
John Whelan |
Education, Outreach
|
21 Aug 2010 |
E1000341-v1 |
HAM-ISI LHO test stand: software, electronic checks, and user guide |
Fabrice Matichard |
Subsystem Test
Seismic Isolation
|
20 Aug 2010 |
C1001360-v2 |
SOW for Manufacture of aLIGO TCS Ring Heater Upper & Lower Assembly Components |
Mindy Jacobson |
Fabrication
Final Design
Auxiliary Optics
Vacuum
|
19 Aug 2010 |
D030023-v3 |
Screw, Socket Head Cap, 1/4-20 UNC-3A X 1 Long, Fully Threaded, Rounded End |
Derek Bridges |
System Engineering
Final Design
|
16 Aug 2010 |
E060231-v1 |
Printed Circuit Checklist Prior To Manufacture |
Rich Abbott |
Fabrication
System Engineering
|
11 Aug 2010 |
E1000217-v1 |
LHO QUAD Lower Structure FTIR Post Bake, Repeat |
Betsy Weaver |
Incoming Inspection
Suspensions
|
11 Aug 2010 |
E1000307-x0 |
aLIGO HAM-HEPI Testing and Commissioning Documentation |
Fabrice Matichard |
Seismic Isolation
Subsystem Test
|
11 Aug 2010 |
D1000682-v2 |
TCS Glass Rod Insulator for Ring Heater |
Mindy Jacobson et al. |
Auxiliary Optics
Final Design
Conceptual Design
Preliminary Design
|
10 Aug 2010 |
G1000736-v1 |
Using LIGO To Listen For Gravitational Waves |
Gregory Mendell et al. |
Education, Outreach
|
10 Aug 2010 |
T1000454-v1 |
Wiring Instructions for 64 Channel Binary Input and Output Modules |
Charles Osthelder |
Fabrication
|
10 Aug 2010 |
T1000455-v2 |
64 Channel Binary Output |
Charles Osthelder |
Fabrication
|
09 Aug 2010 |
D1002057-v1 |
Cable Assembly for 64 Channel Binary Input and Output Modules |
Charles Osthelder |
Fabrication
|
09 Aug 2010 |
T1000474-v1 |
Miscellaneous Other Hardware Bill of Material for 64 Channel Binary Input Module |
Charles Osthelder |
Assembly
|
09 Aug 2010 |
T1000453-v3 |
Assembly Instruction for D0902796 (Quad Demodulator Module) |
Charles Osthelder |
Fabrication
|
05 Aug 2010 |
D1002033-v1 |
LED Wiring Connection for DC Regulator Board |
Charles Osthelder |
Fabrication
|
04 Aug 2010 |
T1000467-v1 |
4 Channel WFS Quad IQ Demodulator Module Misc. Parts |
Rich Abbott |
Sensing and Control
Assembly
|
04 Aug 2010 |
D1000969-v2 |
aLIGO TCS Monolithic Ring Heater Shield |
Guido Mueller et al. |
Preliminary Design
Fabrication
Final Design
Auxiliary Optics
|
04 Aug 2010 |
D1001633-v1 |
aLIGO ETM/ITM ear bonding jig - T-piece |
Russell Jones |
Suspensions
Installation
|
04 Aug 2010 |
D020653-v2 |
Screwdrive System, Upper Mass, HLTS |
Derek Bridges |
Final Design
Suspensions
|
03 Aug 2010 |
D020607-v3 |
T-Piece, Upper Mass, HLTS |
Derek Bridges |
Suspensions
Final Design
|
03 Aug 2010 |
D020605-v3 |
Main Section, Upper Mass, HLTS |
Derek Bridges |
Suspensions
Final Design
|
03 Aug 2010 |
E0900028-v1 |
BSC ISI-Quad Modal analysis |
Fabrice Matichard |
Seismic Isolation
System Test
|
02 Aug 2010 |
D047935-v4 |
Locker Spherical Pin |
Andy Stein et al. |
Seismic Isolation
Final Design
|
30 Jul 2010 |
D1001940-x0 |
aLIGO TIE IN TO EARTHQUAKE STOP SIDE BAR LT |
Ken Mailand |
Preliminary Design
Auxiliary Optics
|
29 Jul 2010 |
D1000944-v2 |
ALIGO TEST MASS RING HEATER OUTER RING |
Mindy Jacobson et al. |
Auxiliary Optics
Final Design
Fabrication
Preliminary Design
|
26 Jul 2010 |
G1000500-v2 |
LIGO Status Update |
Brett Shapiro |
Meeting
|
26 Jul 2010 |
D1000943-v2 |
ALIGO TEST MASS RING HEATER INNER RING |
Mindy Jacobson et al. |
Vacuum
Auxiliary Optics
Fabrication
Preliminary Design
|
26 Jul 2010 |
G1000559-v1 |
Black Holes, Einstein, and Gravitational Waves |
Peter Saulson |
Public Talk / Colloquium
|
25 Jul 2010 |
C961213-v1 |
Technical Direction Memorandum 15 to CBI: DI Water Specification |
Dennis Coyne |
Fabrication
Vacuum
|
23 Jul 2010 |
D0900895-v2 |
BSC-ISI Stage 0 Monolithic Half Top |
Celine Ramet |
Final Design
Seismic Isolation
|
23 Jul 2010 |
D0900894-v2 |
BSC-ISI Stage 0 Monolithic Half Bottom |
Celine Ramet |
Final Design
Seismic Isolation
|
23 Jul 2010 |
D1001818-x0 |
aLIGO TCS Ring Heater Element Retainer, Left |
Mindy Jacobson |
Preliminary Design
Final Design
Vacuum
Auxiliary Optics
|
23 Jul 2010 |
D1001710-v1 |
I/O EXPANSION CHASSIS - SPOTWELD PANEL C |
Emery Brown |
Data Acquisition System
Fabrication
|
23 Jul 2010 |
D1001817-x0 |
SLC FIXTURE CLAMP FOR BLADE D1001006 HEAT TREAT |
Niem Nguyen |
Modelling
Auxiliary Optics
|
20 Jul 2010 |
D1001815-x0 |
aLIGO TCS Ring Heater Winding Tool, Upper |
Mindy Jacobson et al. |
Auxiliary Optics
Vacuum
Final Design
Preliminary Design
|
20 Jul 2010 |
D0900990-v2 |
Screw, Socket Head Cap, #8-32 UNC-3A X 1.5 Long, Fully Threaded, Rounded End |
Derek Bridges |
System Engineering
Final Design
|
20 Jul 2010 |
D1001809-v1 |
aLIGO PSL/IO optical table leg |
Richard Savage |
Laser Systems
Fabrication
|
16 Jul 2010 |
T970191-v1 |
Test Mass Transmissibility |
Dennis Coyne |
Core Optics
Modelling
|
16 Jul 2010 |
G1000650-v2 |
Monolithic suspensions of the mirrors of the Advanced LIGO gravitational-wave detector |
Kirill Tokmakov |
Suspensions
Public Talk / Colloquium
|
15 Jul 2010 |
G1000699-v1 |
40m TAC Meeting Jul 2010 Presentation |
Rana Adhikari et al. |
Subsystem Test
Detector
Basic R&D
|
15 Jul 2010 |
G0900060-v3 |
Absolute Length Meaurement of the Caltech 40 Meter Interferometer's Optical Cavities |
Alberto Stochino et al. |
Basic R&D
Modelling
|
15 Jul 2010 |
G1000323-v1 |
40m upgrade status |
Koji Arai |
Meeting
Upgrades
Sensing and Control
|
15 Jul 2010 |
G1000546-v1 |
Simulated Plant Approach |
Peter Michael Kalmus et al. |
Commissioning
Modelling
Sensing and Control
Basic R&D
|
15 Jul 2010 |
G1000642-v1 |
Technologies of Gravitational Wave Detection |
Koji Arai |
Detector
Education, Outreach
|
15 Jul 2010 |
D1001714-v1 |
I/O EXPANSION CHASSIS - TOP COVER |
Emery Brown |
Data Acquisition System
Fabrication
|
13 Jul 2010 |
D1001711-v1 |
I/O EXPANSION CHASSIS - SPOTWELD PANEL D |
Emery Brown |
Fabrication
Data Acquisition System
|
13 Jul 2010 |
D1001707-v1 |
I/O EXPANSION CHASSIS - REAR BOTTOM PANEL |
Emery Brown |
Data Acquisition System
Fabrication
|
13 Jul 2010 |
D1001706-v1 |
I/O EXPANSION CHASSIS - INTERNAL PANEL |
Emery Brown |
Data Acquisition System
Fabrication
|
13 Jul 2010 |
D1001705-v1 |
I/O EXPANSION CHASSIS - INTERNAL BRACKET |
Emery Brown |
Data Acquisition System
Fabrication
|
13 Jul 2010 |
D1001704-v1 |
I/O EXPANSION CHASSIS - I/O BRACKET |
Emery Brown |
Fabrication
Data Acquisition System
|
13 Jul 2010 |
D1001703-v1 |
I/O EXPANSION CHASSIS - BACK PANEL |
Emery Brown |
Fabrication
Data Acquisition System
|
13 Jul 2010 |
D1001702-v1 |
I/O EXPANSION CHASSIS - HANDLE BRACKET |
Emery Brown |
Data Acquisition System
Fabrication
|
13 Jul 2010 |
D0901845-x0 |
COC_CONTAINER_SIMPLIFIED-obsolete |
Ken Mailand |
Preliminary Design
Core Optics
|
13 Jul 2010 |
D0901548-v2 |
AOSEM Adjustment Collar |
Bobby Moore |
Suspensions
Final Design
|
13 Jul 2010 |
T080245-v1 |
ALIGO NP-type: - Report on bonding Viton stops, magnet holders and break-off prisms at LASTI |
Russell Jones et al. |
Subsystem Test
Suspensions
|
13 Jul 2010 |
D1001750-x0 |
SLC ARM CAVITY BAFFLE SUPPORT-LASTI |
Niem Nguyen |
Modelling
Auxiliary Optics
|
12 Jul 2010 |
T1000380-v1 |
Caltech WYKO pixel calibration |
GariLynn Billingsley |
Quality Assurance
Core Optics
Subsystem Test
|
09 Jul 2010 |
D1001741-x0 |
SLC ARM CAVITY BAFFLE MOUNTING-LASTI |
Niem Nguyen |
Modelling
Auxiliary Optics
|
09 Jul 2010 |
D1001739-x0 |
SLC ARM CAVITY BAFFLE STAGE 0 MOUNTING FOR LASTI |
Niem Nguyen |
Modelling
Auxiliary Optics
|
09 Jul 2010 |
D1001724-x0 |
CHASSIS FAN MODULE SHIELD |
Emery Brown |
Data Acquisition System
Fabrication
|
08 Jul 2010 |
D1001723-x0 |
CHASSIS FAN MODULE |
Emery Brown |
Data Acquisition System
Fabrication
|
08 Jul 2010 |
D1001719-x0 |
I/O EXPANSION CHASSIS |
Emery Brown |
Data Acquisition System
Fabrication
|
08 Jul 2010 |
D1001718-x0 |
I/O EXPANSION CHASSIS |
Emery Brown |
Data Acquisition System
Fabrication
|
08 Jul 2010 |
D1001717-x0 |
I/O EXPANSION CHASSIS |
Emery Brown |
Fabrication
Data Acquisition System
|
08 Jul 2010 |
D1001716-x0 |
I/O EXPANSION CHASSIS |
Emery Brown |
Fabrication
Data Acquisition System
|
08 Jul 2010 |
D1001713-x0 |
I/O EXPANSION CHASSIS |
Emery Brown |
Fabrication
Data Acquisition System
|
08 Jul 2010 |
D1001708-x0 |
I/O EXPANSION CHASSIS |
Emery Brown |
Data Acquisition System
Fabrication
|
08 Jul 2010 |
D1001653-v1 |
TORQUE TESTING PLATE - SS |
Richard Biedenharn |
Conceptual Design
Suspensions
|
07 Jul 2010 |
D1001654-v1 |
TORQUE TESTING PLATE - ALUM |
Richard Biedenharn |
Conceptual Design
Suspensions
|
07 Jul 2010 |
D080221-v2 |
Guard, Lower Blade, HLTS |
Derek Bridges |
Suspensions
Preliminary Design
|
07 Jul 2010 |
D0900666-v2 |
Base Plate, Library of Clamps, Upper Blade, HLTS |
Derek Bridges |
Suspensions
Preliminary Design
|
06 Jul 2010 |
D030715-v1 |
Relevant Dimensions for Quad and SEI Installation at LASTI |
Dennis Coyne |
Installation
|
25 Jun 2010 |
T0900324-v2 |
Design Equations for Initially Flat Blade Springs at Arbitrary Mounting Angles |
Michael Smith |
Auxiliary Optics
Preliminary Design
|
24 Jun 2010 |
G1000648-v1 |
Lecture on Fundamental Noise Sources in GW Detectors |
Jan Harms |
Education, Outreach
|
21 Jun 2010 |
D1001610-x0 |
SLC ARM CAVITY BAFFLE SIDE ANGLE INTERFACE PLATE |
Niem Nguyen |
Modelling
Auxiliary Optics
|
21 Jun 2010 |
D1000945-v2 |
ALIGO TEST MASS RING HEATER ASSEMBLY |
Mindy Jacobson et al. |
Final Design
Auxiliary Optics
Preliminary Design
Fabrication
|
15 Jun 2010 |
T1000306-v1 |
Standard Ordering Information for Printed Circuit Boards |
Rich Abbott et al. |
Quality Assurance
Assembly
|
15 Jun 2010 |
D1001016-v1 |
ALIGO TEST MASS RING HEATER WIRE PLATE |
Mindy Jacobson et al. |
Preliminary Design
Fabrication
Final Design
Auxiliary Optics
|
14 Jun 2010 |
D1000956-v1 |
ALIGO TEST MASS RING HEATER WIRE INTERSECTION BLOCK |
Mindy Jacobson et al. |
Final Design
Auxiliary Optics
Preliminary Design
Fabrication
|
14 Jun 2010 |
D1001513-x0 |
SLC ARM CAVITY BAFFLE INNER WELDMENT |
Niem Nguyen |
Modelling
Auxiliary Optics
|
11 Jun 2010 |
D1001489-v1 |
OPO SHV Plate |
Daniel Sigg et al. |
Fabrication
|
09 Jun 2010 |
D1001490-v1 |
SHG Front Panel |
Daniel Sigg et al. |
Fabrication
|
09 Jun 2010 |
D080663-v3 |
D080663_AdLIGO_COC_F-PR3_SUBSTRATE |
Calum Torrie |
Core Optics
Final Design
|
09 Jun 2010 |
G1000606-v1 |
aLIGO Binary Input and Output Interface |
Rich Abbott |
Conceptual Design
|
08 Jun 2010 |
G0900422-v1 |
Jupiter To Black Holes |
Gregory Mendell |
Education, Outreach
|
04 Jun 2010 |
E1000201-x0 |
DCN ETM Telescope Secondary Parabolic Mirror, ADLIGO, v5 |
Michael Smith |
Preliminary Design
Auxiliary Optics
|
04 Jun 2010 |
T1000251-v1 |
Report of the Committee to Compare the Scientific Cases for AHLV and HHLV |
B Sathyaprakash et al. |
Collaboration
Modelling
Reports
Astrophysics / Multi-messenger
|
02 Jun 2010 |
D1001414-x0 |
Faraday Isolator Prism Block-LH |
Niem Nguyen |
Modelling
Auxiliary Optics
|
01 Jun 2010 |
D1001413-x0 |
Faraday Isolator Prism Block-RH |
Niem Nguyen |
Modelling
Auxiliary Optics
|
01 Jun 2010 |
D0900358-v1 |
Faraday Isolator Wedge Window Plate Holder |
Niem Nguyen |
Modelling
Auxiliary Optics
|
28 May 2010 |
D080664-v3 |
D080664_AdLIGO_COC_SR3_SUBSTRATE |
Calum Torrie |
Final Design
Core Optics
|
28 May 2010 |
D080662-v3 |
D080662_ALIGO COC_PR3_SUBSTRATE |
Calum Torrie |
Core Optics
Final Design
|
28 May 2010 |
D080661-v4 |
D080661_ALIGO COC_FM_SUBSTRATE |
Calum Torrie |
Final Design
Core Optics
|
28 May 2010 |
T1000284-x0 |
Signal loss estimation using mode mismatch |
Hiro Yamamoto |
Modelling
Core Optics
|
27 May 2010 |
D0902754-v1 |
Faraday Isolator Picomotor Motion Mass Control Assy |
Niem Nguyen |
Modelling
Auxiliary Optics
|
27 May 2010 |
D0902755-v1 |
Faraday Isolator Picomotor 8330 Pivot Bracket |
Niem Nguyen |
Auxiliary Optics
Modelling
|
27 May 2010 |
D0902750-v1 |
Farady Isolator Picomotor Pivot Lever |
Niem Nguyen |
Modelling
Auxiliary Optics
|
27 May 2010 |
D0900624-v1 |
Faraday Isolator Table Hanger Assembly |
Niem Nguyen |
Auxiliary Optics
Modelling
|
26 May 2010 |
D0900584-v1 |
Faraday Isolator Upper Music Wire |
Niem Nguyen |
Modelling
Auxiliary Optics
|
26 May 2010 |
D0900356-v1 |
Faraday Isolator Wedge Set Screw #1 1/8-20 UN |
Niem Nguyen |
Modelling
Auxiliary Optics
|
26 May 2010 |
T1000274-v1 |
Mathematica model of BS suspension (triple model cases 20081113bsZZ and 20081113bsNWZZ) |
Mark Barton |
Suspensions
Modelling
|
25 May 2010 |
D0902753-v1 |
Faraday Isolator Picomotor Linear Travel Bracket |
Niem Nguyen |
Auxiliary Optics
Modelling
|
25 May 2010 |
D0902752-v1 |
Faraday Isolator Picomotor Mounting Bracket |
Niem Nguyen |
Modelling
Auxiliary Optics
|
25 May 2010 |
D0900165-v1 |
Faraday Isolator Counter Mass Block |
Niem Nguyen |
Auxiliary Optics
Modelling
|
25 May 2010 |
D0900143-v1 |
Faraday Isolator Wire Lower Bridge |
Niem Nguyen |
Modelling
Auxiliary Optics
|
25 May 2010 |
D0900147-v1 |
Faraday Isolator Wire Lower Plate |
Niem Nguyen |
Auxiliary Optics
Modelling
|
25 May 2010 |
D0900355-v1 |
Faraday Isolator Wedge Rotating Fixture |
Niem Nguyen |
Modelling
Auxiliary Optics
|
25 May 2010 |
G1000550-v1 |
Gravitational Waves |
Amber Stuver |
Education, Outreach
|
21 May 2010 |
T1000263-v1 |
Mathematica/Matlab model of ETM/ITM suspension (quad model case 20090819TM) |
Mark Barton |
Modelling
Suspensions
|
20 May 2010 |
D1001243-x0 |
TCS Customized OTS Ring Heater Element |
Mindy Jacobson |
Preliminary Design
Auxiliary Optics
|
19 May 2010 |
D1000008-v3 |
Fibre storage rack |
Giles Hammond et al. |
Preliminary Design
Suspensions
|
18 May 2010 |
D1000010-v3 |
Fibre storage rack - vertical support |
Marielle van Veggel et al. |
Suspensions
Preliminary Design
|
18 May 2010 |
E1000153-x0 |
DCN - HAM Suspension Testing Cover |
Derek Bridges |
Final Design
Subsystem Test
Suspensions
|
13 May 2010 |
D1000960-v1 |
HAM Suspension Testing Cover Assembly |
Derek Bridges |
Subsystem Test
Suspensions
Final Design
|
13 May 2010 |
D1001085-v1 |
HAM Suspension Testing Cover Door Weldment |
Derek Bridges |
Final Design
Suspensions
Subsystem Test
|
13 May 2010 |
D1000961-v1 |
HAM Suspension Testing Cover Weldment |
Derek Bridges |
Final Design
Suspensions
Subsystem Test
|
13 May 2010 |
T080014-v2 |
UK Top Driver Pre-Production Prototype Test Plan |
Jay Heefner |
Suspensions
System Test
|
12 May 2010 |
G1000391-v1 |
LIGO : The Laser Interferometer Gravitational Wave Observatory |
Michael Landry et al. |
Detector
Public Talk / Colloquium
|
12 May 2010 |
D1001119-x0 |
SLC ARM CAVITY BAFFLE TUBE MTG PLATE DUMMY |
Niem Nguyen |
Auxiliary Optics
Modelling
|
10 May 2010 |
D1001115-x0 |
SLC ARM CAVITY BAFFLE TUBE MTG PLATE DUMMY |
Niem Nguyen |
Modelling
Auxiliary Optics
|
10 May 2010 |
D1001114-x0 |
SLC ARM CAVITY BAFFLE TUBE ADJUSTA WELDMENT DUMMY |
Niem Nguyen |
Auxiliary Optics
Modelling
|
10 May 2010 |
D1000885-v1 |
SLC FOLD MIRROR ELLIP BAFFLE WITH STANDOFFS |
Niem Nguyen |
Modelling
Auxiliary Optics
|
04 May 2010 |
T1000226-v2 |
Marginally stable cavity simulation : FFT vs Modal Model |
Hiro Yamamoto |
Core Optics
Modelling
|
29 Apr 2010 |
G0901015-v1 |
Immersing Southeastern Louisiana Middle School Students in Physics at the LIGO Livingston Science Education Center |
Amber Stuver |
Education, Outreach
|
29 Apr 2010 |
F1000013-v1 |
Ear quality control sheets |
Marielle van Veggel |
Fabrication
Suspensions
|
27 Apr 2010 |
G1000484-v1 |
Effects of small size anomalies in a FP cavity |
Hiro Yamamoto |
Modelling
Core Optics
|
22 Apr 2010 |
G1000483-v1 |
RM3 size and astigmatism of AdvVirgo stable cavity |
Hiro Yamamoto |
Core Optics
Modelling
|
22 Apr 2010 |
T1000218-v3 |
RM3 size and astigmatism of AdvVirgo stable cavity |
Hiro Yamamoto |
Core Optics
Modelling
|
22 Apr 2010 |
G1000475-v1 |
An Idiosyncratic History of Technical Developments Leading to LIGO |
Stan Whitcomb |
Public Talk / Colloquium
|
20 Apr 2010 |
G1000436-v3 |
Progress monolithic suspension work Glasgow and MIT since April 2009 |
Giles Hammond et al. |
Reviews
Meeting
Suspensions
|
16 Apr 2010 |
T1000154-v5 |
Effects of small size anomalies in a FP cavity |
Hiro Yamamoto |
Modelling
Core Optics
|
10 Apr 2010 |
E1000102-v2 |
LHO LABO FTIR Sample Record HR202 |
Hugh Radkins |
Seismic Isolation
Incoming Inspection
|
08 Apr 2010 |
E1000108-v1 |
DCN - Manufacture Porcelain Coated Test Plates |
Heidy Kelman |
Fabrication
Auxiliary Optics
|
05 Apr 2010 |
E1000105-x0 |
DCN ETM Telescope Secondary Parabolic Mirror, ADLIGO, v4 |
Michael Smith |
Preliminary Design
|
01 Apr 2010 |
E1000097-v1 |
ETM TransMon Telescope SUS Installation Plan |
Ken Mailand |
Installation
Auxiliary Optics
|
30 Mar 2010 |
T1000170-x0 |
Installation Plan Transmon_Telescope_SUS |
Ken Mailand |
Auxiliary Optics
Installation
|
30 Mar 2010 |
T1000151-v2 |
LIGO and the MIT Kavli Institute |
David Shoemaker |
Education, Outreach
Reviews
Detector
Data Analysis
|
26 Mar 2010 |
T1000147-v1 |
TGG Crystal Wedge Angle for aLIGO Output Faraday Isolator |
Michael Smith |
Fabrication
Auxiliary Optics
|
17 Mar 2010 |
G1000328-v1 |
A Galactic Scale Gravitational Wave Detector |
Andrea Lommen |
Meeting
Astrophysics / Multi-messenger
|
16 Mar 2010 |
G1000349-v1 |
New Senior Member from Stanford - Stebbins introduction |
Martin Fejer et al. |
Meeting
|
16 Mar 2010 |
G1000297-v1 |
Development of triple resonant EOM for advanced detectors |
Kiwamu Izumi et al. |
Meeting
|
15 Mar 2010 |
T1000114-v1 |
ALIGO NP-type: - Ear Bonding at LASTI - February 2010 |
Gerardo Moreno et al. |
Installation
Suspensions
|
15 Mar 2010 |
G1000316-v3 |
Optics Posters |
Gregg Harry |
Meeting
|
15 Mar 2010 |
D1000569-x0 |
CUSTOM CABLE V25K |
Emery Brown |
Fabrication
Sensing and Control
|
15 Mar 2010 |
D1000567-x0 |
CUSTOM CABLE V25H |
Emery Brown |
Fabrication
Suspensions
|
15 Mar 2010 |
G1000210-v1 |
Role of Optics Working Group Chair |
Gregg Harry |
Meeting
|
15 Mar 2010 |
G1000315-v1 |
Paper you should be reading -"Advanced LIGO and Beyond" |
Gregg Harry |
Meeting
|
15 Mar 2010 |
G1000309-v1 |
Optical lever for AdvLIGO |
Tara Chalermsongsak |
Meeting
Auxiliary Optics
|
15 Mar 2010 |
T0900453-v2 |
ETM-Telescope, Comparison of Off-axis Parabolic Telescope with Spherical Mirror Secondary, or Triplet Lens |
Michael Smith |
Preliminary Design
Auxiliary Optics
|
12 Mar 2010 |
D1000546-x0 |
aLIGO_CENTER_SUPPORT_BRIDGE_FOR_THE_TELESCOPE_AND_TABLE |
Ken Mailand |
Conceptual Design
Auxiliary Optics
|
10 Mar 2010 |
D1000545-x0 |
aLIGO_TransMon_ Wire_Attachment_Plate |
Ken Mailand |
Conceptual Design
Auxiliary Optics
|
10 Mar 2010 |
D1000544-x0 |
aLIGO_TransMon_Music_Wire_Adj_Brkt |
Ken Mailand |
Auxiliary Optics
Conceptual Design
|
10 Mar 2010 |
D1000543-x0 |
aLIGO_TransMon_Music_Wire_Split_Clamp_CS |
Ken Mailand |
Conceptual Design
Auxiliary Optics
|
10 Mar 2010 |
D1000542-x0 |
CENTER_SUPPORT_BRIDGE_FOR THE TELESCOPE AND TABLE_ASSEMBLY. |
Ken Mailand |
Auxiliary Optics
Conceptual Design
|
10 Mar 2010 |
D0901751-v1 |
EOM Block Vertical 3" Optical Height |
Richard Savage |
Fabrication
|
10 Mar 2010 |
D0901750-v1 |
EOM Block Vertical 4" Optical Height |
Richard Savage |
Fabrication
|
10 Mar 2010 |
D0901748-v1 |
EOM Block Horizontal 3" Optical Height |
Richard Savage |
Fabrication
|
10 Mar 2010 |
D0901744-v1 |
Faraday Block 4" Optical Height |
Richard Savage |
Fabrication
|
10 Mar 2010 |
D071496-v2 |
Asm, Fixture, GS-13 Install Horiz |
Andy Stein et al. |
Seismic Isolation
Final Design
|
04 Mar 2010 |
D071425-v2 |
Asm, Keel Wall |
Andy Stein et al. |
Seismic Isolation
Final Design
|
04 Mar 2010 |
D071423-v2 |
Asm, Pitchfork |
Andy Stein et al. |
Seismic Isolation
Final Design
|
04 Mar 2010 |
D071422-v2 |
Asm, Boxwork |
Andy Stein et al. |
Final Design
Seismic Isolation
|
04 Mar 2010 |
G1000152-v1 |
Black Holes, Einstein, and space-time ripples |
Peter Saulson |
Education, Outreach
|
03 Mar 2010 |
D1000232-v1 |
CUSTOM CABLE V25U |
Emery Brown |
Fabrication
Sensing and Control
|
02 Mar 2010 |
T060040-v1 |
Quad Suspension Noise Prototype Assembly Procedure |
Ian Wilmut |
Suspensions
Final Design
|
02 Mar 2010 |
T0900627-v2 |
Quad Suspension Cable Modeling in Mathematica™ |
Mark Barton |
Suspensions
Modelling
Final Design
|
01 Mar 2010 |
E0900446-x0 |
DCN - HLTS Prototype Assembly Drawings and As-Built Revisions |
Derek Bridges |
Preliminary Design
Suspensions
Change Control
|
01 Mar 2010 |
D060102-v1 |
aLIGO ETM and ITM SUS Recycling Mirror Envelope |
Calum Torrie |
Conceptual Design
Suspensions
|
28 Feb 2010 |
D1000440-v1 |
aLIGO ISC Whitening Filter Block Diagram |
Rich Abbott |
Conceptual Design
Sensing and Control
|
26 Feb 2010 |
T1000049-v3 |
Procedure for monolithic rehang at LASTI |
Douglas Cook et al. |
Subsystem Test
Suspensions
|
25 Feb 2010 |
G1000112-v2 |
Searches for coalescence of binary systems in LIGO and Virgo data |
LVC |
Meeting
Compact Binaries
|
17 Feb 2010 |
D060278-v1 |
8 Channel SUS Coil Driver |
Jay Heefner |
Suspensions
Final Design
|
17 Feb 2010 |
G1000098-v2 |
Advanced LIGO Test Masses and Core Optics- Talk for AIGO Conference |
Gregg Harry |
Core Optics
Meeting
|
12 Feb 2010 |
P1000001-v3 |
Second Generation Gravitational Wave Detectors |
Gregg Harry |
Meeting
|
12 Feb 2010 |
E970063-v1 |
LIGO Seismic Isolation System (SEI): Fabrication Process Specification |
Dennis Coyne |
Seismic Isolation
Vacuum
Fabrication
|
12 Feb 2010 |
E1000021-x0 |
CUSTOM CABLE V2A |
Emery Brown |
Sensing and Control
Fabrication
|
11 Feb 2010 |
P080093-v13 |
Search for Gravitational Wave Ringdowns from Perturbed Black Holes in LIGO S4 Data |
Lisa Goggin |
GW Bursts
|
10 Feb 2010 |
D070350-v1 |
Assembly Stand, HAM ISI |
Andy Stein |
Seismic Isolation
Final Design
|
09 Feb 2010 |
G1000029-v1 |
Gravitational Waves and Precision Measurement |
Michael Smith |
Meeting
Detector
|
09 Feb 2010 |
G1000038-v3 |
Gravitational Wave Detectors: Technology and Science |
Peter Saulson |
Education, Outreach
|
05 Feb 2010 |
E0900094-v4 |
Substrate, ALIGO Signal Recycling Mirror 2 (F-SR2) for H2 interferometer - folded |
Rodica Martin |
Core Optics
Input Optics
Final Design
|
05 Feb 2010 |
E0900092-v4 |
Substrate, ALIGO Power Recycling Mirror 2 (F-PR2) for H2 interferometer - folded |
Rodica Martin |
Input Optics
Core Optics
Final Design
|
05 Feb 2010 |
E0900090-v4 |
Substrate, ALIGO Signal Recycling Mirror (F-SRM) for H2 interferometer - folded |
Rodica Martin |
Input Optics
Core Optics
Final Design
|
05 Feb 2010 |
E0900088-v4 |
Substrate, ALIGO Power Recycling Mirror (F-PRM) for H2 interferometer - folded |
Rodica Martin |
Final Design
Input Optics
Core Optics
|
05 Feb 2010 |
T0900640-v2 |
Acceleration of the FFT simulation of stable cavity |
Hiro Yamamoto |
Modelling
Core Optics
|
01 Feb 2010 |
T1000041-v1 |
Electrostatic Drive Soldering Procedure |
Richard Mittleman et al. |
Fabrication
|
01 Feb 2010 |
D1000240-x0 |
CUSTOM CABLE VC10B |
Emery Brown |
Fabrication
|
01 Feb 2010 |
E048225-v2 |
Process Specification for AdLIGO Seismic Isolation System In-Vacuum Mechanical Elements Fabrication |
Dennis Coyne |
Seismic Isolation
Final Design
Fabrication
|
30 Jan 2010 |
G1000056-v1 |
Intro to LIGO and the role of cleanliness in LIGO vacuum fabrications |
Michael Zucker |
Vacuum
Quality Assurance
Requirements
|
28 Jan 2010 |
D1000190-x0 |
Pod Testing Vacuum Chamber Cart |
Michael Meyer |
Preliminary Design
Observatory Facilities
|
28 Jan 2010 |
D1000129-x0 |
Assembly of the bonding jig with prism holder on the ETM/ITM penultimate mass |
Marielle van Veggel |
Preliminary Design
Suspensions
|
25 Jan 2010 |
E960085-v2 |
Specification for O-Ring Procurement |
John Worden et al. |
Vacuum
Fabrication
|
22 Jan 2010 |
E0900225-x0 |
DCN - 40-Meter Cable Clamp |
Derek Bridges |
Suspensions
Preliminary Design
Change Control
|
21 Jan 2010 |
T080108-v1 |
Notes on Lower Quad Installation at LASTI |
Gerardo Moreno et al. |
Suspensions
Subsystem Test
Installation
|
20 Jan 2010 |
E1000012-x0 |
Material, Process, Handling, and Shipping Specification for Molded PEEK Parts |
Michael Meyer |
Vacuum
Fabrication
System Engineering
|
19 Jan 2010 |
E1000009-x0 |
DCN ETM Telescope Secondary Parabolic Mirror, ADLIGO |
Michael Smith |
Detector
Preliminary Design
|
15 Jan 2010 |
D0900928-v2 |
D0900928 Vacuum Equipment Layout, Right End Station, LHO, Adv. LIGO |
John Worden et al. |
Vacuum
System Engineering
Integration
|
11 Jan 2010 |
E1000002-v1 |
Certification for Viton for L1 HAM6 OMC damping struts |
Robert Taylor et al. |
Installation
Seismic Isolation
Suspensions
Commissioning
Incoming Inspection
|
11 Jan 2010 |
E080137-v2 |
Coated Substrate, ALIGO PRE-MODE MATCHING TELESCOPE MIRROR #1 |
Rodica Martin et al. |
Preliminary Design
Input Optics
|
06 Jan 2010 |
E070084-v1 |
COMPONENT SPECIFICATION - SUBSTRATE, ALIGO STEERING MIRROR |
Rodica Martin et al. |
Preliminary Design
Input Optics
|
14 Sep 2009 |
E080133-v1 |
COMPONENT SPECIFICATION - MIRROR BLANK MATERIAL, ALIGO PRE-MODE MATCHING TELESCOPE MIRROR #1AND 2 (PMMT) |
Rodica Martin et al. |
Input Optics
Preliminary Design
|
11 Sep 2009 |
E070077-v1 |
COMPONENT SPECIFICATION - MIRROR BLANK MATERIAL, ALIGO STEERING MIRROR (SM) |
Rodica Martin et al. |
Preliminary Design
Input Optics
|
11 Sep 2009 |
E070072-v1 |
COMPONENT SPECIFICATION - MIRROR BLANK MATERIAL, ALIGO INPUT MODE CLEANER CURVED MIRROR (IMCC) |
Rodica Martin et al. |
Input Optics
Preliminary Design
|
11 Sep 2009 |
E070071-v1 |
COMPONENT SPECIFICATION - MIRROR BLANK MATERIAL, ALIGO INPUT MODE CLEANER FLAT MIRROR (IMCF) |
Rodica Martin et al. |
Input Optics
Preliminary Design
|
11 Sep 2009 |
T0900647-v2 |
Ray optics calculations of alignment matrices |
Sam Waldman |
Modelling
Sensing and Control
|
18 Dec 2009 |
T0900637-v1 |
Fan Gasket for LLO Rack 6 |
David Kinzel |
Conceptual Design
Observatory Facilities
|
16 Dec 2009 |
D080723-v2 |
Cap Body, Resin, Earthquake Stop |
Derek Bridges |
Preliminary Design
Suspensions
|
15 Dec 2009 |
T0900626-v1 |
LMA Computation of Surface E-Field Acheivable for Advanced LIGO ITM |
Rand Dannenberg |
Core Optics
Fabrication
Modelling
|
15 Dec 2009 |
G0900992-v1 |
LIGO Hanford Observatory Outreach Summary 2008-2009 |
Dale Ingram |
Education, Outreach
|
15 Dec 2009 |
T0900518-v2 |
Quad Electronic and Optical Alignment Procedure |
Brett Shapiro |
Commissioning
|
15 Dec 2009 |
T0900615-x0 |
TransMon-SUS Preliminary Est Task-Schedule-Cost |
Ken Mailand |
Preliminary Design
Auxiliary Optics
|
08 Dec 2009 |
E0900477-x0 |
Traveler for HLTS Prototype Parts - Batch 8 |
Derek Bridges |
Preliminary Design
Suspensions
|
08 Dec 2009 |
D0902795-x0 |
aLIGO_Mezzanine_Lab_Floor_Layout |
Ken Mailand |
Auxiliary Optics
Installation
|
04 Dec 2009 |
D070581-v1 |
Leg, HLTS Structural Weldment |
Derek Bridges |
Preliminary Design
Suspensions
|
03 Dec 2009 |
D070583-v1 |
Front Cross Beam, Thin, HLTS Structural Weldment |
Derek Bridges |
Suspensions
Preliminary Design
|
03 Dec 2009 |
D070584-v1 |
Side Cross Beam, Thin, HLTS Structural Weldment |
Derek Bridges |
Preliminary Design
Suspensions
|
03 Dec 2009 |
D080283-v1 |
Front Cross Beam, Thick, HLTS Structural Weldment |
Derek Bridges |
Preliminary Design
Suspensions
|
03 Dec 2009 |
D080282-v1 |
Side Cross Beam, Thick, HLTS Structural Weldment |
Derek Bridges |
Suspensions
Preliminary Design
|
03 Dec 2009 |
D070582-v1 |
Top Gusset, Short, HLTS Structural Weldment |
Derek Bridges |
Preliminary Design
Suspensions
|
03 Dec 2009 |
D0902069-v1 |
Standoff Block, Magnet Placement Fixture, HLTS |
Derek Bridges |
Preliminary Design
Suspensions
|
03 Dec 2009 |
E0900442-x0 |
Traveler HLTS Prototype Additional Helicoils (Batch 8) |
Derek Bridges |
Fabrication
Suspensions
|
01 Dec 2009 |
E0900425-x0 |
DCN - HSTS Sapphire Prism Placement Fixture |
Michael Meyer |
Change Control
Suspensions
Preliminary Design
|
23 Nov 2009 |
E0900369-x0 |
DCN - HLTS Sapphire Prism Placement Fixture |
Derek Bridges |
Change Control
Suspensions
Preliminary Design
|
23 Nov 2009 |
E0900421-v1 |
LAYOUT SHOWING THE ELEMENTS OF THE TRANSMON SUS |
Ken Mailand |
Auxiliary Optics
Conceptual Design
|
18 Nov 2009 |
D080468-v1 |
Screw, Socket Head Cap, #2-56 UNC-2A X 0.375 Long, Fully Threaded, Rounded End |
Derek Bridges |
Preliminary Design
System Engineering
|
18 Nov 2009 |
P080059-x0 |
Gravitational-wave Astronomy: Opening a New Window on the Universe for Students, Educators and the Public |
Dennis Ugolini et al. |
Document Migration
Education, Outreach
Public relations
|
17 Nov 2009 |
D0902585-v1 |
Optic Rest Plate, Optic Holder |
Derek Bridges |
Suspensions
Preliminary Design
|
11 Nov 2009 |
D0902638-x0 |
LLO Vacuum Bake Oven Lid Cart Assembly |
Michael Meyer |
Preliminary Design
Observatory Facilities
|
09 Nov 2009 |
T0900401-v2 |
Analyzing Elastic Deformation of Test Masses in Ligo |
Richard Savage et al. |
Modelling
Calibration
Core Optics
|
09 Nov 2009 |
E0900337-v1 |
Traveler for HLTS Prototype Parts - Batch 2 |
Derek Bridges |
Preliminary Design
Suspensions
|
06 Nov 2009 |
E0900338-v1 |
Traveler for HLTS Prototype Parts - Batch 3 |
Derek Bridges |
Suspensions
Preliminary Design
|
06 Nov 2009 |
E0900339-v1 |
Traveler for HLTS Prototype Parts - Batch 4 |
Derek Bridges |
Suspensions
Preliminary Design
|
06 Nov 2009 |
E0900368-v1 |
Traveler for HLTS Prototype Parts - Batch 5 |
Derek Bridges |
Preliminary Design
Suspensions
|
06 Nov 2009 |
E0900390-v1 |
Traveler for HLTS Prototype Parts - Batch 6 |
Derek Bridges |
Suspensions
Preliminary Design
|
06 Nov 2009 |
E0900395-v1 |
Traveler for HLTS Prototype Parts - Batch 7 |
Derek Bridges |
Suspensions
Preliminary Design
|
06 Nov 2009 |
D0901404-v1 |
Active Tip-Tilt Blade Spring Mounting Platform |
Michael Meyer |
Preliminary Design
Suspensions
|
05 Nov 2009 |
D0901871-v1 |
Breakout Board - DB37 |
David Kinzel |
Subsystem Test
System Test
|
04 Nov 2009 |
D0901869-v1 |
Breakout Board - DB15 |
David Kinzel |
System Test
Subsystem Test
|
04 Nov 2009 |
P0900119-v2 |
Commissioning of the tuned DC readout at GEO600 |
Hartmut Grote et al. |
Commissioning
|
29 Oct 2009 |
T070063-v1 |
PZT Driver Quick Start Guide |
Rich Abbott |
Conceptual Design
|
28 Oct 2009 |
E950062-v1 |
Cleaning of Beam Tube Can Modules |
Dennis Coyne |
Fabrication
Vacuum
|
27 Oct 2009 |
D0901269-v2 |
ADV_LIGO_TCS_RING_HEATER_AND_SHIELD_ASSEM |
Ken Mailand |
Preliminary Design
Auxiliary Optics
|
27 Oct 2009 |
G0900960-v1 |
How to Build a Gravitational-wave Detector |
Stan Whitcomb |
Conceptual Design
|
26 Oct 2009 |
T0900249-v2 |
UIM Users Guide |
Ron Cutler |
Final Design
|
22 Oct 2009 |
E0900302-x0 |
DCN - HLTS Magnet Placement Fixtures |
Derek Bridges |
Change Control
Suspensions
Preliminary Design
|
21 Oct 2009 |
D0902335-v1 |
Plunger/Gripper Assembly |
Derek Bridges |
Suspensions
Preliminary Design
|
21 Oct 2009 |
E0900069-v4 |
Advanced LIGO Signal Recycling Mirror 3 (SR3) Coating Specification |
Rand Dannenberg |
Core Optics
Final Design
|
19 Oct 2009 |
T0900513-v1 |
Electrostatic Drive Redesign Suggestions from LASTI Experience |
Brett Shapiro |
Basic R&D
|
19 Oct 2009 |
E0900071-v4 |
Advanced LIGO Power Recycling Mirror 3 (PR3) Coating Specification |
Rand Dannenberg |
Final Design
Core Optics
|
15 Oct 2009 |
E0900072-v3 |
Advanced LIGO Folding Mirror (FM) Coating Specification |
Rand Dannenberg |
Core Optics
Final Design
|
15 Oct 2009 |
D0901296-v2 |
Blade Characterization Stand - Wire Clamp Bolt |
Michael Meyer |
Final Design
Suspensions
|
13 Oct 2009 |
D990160-v1 |
Brass Plunger |
Janeen Romie |
Preliminary Design
Suspensions
|
12 Oct 2009 |
D990161-v1 |
Pencil Mechanism Holder |
Janeen Romie |
Suspensions
Preliminary Design
|
12 Oct 2009 |
D990148-v1 |
Fluorel Tip, 1/4-20 |
Janeen Romie |
Preliminary Design
Suspensions
|
12 Oct 2009 |
D970562-v1 |
Beamsplitter Chamfer Stop |
Janeen Romie |
Suspensions
Preliminary Design
|
12 Oct 2009 |
G0900577-v3 |
Arm Length Stabilization for Advanced Gravitational Wave Detectors |
Daniel Shaddock et al. |
Conceptual Design
Sensing and Control
|
11 Oct 2009 |
P0900124-v1 |
Quantum noise of a Michelson-Sagnac interferometer with translucent mechanical oscillator |
Stefan Gossler et al. |
Basic R&D
Detector
|
09 Oct 2009 |
T0900488-v1 |
TransMon_SUS_Assembly_Naming_Conventions |
Ken Mailand |
Auxiliary Optics
Preliminary Design
|
08 Oct 2009 |
D0902369-x0 |
TransMon_SUS_Assembly_Naming_Conventions |
Ken Mailand |
Auxiliary Optics
Final Design
|
08 Oct 2009 |
T0900391-v1 |
Pulling/Welding Procedure (LASTI, September 2009) |
Mark Barton |
Suspensions
Subsystem Test
|
08 Oct 2009 |
E0900331-v1 |
DCN Updated R3 Coating Specification |
Rand Dannenberg |
Core Optics
Fabrication
|
06 Oct 2009 |
D0902347-x0 |
Stage0-1 Horizontal Sensor Target Mount |
Sam Barnum |
Seismic Isolation
Preliminary Design
|
06 Oct 2009 |
D0902344-x0 |
AdvLIGO HSTS Metal Test Mass Assembly (D070092 Optic) |
Michael Meyer |
Suspensions
Final Design
|
06 Oct 2009 |
D0902343-x0 |
AdvLIGO HSTS Metal Test Mass (D070092 Optic) |
Michael Meyer |
Suspensions
Final Design
|
06 Oct 2009 |
D0902314-x0 |
OSEM Magnet and Flag Assembly (5mm thick magnets) |
Michael Meyer |
Final Design
Suspensions
|
02 Oct 2009 |
D0902313-x0 |
HSTS Upper Mass Magnet Spacer |
Michael Meyer |
Final Design
Suspensions
|
02 Oct 2009 |
D0902311-x0 |
HSTS Weldment Gusset |
Michael Meyer |
Suspensions
Final Design
|
02 Oct 2009 |
D0902290-x0 |
HSTS Structural Weldment Gusset (2.4 x 3 x 0.375) |
Michael Meyer |
Final Design
Suspensions
|
01 Oct 2009 |
T0900458-v1 |
Multiply Resonant EOM for the LIGO 40-meter Interferometer |
Stephanie Erickson et al. |
Basic R&D
Laser Systems
Input Optics
|
29 Sep 2009 |
D080351-v2 |
TCS_ISS Servo and Interface Board |
Mohana Mageswaran |
Auxiliary Optics
Final Design
|
29 Sep 2009 |
T0900079-v1 |
AdvLIGO OMC Suspension Electronics Requirements |
Jay Heefner |
Suspensions
Requirements
|
28 Sep 2009 |
D0902181-x0 |
Foil Holder Top Plate |
Michael Meyer |
Observatory Facilities
Final Design
|
24 Sep 2009 |
D0902169-x0 |
ADLIGO_ETM_TELE_MASS_MOMENTS |
Ken Mailand |
Auxiliary Optics
Preliminary Design
|
23 Sep 2009 |
T0900443-v2 |
AOSEM Initial Electrical Test Results |
Rich Abbott |
Basic R&D
Subsystem Test
|
23 Sep 2009 |
D0902132-x0 |
ADLIGO_ETM_TELE_DIMENSION_SUS_DRAWING |
Ken Mailand |
Auxiliary Optics
Preliminary Design
|
22 Sep 2009 |
D0901288-v1 |
SUS_OPTICAL_TEST_BENCH_I_BEAM |
Ken Mailand |
Preliminary Design
Auxiliary Optics
|
24 Jun 2009 |
T0900128-v3 |
Scattered Light Loss from LIGO Arm Cavity Mirrors |
William Kells |
Core Optics
Basic R&D
|
21 Sep 2009 |
D0902098-x0 |
ADLIGO_ETM_TELE_VERTICA;L_BRACE_ |
Ken Mailand |
Preliminary Design
Auxiliary Optics
|
16 Sep 2009 |
D0902097-x0 |
ADLIGO_ETM_TELE_END_BRACE_ |
Ken Mailand |
Preliminary Design
Auxiliary Optics
|
16 Sep 2009 |
D0902096-x0 |
ADLIGO_ETM_TELE_RAY_SECONDARY_ |
Ken Mailand |
Auxiliary Optics
Preliminary Design
|
16 Sep 2009 |
D0902095-x0 |
ADLIGO_ETM_TELE_RAY_INCOMING |
Ken Mailand |
Auxiliary Optics
Preliminary Design
|
16 Sep 2009 |
D0902094-x0 |
ADLIGO_ETM_TELE_RAY_CONE_F2_SEC_ |
Ken Mailand |
Auxiliary Optics
Preliminary Design
|
16 Sep 2009 |
D0902093-x0 |
ADLIGO_ETM_TELE_RAY_CONE_F1_F2_ |
Ken Mailand |
Auxiliary Optics
Preliminary Design
|
16 Sep 2009 |
D0902092-x0 |
ADLIGO_ETM_TELE_RAY_CONE_PRIM_F1_ |
Ken Mailand |
Preliminary Design
Auxiliary Optics
|
16 Sep 2009 |
D0902091-x0 |
ADLIGO_ETM_TELE_RAY_CONE_NON_FOLD |
Ken Mailand |
Preliminary Design
Auxiliary Optics
|
16 Sep 2009 |
D0902083-x0 |
ADLIGO_ETM_TELE_VERTICAL_SUS_ASSEM |
Ken Mailand |
Auxiliary Optics
Preliminary Design
|
16 Sep 2009 |
D0902074-x0 |
ETM_TELE_1INCH_PERISCOPE_6825-E0W.sldprt |
Ken Mailand |
Auxiliary Optics
Preliminary Design
|
15 Sep 2009 |
D0902073-x0 |
ETM_TELE_1INCH_MOUNT_CLAMP_ |
Ken Mailand |
Preliminary Design
Auxiliary Optics
|
15 Sep 2009 |
D0902072-x0 |
ETM_TELE_1INCH_MOUNT_6628-E0W |
Ken Mailand |
Preliminary Design
Auxiliary Optics
|
15 Sep 2009 |
D0902071-x0 |
ADLIGO_ETM_TELE_OPTICAL_BENCH_PL_ |
Ken Mailand |
Auxiliary Optics
Preliminary Design
|
15 Sep 2009 |
D0902065-x0 |
ADLIGO_ETM_TELE_BEAM_END_PL |
Ken Mailand |
Auxiliary Optics
Preliminary Design
|
15 Sep 2009 |
D0902070-x0 |
Standoff Side Bracket, Magnet Placement Fixture, Test Mass, HLTS |
Derek Bridges |
Suspensions
Preliminary Design
|
15 Sep 2009 |
D0902067-x0 |
Pressure Bracket, Magnet Placement Fixture, Test Mass, HLTS |
Derek Bridges |
Suspensions
Preliminary Design
|
15 Sep 2009 |
D0902063-x0 |
ADLIGO_ETM_TELE_OPP_BEAM_END_PL |
Ken Mailand |
Auxiliary Optics
Preliminary Design
|
15 Sep 2009 |
D0902061-x0 |
ADLIGO_ETM_TELE_SPREADER_TUBE. |
Ken Mailand |
Auxiliary Optics
Preliminary Design
|
15 Sep 2009 |
D0902059-x0 |
ADLIGO ETM TELE BENCH LAYOUT |
Ken Mailand |
Auxiliary Optics
Preliminary Design
|
15 Sep 2009 |
D0902058-x0 |
ETM_TELE_OPTIC_LAYOUT |
Ken Mailand |
Auxiliary Optics
Preliminary Design
|
15 Sep 2009 |
D0902055-x0 |
ADLIGO_ETM_TELE_W-BENCH_ASSEM_ |
Ken Mailand |
Preliminary Design
Auxiliary Optics
|
15 Sep 2009 |
T070247-v1 |
AdvLIGO Interferometer Sensing and Control Conceptual Design |
Peter Fritschel |
Conceptual Design
Sensing and Control
|
14 Sep 2009 |
E070087-v1 |
COMPONENT SPECIFICATION - ALIGO MODE CLEANER MIRROR #3 SUBSTRATE, COATED |
Rodica Martin et al. |
Input Optics
Preliminary Design
|
14 Sep 2009 |
E070080-v1 |
COMPONENT SPECIFICATION - SUBSTRATE, ALIGO MODE CLEANER MIRROR #3 |
Rodica Martin et al. |
Preliminary Design
Input Optics
|
14 Sep 2009 |
E0900243-x0 |
DCN - AOSEM Alignment and Mounting Brackets |
Derek Bridges |
Change Control
Preliminary Design
Suspensions
|
11 Sep 2009 |
E0900277-x0 |
DCN - Updated HLTS Test Mass Parts and Assembly, Lower Loop Wire Parts, Jig, and Assembly, and Intermediate Mass Assembly |
Derek Bridges |
Change Control
Suspensions
Preliminary Design
|
11 Sep 2009 |
E080134-v1 |
COMPONENT SPECIFICATION - MIRROR BLANK MATERIAL, ALIGO PRE-MODE MATCHING TELESCOPE MIRROR #2 |
Rodica Martin et al. |
Input Optics
Preliminary Design
|
11 Sep 2009 |
E070073-v1 |
COMPONENT SPECIFICATION - MIRROR BLANK MATERIAL, ALIGO INPUT MODE CLEANER MIRROR #3 |
Rodica Martin et al. |
Preliminary Design
Input Optics
|
11 Sep 2009 |
D0902014-x0 |
HSTS Intermediate Wire Clamp (Lower) Angled |
Michael Meyer |
Suspensions
Final Design
|
10 Sep 2009 |
D0901544-v1 |
Cable Clamp Liner, 40-Meter Cable Clamp |
Derek Bridges |
Suspensions
Preliminary Design
|
04 Sep 2009 |
D0901976-x0 |
ADLIGO_ETM_VERTICAL_TELE_MASS_PLACE_HOLDER_ASSEMBLY_ |
Ken Mailand |
Preliminary Design
Auxiliary Optics
|
04 Sep 2009 |
D010120-v1 |
40-Meter Cable Clamp |
Derek Bridges |
Preliminary Design
Suspensions
|
04 Sep 2009 |
D0901547-v1 |
Top Plate, 40-Meter Cable Clamp |
Derek Bridges |
Suspensions
Preliminary Design
|
04 Sep 2009 |
D0901545-v1 |
Base Plate, 40-Meter Cable Clamp |
Derek Bridges |
Suspensions
Preliminary Design
|
03 Sep 2009 |
E080356-v1 |
HAM Crossbeam Redesign for Advanced LIGO: Technical Justification |
Andy Stein |
Seismic Isolation
Modelling
|
03 Sep 2009 |
E080166-v1 |
HAM Crossbeam Redesign for Advanced LIGO: FEA Study |
Andy Stein |
Seismic Isolation
Conceptual Design
|
03 Sep 2009 |
T0900409-v1 |
Underground Seismic Studies for 3rd Generation Gravitational Wave Interferometric Detectors at the Former Homestake Mine in Lead, South Dakota |
Riccardo DeSalvo et al. |
Activity
Seismic Isolation
|
02 Sep 2009 |
E0900266-x0 |
DCN - HAM Crossbeam Miscellaneous |
Andy Stein |
Change Control
Seismic Isolation
Final Design
|
02 Sep 2009 |
D0901340-v3 |
Trillium 240 OBS, LIGO Version |
Sam Barnum |
Final Design
Seismic Isolation
|
01 Sep 2009 |
E0900261-x0 |
DCN - HAM Crossbeam Connector Weldment (D080462) |
Andy Stein |
Seismic Isolation
Final Design
Change Control
|
28 Aug 2009 |
D0901882-x0 |
OMC SUS Riser Block for PD replacement |
Michael Meyer |
Preliminary Design
Suspensions
|
27 Aug 2009 |
E0900258-x0 |
DCN - HAM Crossbeam Weldment (D080456) |
Andy Stein |
Seismic Isolation
Final Design
Change Control
|
27 Aug 2009 |
D0901881-x0 |
Beam Dump Clamp for Active Tip-Tilt |
Michael Meyer |
Sensing and Control
Preliminary Design
|
26 Aug 2009 |
G0900747-v1 |
LIGO USA! |
Munier Salem et al. |
Education, Outreach
|
26 Aug 2009 |
T0900164-v1 |
UK PUM Driver Pre-Production Prototype Test Plan |
Jay Heefner |
System Test
Suspensions
|
26 Aug 2009 |
G0900674-v1 |
Gravity Waves: Next Window on the Universe |
Thomas Nash et al. |
Stochastic
Compact Binaries
Operations
Detector
Continuous Wave
GW Bursts
Astrophysics / Multi-messenger
|
25 Aug 2009 |
G0900746-v1 |
Squeezer Update Review |
Daniel Sigg |
Basic R&D
|
25 Aug 2009 |
D0901576-v1 |
Foil Holder Assembly |
Michael Meyer |
Observatory Facilities
Preliminary Design
|
21 Aug 2009 |
D0901572-v1 |
Foil Holder Base Plate |
Michael Meyer |
Preliminary Design
Observatory Facilities
|
21 Aug 2009 |
D0901573-v1 |
Foil Holder Vertical Support |
Michael Meyer |
Preliminary Design
Observatory Facilities
|
21 Aug 2009 |
D0901574-v1 |
Foil Holder Horizontal Support |
Michael Meyer |
Observatory Facilities
Preliminary Design
|
21 Aug 2009 |
D0901575-v1 |
Foil Holder Rod |
Michael Meyer |
Preliminary Design
Observatory Facilities
|
21 Aug 2009 |
D0901785-v1 |
Foil Holder - Roll Stop |
Michael Meyer |
Preliminary Design
Observatory Facilities
|
21 Aug 2009 |
D0901831-x0 |
GS-13 Stabilizer Plate Spacer. |
Sam Barnum |
Seismic Isolation
Preliminary Design
|
19 Aug 2009 |
D0901827-x0 |
BSC_Weld_Nut-Custom .25-20 Thread |
Sam Barnum |
Seismic Isolation
Preliminary Design
|
19 Aug 2009 |
D0901824-x0 |
GS-13_Horizontal_Top_Anchor |
Sam Barnum |
Preliminary Design
|
19 Aug 2009 |
G0900736-v1 |
Construction of a Seismic Array at the Former Homestake Mine |
Jan Harms |
Basic R&D
|
18 Aug 2009 |
D0901251-v1 |
Blade Characterization Stand Assembly |
Michael Meyer |
Suspensions
Preliminary Design
|
14 Aug 2009 |
D0901249-v1 |
Blade Characterization Stand - Actuator Assembly |
Michael Meyer |
Preliminary Design
Suspensions
|
14 Aug 2009 |
D0901250-v1 |
Blade Characterization Stand - Ball Slide Assembly |
Michael Meyer |
Suspensions
Preliminary Design
|
14 Aug 2009 |
D0901298-v1 |
Blade Characterization Stand - Wire Clamp Bolt Assembly |
Michael Meyer |
Suspensions
Preliminary Design
|
14 Aug 2009 |
D0901297-v1 |
Blade Characterization Stand - Wire Clamp Bolt, Outside |
Michael Meyer |
Preliminary Design
Suspensions
|
14 Aug 2009 |
D0901293-v1 |
Blade Characterization Stand - Track Top Adapter |
Michael Meyer |
Preliminary Design
Suspensions
|
14 Aug 2009 |
D0901246-v1 |
Blade Characterization Stand - Actuator Mount |
Michael Meyer |
Suspensions
Preliminary Design
|
14 Aug 2009 |
D0901245-v1 |
Blade Characterization Stand - Track Mount |
Michael Meyer |
Preliminary Design
Suspensions
|
14 Aug 2009 |
D0901243-v1 |
Blade Characterization Stand - Baseplate |
Michael Meyer |
Preliminary Design
Suspensions
|
14 Aug 2009 |
D0901242-v1 |
Blade Characterization Stand - Adapter |
Michael Meyer |
Preliminary Design
Suspensions
|
14 Aug 2009 |
E0900239-x0 |
DCN - HLTS Updated Drawings (Upper Wire and Upper Blade Bake Fixture) |
Derek Bridges |
Change Control
Suspensions
Preliminary Design
|
14 Aug 2009 |
D047792-v2 |
HAM, GS-13, Foot, Jam nut |
Sam Barnum |
Seismic Isolation
Final Design
|
13 Aug 2009 |
D047791-v2 |
HAM, GS-13, Foot |
Sam Barnum |
Seismic Isolation
Final Design
|
13 Aug 2009 |
D047811-v3 |
HAM, GS-13, Crossbar |
Sam Barnum |
Final Design
Seismic Isolation
|
13 Aug 2009 |
T0900327-v1 |
Review Report Interferometer Sensing and Control Preliminary Design |
Robert Schofield et al. |
Preliminary Design
Sensing and Control
|
12 Aug 2009 |
E0900233-v1 |
DCN for Radius of curvature change for SPR3, PR3, F-PR3 |
GariLynn Billingsley et al. |
Core Optics
Fabrication
|
11 Aug 2009 |
E0900205-x0 |
DCN - HLTS Lower Loop Wire Jig |
Derek Bridges |
Change Control
Preliminary Design
Suspensions
|
10 Aug 2009 |
T0900380-v1 |
Quad Noise Prototype Cabling Routing |
Brett Shapiro |
Basic R&D
|
10 Aug 2009 |
E070141-v1 |
DCN for ELi Septum Window Coating specification |
GariLynn Billingsley |
Vacuum
Fabrication
|
07 Aug 2009 |
D0901447-v1 |
ADLIGO_TCS_LASER_ENCLOSURE_SHUTTER |
Ken Mailand |
Auxiliary Optics
Final Design
|
06 Aug 2009 |
D047864-v1 |
Angle Bracket, Long, Bay Bulkhead, Stage 2 |
Andy Stein |
Seismic Isolation
Final Design
|
06 Aug 2009 |
D047860-v1 |
Gusset, Stiffener, Baseplate, Stage 2 |
Andy Stein |
Final Design
Seismic Isolation
|
06 Aug 2009 |
E0900234-x0 |
Vacuum Flipper Mirror Specification |
Sam Waldman |
Requirements
|
06 Aug 2009 |
D0901417-v1 |
ADLIGO_TCS_LASER_ENCLOSURE_ASSEM. |
Ken Mailand |
Final Design
Auxiliary Optics
|
05 Aug 2009 |
D0901424-v1 |
ADLIGO_TCS_LASER_ENCLOSURE_OPP_APERTURE |
Ken Mailand |
Final Design
Auxiliary Optics
|
05 Aug 2009 |
E0900232-x0 |
DCN - HLTS Test Mass and Related Parts |
Derek Bridges |
Preliminary Design
Suspensions
Change Control
|
05 Aug 2009 |
D0901568-x0 |
ADLIGO_ETM_TELE_TUBE |
Ken Mailand |
Auxiliary Optics
Preliminary Design
|
05 Aug 2009 |
D0901567-x0 |
ADLIGO_ETM_TELE_FOLD_END |
Ken Mailand |
Preliminary Design
Auxiliary Optics
|
05 Aug 2009 |
D0901566-x0 |
ADLIGO_ETM_TELE_PRIMARY_END |
Ken Mailand |
Auxiliary Optics
Preliminary Design
|
05 Aug 2009 |
E080517-v3 |
E080517 F-PR3 Polishing Specification |
Margot Hennig |
Final Design
Core Optics
|
05 Aug 2009 |
E080518-v3 |
E080518_SR3_Spec |
Margot Hennig |
Final Design
Core Optics
|
05 Aug 2009 |
D0901563-x0 |
ADLIGO_ETM_TELE_F3 |
Ken Mailand |
Preliminary Design
Auxiliary Optics
|
04 Aug 2009 |
D0901562-x0 |
ADLIGO_ETM_TELE_F1 |
Ken Mailand |
Auxiliary Optics
Preliminary Design
|
04 Aug 2009 |
D0901561-x0 |
ADLIGO_ETM_TELE_F2 |
Ken Mailand |
Preliminary Design
Auxiliary Optics
|
04 Aug 2009 |
D0901558-x0 |
ADLIGO_ETM_TELE_ASSEM. |
Ken Mailand |
Auxiliary Optics
Preliminary Design
|
04 Aug 2009 |
D0901557-x0 |
ADLIGO_ETM_TELE_PRIMARY |
Ken Mailand |
Auxiliary Optics
Preliminary Design
|
04 Aug 2009 |
D0901556-x0 |
ADLIGO_ETM_TELE_TABLE |
Ken Mailand |
Preliminary Design
Auxiliary Optics
|
04 Aug 2009 |
D0901432-v1 |
ADLIGO TCS_LASER_ENCLOSURE_LASER_MIRROR_COVER |
Ken Mailand |
Final Design
Auxiliary Optics
|
04 Aug 2009 |
D0901484-v1 |
ADLIGO_TCS_LASER_ENCLOSURE_SLIDE |
Ken Mailand |
Final Design
Auxiliary Optics
|
04 Aug 2009 |
D0901482-v1 |
ADLIGO_TCS_LASER_ENCLOSURE_HANDLE |
Ken Mailand |
Auxiliary Optics
Final Design
|
04 Aug 2009 |
D0901453-v1 |
ADLIGO_TCS_LASER_ENCLOSURE_W1008-Z-AR_WINDOW |
Ken Mailand |
Final Design
Auxiliary Optics
|
04 Aug 2009 |
D0901451-v1 |
ADLIGO_TCS_LASER_ENCLOSURE_DUMP_MIRROR |
Ken Mailand |
Auxiliary Optics
Final Design
|
04 Aug 2009 |
D0901450-v1 |
ADLIGO_TCS_LASER_ENCLOSURE_DUMP_CAP |
Ken Mailand |
Auxiliary Optics
Final Design
|
04 Aug 2009 |
D0901449-v1 |
ADLIGO_TCS_LASER_ENCLOSURE_DUMP_TUBE |
Ken Mailand |
Auxiliary Optics
Final Design
|
04 Aug 2009 |
D0901448-v1 |
ADLIGO_TCS_LASER_ENCLOSURE_BM_DMP_ASEM |
Ken Mailand |
Auxiliary Optics
Final Design
|
04 Aug 2009 |
D0901437-v1 |
ADLIGO_TCS_LASER_ENCLOSURE_SHUTTER_LOCK |
Ken Mailand |
Auxiliary Optics
Final Design
|
04 Aug 2009 |
D0901434-v1 |
ADLIGO_TCS_LASER_ENCLOSURE_LASER_WINDOW_RING |
Ken Mailand |
Auxiliary Optics
Final Design
|
04 Aug 2009 |
D0901431-v1 |
ADLIGO_TCS_LASER_ENCLOSURE_LASER_MOUNT_PL |
Ken Mailand |
Final Design
Auxiliary Optics
|
04 Aug 2009 |
D0901430-v1 |
ADLIGO_TCS_LASER_ENCLOSURE_SPACER |
Ken Mailand |
Final Design
Auxiliary Optics
|
04 Aug 2009 |
D0901429-v1 |
ADLIGO_TCS_LASER_ENCLOSURE_COVER_ANGLE |
Ken Mailand |
Final Design
Auxiliary Optics
|
04 Aug 2009 |
D0901428-v1 |
ADLIGO_TCS_LASER_ENCLOSURE_APERTURE_PL |
Ken Mailand |
Auxiliary Optics
Final Design
|
04 Aug 2009 |
D0901427-v1 |
ADLIGO_TCS_LASER_ENCLOSURE_BULKHEAD_PL |
Ken Mailand |
Auxiliary Optics
Final Design
|
04 Aug 2009 |
D0901426-v1 |
ADLIGO_TCS_LASER_ENCLOSURE_WINDOW |
Ken Mailand |
Auxiliary Optics
Final Design
|
04 Aug 2009 |
D0901425-v1 |
ADLIGO_TCS_LASER_ENCLOSURE_MIRROR_ROD |
Ken Mailand |
Final Design
Auxiliary Optics
|
04 Aug 2009 |
D0901423-v1 |
ADLIGO_TCS_LASER_ENCLOSURE_COVER_TOP |
Ken Mailand |
Auxiliary Optics
Final Design
|
04 Aug 2009 |
D0901422-v1 |
ADLIGO_TCS_LASER_ENCLOSURE_COVER_SIDE |
Ken Mailand |
Final Design
Auxiliary Optics
|
04 Aug 2009 |
D0901421-v1 |
ADLIGO_TCS_LASER_ENCLOSURE_KEY_SHAFT |
Ken Mailand |
Final Design
Auxiliary Optics
|
04 Aug 2009 |
D0901420-v1 |
ADLIGO_TCS_LASER_ENCLOSURE_BASE_PLATE |
Ken Mailand |
Auxiliary Optics
Final Design
|
04 Aug 2009 |
D0901418-v1 |
ADLIGO_TCS_LASER_ENCLOSURE_MIRROR_MT |
Ken Mailand |
Auxiliary Optics
Final Design
|
04 Aug 2009 |
T0900375-v1 |
AR absorption measurement on Contamination Cavity Sample |
GariLynn Billingsley et al. |
Core Optics
Basic R&D
|
04 Aug 2009 |
G0900540-v2 |
Attometer astrophysics: News of gravitational wave detectors |
Sam Waldman |
Public relations
Education, Outreach
|
03 Aug 2009 |
E0900221-x0 |
DCN - HLTS Coil Holder (Tablecloth) Assembly and Parts |
Derek Bridges |
Change Control
Suspensions
Preliminary Design
|
03 Aug 2009 |
E0900204-x0 |
DCN - HLTS Intermediate Wire Jig |
Derek Bridges |
Change Control
Preliminary Design
Suspensions
|
03 Aug 2009 |
D0901409-v1 |
Tip-Tilt Blade Spring Viton Damper Mount |
Michael Meyer |
Preliminary Design
Suspensions
|
30 Jul 2009 |
D0901403-v1 |
Passive Tip-Tilt Blade Spring Mounting Platform |
Michael Meyer |
Preliminary Design
Suspensions
|
30 Jul 2009 |
D0901166-v1 |
Tip-Tilt Blade Wire Clamp |
Michael Meyer |
Suspensions
Preliminary Design
|
30 Jul 2009 |
D0901165-v1 |
Tip-Tilt Blade Wire Clamp Block |
Michael Meyer |
Preliminary Design
Suspensions
|
30 Jul 2009 |
D0901164-v1 |
Tip-Tilt Blade Spring |
Michael Meyer |
Preliminary Design
Suspensions
|
30 Jul 2009 |
D0901452-x0 |
ADLIGO_TCS_LASER_ENCLOSURE_KEY_SHFT_KNOB |
Ken Mailand |
Auxiliary Optics
Final Design
|
29 Jul 2009 |
G0900704-v1 |
Image Processing Pipeline for Follow-up Observations with Optical Telescopes (by Brenden Simoneaux) |
Amber Stuver |
Data analysis software
Astrophysics / Multi-messenger
Education, Outreach
|
29 Jul 2009 |
D080054-v1 |
ADLIGO FOLDING MIRROR BLANK |
Vagesh Parameshwaraiah |
Activity
|
29 Jul 2009 |
D080053-v1 |
ADLIGO RECYCLING MIRROR 3 BLANK |
Vagesh Parameshwaraiah |
Activity
|
29 Jul 2009 |
D080051-v1 |
ADLIGO CP MIRROR BLANK |
Vagesh Parameshwaraiah |
Activity
|
29 Jul 2009 |
D080050-v1 |
ADLIGO BS MIRROR BLANK |
Vagesh Parameshwaraiah |
Activity
|
29 Jul 2009 |
D0900997-v1 |
Screw, Socket Head Cap, 1/4-20 UNC-2A X 1.5 Long, Fully Threaded, Rounded End |
Derek Bridges |
Final Design
System Engineering
|
29 Jul 2009 |
D0901507-x0 |
Tip-Tilt Viton Damper Mount (Extended) |
Michael Meyer |
Suspensions
Preliminary Design
|
29 Jul 2009 |
T0900314-v1 |
Satellite Box Design Description |
Ron Cutler |
Final Design
|
29 Jul 2009 |
E0900189-x0 |
DCN - HLTS Test Mass Assembly Parts (and HLTS Intermediate Mass Main Section) |
Derek Bridges |
Change Control
Preliminary Design
Suspensions
|
28 Jul 2009 |
E0900176-x0 |
DCN - HLTS Assembly Drawings |
Derek Bridges |
Change Control
Suspensions
Preliminary Design
|
27 Jul 2009 |
T0900276-v4 |
LSC Instrument Science White Paper 2009 |
David Shoemaker |
Collaboration
Detector
Basic R&D
|
25 Jul 2009 |
P0900076-v1 |
Astrophysics issues and low frequency mechanical noise for third generation gravitational waves detectors |
Arianna Di Cintio |
Seismic Isolation
Basic R&D
|
25 Jul 2009 |
E0900198-x0 |
DCN - HLTS Upper Mass Parts |
Derek Bridges |
Suspensions
Preliminary Design
Change Control
|
24 Jul 2009 |
D0901483-x0 |
Hanging STS-2 or Trillium Vacuum Pod |
Stephany Foley |
Final Design
Seismic Isolation
|
23 Jul 2009 |
D0901476-v1 |
PEEK Braid Comparison |
Rich Abbott |
Basic R&D
|
22 Jul 2009 |
E0900213-x0 |
DCN - Magnet Holder (OMC SUS, HLTS) |
Derek Bridges |
Suspensions
Preliminary Design
Change Control
|
22 Jul 2009 |
D020608-v1 |
X-Direction Offset, T-Piece, Upper Mass, HLTS |
Derek Bridges |
Suspensions
Preliminary Design
|
21 Jul 2009 |
E0900193-x0 |
DCN - HLTS Lower Loop Wire Parts |
Derek Bridges |
Preliminary Design
Suspensions
Change Control
|
20 Jul 2009 |
G0900695-v1 |
LIGO Lab Education & Public Outreach (PAC26) |
Fred Raab |
Education, Outreach
Advisory Boards (e.g., PAC, PAP, ...)
|
20 Jul 2009 |
G0900692-v1 |
H1 Squeezer Update |
Daniel Sigg |
Sensing and Control
Basic R&D
|
19 Jul 2009 |
E960159-v1 |
Specification for Viton Vacuum Bakeout, LIGO Vacuum Equipment - Hanford and Livingston |
Dennis Coyne |
Fabrication
Vacuum
|
17 Jul 2009 |
G0900689-v1 |
Gravitational Waves |
John Whelan |
Education, Outreach
|
17 Jul 2009 |
E0900207-v1 |
Traveler for HLTS Structural Weldment (D070442) Prototype |
Derek Bridges |
Suspensions
Preliminary Design
|
17 Jul 2009 |
D0901266-v1 |
AdvLIGO COC FM BS Optic Container Cover, Top, |
Jose Eduardo Chavez |
System Engineering
Final Design
|
17 Jul 2009 |
D0901400-v1 |
Adv LIGO COC R Optic Container, Plastic, Insert, Base, Alum Box Rnd |
Jose Eduardo Chavez |
System Engineering
Final Design
|
17 Jul 2009 |
D0901352-v1 |
Adv LIGO COC R Optic Container, Cover, Lid, Alum Box Rnd |
Jose Eduardo Chavez |
Final Design
System Engineering
|
17 Jul 2009 |
D0901354-v1 |
Adv LIGO COC R Optic Container, Base, Lid, Alum Box Rnd |
Jose Eduardo Chavez |
Final Design
System Engineering
|
17 Jul 2009 |
D0901353-v1 |
Adv LIGO COC R Optic Container, Cover, Ring, Alum Box Rnd |
Jose Eduardo Chavez |
Installation
System Engineering
|
17 Jul 2009 |
D0901355-v1 |
Adv LIGO COC R Optic Container, Base, Ring, Alum Box Rnd |
Jose Eduardo Chavez |
System Engineering
Final Design
|
17 Jul 2009 |
D0901356-v1 |
Adv LIGO COC R Optic Container, Plate, Fitting, Mirror Wedge, Alum Box Rnd |
Jose Eduardo Chavez |
Final Design
System Engineering
|
17 Jul 2009 |
D0901399-v1 |
AdvLIGO COC CP Optic Container Plastic, Insert, Base, Alum Box Rnd, CP |
Jose Eduardo Chavez |
System Engineering
Final Design
|
17 Jul 2009 |
D0901330-v1 |
AdvLIGO COC CP Optic Container Base, Lid, Alum Box Rnd |
Jose Eduardo Chavez |
Final Design
System Engineering
|
17 Jul 2009 |
D0901331-v1 |
AdvLIGO COC CP Optic Container Base, Ring, Alum Box Rnd, CP |
Jose Eduardo Chavez |
Final Design
System Engineering
|
17 Jul 2009 |
D0901329-v1 |
AdvLIGO COC CP Optic Container Plate, Fitting, Mirror Wedge, Alum Box Rnd, CP |
Jose Eduardo Chavez |
System Engineering
Final Design
|
17 Jul 2009 |
D0901328-v1 |
AdvLIGO COC CP Optic Container Cover, Ring, Alum Box Rnd, CP |
Jose Eduardo Chavez |
Final Design
System Engineering
|
17 Jul 2009 |
D0901327-v1 |
AdvLIGO COC CP Optic Container Cover, Lid, Alum Box Rnd |
Jose Eduardo Chavez |
Final Design
System Engineering
|
17 Jul 2009 |
D0901270-v1 |
AdvLIGO COC FM BS Optic Container Plastic, Insert, Base |
Jose Eduardo Chavez |
System Engineering
Final Design
|
17 Jul 2009 |
D0901268-v1 |
AdvLIGO COC FM BS Optic Container Plate, Fitting, Mirror Wedge |
Jose Eduardo Chavez |
Final Design
System Engineering
|
17 Jul 2009 |
D0901267-v1 |
AdvLIGO COC FM BS Optic Container Base, Bottom, |
Jose Eduardo Chavez |
Final Design
System Engineering
|
17 Jul 2009 |
D0901212-v1 |
AdvLIGO COC ETM Optic Container Base, Lid, |
Jose Eduardo Chavez |
System Engineering
Final Design
|
17 Jul 2009 |
D0901211-v1 |
AdvLIGO COC ETM Optic Container Base, Ring, |
Jose Eduardo Chavez |
Fabrication
System Engineering
|
17 Jul 2009 |
D0901210-v1 |
AdvLIGO COC ETM Optic Container Cover, Lid, |
Jose Eduardo Chavez |
Final Design
System Engineering
|
17 Jul 2009 |
D0901317-v1 |
AdvLIGO COC ETM Optic Container Plastic, Insert, Base, Alum Box Rnd |
Jose Eduardo Chavez |
Final Design
System Engineering
|
17 Jul 2009 |
D0901316-v1 |
AdvLIGO COC ETM Optic Container Block, Spring Loaded, Adjustable/Alignment Stop Mirror |
Jose Eduardo Chavez |
Final Design
System Engineering
|
17 Jul 2009 |
D0901398-v1 |
AdvLIGO COC ETM Optic Container Plate, Adjustable/Alignment Stop Mirror, |
Jose Eduardo Chavez |
Final Design
System Engineering
|
17 Jul 2009 |
D0901209-v1 |
AdvLIGO COC ETM Optic Container Cover, Ring |
Jose Eduardo Chavez |
System Engineering
Final Design
|
17 Jul 2009 |
D0901208-v1 |
AdvLIGO COC ETM Optic Container Plate, Fitting, Mirror Wedge |
Jose Eduardo Chavez |
System Engineering
Final Design
|
17 Jul 2009 |
D0901064-v1 |
AdvLIGO COC Optic Container Handle, Cover Lid |
Jose Eduardo Chavez |
System Engineering
Final Design
|
17 Jul 2009 |
D0901063-v1 |
AdvLIGO COC Optic Container Plate, Retaining Screw, Fitting Plate, Mirror Wedge |
Jose Eduardo Chavez |
Final Design
System Engineering
|
17 Jul 2009 |
D0901321-v1 |
AdvLIGO COC Optic Container Rod, Guide, End Threaded, 1/4-20 |
Jose Eduardo Chavez |
System Engineering
Final Design
|
17 Jul 2009 |
D0901320-v1 |
AdvLIGO COC Optic Container Screw Retaining End Slot |
Jose Eduardo Chavez |
Final Design
System Engineering
|
17 Jul 2009 |
D0901322-v1 |
AdvLIGO COC Optic Container Block Cover Removal |
Jose Eduardo Chavez |
Final Design
System Engineering
|
17 Jul 2009 |
T0900089-v1 |
Replacement Flexures for the GS-13 Seismometer |
Daniel Clark et al. |
Seismic Isolation
Basic R&D
|
16 Jul 2009 |
D080055-v1 |
ADLIGO ETM MIRROR BLANK |
GariLynn Billingsley et al. |
Core Optics
Final Design
|
16 Jul 2009 |
S0900001-v1 |
OMC Tip/Tilt Shutter - Modified |
Charles Osthelder |
Final Design
|
22 Apr 2009 |
D080039-v1 |
ADLIGO ITM MIRROR BLANK |
GariLynn Billingsley et al. |
Core Optics
Final Design
|
15 Jul 2009 |
G0900349-v4 |
The Present and Near Future of LIGO |
Jeffrey Kissel |
Installation
Final Design
Basic R&D
Commissioning
Meeting
Upgrades
|
15 Jul 2009 |
G0900675-v3 |
Advanced Gravitational Wave Interferometers:Status and Technology of Second Generation Detectors |
Gregg Harry |
Meeting
|
15 Jul 2009 |
D0901411-x0 |
Tip-Tilt Viton Holder |
Michael Meyer |
Preliminary Design
Suspensions
|
14 Jul 2009 |
C962778-v1 |
Report of Materials Analysis: Analysis of Three Liquid Samples for Nonvolatile Residue Content. Analysis of Nonvolatile Portion of "Mirachem from Scrubber" for Comparison to the Residues |
Dennis Coyne |
Vacuum
Fabrication
|
09 Jul 2009 |
D0901041-v1 |
HAM to BSC Test/Assembly Stand Adapter |
Sam Barnum |
Seismic Isolation
Final Design
|
09 Jul 2009 |
E960046-v1 |
Specification for Cleaning Procedure for LIGO Vacuum Equipment (PSI) |
Dennis Coyne |
Vacuum
Fabrication
|
09 Jul 2009 |
T0900334-v2 |
Response to Stray Light Control PDD Comments |
Michael Smith |
Auxiliary Optics
Preliminary Design
|
09 Jul 2009 |
G0900558-v1 |
Optical Design of the Advanced LIGO Detectors with Stable Recycling Cavities |
David Tanner et al. |
Laser Systems
Meeting
Input Optics
Core Optics
|
09 Jul 2009 |
D0901383-x0 |
ADVL_ARM_CVTY_BAFF_EARTHQ_STOP |
Ken Mailand |
Auxiliary Optics
Preliminary Design
|
08 Jul 2009 |
D0901382-x0 |
ADVL_ARM_CVTY_BAFF_BSC3_CYL_BRKT |
Ken Mailand |
Preliminary Design
Auxiliary Optics
|
08 Jul 2009 |
D0901381-x0 |
ADVL_ARM_CAVITY_BAFFLE_BSC3_CYL |
Ken Mailand |
Preliminary Design
Auxiliary Optics
|
08 Jul 2009 |
G0900569-v1 |
Gingin high power parametric instability experiment |
Chunnong Zhao et al. |
Preliminary Design
|
08 Jul 2009 |
G0900574-v1 |
A Bayesian Search For Gravitational Wave Ring-downs Associated With Pulsar Glitches |
James Clark et al. |
Meeting
Astrophysics / Multi-messenger
|
08 Jul 2009 |
G0900575-v1 |
Parametric Instabilities in Adavanced Gravitational Wave Detectors |
Slawomir Gras |
Modelling
|
08 Jul 2009 |
D0901374-x0 |
ADVL_CAVITY_BAFFLE_CYL. |
Ken Mailand |
Auxiliary Optics
Preliminary Design
|
08 Jul 2009 |
T0900332-v2 |
Response to the PUM Evaluation Document T0900313-v1 |
Ron Cutler |
Final Design
|
08 Jul 2009 |
T000083-v1 |
COS Faraday Isolator Pre-alignment Procedure |
Michael Smith |
Installation
|
07 Jul 2009 |
E0900184-x0 |
DCN - HLTS Intermediate Wire Parts |
Derek Bridges |
Suspensions
Preliminary Design
Change Control
|
07 Jul 2009 |
E0900173-x0 |
DCN - HLTS Intermediate Mass Parts |
Derek Bridges |
Change Control
Suspensions
Preliminary Design
|
07 Jul 2009 |
P0900079-v2 |
Probing the atomic structure of amorphous Ta2O5 mirror coatings for advanced gravitational wave detectors using transmission electron microscopy |
James Hough et al. |
Basic R&D
|
07 Jul 2009 |
G0900673-v1 |
Gravity Waves: Next Window on the Universe |
Thomas Nash et al. |
Data Analysis
Activity
Compact Binaries
Continuous Wave
Detector
Astrophysics / Multi-messenger
GW Bursts
|
06 Jul 2009 |
G0900585-v1 |
Demonstration Of A Diffractively-Coupled Fabry Perot Cavity |
Matthew Edgar et al. |
Input Optics
Basic R&D
|
06 Jul 2009 |
G0900523-v1 |
The transition to GEO HF |
Harald Lueck |
Detector
Upgrades
|
06 Jul 2009 |
T0900278-v2 |
ALIGO NP-type: Preparations and hazard analysis for test hangs at LASTI in July/August 2009 |
Giles Hammond et al. |
Suspensions
System Test
|
02 Jul 2009 |
G0900563-v1 |
Astronomy's New Messengers: A LIGO traveling exhibit to reach out to a young adult audience |
Marco Cavaglia et al. |
Education, Outreach
|
02 Jul 2009 |
D0901341-x0 |
ADVL_MANIFOLD_CRYO_BAFFLE |
Ken Mailand |
Conceptual Design
Auxiliary Optics
|
01 Jul 2009 |
G0900564-v2 |
Searches for gravitational waves from compact binary coalescences by the LIGO and Virgo Collaborations |
Anand Sengupta et al. |
Meeting
Compact Binaries
|
01 Jul 2009 |
G0900518-v1 |
Performance of the ANU Travelling-wave Squeezing Cavity for the LIGO H1 Squeezing Injection Experiment |
Conor Mow-Lowry et al. |
Basic R&D
|
01 Jul 2009 |
G0900508-v1 |
The Status of GEO600 |
Hartmut Grote et al. |
Commissioning
|
01 Jul 2009 |
T0900321-v1 |
Satellite Box Users Guide |
Ron Cutler |
Final Design
|
01 Jul 2009 |
G0900600-v1 |
Exploring Coating Thermal Noise via Loss in Fused Silica Coatings |
Steven Penn |
Basic R&D
Core Optics
|
30 Jun 2009 |
G0900545-v3 |
Very Low Latency Search for Low Mass Compact Binary Coalescences in the Upcoming LIGO S6 and Virgo VSR2 Data |
Frederique Marion et al. |
Compact Binaries
Meeting
|
30 Jun 2009 |
G0900520-v2 |
Testing Advanced LIGO length sensing and control scheme at the Caltech 40m interferometer |
David Yeaton-Massey et al. |
Upgrades
|
30 Jun 2009 |
G0900521-v1 |
Seismic attenuation, problems for LF underground GW Observatories |
Riccardo DeSalvo |
Basic R&D
|
30 Jun 2009 |
D080448-v1 |
Passive Tip-Tilt Structure Assembly |
Michael Meyer |
Preliminary Design
Suspensions
|
30 Jun 2009 |
D080722-v1 |
Passive Tip-Tilt ECD (Low-Damping) |
Michael Meyer |
Preliminary Design
Suspensions
|
30 Jun 2009 |
D080450-v1 |
Passive Tip-Tilt ECD Mount |
Michael Meyer |
Suspensions
Preliminary Design
|
30 Jun 2009 |
G0900535-v4 |
Advanced LIGO and Beyond: The next generations of gravitational wave detection |
Gregg Harry |
Meeting
|
30 Jun 2009 |
G0900531-v4 |
Sky localization of burst sources with networks of GW detectors |
Sergei Klimenko et al. |
Modelling
Data Analysis
|
29 Jun 2009 |
G0900543-v4 |
The Search for Low Mass Compact Binary Coalescences in LIGO's S5 and Virgo's VSR1 Data |
Ruslan Vaulin et al. |
Meeting
Compact Binaries
|
29 Jun 2009 |
G0900426-v1 |
Big Bang Observer |
Gregg Harry |
Meeting
|
29 Jun 2009 |
E080337-v1 |
Drawing Tree - OMC SUS (LHO) Overall Assembly and Fixtures |
Derek Bridges |
Basic R&D
Suspensions
|
25 Jun 2009 |
D0901300-x0 |
SYNRAD_48-2KWL_LASER_ASSEMBLY |
Ken Mailand |
Auxiliary Optics
Preliminary Design
|
24 Jun 2009 |
D0901287-v1 |
SUS OPTICAL TEST BENCH |
Ken Mailand |
Auxiliary Optics
Preliminary Design
|
24 Jun 2009 |
G0900502-v1 |
Education and Public Outreach at the LIGO Science Education Center, Livingston, Louisiana |
Amber Stuver et al. |
Education, Outreach
|
24 Jun 2009 |
E080418-v1 |
DCN - HAM Large Triple Suspension Blade and Wire Clamps |
Michael Meyer |
Preliminary Design
Suspensions
Change Control
|
23 Jun 2009 |
D0901290-x0 |
SUS_OPTICAL_TEST_BENCH_LEVELING_FOOT |
Ken Mailand |
Auxiliary Optics
Preliminary Design
|
23 Jun 2009 |
D0901289-x0 |
SUS_OPTICAL_TEST_BENCH_SOLID_TOP |
Ken Mailand |
Preliminary Design
Auxiliary Optics
|
23 Jun 2009 |
T0900308-v1 |
Response to the Satellite Box Evaluation report, T0900261-v1 |
Ron Cutler |
Final Design
|
22 Jun 2009 |
G0900550-v4 |
Advanced Interferometers and their Science Reach |
David Shoemaker |
Meeting
|
21 Jun 2009 |
G0900595-v1 |
Education and Outreach (Invited Talk for Amaldi-8) |
Fred Raab |
Education, Outreach
|
19 Jun 2009 |
T0900244-v1 |
Triboelectric Effect in ESD Drive Cable |
Rich Abbott |
System Engineering
Basic R&D
|
19 Jun 2009 |
E0900162-x0 |
DCN - HLTS Earthquake Stop Mounts and Assemblies |
Derek Bridges |
Change Control
Suspensions
Preliminary Design
|
19 Jun 2009 |
G0900586-v1 |
Flame welding tests for monolithic suspensions of the mirrors of future GW interferometers. |
Giles Hammond et al. |
Basic R&D
Suspensions
|
19 Jun 2009 |
G0900507-v2 |
Overview of monolithic suspension work for Advanced LIGO |
Timothy Bodiya et al. |
Basic R&D
Suspensions
|
19 Jun 2009 |
G0900583-v1 |
Properties of hydroxy-catalysis bonds for use in advanced gravitational wave detectors |
Karen Haughian et al. |
Basic R&D
|
19 Jun 2009 |
G0900581-v1 |
Transmission electron microscopy of mirror coatings for advanced and future gravitational wave detectors |
James Hough et al. |
Basic R&D
|
19 Jun 2009 |
D0901279-x0 |
TSC_RING_HEATER_ELEMENT |
Ken Mailand |
Auxiliary Optics
Preliminary Design
|
17 Jun 2009 |
D0901277-x0 |
SUS_MEZZANINE_LAB_OPTICAL_BENCH_ASSEM |
Ken Mailand |
Preliminary Design
Suspensions
|
17 Jun 2009 |
D0901274-x0 |
ELLIPTICAL_BAFFLE_FRAME_APERTURE_BSC7-8 |
Ken Mailand |
Preliminary Design
Auxiliary Optics
|
17 Jun 2009 |
D0901273-x0 |
ELLIPTICAL_BAFFLE_APERTURE_SUS_TUBE_BSC7-8 |
Ken Mailand |
Auxiliary Optics
Preliminary Design
|
17 Jun 2009 |
D0901272-x0 |
ADV_LIGO_UPPER_SUS_TUBE_ASSEM |
Ken Mailand |
Preliminary Design
Auxiliary Optics
|
17 Jun 2009 |
T080199-v1 |
Tautochrone: Quantitative Exhibit Activity |
Amber Stuver |
Education, Outreach
|
16 Jun 2009 |
D0900823-x0 |
Blade Characterization Stand - Table (Reference Only) |
Michael Meyer |
Suspensions
Conceptual Design
|
15 Jun 2009 |
D0901244-x0 |
Blade Characterization Stand - Wheel Carriage |
Michael Meyer |
Conceptual Design
Suspensions
|
15 Jun 2009 |
D0901227-x0 |
CO2_ITM_STEERING_MIRROR_M2_SUSPENSION |
Ken Mailand |
Auxiliary Optics
Preliminary Design
|
11 Jun 2009 |
D0901226-x0 |
CO2_ITM_STEERING_MIRROR_M1_SUSPENSION |
Ken Mailand |
Preliminary Design
Auxiliary Optics
|
11 Jun 2009 |
D0901225-x0 |
H2_TCS_CO2_STEERING_MIRROR_SUSPENSION |
Ken Mailand |
Preliminary Design
Auxiliary Optics
|
11 Jun 2009 |
D0901224-x0 |
CO2_ITM_STEERING_MIRROR_M1_FLEXURE_ASSEM. |
Ken Mailand |
Auxiliary Optics
Preliminary Design
|
11 Jun 2009 |
D0901223-x0 |
CO2_ITM_STEERING_MIRROR_M2_FLEXURE_ASSEM. |
Ken Mailand |
Preliminary Design
Auxiliary Optics
|
11 Jun 2009 |
D0901222-x0 |
CO2 ITM STEERING MIRROR M1 FLEXURE |
Ken Mailand |
Auxiliary Optics
Preliminary Design
|
11 Jun 2009 |
D0901221-x0 |
CO2_ITM_STEERING_MIRROR_M2_FLEXURE |
Ken Mailand |
Preliminary Design
Auxiliary Optics
|
11 Jun 2009 |
D0901220-x0 |
CO2_ITM_STEERING_MIRROR_M2 |
Ken Mailand |
Preliminary Design
Auxiliary Optics
|
11 Jun 2009 |
D0901219-x0 |
CO2_ITM_STEERING_MIRROR_M1 |
Ken Mailand |
Preliminary Design
Auxiliary Optics
|
11 Jun 2009 |
D0901218-x0 |
H2_TCS_CO2_STEERING_MIRROR_BRACKET |
Ken Mailand |
Auxiliary Optics
Preliminary Design
|
11 Jun 2009 |
D0901217-x0 |
H2_TCS_CO2_STEERING_MIRROR_CLAMP |
Ken Mailand |
Preliminary Design
Auxiliary Optics
|
11 Jun 2009 |
D0901216-x0 |
H2_TCS_CO2_STEERING_MIRROR_FLEXURE_ASSEM. |
Ken Mailand |
Auxiliary Optics
Preliminary Design
|
11 Jun 2009 |
D0901215-x0 |
H2_TCS_CO2_STEERING_MIRROR_FLEXURE |
Ken Mailand |
Auxiliary Optics
Preliminary Design
|
11 Jun 2009 |
D0901214-x0 |
H2_TCS_CO2_STEERING_MIRROR |
Ken Mailand |
Auxiliary Optics
Preliminary Design
|
11 Jun 2009 |
D0901213-x0 |
PR2_SCRAPER_BAFFLE |
Ken Mailand |
Auxiliary Optics
Preliminary Design
|
11 Jun 2009 |
D0901207-x0 |
SR2_SCRAPER _BAFFLE_BASE |
Ken Mailand |
Auxiliary Optics
Preliminary Design
|
11 Jun 2009 |
D0901206-x0 |
SR2_SCRAPER_BAFFLE_HORN |
Ken Mailand |
Auxiliary Optics
Preliminary Design
|
11 Jun 2009 |
E0900166-x0 |
DCN - HLTS Upper Blade Bake Fixture |
Derek Bridges |
Change Control
Suspensions
Preliminary Design
|
11 Jun 2009 |
D070558-v1 |
Side Support, Upper Blade Bake Fixture |
Derek Bridges |
Suspensions
Preliminary Design
|
11 Jun 2009 |
D0901201-x0 |
SR2_SCRAPER_BAFFLE |
Ken Mailand |
Preliminary Design
Auxiliary Optics
|
10 Jun 2009 |
D0901200-x0 |
ARM_CAVITY_BAFFLE_SUSPENSION |
Ken Mailand |
Auxiliary Optics
Preliminary Design
|
10 Jun 2009 |
D0901198-x0 |
ARM_CAVITY_BAFFLE_SUPPORT_PL. |
Ken Mailand |
Auxiliary Optics
Preliminary Design
|
10 Jun 2009 |
D0901199-x0 |
COC_WIDE_ANGLE_BAFFLE |
Ken Mailand |
Auxiliary Optics
Preliminary Design
|
10 Jun 2009 |
D070484-v1 |
EQ BRACKET SIDE ALT |
Bobby Moore |
Final Design
Suspensions
|
10 Jun 2009 |
D070049-v1 |
EQ BRACKET TOP |
Bobby Moore |
Final Design
Suspensions
|
10 Jun 2009 |
F080008-v8 |
Advanced LIGO Inventory Database PO/Line Parts Import Template |
Dwayne Giardina et al. |
Procurements
Installation
Operations Business
Quality Assurance
Commissioning
|
10 Jun 2009 |
D0901193-x0 |
HSTS Structural Weldment Gusset (4.25x3x0.375) |
Michael Meyer |
Preliminary Design
Suspensions
|
10 Jun 2009 |
D0901192-x0 |
HSTS Structrural Weldment |
Michael Meyer |
Preliminary Design
Suspensions
|
10 Jun 2009 |
D0901191-x0 |
HSTS Structural Weldment Gusset (3x3x0.25") |
Michael Meyer |
Preliminary Design
Suspensions
|
10 Jun 2009 |
D0901190-x0 |
PR3__ELLIPTICAL_BAFFLE_FORM |
Ken Mailand |
Conceptual Design
Auxiliary Optics
|
09 Jun 2009 |
D0901188-x0 |
HSTS Structural Weldment Gusset (3 x 3 x 0.375") |
Michael Meyer |
Suspensions
Preliminary Design
|
09 Jun 2009 |
T0900203-v2 |
Assembly procedure of monolithic part of the suspension for advanced LIGO |
Giles Hammond et al. |
Preliminary Design
|
09 Jun 2009 |
T0900204-v2 |
Analysis of iLigo Witness Plate by Battelle, PNNL |
GariLynn Billingsley et al. |
Core Optics
Basic R&D
|
09 Jun 2009 |
E0900160-x0 |
DCN - HLTS Upper Wire Assembly and Upper Wire Jig |
Derek Bridges |
Suspensions
Preliminary Design
Change Control
|
08 Jun 2009 |
E0900130-v1 |
DCN 35 WATT AIR COOLED BEAM DUMP |
Ken Mailand |
Final Design
Auxiliary Optics
|
05 Jun 2009 |
E0900159-x0 |
DCN - HLTS Top Blade Guard |
Derek Bridges |
Suspensions
Preliminary Design
Change Control
|
04 Jun 2009 |
D0901158-x0 |
A-1_ADAPTOR_ADLIGO_VE |
Ken Mailand |
Auxiliary Optics
Conceptual Design
|
03 Jun 2009 |
D0900822-v2 |
LLO As Built HAM6 optical layout |
Sam Waldman |
Final Design
Sensing and Control
|
02 Jun 2009 |
T0900238-v1 |
PP Top Board v4 |
Ron Cutler |
Final Design
|
02 Jun 2009 |
T0900235-v1 |
Response to the TOP evaluation report T09000170 |
Ron Cutler |
Final Design
|
02 Jun 2009 |
T080208-v1 |
Stable Recycling Cavities for Advanced LIGO |
Guido Mueller et al. |
Activity
|
01 Jun 2009 |
T0900234-v2 |
Response to the UIM Evaluation Report T0900014 |
Ron Cutler |
Final Design
|
26 May 2009 |
D071075-v2 |
Flexure Post Bracket, Rad |
Andy Stein et al. |
Seismic Isolation
Final Design
|
22 May 2009 |
D071490-v1 |
Asm, Shipping Brace |
Sam Barnum |
Seismic Isolation
Final Design
|
22 May 2009 |
D0901059-x0 |
BSC7-8_APERTURE |
Ken Mailand |
Auxiliary Optics
Conceptual Design
|
22 May 2009 |
D071251-v2 |
Gang Barrel Nut |
Andy Stein et al. |
Final Design
Seismic Isolation
|
22 May 2009 |
D071255-v2 |
Wiring Breadboard, Large |
Sam Barnum |
Final Design
Seismic Isolation
|
22 May 2009 |
D071421-v1 |
Asm, Stage 1 Pre-Asm |
Sam Barnum |
Final Design
Seismic Isolation
|
22 May 2009 |
D071480-v1 |
ASM, Adjustment Masses |
Sam Barnum |
Seismic Isolation
Final Design
|
22 May 2009 |
D0900897-v1 |
Earthquake Stop for Glass (No Glass Tip), Simplified, 2 Inch |
Derek Bridges |
Suspensions
Final Design
|
21 May 2009 |
E0900152-x0 |
DCN - Earthquake Stops |
Derek Bridges |
Change Control
Suspensions
Preliminary Design
|
21 May 2009 |
E0900066-x0 |
DCN - HAM Large Triple Suspension Nonsuspended Hardware |
Derek Bridges |
Suspensions
Change Control
Basic R&D
|
21 May 2009 |
D0900813-v1 |
ELIGO_35_WATT_BEAM_DUMP_P.POL_PIVOT |
Ken Mailand |
Final Design
Auxiliary Optics
|
21 May 2009 |
E0900131-v2 |
35 Watt Air Cooled Beam Dump Assembly Procedures |
Ken Mailand |
Auxiliary Optics
Installation
|
21 May 2009 |
E0900155-x0 |
DCN - HLTS Lower Blade Library of Clamps |
Derek Bridges |
Suspensions
Preliminary Design
Change Control
|
21 May 2009 |
T0900157-v2 |
Proposed changes for the Advanced LIGO Output Mode Cleaner |
Sam Waldman |
Sensing and Control
Final Design
|
21 May 2009 |
G0900278-v1 |
ASC Modeling for Advanced LIGO |
Lisa Barsotti |
Modelling
|
21 May 2009 |
D0901046-x0 |
AdvLIGO SYSTEMS_BSC2_ITMY_ELLIPTICAL_BAFFLE_CLAMP_HOLE_TRANSFER_PL |
Ken Mailand |
Conceptual Design
Auxiliary Optics
|
20 May 2009 |
D0901044-x0 |
BSC2_TABLE_RING_DIMENSIONS_ |
Ken Mailand |
Installation
Auxiliary Optics
|
20 May 2009 |
D0900177-v1 |
ELIGO_35_WATT_AIR_COOLED_BEAM_DUMP_4"_S.POL |
Ken Mailand |
Final Design
Auxiliary Optics
|
20 May 2009 |
D0900095-v1 |
ELIGO_35_WATT_AIR_COOLED_BEAM_DUMP_3INCH_P.POL |
Ken Mailand |
Auxiliary Optics
Conceptual Design
|
20 May 2009 |
D0900934-v1 |
ELIGO_35_WATT_AIR_COOLED_BEAM_DUMP_AIMING_MIRROR |
Ken Mailand |
Auxiliary Optics
Final Design
|
20 May 2009 |
D0900969-v1 |
35W_AIR_COOL_BEAM_DUMP_TARGET_ASSEM. |
Ken Mailand |
Final Design
Auxiliary Optics
|
20 May 2009 |
T0900207-v1 |
AdL Triple Low Current Driver Final Design Report |
Jay Heefner |
Final Design
Suspensions
|
20 May 2009 |
G0900434-v4 |
LIGO and the Search for Gravitational Waves |
Warren Anderson et al. |
Data Analysis
Detector
Meeting
|
19 May 2009 |
E0900154-x0 |
DCN - HLTS Upper Blade Library of Clamps |
Derek Bridges |
Change Control
Suspensions
Preliminary Design
|
19 May 2009 |
Q0900002-v1 |
ICS Load Management Workflows |
Mick Flanigan |
Procurements
Requirements
Quality Assurance
|
19 May 2009 |
E0900065-x0 |
DCN - HAM Large Triple Suspension Suspended Hardware |
Derek Bridges |
Suspensions
Change Control
Basic R&D
|
15 May 2009 |
D0901025-x0 |
Cap, Resin, Earthquake Stop |
Derek Bridges |
Preliminary Design
Suspensions
|
15 May 2009 |
D0901035-x0 |
ELLIPTICAL_BAFFLE_FORM_LAYOUT_RETAINER |
Ken Mailand |
Conceptual Design
Auxiliary Optics
|
14 May 2009 |
D0901034-x0 |
ELLIPTICAL_BAFFLE_FORM_LAYOUT_PIN |
Ken Mailand |
Auxiliary Optics
Conceptual Design
|
14 May 2009 |
D0901033-x0 |
ELLIPTICAL_BAFFLE_FORM_LAYOUT_WASHER |
Ken Mailand |
Auxiliary Optics
Conceptual Design
|
14 May 2009 |
D0901032-x0 |
ELLIPTICAL_BAFFLE_FORM_LAYOUT_CLAMP |
Ken Mailand |
Auxiliary Optics
Conceptual Design
|
14 May 2009 |
D0901031-x0 |
ELLIPTICAL_BAFFLE_FORM_LAYOUT_O'RING |
Ken Mailand |
Conceptual Design
Auxiliary Optics
|
14 May 2009 |
D0901030-x0 |
ELLIPTICAL_BAFFLE_FORM_LAYOUT_TUBE |
Ken Mailand |
Conceptual Design
Auxiliary Optics
|
14 May 2009 |
D0901029-x0 |
ELLIPTICAL_BAFFLE_FORM_LAYOUT_FOOT |
Ken Mailand |
Conceptual Design
Auxiliary Optics
|
14 May 2009 |
D0901028-x0 |
ELLIPTICAL_BAFFLE_FORM_LAYOUT_BLOCK |
Ken Mailand |
Auxiliary Optics
Conceptual Design
|
14 May 2009 |
D0901027-x0 |
ELLIPTICAL_BAFFLE_FORM_LAYOUT_FRAME |
Ken Mailand |
Conceptual Design
Auxiliary Optics
|
14 May 2009 |
D0901024-x0 |
ELLIPTICAL_BAFFLE_FORM_LAYOUT_ASSEMBLY |
Ken Mailand |
Auxiliary Optics
Conceptual Design
|
14 May 2009 |
D0901019-x0 |
Screw, Socket Head Cap, 1/4-20 UNC-2A X 1.75 Long, Fully Threaded, Rounded End, Ag-Plated |
Derek Bridges |
System Engineering
Final Design
|
13 May 2009 |
D0901018-x0 |
Screw, Socket Head Cap, 1/4-20 UNC-2A X 1.5 Long, Fully Threaded, Rounded End, Ag-Plated |
Derek Bridges |
System Engineering
Final Design
|
13 May 2009 |
D0901017-x0 |
Screw, Socket Head Cap, 1/4-20 UNC-2A X 1.25 Long, Fully Threaded, Rounded End, Ag-Plated |
Derek Bridges |
Final Design
System Engineering
|
13 May 2009 |
D0901016-x0 |
Screw, Socket Head Cap, 1/4-20 UNC-2A X 1 Long, Fully Threaded, Rounded End, Ag-Plated |
Derek Bridges |
Final Design
System Engineering
|
13 May 2009 |
D0901015-x0 |
Screw, Socket Head Cap, 1/4-20 UNC-2A X 0.75 Long, Fully Threaded, Rounded End, Ag-Plated |
Derek Bridges |
System Engineering
Final Design
|
13 May 2009 |
D0901014-x0 |
Screw, Socket Head Cap, 1/4-20 UNC-2A X 0.5 Long, Fully Threaded, Rounded End, Ag-Plated |
Derek Bridges |
Final Design
System Engineering
|
13 May 2009 |
D0901013-x0 |
Screw, Socket Head Cap, 1/4-20 UNC-2A X 0.25 Long, Fully Threaded, Rounded End, Ag-Plated |
Derek Bridges |
System Engineering
Final Design
|
13 May 2009 |
D0901022-x0 |
Screw, Socket Head Cap, 1/4-20 UNC-2A X 2.5 Long, Fully Threaded, Rounded End, Ag-Plated |
Derek Bridges |
Final Design
System Engineering
|
13 May 2009 |
D0901021-x0 |
Screw, Socket Head Cap, 1/4-20 UNC-2A X 2.25 Long, Fully Threaded, Rounded End, Ag-Plated |
Derek Bridges |
System Engineering
Final Design
|
13 May 2009 |
D0901012-x0 |
Screw, Socket Head Cap, #8-32 UNC-2A X 1.5 Long, Fully Threaded, Rounded End, Ag-Plated |
Derek Bridges |
Final Design
System Engineering
|
13 May 2009 |
D0901011-x0 |
Screw, Socket Head Cap, #8-32 UNC-2A X 1.25 Long, Fully Threaded, Rounded End, Ag-Plated |
Derek Bridges |
Final Design
System Engineering
|
13 May 2009 |
D0901010-x0 |
Screw, Socket Head Cap, #8-32 UNC-2A X 0.75 Long, Fully Threaded, Rounded End, Ag-Plated |
Derek Bridges |
System Engineering
Final Design
|
13 May 2009 |
D0901009-x0 |
Screw, Socket Head Cap, #8-32 UNC-2A X 0.5 Long, Fully Threaded, Rounded End, Ag-Plated |
Derek Bridges |
Final Design
System Engineering
|
13 May 2009 |
D0901008-x0 |
Screw, Socket Head Cap, #8-32 UNC-2A X 0.25 Long, Fully Threaded, Rounded End, Ag-Plated |
Derek Bridges |
System Engineering
Final Design
|
13 May 2009 |
D0901007-x0 |
Screw, Socket Head Cap, #8-32 UNC-2A X 0.1875 Long, Fully Threaded, Rounded End, Ag-Plated |
Derek Bridges |
Final Design
System Engineering
|
13 May 2009 |
D0901005-x0 |
Screw, Socket Head Cap, #4-40 UNC-2A X 0.4375 Long, Fully Threaded, Rounded End, Ag-Plated |
Derek Bridges |
System Engineering
Final Design
|
13 May 2009 |
D0901004-x0 |
Screw, Socket Head Cap, #4-40 UNC-2A X 0.375 Long, Fully Threaded, Rounded End, Ag-Plated |
Derek Bridges |
System Engineering
Final Design
|
13 May 2009 |
D0901003-x0 |
Screw, Socket Head Cap, #4-40 UNC-2A X 0.3125 Long, Fully Threaded, Rounded End, Ag-Plated |
Derek Bridges |
System Engineering
Final Design
|
13 May 2009 |
D0901002-x0 |
Screw, Socket Head Cap, #4-40 UNC-2A X 0.25 Long, Fully Threaded, Rounded End, Ag-Plated |
Derek Bridges |
System Engineering
Final Design
|
13 May 2009 |
D0901001-x0 |
Screw, Socket Head Cap, #4-40 UNC-2A X 0.1875 Long, Fully Threaded, Rounded End, Ag-Plated |
Derek Bridges |
Final Design
System Engineering
|
13 May 2009 |
D0901000-x0 |
Screw, Socket Head Cap, #4-40 UNC-2A X 0.125 Long, Fully Threaded, Rounded End, Ag-Plated |
Derek Bridges |
Final Design
System Engineering
|
13 May 2009 |
D0900998-x0 |
Screw, Socket Head Cap, 1/4-20 UNC-2A X 1.75 Long, Fully Threaded, Rounded End |
Derek Bridges |
Final Design
System Engineering
|
13 May 2009 |
D0900996-x0 |
Screw, Socket Head Cap, 1/4-20 UNC-2A X 1.25 Long, Fully Threaded, Rounded End |
Derek Bridges |
System Engineering
Final Design
|
13 May 2009 |
D0900995-x0 |
Screw, Socket Head Cap, 1/4-20 UNC-2A X 0.75 Long, Fully Threaded, Rounded End |
Derek Bridges |
Final Design
System Engineering
|
13 May 2009 |
D0900994-x0 |
Screw, Socket Head Cap, 1/4-20 UNC-2A X 0.5 Long, Fully Threaded, Rounded End |
Derek Bridges |
Final Design
System Engineering
|
13 May 2009 |
D0900993-x0 |
Screw, Socket Head Cap, 1/4-20 UNC-2A X 0.25 Long, Fully Threaded, Rounded End |
Derek Bridges |
System Engineering
Final Design
|
13 May 2009 |
D0900992-x0 |
Screw, Socket Head Cap, #8-32 UNC-2A X 2 Long, Fully Threaded, Rounded End |
Derek Bridges |
System Engineering
Final Design
|
13 May 2009 |
D0900989-x0 |
Screw, Socket Head Cap, #8-32 UNC-2A X 1.25 Long, Fully Threaded, Rounded End |
Derek Bridges |
Final Design
System Engineering
|
13 May 2009 |
D0900988-x0 |
Screw, Socket Head Cap, #8-32 UNC-2A X 1 Long, Fully Threaded, Rounded End |
Derek Bridges |
Final Design
System Engineering
|
13 May 2009 |
D0900987-x0 |
Screw, Socket Head Cap, #8-32 UNC-2A X 0.75 Long, Fully Threaded, Rounded End |
Derek Bridges |
Final Design
System Engineering
|
13 May 2009 |
D0900986-x0 |
Screw, Socket Head Cap, #8-32 UNC-2A X 0.5 Long, Fully Threaded, Rounded End |
Derek Bridges |
Final Design
System Engineering
|
13 May 2009 |
D0900985-x0 |
Screw, Socket Head Cap, #8-32 UNC-2A X 0.375 Long, Fully Threaded, Rounded End |
Derek Bridges |
System Engineering
Final Design
|
13 May 2009 |
D0900984-x0 |
Screw, Socket Head Cap, #8-32 UNC-2A X 0.25 Long, Fully Threaded, Rounded End |
Derek Bridges |
System Engineering
Final Design
|
13 May 2009 |
D0900983-x0 |
Screw, Socket Head Cap, #8-32 UNC-2A X 0.1875 Long, Fully Threaded, Rounded End |
Derek Bridges |
System Engineering
Final Design
|
13 May 2009 |
D0900982-x0 |
Screw, Socket Head Cap, #4-40 UNC-2A X 0.5 Long, Fully Threaded, Rounded End |
Derek Bridges |
Final Design
System Engineering
|
13 May 2009 |
D0900981-x0 |
Screw, Socket Head Cap, #4-40 UNC-2A X 0.4375 Long, Fully Threaded, Rounded End |
Derek Bridges |
System Engineering
Final Design
|
13 May 2009 |
D0900979-x0 |
Screw, Socket Head Cap, #4-40 UNC-2A X 0.3125 Long, Fully Threaded, Rounded End |
Derek Bridges |
Final Design
System Engineering
|
13 May 2009 |
D0900978-x0 |
Screw, Socket Head Cap, #4-40 UNC-2A X 0.25 Long, Fully Threaded, Rounded End |
Derek Bridges |
System Engineering
Final Design
|
13 May 2009 |
D0900977-x0 |
Screw, Socket Head Cap, #4-40 UNC-2A X 0.1875 Long, Fully Threaded, Rounded End |
Derek Bridges |
Final Design
System Engineering
|
13 May 2009 |
D0900976-x0 |
Screw, Socket Head Cap, #4-40 UNC-2A X 0.125 Long, Fully Threaded, Rounded End |
Derek Bridges |
System Engineering
Final Design
|
13 May 2009 |
D0900814-v1 |
ELIGO_35_WATT_BEAM_DUMP_P.POL_PIVOT_PL. |
Ken Mailand |
Final Design
Auxiliary Optics
|
13 May 2009 |
D0900812-v1 |
ELIGO_35_WATT_BEAM_DUMP_P.POL_FOOT |
Ken Mailand |
Auxiliary Optics
Final Design
|
13 May 2009 |
D0900345-v1 |
ELIGO_35_WATT_AIR_COOLED_BEAM_DUMP_SI_SUBSTRATE |
Ken Mailand |
Final Design
Auxiliary Optics
|
13 May 2009 |
D0900321-v1 |
ELIGO_35_WATT_HEAT_SINK_BODY |
Ken Mailand |
Auxiliary Optics
Conceptual Design
|
13 May 2009 |
D0900329-v1 |
HEAT _SINK_35_WATT_BEAM_DUMP_ INSIDE_PLATE |
Ken Mailand |
Auxiliary Optics
Final Design
|
13 May 2009 |
D0900326-v1 |
ELIGO_35_WATT_ AIR_COOLED_BEAM_DUMP- TOP PLATE |
Ken Mailand |
Auxiliary Optics
Final Design
|
13 May 2009 |
D0900765-v1 |
ELIGO_35_WATT_ AIR_COOLED_BEAM_DUMP_BOTTOM _PLATE |
Ken Mailand |
Final Design
Auxiliary Optics
|
13 May 2009 |
D0900328-v1 |
HEAT _SINK_35_WATT_BEAM_DUMP_ OUTSIDE_PLATE |
Ken Mailand |
Final Design
Auxiliary Optics
|
13 May 2009 |
D0900815-v1 |
ELIGO_35_WATT_BEAM_DUMP_APERTURE_PL |
Ken Mailand |
Auxiliary Optics
Final Design
|
13 May 2009 |
D0900810-v1 |
ELIGO_35_WATT_BEAM_DUMP_S.POL_FOOT_SPACER |
Ken Mailand |
Auxiliary Optics
Final Design
|
13 May 2009 |
D0900809-v1 |
ELIGO_35_WATT_BEAM_DUMP_S.POL_FOOT |
Ken Mailand |
Final Design
Auxiliary Optics
|
13 May 2009 |
D0900811-v1 |
ELIGO_35_WATT_BEAM_DUMP_S.POL_FOOT_SPACER_LH |
Ken Mailand |
Auxiliary Optics
Final Design
|
13 May 2009 |
D0900843-v1 |
ELIGO_35W_AIR_COOL_BM_DUMP_TARGET |
Ken Mailand |
Final Design
Auxiliary Optics
|
13 May 2009 |
D0900971-x0 |
Cylindrical Shell, 60.50" ID |
Dennis Coyne |
Vacuum
Final Design
|
12 May 2009 |
D0900974-x0 |
Support Plate, 6 x 12 x 1.375, LIGO VE |
Dennis Coyne |
Vacuum
Final Design
|
12 May 2009 |
D0900973-x0 |
Support Tubing, 4 x 2 x 0.1875, LIGO VE |
Dennis Coyne |
Vacuum
Final Design
|
12 May 2009 |
D0900972-x0 |
Support Assembly, Adapter A-18, LIGO VE |
Dennis Coyne |
Final Design
Vacuum
|
12 May 2009 |
D0900970-x0 |
Cylindrical Shell, 72.25 ID |
Dennis Coyne |
Vacuum
Final Design
|
12 May 2009 |
D0900968-x0 |
Flange, Flat Faced, 50 1/2" ID x 68 1/4" OD, LIGO VE |
Dennis Coyne |
Vacuum
Final Design
|
12 May 2009 |
D0900967-x0 |
Ring, Angle, 4" x 4" x 1/4", LIGO VE |
Dennis Coyne |
Vacuum
Final Design
|
12 May 2009 |
D0900966-x0 |
Flange, Grooved, 72 1/4 ID x 80 OD, LIGO VE |
Dennis Coyne |
Final Design
Vacuum
|
12 May 2009 |
D0900965-x0 |
Flange, Reducing, 61.06 ID x 72.12 OD x 1 Thk, LIGO VE |
Dennis Coyne |
Vacuum
Final Design
|
12 May 2009 |
D0900964-x0 |
Lifting Lug |
Dennis Coyne |
Final Design
Vacuum
|
12 May 2009 |
D0900962-x0 |
Cylindrical Shell for Adapter A-16, 44 5/8" ID, LIGO VE |
Dennis Coyne |
Vacuum
Final Design
|
12 May 2009 |
E0900139-x0 |
DCN for release of gold coating specifications and mask drawings for Advanced LIGO |
GariLynn Billingsley |
Final Design
Sensing and Control
Auxiliary Optics
Core Optics
|
12 May 2009 |
E0900142-v1 |
End Reaction Mass Barrel Coating |
GariLynn Billingsley |
System Engineering
Suspensions
Core Optics
Final Design
Auxiliary Optics
|
12 May 2009 |
D047932-v2 |
Locker Sleeve Housing |
Andy Stein |
Final Design
Seismic Isolation
|
12 May 2009 |
E080041-v1 |
Specification: Mirror Blank Material, Adv. LIGO Recycling Mirror 3 |
GariLynn Billingsley et al. |
Final Design
Fabrication
Core Optics
|
12 May 2009 |
E080045-v1 |
Specification: Blank Material, Adv. LIGO Folding Mirror |
GariLynn Billingsley et al. |
Core Optics
Fabrication
Final Design
|
12 May 2009 |
E080037-v1 |
Specification: Blank Material, Adv. LIGO Compensation Plate |
GariLynn Billingsley et al. |
Fabrication
Core Optics
Final Design
|
12 May 2009 |
E0900132-x0 |
DCN for initial release of Core Optic Coating Specifications for Adv. LIGO |
Dennis Coyne |
Final Design
Change Control
Fabrication
Core Optics
|
12 May 2009 |
D0900952-x0 |
tie-rod bracket for vacuum equipment spools and adapters |
Dennis Coyne |
Final Design
Vacuum
|
12 May 2009 |
D070534-v2 |
Actuator Stop |
Andy Stein |
Seismic Isolation
Final Design
|
11 May 2009 |
D071301-v2 |
Angle Brace, Shipping |
Andy Stein |
Final Design
Seismic Isolation
|
11 May 2009 |
D071300-v2 |
Plate, Shipping |
Andy Stein |
Final Design
Seismic Isolation
|
11 May 2009 |
D0900832-v1 |
Locating Bar, Horiz GS-13 Shelf, HAM ISI |
Andy Stein |
Seismic Isolation
Final Design
|
11 May 2009 |
D0900338-v1 |
Brace, Horiz GS-13 Shelf, HAM ISI |
Andy Stein et al. |
Seismic Isolation
Final Design
|
11 May 2009 |
D0900337-v1 |
Mounting Bar, Horiz GS-13 Shelf, HAM ISI |
Andy Stein et al. |
Final Design
Seismic Isolation
|
11 May 2009 |
D0900336-v1 |
Plate, Horiz GS-13 Shelf, HAM ISI |
Andy Stein et al. |
Final Design
Seismic Isolation
|
11 May 2009 |
D071317-v2 |
Actuator Set-Up Fixture, Plate 2 |
Andy Stein |
Final Design
Seismic Isolation
|
11 May 2009 |
D071316-v2 |
Actuator Set-Up Fixture, Plate 1 |
Andy Stein |
Final Design
Seismic Isolation
|
11 May 2009 |
D0900318-v1 |
Bracket Base, Horz L4-C, HAM ISI |
Andy Stein et al. |
Preliminary Design
Seismic Isolation
|
11 May 2009 |
D0900320-v1 |
Gusset, Horz L4-C, HAM ISI |
Andy Stein et al. |
Preliminary Design
Seismic Isolation
|
11 May 2009 |
D0900310-v1 |
Dog Clamp, Vert L4-C, HAM ISI |
Andy Stein |
Seismic Isolation
Preliminary Design
|
11 May 2009 |
D071322-v2 |
GS-13 Weld Nut Heat Sink |
Andy Stein |
Final Design
Seismic Isolation
|
11 May 2009 |
D071320-v2 |
Spring Pull-Down, Offset Washer |
Andy Stein |
Seismic Isolation
Final Design
|
11 May 2009 |
D071308-v2 |
Spring Pull-Down, Nut |
Andy Stein |
Final Design
Seismic Isolation
|
11 May 2009 |
D071303-v2 |
Spring Pull-Down, Pull Rod |
Andy Stein |
Final Design
Seismic Isolation
|
11 May 2009 |
D071302-v2 |
Spring Pull-Down, Rod End Spacer |
Andy Stein |
Seismic Isolation
Final Design
|
11 May 2009 |
D071305-v2 |
Spring Pull-Down, Cap |
Andy Stein |
Final Design
Seismic Isolation
|
11 May 2009 |
D071309-v2 |
Spring Pull-Down, ACME Screw |
Andy Stein |
Final Design
Seismic Isolation
|
11 May 2009 |
D071304-v2 |
Spring Pull-Down, Conversion Bushing |
Andy Stein |
Seismic Isolation
Final Design
|
11 May 2009 |
D071306-v2 |
Spring Pull-Down, Bar |
Andy Stein |
Final Design
Seismic Isolation
|
11 May 2009 |
D071307-v2 |
Spring Pull-Down, Base |
Andy Stein |
Final Design
Seismic Isolation
|
11 May 2009 |
D071312-v2 |
GS-13 Install, Standoff |
Andy Stein |
Seismic Isolation
Final Design
|
11 May 2009 |
D071314-v2 |
GS-13 Install, Right Rail |
Andy Stein |
Final Design
Seismic Isolation
|
11 May 2009 |
D071311-v2 |
GS-13 Install, Left Rail |
Andy Stein |
Final Design
Seismic Isolation
|
11 May 2009 |
D071310-v2 |
GS-13 Install, Slider-Stop |
Andy Stein |
Seismic Isolation
Final Design
|
11 May 2009 |
D071313-v2 |
GS-13 Install, Base |
Andy Stein |
Final Design
Seismic Isolation
|
11 May 2009 |
D071129-v2 |
Actuator Setup Bar |
Andy Stein |
Seismic Isolation
Final Design
|
11 May 2009 |
D071183-v2 |
GS-13 Cable Restraint |
Andy Stein et al. |
Seismic Isolation
Final Design
|
11 May 2009 |
D071201-v2 |
Mass Spacer |
Andy Stein et al. |
Final Design
Seismic Isolation
|
11 May 2009 |
D071136-v2 |
SHCS, Custom Captive |
Andy Stein |
Seismic Isolation
Final Design
|
11 May 2009 |
D071321-v2 |
Spring Tension Bushing |
Andy Stein |
Final Design
Seismic Isolation
|
11 May 2009 |
D071182-v2 |
Weld Nut, Custom |
Andy Stein et al. |
Seismic Isolation
Final Design
|
11 May 2009 |
D071181-v2 |
GS-13 Stabilizer |
Andy Stein et al. |
Seismic Isolation
Final Design
|
11 May 2009 |
D071167-v2 |
Sensor Target Post |
Andy Stein et al. |
Seismic Isolation
Final Design
|
11 May 2009 |
D071166-v2 |
Sensor Target Body |
Andy Stein et al. |
Seismic Isolation
Final Design
|
11 May 2009 |
D071160-v2 |
Sensor Target Mount |
Andy Stein |
Seismic Isolation
Final Design
|
11 May 2009 |
D0900635-v1 |
Locker Pin Cap |
Andy Stein |
Seismic Isolation
Final Design
|
11 May 2009 |
D071140-v2 |
Locker Sleeve Base |
Andy Stein |
Final Design
Seismic Isolation
|
11 May 2009 |
D047936-v2 |
Locker Pin Base |
Andy Stein |
Seismic Isolation
Final Design
|
11 May 2009 |
D071163-v2 |
Sensor Head Mount |
Andy Stein et al. |
Final Design
Seismic Isolation
|
11 May 2009 |
D071161-v2 |
Sensor Head Base |
Andy Stein |
Final Design
Seismic Isolation
|
11 May 2009 |
D071175-v2 |
Semsor Head Bracket, Vert |
Andy Stein et al. |
Final Design
Seismic Isolation
|
11 May 2009 |
D071162-v2 |
Sensor Head Washer |
Andy Stein et al. |
Seismic Isolation
Final Design
|
11 May 2009 |
D071164-v2 |
Sensor Head Base Plate |
Andy Stein et al. |
Final Design
Seismic Isolation
|
11 May 2009 |
D071170-v2 |
Sensor Head Standoff, Horiz |
Andy Stein et al. |
Final Design
Seismic Isolation
|
11 May 2009 |
D071122-v2 |
Actuator U-Bracket, Vert |
Andy Stein |
Final Design
Seismic Isolation
|
11 May 2009 |
D071132-v2 |
Actuator L-Bracket, Horiz |
Andy Stein |
Final Design
Seismic Isolation
|
11 May 2009 |
D071123-v2 |
Actuator Thermal Bar |
Andy Stein |
Final Design
Seismic Isolation
|
11 May 2009 |
D071121-v2 |
Actuator Coil Support |
Andy Stein |
Seismic Isolation
Final Design
|
11 May 2009 |
D071076-v2 |
Flexure Post Bracket, Tan |
Andy Stein et al. |
Final Design
Seismic Isolation
|
11 May 2009 |
D071074-v2 |
Flexure Post |
Andy Stein et al. |
Final Design
Seismic Isolation
|
11 May 2009 |
D071063-v2 |
Keel Wall |
Andy Stein et al. |
Final Design
Seismic Isolation
|
11 May 2009 |
D071250-v2 |
Barrel Nut |
Andy Stein et al. |
Seismic Isolation
Final Design
|
11 May 2009 |
D071141-v2 |
Locker Spacer |
Andy Stein |
Final Design
Seismic Isolation
|
11 May 2009 |
D071067-v2 |
Spring Hatch, Optics Table |
Andy Stein |
Final Design
Seismic Isolation
|
11 May 2009 |
D071073-v2 |
Rib Bracket, 60 Deg |
Andy Stein et al. |
Seismic Isolation
Final Design
|
11 May 2009 |
D071059-v2 |
Outer Wall, Small Panel |
Andy Stein et al. |
Seismic Isolation
Final Design
|
11 May 2009 |
D0900312-v1 |
Wiring Breadboard, Small |
Andy Stein |
Final Design
Seismic Isolation
|
11 May 2009 |
D071072-v2 |
Rib, Tan, Flexure Mid Cover |
Andy Stein |
Seismic Isolation
Final Design
|
11 May 2009 |
D071061-v2 |
Outer Wall, Bracket 90 |
Andy Stein et al. |
Seismic Isolation
Final Design
|
11 May 2009 |
D071009-v2 |
Particle Fence |
Andy Stein et al. |
Seismic Isolation
Final Design
|
11 May 2009 |
D071005-v2 |
Support Post Gusset, Main |
Andy Stein et al. |
Final Design
Seismic Isolation
|
11 May 2009 |
D071004-v2 |
Support Post Gusset, Aux |
Sam Barnum et al. |
Seismic Isolation
Final Design
|
11 May 2009 |
T0900185-v1 |
Iterative Functional Synthesis of Coatings |
Rand Dannenberg |
Modelling
Core Optics
Reports
Other data analysis
|
11 May 2009 |
T980044-v1 |
Determination of Global and Local Coordinate Axes for the LIGO Sites |
Albert Lazzarini |
Vacuum
Installation
System Engineering
Integration
|
11 May 2009 |
D950148-v2 |
LVEA and VEA Foundations Relative to the Beam Tube Center Line |
Dennis Coyne |
Integration
System Engineering
Vacuum
Installation
|
10 May 2009 |
D071003-v2 |
Support Post Cap |
Andy Stein et al. |
Seismic Isolation
Final Design
|
08 May 2009 |
D047845-v1 |
Stage 2 Structure Sub-Assembly |
Andy Stein |
Final Design
Seismic Isolation
|
08 May 2009 |
D048048-v1 |
Lift Hook Assy, BSC Assy |
Andy Stein |
Final Design
Seismic Isolation
|
08 May 2009 |
E0900126-v2 |
LLO HAM6 AFWFS installation |
Sam Waldman |
Installation
Sensing and Control
|
08 May 2009 |
D030027-x0 |
Screw, Socket Head Cap, #8-32 UNC-2A X 2 Long, Fully Threaded, Rounded End, Ag-Plated |
Derek Bridges et al. |
Document Migration
System Engineering
Fabrication
|
08 May 2009 |
D030026-x0 |
Screw, Socket Head Cap, #8-32 UNC-2A X 1.75 Long, Fully Threaded, Rounded End, Ag-Plated |
Derek Bridges et al. |
System Engineering
Fabrication
Document Migration
|
08 May 2009 |
D030024-x0 |
Screw, Socket Head Cap, #8-32 UNC-2A X 0.375 Long, Fully Threaded, Rounded End, Ag-Plated |
Derek Bridges et al. |
System Engineering
Fabrication
Document Migration
|
08 May 2009 |
D071471-v2 |
Asm, Stabilizer, GS-13 |
Andy Stein et al. |
Final Design
Seismic Isolation
|
07 May 2009 |
D071499-v2 |
Asm, Spring Tension Screw |
Andy Stein et al. |
Seismic Isolation
Final Design
|
07 May 2009 |
G0900323-v2 |
Kick-off Meeting Stage 0 Redesign- Presentation |
Celine Ramet |
Conceptual Design
|
07 May 2009 |
T0900222-v1 |
CIT Sprayed First Contact & Charging Tests 5-6-09 |
Rand Dannenberg |
Installation
Core Optics
|
07 May 2009 |
T0900221-v1 |
CIT Sprayed First Contact Peeling & Charging Tests 5-3-09 |
Rand Dannenberg |
Installation
Core Optics
|
07 May 2009 |
D020466-v1 |
SMALL TRIPLES 10x10mm Magnet |
Calum Torrie |
Basic R&D
Suspensions
|
07 May 2009 |
T0900179-v1 |
Manufacturing Study of Two ETM Designs |
Rand Dannenberg |
Core Optics
Reports
Modelling
Other data analysis
|
07 May 2009 |
T0900181-v1 |
TNI Coating Modeling |
Rand Dannenberg |
Core Optics
Reports
Modelling
Other data analysis
|
07 May 2009 |
T0900182-v1 |
Modeling of Absorption from Surface Contamination of Dielectric Mirror |
Rand Dannenberg |
Other data analysis
Modelling
Core Optics
Reports
|
07 May 2009 |
T0900183-v1 |
Rugated Mirrors - Thermal Noise Study |
Rand Dannenberg |
Other data analysis
Reports
Core Optics
Modelling
|
07 May 2009 |
T0900184-v1 |
Rugated Mirrors - Profiles for Two Wavelength Reflectors |
Rand Dannenberg |
Other data analysis
Modelling
Reports
Core Optics
|
07 May 2009 |
T0900186-v1 |
Optical Dark Field Microscopy with First Contact |
Rand Dannenberg |
Other data analysis
Fabrication
Core Optics
Reports
|
07 May 2009 |
D0900659-v1 |
Glasgow Cantilever Drawings Old / Original |
Rand Dannenberg |
Reports
Core Optics
Basic R&D
Other data analysis
|
07 May 2009 |
T0900218-v1 |
Relation Between Loss Angle & Per mol-atom Specific Heat |
Rand Dannenberg et al. |
Other data analysis
Basic R&D
Core Optics
|
07 May 2009 |
D048047-v1 |
Base, Lift Hook, BSC Assembly |
Andy Stein |
Final Design
Seismic Isolation
|
06 May 2009 |
D048046-v1 |
Plate, Lift Hook, BSC Assy |
Andy Stein |
Final Design
Seismic Isolation
|
06 May 2009 |
D048045-v1 |
Pin, Lift Hook, BSC Assembly |
Andy Stein |
Seismic Isolation
Final Design
|
06 May 2009 |
D048017-v1 |
Retain, Lift Pin, BSC Assy |
Andy Stein |
Seismic Isolation
Final Design
|
06 May 2009 |
D047866-v1 |
Trim Weight Plate, Stage 2 |
Andy Stein |
Seismic Isolation
Final Design
|
06 May 2009 |
D047865-v1 |
Angle Bracket, Short, Bay Bulkhead, Stage 2 |
Andy Stein |
Final Design
Seismic Isolation
|
06 May 2009 |
D047863-v1 |
Plate, Bay Bulkhead, Stage 2 |
Andy Stein |
Seismic Isolation
Final Design
|
06 May 2009 |
D047862-v1 |
Plate, Keel Table Brace, Stage 2 |
Andy Stein |
Final Design
Seismic Isolation
|
06 May 2009 |
D047861-v1 |
Plate, Bay Closeout, GS-13, Stage 2 |
Andy Stein |
Final Design
Seismic Isolation
|
06 May 2009 |
D047859-v1 |
Gusset, GS-13, Stage 2 |
Andy Stein |
Seismic Isolation
Final Design
|
06 May 2009 |
D047858-v1 |
Hex Wall Splice, Keel, Stage 2 |
Andy Stein |
Seismic Isolation
Final Design
|
06 May 2009 |
D047857-v1 |
Hex Wall Half, Keel Table Side, Stage 2 |
Andy Stein |
Seismic Isolation
Final Design
|
06 May 2009 |
D047856-v1 |
Angled Hex Wall, Keel, Stage 2 |
Andy Stein |
Final Design
Seismic Isolation
|
06 May 2009 |
D047855-v1 |
Hex Wall Splice - Optical Side, Stage 2 |
Andy Stein |
Final Design
Seismic Isolation
|
06 May 2009 |
D047854-v1 |
Hex Wall Half - L and R, Stage 2 |
Andy Stein |
Final Design
Seismic Isolation
|
06 May 2009 |
D047853-v1 |
Angled Hex Wall, Stage 2 |
Andy Stein |
Seismic Isolation
Final Design
|
06 May 2009 |
D047852-v1 |
Plate, Side (GS-13), Stage 2 |
Andy Stein |
Seismic Isolation
Final Design
|
06 May 2009 |
D047851-v1 |
Plate, Side, Stage 2 |
Andy Stein |
Seismic Isolation
Final Design
|
06 May 2009 |
D047850-v1 |
Baseplate, Stage 2 |
Andy Stein |
Seismic Isolation
Final Design
|
06 May 2009 |
D047849-v1 |
Keel Plate, Lower, Stage 2 |
Andy Stein |
Seismic Isolation
Final Design
|
06 May 2009 |
D047848-v1 |
Keel Plate, Upper, Stage 2 |
Andy Stein |
Final Design
Seismic Isolation
|
06 May 2009 |
D047847-v1 |
Lower Optical Table, Stage 2 |
Andy Stein |
Seismic Isolation
Final Design
|
06 May 2009 |
D047846-v1 |
Upper Optical Table, Stage 2 |
Andy Stein |
Seismic Isolation
Final Design
|
06 May 2009 |
D0900175-v1 |
HAM HEPI Install Tooling Plate |
Andy Stein |
Final Design
Seismic Isolation
|
06 May 2009 |
D071410-v1 |
Asm, Stage 0 |
Andy Stein |
Final Design
Seismic Isolation
|
06 May 2009 |
D0900907-x0 |
Earthquake Stop for Glass, Simplified |
Derek Bridges |
Preliminary Design
Suspensions
|
06 May 2009 |
D060456-x0 |
Impact Absorber, Earthquake Stop |
Derek Bridges et al. |
Suspensions
Document Migration
Preliminary Design
|
06 May 2009 |
T0900190-v1 |
AdL Triple Low Current Driver Board Prototype Test Plan |
Jay Heefner |
System Test
Suspensions
|
06 May 2009 |
T0900211-x0 |
Welding tests at Glasgow (5-8 May 2009) |
Marielle van Veggel et al. |
Suspensions
Final Design
|
06 May 2009 |
D080672-v1 |
Kaman Sensor Target |
Andy Stein |
Seismic Isolation
Final Design
|
05 May 2009 |
D080671-v1 |
Kaman Sensor Mount 2 |
Andy Stein |
Seismic Isolation
Final Design
|
05 May 2009 |
D080670-v1 |
Kaman Sensor Mount 1 |
Andy Stein |
Seismic Isolation
Final Design
|
05 May 2009 |
D080675-v1 |
ADE Sensor Target |
Andy Stein |
Seismic Isolation
Final Design
|
05 May 2009 |
D080674-v1 |
ADE Sensor Mount |
Andy Stein |
Final Design
Seismic Isolation
|
05 May 2009 |
D071002-v2 |
Support Post |
Andy Stein et al. |
Seismic Isolation
Final Design
|
04 May 2009 |
T0900209-v1 |
Thermal noise of GEO's beamsplitter |
Kentaro Somiya |
Modelling
Core Optics
|
04 May 2009 |
D070360-x0 |
Mounting Bracket, Left, Coil Holder, HLTS |
Derek Bridges |
Preliminary Design
Suspensions
|
30 Apr 2009 |
T0900176-v1 |
LIGO Concepts Self Awareness Assessments |
Amber Stuver |
Education, Outreach
|
27 Apr 2009 |
D020324-v1 |
UPPER BLADE CLAMP, LOWER SIDE, ANGLED 2.5 DEGREES |
Michael Meyer |
Final Design
Suspensions
|
24 Apr 2009 |
T070205-x0 |
OMC STRUCTURE SUMMARY (inc. FEA & EXPT results and weld tests) |
Calum Torrie |
Suspensions
Preliminary Design
|
25 Feb 2009 |
D020307-v1 |
UPPER BLADE CLAMP, LOWER SIDE |
Michael Meyer |
Suspensions
Final Design
|
24 Apr 2009 |
D020321-v1 |
UPPER BLADE CLAMP, LOWER SIDE, ANGLED 0.5 DEGREES |
Michael Meyer |
Final Design
Suspensions
|
24 Apr 2009 |
D020311-v1 |
UPPER BLADE CLAMP, LOWER SIDE, ANGLED 2.0 DEGREES |
Michael Meyer |
Final Design
Suspensions
|
24 Apr 2009 |
D020323-v1 |
UPPER BLADE CLAMP, LOWER SIDE, ANGLED 1.5 DEGREES |
Michael Meyer |
Suspensions
Final Design
|
24 Apr 2009 |
D020322-v1 |
UPPER BLADE CLAMP, LOWER SIDE, ANGLED 1.0 DEGREES |
Michael Meyer |
Suspensions
Final Design
|
24 Apr 2009 |
D020687-v1 |
Upper Blade Clamp, Lower Side, 3.0 Degree |
Derek Bridges |
Final Design
Suspensions
|
24 Apr 2009 |
D020688-v1 |
Upper Blade Clamp, Lower Side, 3.5 Degree |
Derek Bridges |
Suspensions
Final Design
|
24 Apr 2009 |
G040442-v1 |
Mode mismatch and sideband imbalance |
Hiro Yamamoto |
Modelling
Core Optics
|
23 Apr 2009 |
D070031-v1 |
Lower Blade Clamp, Upper Side |
Derek Bridges |
Final Design
Suspensions
|
23 Apr 2009 |
T040177-v1 |
Mode mismatch and sideband imbalance in LIGO I PRM |
Hiro Yamamoto |
Modelling
Core Optics
|
23 Apr 2009 |
T080046-v1 |
UK Upper Intermediate Mass Driver Pre-Production Prototype Bench Test and Evaluation |
Vernon Sandberg et al. |
Preliminary Design
Suspensions
|
23 Apr 2009 |
T0900170-v1 |
UK Top Driver Pre-Production Prototype Bench Test and Evaluation |
Jay Heefner |
Suspensions
System Test
|
23 Apr 2009 |
E0900104-v3 |
BSC-ISI Design, Stage1 Kick off meeting notes |
Fabrice Matichard |
Conceptual Design
|
22 Apr 2009 |
T080203-v2 |
Giant Slinky: Quantitative Exhibit Activity |
Amber Stuver |
Education, Outreach
|
22 Apr 2009 |
T0900166-v1 |
Interference Concepts in the LIGO Science Education Center (SEC) |
Amber Stuver |
Education, Outreach
|
22 Apr 2009 |
L0900072-v1 |
SEC Exhibit -> Document Index |
Amber Stuver |
Memorandum
Education, Outreach
|
22 Apr 2009 |
G0900293-v3 |
Transmon sensitivity calculations |
Sam Waldman |
Conceptual Design
Auxiliary Optics
Sensing and Control
|
22 Apr 2009 |
T080232-v1 |
Gravitational Waves and LIGO: Opening New "Eyes" on the Universe |
Amber Stuver |
Education, Outreach
|
22 Apr 2009 |
G0900288-v2 |
LIGO Education and Outreach |
Gregg Harry |
Education, Outreach
|
22 Apr 2009 |
T0900156-v3 |
Reply to "OMC SUS FDR comments from reviewers" |
Norna Robertson et al. |
Suspensions
Reviews
Final Design
|
22 Apr 2009 |
T0900158-v1 |
Analysis and Optimization of LIGO In-vacuum Shielded Cables |
Rich Abbott |
Basic R&D
|
21 Apr 2009 |
E0900108-v1 |
DCN for Glasgow Cantilever Drawing Old/Original |
Rand Dannenberg |
Core Optics
Basic R&D
|
20 Apr 2009 |
T0900189-v1 |
Vibrational Transfer Function and the Sound Velocity in a Finite Elastic Body |
Keita Kawabe |
Basic R&D
Suspensions
|
20 Apr 2009 |
E0900100-v1 |
DCN to change D080748 & D080749 |
Janeen Romie |
Suspensions
Final Design
|
17 Apr 2009 |
G0900358-v1 |
Thermal Compensation in LIGO |
Rupal Amin |
Auxiliary Optics
Core Optics
Modelling
|
17 Apr 2009 |
C0900025-v1 |
LIGO Review of 'Compliance to LIGO Modifications on GS-13' |
Brian Lantz |
Seismic Isolation
Fabrication
|
26 Feb 2009 |
T080325-v1 |
Earthquake Stop Scatter |
Michael Smith |
Suspensions
Auxiliary Optics
Final Design
|
16 Apr 2009 |
G0900292-v2 |
BSC ISI Flexure Attachment Kick-Off Meeting |
Ken Mason |
Seismic Isolation
Conceptual Design
|
16 Apr 2009 |
D0900637-v1 |
Self-Clinching Nut Test Assembly |
Derek Bridges |
Basic R&D
Suspensions
|
15 Apr 2009 |
G0900202-x0 |
Enhanced LIGO Commissioning Update |
Keita Kawabe |
Commissioning
|
17 Mar 2009 |
P0900028-v2 |
Dislocation movement and hysteresis in Maraging blades |
Arianna Di Cintio |
Basic R&D
|
14 Apr 2009 |
G0900141-v3 |
Performance of eLIGO Prototype HAM ISIs and improvements for aLIGO HAM ISIs |
Jeffrey Kissel |
Commissioning
Requirements
Modelling
Upgrades
Seismic Isolation
Final Design
|
13 Apr 2009 |
G0900332-v1 |
You Can't Replace the Face |
Dale Ingram |
Education, Outreach
|
13 Apr 2009 |
D0900636-v1 |
Self-Clinching Nut Test Piece |
Derek Bridges |
Basic R&D
Suspensions
|
13 Apr 2009 |
G070657-v1 |
Scattering Loss - talk at LSC meeting at Hannover, Oct. 2007 |
Hiro Yamamoto |
Core Optics
Modelling
|
07 Apr 2009 |
G0900289-v1 |
Black holes, Einstein, and space-time ripples |
Peter Saulson |
Education, Outreach
|
07 Apr 2009 |
E080446-v1 |
DCN - HAM Large Triple Suspension Structure |
Derek Bridges |
Suspensions
Fabrication
|
03 Apr 2009 |
G080621-v1 |
The Status of Enhanced LIGO |
Aidan Brooks |
Commissioning
Seismic Isolation
|
02 Apr 2009 |
D080497-v1 |
HEPI Pump Station Filter Braket Support Gusset |
Hugh Radkins et al. |
Seismic Isolation
Final Design
|
02 Apr 2009 |
L080076-v1 |
Resolution of BOSEM FDR and FRR Design Issues |
Norna Robertson |
Final Design
Reviews
|
02 Apr 2009 |
G050229-v1 |
FFT study of Mode matching at LHO and LLO |
Hiro Yamamoto |
Core Optics
Modelling
|
02 Apr 2009 |
G0900275-v1 |
ISC Face 2 Face OMC lessons learned |
Sam Waldman |
Sensing and Control
Meeting
|
01 Apr 2009 |
D020201-v1 |
HSTS Lower Blade |
Bobby Moore |
Suspensions
|
01 Apr 2009 |
G0900270-v2 |
Optical Gyroscopes for Ground Tilt Sensing in Advanced LIGO |
Alastair Heptonstall |
Seismic Isolation
Meeting
|
01 Apr 2009 |
L0900059-v1 |
Notes on the optomechanical layout meeting, 31-Mar-2009 |
Dennis Coyne |
Final Design
System Engineering
|
01 Apr 2009 |
P0900042-v1 |
Technology Development toward Third Generation Ground-based Gravitational Wave Detectors |
Vuk Mandic et al. |
Proposals
Basic R&D
|
31 Mar 2009 |
T0900127-v1 |
Thoughts for the VRB on Backfilling the ISI pods with Tracer Gasses |
Brian Lantz |
Final Design
Seismic Isolation
|
31 Mar 2009 |
G0900098-v2 |
H1 Squeezer Experiment Update |
Daniel Sigg |
Basic R&D
|
31 Mar 2009 |
T0900120-v2 |
Dynamics of the Damper Suspension for the ETM Transmission Telescope/Monitor |
Dennis Coyne |
Conceptual Design
Auxiliary Optics
|
30 Mar 2009 |
L0900058-v1 |
Request for waiver on glass shot blasted parts (BS/FM stay brackets) |
Dennis Coyne |
Final Design
Suspensions
|
29 Mar 2009 |
M0900087-v1 |
All in vacuum cabling will be shielded |
Dennis Coyne |
Final Design
System Engineering
|
29 Mar 2009 |
G0900274-v2 |
The Search For Continous Gravitational Waves (for the LSC at PCGM25) |
Gregory Mendell |
Meeting
Continuous Wave
|
26 Mar 2009 |
G0900219-v2 |
International REU for Gravitational Physics |
Guido Mueller |
Reports
Meeting
|
26 Mar 2009 |
G0900169-v1 |
BSC Internal Seismic Isolation (BSC-ISI) and Quadruple Pendulum Noise Prototype (Quad NP) Testing at LASTI |
Brett Shapiro et al. |
Meeting
|
25 Mar 2009 |
T960168-v1 |
Measurement of coating later thickness |
Hiro Yamamoto |
Core Optics
Modelling
|
24 Mar 2009 |
G0900070-v1 |
Status of the search for Gravitational Waves |
Alan Weinstein |
Education, Outreach
|
24 Mar 2009 |
G0900135-v2 |
Status of Japanese Projects |
Osamu Miyakawa et al. |
Meeting
Reports
|
22 Mar 2009 |
G0900212-v2 |
Status Report from Homestake |
Jan Harms |
Meeting
|
19 Mar 2009 |
G0900106-v1 |
HAM Suspensions Update - LSC/Virgo Collaborations Meeting, March 16-29, 2009 |
Derek Bridges |
Meeting
Suspensions
|
19 Mar 2009 |
G0900252-v1 |
Damping struts at the Stanford ETF |
Brian Lantz |
Suspensions
Seismic Isolation
Basic R&D
|
19 Mar 2009 |
D0900450-v2 |
Coating Mask for type B mechanical Q R&D Substrate |
Helena Armandula |
Basic R&D
Core Optics
|
18 Mar 2009 |
G0900215-v1 |
Advanced LIGO Arm Length Stabilization |
Bram Slagmolen |
Sensing and Control
Meeting
|
18 Mar 2009 |
T080308-v1 |
IAS Conceptual Design Document |
Michael Smith |
Auxiliary Optics
Conceptual Design
|
17 Mar 2009 |
T0900113-v1 |
Recent Investigations/Modifications on the ISS |
Hartmut Grote |
Laser Systems
Commissioning
|
17 Mar 2009 |
T950008-v1 |
Muti thin layer coating modeling |
Hiro Yamamoto |
Modelling
Core Optics
|
17 Mar 2009 |
G0900127-v1 |
Collective dislocations movement and anomalous dissipation in Maraging blades |
Arianna Di Cintio |
Basic R&D
Seismic Isolation
|
17 Mar 2009 |
T0900062-v1 |
OMC Suspension Final Design Review Checklist |
Janeen Romie |
Final Design
Suspensions
|
17 Mar 2009 |
G0900207-v1 |
Shahriar-AIC-presentation |
Selim Shahriar |
Basic R&D
|
17 Mar 2009 |
G0900197-v1 |
Mitigation of environmental coupling for eLIGO |
Robert Schofield |
Commissioning
|
16 Mar 2009 |
E080112-v1 |
Component Specification: ITM Penultimate Mass |
Russell Jones |
Final Design
Suspensions
Fabrication
|
16 Mar 2009 |
E080090-v1 |
Component Specification: ETM Penultimate Mass |
Russell Jones |
Final Design
Fabrication
Suspensions
|
16 Mar 2009 |
D080128-v1 |
Penultimate Mass, ITM Quad |
Russell Jones |
Suspensions
Fabrication
Final Design
|
16 Mar 2009 |
G0900137-v1 |
Optimisation of the ISS |
Hartmut Grote |
Laser Systems
Commissioning
|
16 Mar 2009 |
T0900112-v1 |
Seismic studies at the Homestake mine in Lead, South Dakota |
Vuk Mandic et al. |
Basic R&D
|
15 Mar 2009 |
M080034-v1 |
Magnet Swap Review for Enhanced LIGO |
Norna Robertson |
Suspensions
Upgrades
Reviews
|
13 Mar 2009 |
E040136-v1 |
Seismic Isolation System (SEI) Payload Mass Properties |
Dennis Coyne |
Seismic Isolation
Final Design
System Engineering
|
13 Mar 2009 |
T070035-v1 |
UK Coil Driver Reviewer Comments Summary |
Vernon Sandberg et al. |
Suspensions
Conceptual Design
|
13 Mar 2009 |
G0900065-v1 |
Improving LIGO's sensitivity |
Pinkesh Patel |
Education, Outreach
|
13 Mar 2009 |
E0900075-v1 |
Response to HAM-ISI Watchdog Committee Recommendations |
Jeffrey Kissel et al. |
Seismic Isolation
Commissioning
|
09 Mar 2009 |
D030243-v2 |
Cu Damper 2x2 Array Stripped |
Calum Torrie |
Suspensions
Basic R&D
|
06 Mar 2009 |
D030215-v3 |
Eddy Current Magnet Holder |
Calum Torrie |
Basic R&D
Suspensions
|
06 Mar 2009 |
D080498-v1 |
HEPI Pump Station Valve to Filter Assembly |
Hugh Radkins |
Final Design
Seismic Isolation
|
06 Mar 2009 |
T080159-v1 |
‘What Time is It?’: An Algebra Based Derivation of Time Dilation |
Amber Stuver |
Education, Outreach
|
06 Mar 2009 |
L0900002-v1 |
VRB request: all SmCo magnets UHV compatible? |
Dennis Coyne |
System Engineering
Requirements
|
06 Mar 2009 |
G090004-v1 |
Advanced LIGO and the Second Generation of Gravitational Wave Detection |
Robert Ward |
Upgrades
|
06 Mar 2009 |
T080340-v1 |
Searching for Isolated Pulsars Using Einstein@Home: Setting up S4R2 |
Alicia M Sintes et al. |
System Test
|
06 Mar 2009 |
G0900084-v1 |
LIGO Education and Outreach |
Amber Stuver |
Education, Outreach
|
04 Mar 2009 |
T080059-v1 |
Tilt tests on the RAL noise prototype – part 2 |
Ian Wilmut et al. |
Suspensions
Basic R&D
|
02 Mar 2009 |
T080056-v1 |
Application of hysteresis model to quad SUS |
Ian Wilmut et al. |
Basic R&D
Suspensions
|
02 Mar 2009 |
T080044-v1 |
Tests with single two-wire pendulum – part two |
Ian Wilmut et al. |
Suspensions
Basic R&D
|
02 Mar 2009 |
T080033-v1 |
Tests with single two-wire pendulum |
Ian Wilmut et al. |
Suspensions
Basic R&D
|
02 Mar 2009 |
T080030-v1 |
TILT TESTS ON RAL NOISE PROTOTYPE |
Ian Wilmut et al. |
Basic R&D
Suspensions
|
02 Mar 2009 |
T080028-v1 |
Lateral blade movement in clamps Experiment |
Ian Wilmut et al. |
Basic R&D
Suspensions
|
02 Mar 2009 |
T080111-v1 |
UK Satellite Amplifier Pre-Production Prototype Bench Test and Evaluation |
Jay Heefner et al. |
Suspensions
System Test
|
02 Mar 2009 |
G0900051-v1 |
Preparations for Gravitational Wave Searches with the Enhanced LIGO Detectors |
Dale Ingram |
Education, Outreach
|
02 Mar 2009 |
E080172-v1 |
DCN: ETM and ITM Quad Penultimate Mass drawings and specifications |
Russell Jones |
Change Control
Final Design
Suspensions
|
02 Mar 2009 |
E080171-v1 |
DCN: ALIGO SUS ETM QUAD End Reaction Mass (ERM) Drawing & Specification |
Russell Jones |
Final Design
Change Control
Suspensions
|
02 Mar 2009 |
E080089-v1 |
Component Specification: ETM QUAD End Reaction Mass (ERM) |
Russell Jones |
Suspensions
Final Design
|
02 Mar 2009 |
D0900339-v1 |
Enhanced LIGO OMC SUS Signal Flow Diagram |
Jay Heefner |
Suspensions
Final Design
|
02 Mar 2009 |
E0900008-v1 |
Traveler for Vacuum Bake Parts |
Charles Osthelder |
Upgrades
|
27 Feb 2009 |
T080048-v2 |
The Review of Production Drawings for the ALIGO ETM Quad End Reaction Mass: Support Notes |
Ken Strain et al. |
Suspensions
Final Design
System Test
|
27 Feb 2009 |
G0810032-v1 |
Dissipation processes in Metal springs |
Arianna Di Cintio |
Basic R&D
|
27 Feb 2009 |
G0900081-v1 |
Across the Gravitational Wave Spectrum |
Stan Whitcomb |
Basic R&D
|
26 Feb 2009 |
D0900316-v1 |
ELIGO ISI and OMC SUS Controls Block Diagram |
Jay Heefner et al. |
Final Design
Seismic Isolation
Suspensions
|
25 Feb 2009 |
D070569-v1 |
ELIGO OMC SUS Wiring |
Jay Heefner |
Installation
Suspensions
|
25 Feb 2009 |
G080321-v1 |
Another Satellite Amplifier |
Jay Heefner |
Requirements
Suspensions
|
25 Feb 2009 |
D070070-v1 |
Wire Clamp for Optical Bench, OMC |
Calum Torrie |
Suspensions
Basic R&D
|
24 Feb 2009 |
T0900033-v1 |
Discussion about losses in the perpendicular and parallel directions |
Kentaro Somiya |
Modelling
Core Optics
|
24 Feb 2009 |
D0900311-x0 |
Signal Breakout Circuit Board |
Rich Abbott |
Sensing and Control
Upgrades
|
24 Feb 2009 |
T0810032-v1 |
ETM Transmon Pupil Relay |
Michael Smith |
Conceptual Design
Sensing and Control
Auxiliary Optics
|
24 Feb 2009 |
T0900026-v1 |
Initial Results from PNNL Scanning Electron microscope ITM witness sample |
Cheryl Vorvick |
Basic R&D
Core Optics
|
24 Feb 2009 |
T0900014-v2 |
UK UIM Coil Driver Pre-Production Prototype Bench Test and Evaluation |
Jay Heefner et al. |
Suspensions
System Test
|
24 Feb 2009 |
E080515-v2 |
E080515 Polishing specification for Advanced LIGO FM |
Mick Flanigan |
Core Optics
Final Design
|
23 Feb 2009 |
E080514-v2 |
E080514_BS_Polishing_Specification |
Mick Flanigan |
Final Design
Core Optics
|
23 Feb 2009 |
E080513-v2 |
E080513_CP_Polishing_Specification |
Mick Flanigan |
Final Design
Core Optics
|
23 Feb 2009 |
D080315-v1 |
TCS AA Interface Board |
Mohana Mageswaran |
Final Design
|
20 Feb 2009 |
M0900025-v1 |
RODA: Decision to reduce the beam size on the ITMs to 5.3 cm |
Peter Fritschel |
System Engineering
Activity
|
16 Feb 2009 |
T0900061-v1 |
Collection of Reports on Barkhausen Noise |
Rainer Weiss |
Basic R&D
Suspensions
|
14 Feb 2009 |
T0810042-v1 |
HAM ISI modeling abstract |
Brian Lantz |
Seismic Isolation
Modelling
|
27 Jan 2009 |
T0810007-v2 |
Effect of ITM thermal lens in beam reflection |
Hiro Yamamoto |
Commissioning
Auxiliary Optics
|
27 Jan 2009 |
D0810034-v2 |
AdL Triple Suspensions Electronics Block Diagram |
Jay Heefner |
Preliminary Design
|
23 Jan 2009 |
D020475-v1 |
SUS SMALLTRIPLE 2x2ARRARY (ECD) 2x2copperarray |
Calum Torrie |
Basic R&D
Suspensions
|
23 Jan 2009 |
D030735-v1 |
SUS_SMALLTRIPLE_2x2ARRARY_ECD_MACHINED HEX IN SHCS_SUB-ASSEMBLY |
Calum Torrie |
Basic R&D
Suspensions
|
23 Jan 2009 |
D080519-v1 |
HEPI Pump Station Filter Bracket Assembly |
Hugh Radkins et al. |
Final Design
Seismic Isolation
|
23 Jan 2009 |
G0900052-v1 |
The Golden Fleece: how the most powerful (and lucrative!) ideas comefrom seemingly impractical pursuits |
Fred Raab |
Education, Outreach
|
22 Jan 2009 |
L0810022-v1 |
epoxy resin for Violin Mode (VM) dampers |
Dennis Coyne |
Suspensions
Final Design
Letters
|
16 Dec 2008 |
D010283-x0 |
Fine Actuator Interface Board |
Joshua Myers |
Document Migration
|
06 Mar 2008 |
D000341-x0 |
LOS Bias Module |
Jay Heefner |
Document Migration
|
30 Aug 2005 |
D000325-x0 |
LOS Coil Driver |
Jay Heefner |
Document Migration
|
02 Feb 2005 |
D010264-x0 |
Upper Blade Wire Clamp |
Calum Torrie |
Document Migration
|
04 Aug 2004 |
D020188-x0 |
Coil Former |
Janeen Romie et al. |
Document Migration
|
04 Aug 2004 |
D010265-x0 |
Wire Clamp Plate |
Calum Torrie |
Document Migration
|
04 Aug 2004 |
D020197-x0 |
Flag |
Calum Torrie |
Document Migration
|
04 Aug 2004 |
D020204-x0 |
Lower Wire Clamp Shim |
Calum Torrie |
Document Migration
|
04 Aug 2004 |
D020153-x0 |
Bar Jig for Int. & Upper Wires |
Calum Torrie |
Document Migration
|
04 Aug 2004 |
D020154-x0 |
Bar Jig Step Plate |
Calum Torrie |
Document Migration
|
03 Aug 2004 |
D020158-x0 |
Angled Attachment Upper Blade Clamp Piece |
Calum Torrie |
Document Migration
|
03 Aug 2004 |
D020215-x0 |
small catcher for lower blades |
Russell Jones et al. |
Document Migration
|
03 Aug 2004 |
D020156-x0 |
Clamp Mass Jig |
Calum Torrie |
Document Migration
|
03 Aug 2004 |
D020155-x0 |
Spacer for Mass Jig |
Calum Torrie |
Document Migration
|
03 Aug 2004 |
D020157-x0 |
Test Mass_Jig |
Calum Torrie |
Document Migration
|
03 Aug 2004 |
D020210-x0 |
Bridge Spacer for Magnet |
Calum Torrie |
Document Migration
|
03 Aug 2004 |
D020148-x0 |
Wire Standoff, Mode Cleaner |
Calum Torrie |
Document Migration
|
02 Aug 2004 |
D020161-x0 |
Assembly Upper Wire Jig |
Calum Torrie |
Document Migration
|
02 Aug 2004 |
D020162-x0 |
Lower Wire Jig |
Calum Torrie |
Document Migration
|
02 Aug 2004 |
D020205-x0 |
Upper Blade |
Michael M Perreur-Lloyd et al. |
Document Migration
|
02 Aug 2004 |
D020135-x0 |
Upper Blade Wire Clamp Plate |
Michael M Perreur-Lloyd et al. |
Document Migration
|
30 Jul 2004 |
D020200-x0 |
Magnet Holder (Longitudinal and Yaw) |
Calum Torrie |
Document Migration
|
30 Jul 2004 |
D020196-x0 |
Magnet Spacer |
Calum Torrie |
Document Migration
|
27 Jul 2004 |
D000356-x0 |
WHAM 7 |
Manfredo Chacon |
Document Migration
|
25 May 2004 |
D000354-x0 |
WHAM 1 |
Manfredo Chacon |
Document Migration
|
25 May 2004 |
D000357-x0 |
WHAM 8 |
Manfredo Chacon |
Document Migration
|
24 May 2004 |
D000355-x0 |
WHAM 2 |
Manfredo Chacon |
Document Migration
|
24 May 2004 |
D000210-x0 |
Suspension PD Whitening and Interface Board |
Jay Heefner |
Document Migration
|
16 Dec 2003 |
D020006-x0 |
40 Meter MC ASC and LSC Wiring |
Jay Heefner |
Document Migration
|
09 Dec 2003 |
D000183-x0 |
Universal Dewhitening Filter |
Jay Heefner |
Document Migration
|
07 Oct 2003 |
D000347-x0 |
Mode Cleaner Servo, Rev. B2 |
B Mohana et al. |
Document Migration
|
18 Jun 2003 |
D000392-x0 |
APERTURE ALIGNMENT TOOL ITMX 2K |
Ken Mailand |
Document Migration
|
23 May 2003 |
D000175-x0 |
HAM BEAM DUMP CLAMP |
Ken Mailand |
Document Migration
|
23 May 2003 |
D000159-x0 |
LEFT HAND BOTTOM ANGLE HAM2 TABLE BEAM DUMP |
Ken Mailand |
Document Migration
|
23 May 2003 |
D000390-x0 |
MOUNT GUSSET PLATE 4K_BSC1-4K_BSC2 |
Ken Mailand |
Document Migration
|
23 May 2003 |
D000012-x0 |
Livingston Control Video System Overview |
Rolf Bork |
Document Migration
|
23 May 2003 |
D020147-x0 |
Alumina Circuit Board for Controls Osems, photodiode |
Janeen Romie |
Document Migration
|
15 May 2003 |
D020146-x0 |
Alumina Circuit Board for Controls Osems, LED |
Janeen Romie |
Document Migration
|
15 May 2003 |
D010200-x0 |
40m ITM Right Ear |
Janeen Romie |
Document Migration
|
06 May 2003 |
D010198-x0 |
40m ETM Right Ear |
Janeen Romie |
Document Migration
|
06 May 2003 |
D010197-x0 |
40m ETM Left Ear |
Janeen Romie |
Document Migration
|
06 May 2003 |
D010199-x0 |
40m ITM Left Ear |
Janeen Romie |
Document Migration
|
06 May 2003 |
D020171-x0 |
40M Mtg Collar Beam Tube A |
Larry Jones |
Document Migration
|
23 Apr 2003 |
D010119-x0 |
O-Ring Fixture for 29.5" Port |
Larry Jones |
Document Migration
|
23 Apr 2003 |
D020209-x0 |
SEI TEST PUMP STATION PRELIMINARY PLAN LAYOUT |
Ken Mailand |
Document Migration
|
11 Apr 2003 |
D020124-x0 |
HAM Hydraulic Pre-isolator Assembly |
Ken Mason |
Document Migration
|
14 Mar 2003 |
D020014-x0 |
UPPER ACTUATOR PLATE SHORT - HYDRAULIC PRE-ISOLATOR ASSEMBLY |
Ken Mason |
Document Migration
|
14 Mar 2003 |
D020015-x0 |
UPPER VERTICAL ACTUATOR MOUNT, HYDRAULIC ISOLATOR |
Ken Mason |
Document Migration
|
14 Mar 2003 |
D020003-x0 |
CROSSBEAM FOOT - PRE-ISOLATOR ASSEMBLY, HYDRAULIC |
Ken Mason |
Document Migration
|
14 Mar 2003 |
D020012-x0 |
LOWER ACTUATOR PLATE SHORT - HYDRAULIC PRE-ISOLATOR ASSEMBLY |
Ken Mason |
Document Migration
|
14 Mar 2003 |
D020182-x0 |
Electro-Magnetic Pre-Isolator (MEPI) Top Assembly |
Ken Mason |
Document Migration
|
14 Mar 2003 |
D020001-x0 |
SPRING ADJUSTMENT PLATE, PRE-ISOLATOR - Release for Production |
Dan Mason |
Document Migration
|
14 Mar 2003 |
D020010-x0 |
LOWER ACTUATOR PLATE THIN - HYDRAULIC PRE-ISOLATOR ASSEMBLY |
Ken Mason |
Document Migration
|
14 Mar 2003 |
D020013-x0 |
LOWER VERTICAL ACTUATOR MOUNT - HYDRAULIC ISOLATOR |
Ken Mason |
Document Migration
|
14 Mar 2003 |
D020174-x0 |
40M Tube Beam Tube A |
Larry Jones |
Document Migration
|
14 Feb 2003 |
D020216-x0 |
40M Flange Ring Beam Tube B |
Larry Jones |
Document Migration
|
14 Feb 2003 |
D020077-x0 |
OPLEV Table Cover, 40M Lab |
Larry Jones |
Document Migration
|
14 Feb 2003 |
D010059-x0 |
Hardware for Camera Optics, 40 M Laboratory |
Larry Jones |
Document Migration
|
14 Feb 2003 |
D010227-x0 |
Overhead BSC Crossbeam Bracket |
Larry Jones |
Document Migration
|
14 Feb 2003 |
D020079-x0 |
ETMY Table Cover, 40M Lab |
Larry Jones |
Document Migration
|
14 Feb 2003 |
D020173-x0 |
40M Top Plate Beam Tube A |
Larry Jones |
Document Migration
|
14 Feb 2003 |
D020219-x0 |
40M Mounting Collar Beam Tube C |
Larry Jones |
Document Migration
|
14 Feb 2003 |
D020218-x0 |
40M Top Plate Beam Tube B |
Larry Jones |
Document Migration
|
14 Feb 2003 |
D020172-x0 |
40M Window Cover Beam Tube A |
Larry Jones |
Document Migration
|
14 Feb 2003 |
D020175-x0 |
40M BEAM TUBE A |
Larry Jones |
Document Migration
|
14 Feb 2003 |
D020170-x0 |
40m Flange Ring Beam Tube A |
Larry Jones |
Document Migration
|
14 Feb 2003 |
D010204-x0 |
Cable Alignment Fixture |
Larry Jones |
Document Migration
|
14 Feb 2003 |
D020083-x0 |
Frame Rails #2, Table Cover, 40M Lab |
Larry Jones |
Document Migration
|
13 Feb 2003 |
D020086-x0 |
Feet & Links, Table Cover, 40M Lab |
Larry Jones |
Document Migration
|
13 Feb 2003 |
D020090-x0 |
Walls #4, Table Cover, 40M Lab |
Larry Jones |
Document Migration
|
13 Feb 2003 |
D020081-x0 |
SP&MC Table Cover, 40 M |
Larry Jones |
Document Migration
|
13 Feb 2003 |
D020085-x0 |
Posts, Table Cover, 40M Lab |
Larry Jones |
Document Migration
|
13 Feb 2003 |
D000260-x0 |
LIGO II SEI & SUS Installation Scenario |
Larry Jones |
Document Migration
|
13 Feb 2003 |
D000211-x0 |
Installation Fixtures & Procedures - 40 M Active Isolators |
Larry Jones |
Document Migration
|
13 Feb 2003 |
D020093-x0 |
Lids #2, Table Cover, 40M Lab |
Larry Jones |
Document Migration
|
13 Feb 2003 |
D020101-x0 |
WINDOW COVER, INLINE ILLUMINATOR, 40M |
Larry Jones |
Document Migration
|
13 Feb 2003 |
D000208-x0 |
Grout Plates for 40M Active Isolators |
Larry Jones |
Document Migration
|
13 Feb 2003 |
D020089-x0 |
Walls #3, Table Cover, 40M Lab |
Larry Jones |
Document Migration
|
13 Feb 2003 |
D000241-x0 |
LIGO II Stiff Active Seismic Isolation System |
Larry Jones |
Document Migration
|
13 Feb 2003 |
D020088-x0 |
Walls #2, Table Cover, 40M Lab |
Larry Jones |
Document Migration
|
13 Feb 2003 |
D000187-x0 |
Isolator Brackets for 40M Active Isolators |
Larry Jones |
Document Migration
|
13 Feb 2003 |
D020098-x0 |
Inline Illuminator, 40M |
Larry Jones |
Document Migration
|
13 Feb 2003 |
D000259-x0 |
LIGO II SEI WRAP & PACKAGE PROPOSAL |
Larry Jones |
Document Migration
|
13 Feb 2003 |
D020102-x0 |
FLANGE RING, INLINE ILLUMINATOR,40M |
Larry Jones |
Document Migration
|
13 Feb 2003 |
D020092-x0 |
Lids #1, Table Cover, 40M Lab |
Larry Jones |
Document Migration
|
13 Feb 2003 |
D020100-x0 |
TOP PLATE, INLINE ILLUMINATOR, 40M |
Larry Jones |
Document Migration
|
13 Feb 2003 |
D020099-x0 |
MTG COLLAR, INLINE ILLUMINATOR, 40M |
Larry Jones |
Document Migration
|
13 Feb 2003 |
D020084-x0 |
Central Rails, Table Cover, 40M Lab |
Larry Jones |
Document Migration
|
13 Feb 2003 |
D020091-x0 |
Walls #5, Table Cover, 40M Lab |
Larry Jones |
Document Migration
|
13 Feb 2003 |
D020087-x0 |
Walls #1, Table Cover, 40M Lab |
Larry Jones |
Document Migration
|
13 Feb 2003 |
D020080-x0 |
ITMXY Table Cover |
Larry Jones |
Document Migration
|
13 Feb 2003 |
D020082-x0 |
Frame Rails #1, Table Cover, 40M Lab |
Larry Jones |
Document Migration
|
13 Feb 2003 |
D000086-x0 |
LSC Common Mode Servo |
Dale Ouimette |
Document Migration
|
13 Jan 2003 |
D010285-x0 |
Variable Delay Timing Module |
Mohana Mageswaran |
Document Migration
|
07 Jan 2003 |
D010167-x0 |
40m TM LEG, BACK |
Janeen Romie |
Document Migration
|
03 Dec 2002 |
D010166-x0 |
40m TM LEG, FRONT |
Janeen Romie |
Document Migration
|
03 Dec 2002 |
D010165-x0 |
40m TM SAFETY CAGE BASE |
Janeen Romie |
Document Migration
|
20 Nov 2002 |
D010173-x0 |
40m TM HEAD HOLDER, SIDE |
Janeen Romie |
Document Migration
|
20 Nov 2002 |
D010163-x0 |
40m TEST MASS SUSPENSION |
Janeen Romie |
Document Migration
|
20 Nov 2002 |
D010176-x0 |
40m TM TOP PLATE |
Janeen Romie |
Document Migration
|
20 Nov 2002 |
D010172-x0 |
40m TM HEAD HOLDER, TOP |
Janeen Romie |
Document Migration
|
14 Nov 2002 |
D020164-x0 |
+/- 10A DRIVER Module |
Rich Abbott et al. |
Document Migration
|
07 Aug 2002 |
D010033-x0 |
Optical Lever PD Interface Board |
Jay Heefner et al. |
Document Migration
|
30 Jul 2002 |
D010038-x0 |
LHO 4K SOS Controls Wiring |
Jay Heefner |
Document Migration
|
24 Jul 2002 |
D010036-x0 |
LHO 4K LOS SUS LVEA Rack Assembly |
Jay Heefner |
Document Migration
|
24 Jul 2002 |
D000195-x0 |
Alumina Circuit Board for Sensor/Actuators, Photodiode |
Janeen Romie |
Document Migration
|
22 Jul 2002 |
D000205-x0 |
Alumina Circuit Board for Sensor/Actuators, Long, Photodiode |
Janeen Romie |
Document Migration
|
22 Jul 2002 |
D000194-x0 |
Alumina Circuit Board for Sensor/Actuators, LED |
Janeen Romie |
Document Migration
|
22 Jul 2002 |
D010164-x0 |
40m TM BASE PLATE |
Janeen Romie |
Document Migration
|
05 Jul 2002 |
D010196-x0 |
40m TM Optic Pad |
Janeen Romie |
Document Migration
|
28 Jun 2002 |
D010168-x0 |
40m TM FACE BRACKET |
Janeen Romie |
Document Migration
|
28 Jun 2002 |
D010181-x0 |
40m TM RING FIXTURE |
Janeen Romie |
Document Migration
|
28 Jun 2002 |
D010177-x0 |
40m TM SUSPENSION BLOCK |
Janeen Romie |
Document Migration
|
28 Jun 2002 |
D010170-x0 |
40m TM CORNER BRACKET |
Janeen Romie |
Document Migration
|
28 Jun 2002 |
D010213-x0 |
40m TM Short Stop |
Janeen Romie |
Document Migration
|
28 Jun 2002 |
D010174-x0 |
40m TM BRACE |
Janeen Romie |
Document Migration
|
28 Jun 2002 |
D010201-x0 |
40m Ring Fixture Base Plate |
Janeen Romie |
Document Migration
|
28 Jun 2002 |
D010182-x0 |
40m TM RING ASSEMBLY |
Janeen Romie |
Document Migration
|
28 Jun 2002 |
D010179-x0 |
40m TM FRONT STIFFENER PLATE |
Janeen Romie |
Document Migration
|
28 Jun 2002 |
D010175-x0 |
40m TM SAFETY BAR |
Janeen Romie |
Document Migration
|
28 Jun 2002 |
D010171-x0 |
40m TM HEAD HOLDER, BOTTOM |
Janeen Romie |
Document Migration
|
28 Jun 2002 |
D010178-x0 |
40m TM WIRE CLAMP |
Janeen Romie |
Document Migration
|
28 Jun 2002 |
D010214-x0 |
40m TM Long Stop |
Janeen Romie |
Document Migration
|
28 Jun 2002 |
D010180-x0 |
40m TM SIDE STIFFENER PLATE |
Janeen Romie |
Document Migration
|
28 Jun 2002 |
D010185-x0 |
40m TM GUIDE ROD |
Janeen Romie |
Document Migration
|
28 Jun 2002 |
D010080-x0 |
Top Block Clamp Assembly |
Janeen Romie |
Document Migration
|
26 Jun 2002 |
D010125-x0 |
Left Side Block for 40m SRM, MCC, & MCF2 |
Janeen Romie |
Document Migration
|
26 Jun 2002 |
D010129-x0 |
Right Side Block for 40m MCC & MCF2 |
Janeen Romie |
Document Migration
|
26 Jun 2002 |
D010127-x0 |
Right Side Block for 40m BS, PRM, & MCF1 |
Janeen Romie |
Document Migration
|
26 Jun 2002 |
D020150-x0 |
Substrate, LASTI Test Mass |
GariLynn Billingsley |
Document Migration
|
26 Jun 2002 |
D010128-x0 |
Right Side Block for 40m SRM |
Janeen Romie |
Document Migration
|
26 Jun 2002 |
D010078-x0 |
LOS Top Block |
Janeen Romie |
Document Migration
|
26 Jun 2002 |
D010126-x0 |
Left Side Block for 40m MCF1 |
Janeen Romie |
Document Migration
|
26 Jun 2002 |
D010079-x0 |
LOS Bottom Clamp |
Janeen Romie |
Document Migration
|
26 Jun 2002 |
D010123-x0 |
Left Side Block for 40m BS |
Janeen Romie |
Document Migration
|
26 Jun 2002 |
D010124-x0 |
Left Side Block for 40M PRM |
Janeen Romie |
Document Migration
|
26 Jun 2002 |
D010130-x0 |
Ring for 40m Small Optics |
Janeen Romie |
Document Migration
|
26 Jun 2002 |
D020027-x0 |
Seismic Signal Processor Remote Interface Box Schematic |
Sander Liu |
Document Migration
|
14 Jun 2002 |
D020194-x0 |
Seismic Signal Post Processor |
Sander Liu |
Document Migration
|
14 Jun 2002 |
D020095-x0 |
SQUARE SAPPHIRE SUBSTRATE .60 INCH CREEP EXPERIMENT |
Ken Mailand |
Document Migration
|
22 May 2002 |
D020097-x0 |
SQUARE FUSED SILICA SUBSTRATE .60 INCH CREEP EXPERIMENT |
Ken Mailand |
Document Migration
|
22 May 2002 |
D020185-x0 |
LIGO Hanford Laser Safety System 1 Corner Station |
Douglas Cook |
Document Migration
|
18 Apr 2002 |
D020176-x0 |
PSL Reference Cavity Test Components |
Douglas Cook |
Document Migration
|
18 Apr 2002 |
D020184-x0 |
RF Laser Mount |
Douglas Cook |
Document Migration
|
18 Apr 2002 |
D020186-x0 |
LIGO Hanford Laser Safety System 2 Mid & End Station |
Douglas Cook |
Document Migration
|
18 Apr 2002 |
D020212-x0 |
Active Internal Stack Damping - Production Drawings
|
Riccardo DeSalvo et al. |
Document Migration
|
15 Apr 2002 |
D000457-x0 |
PSL 21.5MHz Frequency Reference |
Rich Abbott |
Document Migration
|
02 Apr 2002 |
D010203-x0 |
LLO SEI Feed Forward System Wiring (End Station) |
Jay Heefner |
Document Migration
|
01 Apr 2002 |
D020167-x0 |
SLEEVE, RESISTOR |
Ken Mailand |
Document Migration
|
01 Apr 2002 |
D020163-x0 |
RESISTOR WASHER MODIFICATION |
Ken Mailand |
Document Migration
|
01 Apr 2002 |
D020065-x0 |
LLO 4K ASC System Wiring (LVEA) |
Jay Heefner |
Document Migration
|
01 Apr 2002 |
D020094-x0 |
Tidal and Microseismic Summing Module |
Jay Heefner |
Document Migration
|
14 Mar 2002 |
D020143-x0 |
VALVE MANIFOLD NOISE FILTER |
Ken Mailand |
Document Migration
|
14 Mar 2002 |
D020041-x0 |
Mechanical Q R&D Substrate |
GariLynn Billingsley |
Document Migration
|
27 Feb 2002 |
D020056-x0 |
Reservoir Tank Top Plate |
Ken Mailand et al. |
Document Migration
|
20 Feb 2002 |
D010169-x0 |
40m TM CRADLE |
Janeen Romie |
Document Migration
|
20 Feb 2002 |
D020021-x0 |
Solid 1" Mirror Mount, 40° |
Jonathan Kern |
Document Migration
|
06 Feb 2002 |
D010282-x0 |
TYPE A MECHANICAL Q SUPRASIL SUBSTRATE |
Janeen Romie |
Document Migration
|
06 Feb 2002 |
D010184-x0 |
40m TM WIRE STANDOFF |
Janeen Romie |
Document Migration
|
06 Feb 2002 |
D010232-x0 |
ROUND SUBSTRATE .5 INCH |
Helena Armandula |
Document Migration
|
06 Feb 2002 |
D020020-x0 |
Solid 1" Mirror Mount, 90° |
Jonathan Kern |
Document Migration
|
06 Feb 2002 |
D010276-x0 |
2 Omega I and Q Demodulator Board |
Jay Heefner |
Document Migration
|
16 Jan 2002 |
D010001-x0 |
SOS Coil Driver Module |
Jay Heefner |
Document Migration
|
07 Jan 2002 |
D000386-x0 |
PSL 35.5 Mhz RF Photodiode Board |
Dale Ouimette |
Document Migration
|
07 Jan 2002 |
D000455-x0 |
PSL 21.5 Mhz RF Photodiode Board |
Dale Ouimette |
Document Migration
|
07 Jan 2002 |
D010284-x0 |
SOS Pole/Zero Module |
Jay Heefner |
Document Migration
|
20 Dec 2001 |
D010072-x0 |
LASTI SOS Controls Wiring |
Jay Heefner |
Document Migration
|
12 Dec 2001 |
D010186-x0 |
SPRING PLUNGER SPRING |
Janeen Romie |
Document Migration
|
12 Dec 2001 |
D010067-x0 |
Type A, Mechanical Q R&D Substrate |
Janeen Romie et al. |
Document Migration
|
19 Nov 2001 |
D010068-x0 |
Type B, Mechanical Q R&D Substrate |
Janeen Romie et al. |
Document Migration
|
19 Nov 2001 |
D010332-x0 |
Document Change Notice (DCN) |
Rick Karwoski |
Document Migration
|
14 Nov 2001 |
D010239-x0 |
LHO 2K LVEA Optical Lever Wiring |
Jay Heefner |
Document Migration
|
05 Nov 2001 |
D010241-x0 |
LIGO-II Seismic Attenuation System (SAS) Test Tower Filter 0 Mechanical Drawings |
Riccardo DeSalvo et al. |
Document Migration
|
02 Nov 2001 |
D010248-x0 |
LIGO-II Seismic Attenuation System (SAS) Test Tower LVDT (Linear Variable Differential Transducer) Electronics Circuits Diagrams |
Riccardo DeSalvo et al. |
Document Migration
|
02 Nov 2001 |
D010250-x0 |
TAMA Seismic Attenuation System (SAS) Mirror Suspension System (SUS) Mechanical Drawings |
Riccardo DeSalvo et al. |
Document Migration
|
02 Nov 2001 |
D010242-x0 |
LIGO-II Seismic Attenuation System (SAS) Test Tower Standard Filter Mechanical Drawings |
Riccardo DeSalvo et al. |
Document Migration
|
02 Nov 2001 |
D010246-x0 |
LIGO-II Seismic Attenuation System (SAS) Test Tower Assembly Tool Mechanical Drawings (Blade Bender Tool) |
Riccardo DeSalvo et al. |
Document Migration
|
02 Nov 2001 |
D010252-x0 |
TOTEM, Blade`s Creep Measuring Facility Mechanical Drawings |
Riccardo DeSalvo et al. |
Document Migration
|
02 Nov 2001 |
D010249-x0 |
TAMA Seismic Attenuation System (SAS) Tower Mechanical Drawings |
Riccardo DeSalvo et al. |
Document Migration
|
02 Nov 2001 |
D010243-x0 |
LIGO-II Seismic Attenuation System (SAS) Test Tower LVDT (Linear Variable Differential Transducer) Mechanical Drawings |
Riccardo DeSalvo et al. |
Document Migration
|
02 Nov 2001 |
D010247-x0 |
LIGO-II Seismic Attenuation System (SAS) Test Tower Assembly Tool Mechanical Drawings (Wedge Compressor Tool) |
Riccardo DeSalvo et al. |
Document Migration
|
02 Nov 2001 |
D010240-x0 |
LIGO-II Seismic Attenuation System (SAS) Test Tower Inverted Pendulum Mechanical Drawings |
Riccardo DeSalvo et al. |
Document Migration
|
02 Nov 2001 |
D010245-x0 |
LIGO-II Seismic Attenuation System (SAS) Test Tower Assembly Tool Mechanical Drawings (Betoniera Filter Assembler Tool) |
Riccardo DeSalvo et al. |
Document Migration
|
02 Nov 2001 |
D010244-x0 |
LIGO-II Seismic Attenuation System (SAS) Test Tower Horizontal Accelerometer Mechanical Drawings |
Alessandro Bertolini et al. |
Document Migration
|
02 Nov 2001 |
D010251-x0 |
TAMA Seismic Attenuation System (SAS) Tower Shipping Crate Drawings |
Riccardo DeSalvo |
Document Migration
|
02 Nov 2001 |
D010208-x0 |
Optical Port Retaining Flange |
Larry Jones |
Document Migration
|
25 Sep 2001 |
D010207-x0 |
Optical Port Seal Flange |
Larry Jones |
Document Migration
|
25 Sep 2001 |
D000095-x0 |
ASC Frequency Distribution Box |
Rich Abbott |
Document Migration
|
18 Sep 2001 |
D000037-x0 |
LSC/ASC Freq. Dist. Sys. AM Stabilizer |
Rich Abbott |
Document Migration
|
18 Sep 2001 |
D010206-x0 |
LLO SEI Feed Forward System Wiring (LVEA) |
Jay Heefner |
Document Migration
|
18 Sep 2001 |
D000253-x0 |
GENERAL PURPOSE DIFFERENTIAL DRIVER/RECEIVER |
Rich Abbott et al. |
Document Migration
|
18 Sep 2001 |
D000097-x0 |
LSC Box Frequency Distribution Module |
Rich Abbott |
Document Migration
|
18 Sep 2001 |
D010103-x0 |
Substrate, Beam Splitter, 40M RSE Experiment |
GariLynn Billingsley |
Document Migration
|
12 Sep 2001 |
D010104-x0 |
Substrate, Input Test Mass, 40M RSE Experiment |
GariLynn Billingsley |
Document Migration
|
12 Sep 2001 |
D010101-x0 |
Substrate, Power Recycling Mirror, 40M RSE Experiment |
GariLynn Billingsley |
Document Migration
|
12 Sep 2001 |
D010105-x0 |
Substrate, End Test Mass, 40M RSE Experiment |
GariLynn Billingsley |
Document Migration
|
12 Sep 2001 |
D010102-x0 |
Substrate, Signal Recycling Mirror, 40M RSE Experiment |
GariLynn Billingsley |
Document Migration
|
12 Sep 2001 |
D010202-x0 |
SEI Interface Module |
Jay Heefner |
Document Migration
|
12 Sep 2001 |
D010192-x0 |
CABLE CLAMPS "B", 40M |
Larry Jones |
Document Migration
|
07 Sep 2001 |
D010193-x0 |
Clamp-On Holes, 40M |
Larry Jones |
Document Migration
|
07 Sep 2001 |
D010190-x0 |
Leg for 5` x 12` Table |
Larry Jones |
Document Migration
|
06 Sep 2001 |
D010188-x0 |
Stand for 4` X 6` Table |
Larry Jones |
Document Migration
|
06 Sep 2001 |
D010189-x0 |
Stand 3 for 3` X 4` Table |
Larry Jones |
Document Migration
|
06 Sep 2001 |
D010191-x0 |
Shim for Optical Tables |
Larry Jones |
Document Migration
|
06 Sep 2001 |
D010117-x0 |
Surface 2 Polish, LIGO Pathfinder II Large Sapphire Substrate |
GariLynn Billingsley |
Document Migration
|
08 Aug 2001 |
D010115-x0 |
WBSC 10 CAVITY BAFFLE LOCATION |
Jonathan Kern |
Document Migration
|
25 Jul 2001 |
D010118-x0 |
NPRO LASER 3" OPTICAL HEIGHT SPACER |
Peter King |
Document Migration
|
13 Jul 2001 |
D010009-x0 |
Staging Building for Livingston, Issued for Construction - Elevator Plan, Details |
John Desmond |
Document Migration
|
11 Jul 2001 |
D010074-x0 |
SOS Flourel tip |
Janeen Romie |
Document Migration
|
06 Jul 2001 |
D010114-x0 |
Hanford Observatory - Office/Laboratory/Auditorium Building |
Anthony Okeefe |
Document Migration
|
19 Jun 2001 |
D010108-x0 |
Leg for Low 3`x5` Table |
Larry Jones |
Document Migration
|
05 Jun 2001 |
D010110-x0 |
LHO 4K LVEA SOS Coil DAQ Connections |
Jay Heefner |
Document Migration
|
05 Jun 2001 |
D010109-x0 |
LHO 4K LVEA COS Coil Voltage DAQ Connections |
Jay Heefner |
Document Migration
|
05 Jun 2001 |
D010106-x0 |
Stand for 3`x4`, 3`x5` Tables |
Larry Jones |
Document Migration
|
05 Jun 2001 |
D010107-x0 |
Stand for 2`x4` Table |
Larry Jones |
Document Migration
|
05 Jun 2001 |
D000348-x0 |
Elliptic Filter |
Mohana Mageswaran |
Document Migration
|
22 May 2001 |
D010091-x0 |
Photodiode DC Driver |
Mohana Mageswaran |
Document Migration
|
22 May 2001 |
D010057-x0 |
Tube Support Brackets, 40M Mode Cleaner |
Larry Jones |
Document Migration
|
15 May 2001 |
D010088-x0 |
8" ID Pressure Balanced Expansion Joint |
Larry Jones |
Document Migration
|
15 May 2001 |
D000405-x0 |
Staging Building for Livingston, Issued for Construction - First Floor Plan, Rev. 01 |
John Desmond |
Document Migration
|
14 May 2001 |
D010090-x0 |
LIGO Staging Building, Livingston - Elevator Plan, Details |
John Desmond |
Document Migration
|
14 May 2001 |
D000437-x0 |
Staging Building for Livingston, Issued for Construction - Second Floor Framing Frame, Rev. 01 |
John Desmond |
Document Migration
|
14 May 2001 |
D000235-x0 |
Short Isolation Stack, Bottom Plate |
Peter King |
Document Migration
|
04 May 2001 |
D000345-x0 |
40m Rack Layout |
Benjamin Abbott |
Document Migration
|
01 May 2001 |
D000340-x0 |
Pump Spool Box Dimensions |
Benjamin Abbott |
Document Migration
|
01 May 2001 |
D000338-x0 |
40 Meter Upgrade Vacuum Controls Wiring |
Benjamin Abbott |
Document Migration
|
01 May 2001 |
D000339-x0 |
OSEM Scattered Noise Reducing S/H Circuit |
Benjamin Abbott |
Document Migration
|
01 May 2001 |
D010084-x0 |
Frequency Shifter Adapter Plates |
Peter King |
Document Migration
|
25 Apr 2001 |
D010054-x0 |
Substrate, Mode Cleaner Flat Mirror, 40M RSE Experiment |
GariLynn Billingsley |
Document Migration
|
20 Apr 2001 |
D000464-x0 |
Substrate, Mode Cleaner Curved Mirror, 40M RSE Experiment |
GariLynn Billingsley |
Document Migration
|
20 Apr 2001 |
D000243-x0 |
Circuit Board Assembly, LED |
Janeen Romie |
Document Migration
|
06 Apr 2001 |
D000244-x0 |
Circuit Board Assembly, Photodiode |
Janeen Romie |
Document Migration
|
06 Apr 2001 |
D010056-x0 |
1.00 in. dia. Super Polished Fused Silica Substrate |
Peter King |
Document Migration
|
19 Mar 2001 |
D010063-x0 |
LHO 4K LSC LVEA Rack Assembly (Rack 1X9) |
Jay Heefner |
Document Migration
|
09 Mar 2001 |
D010062-x0 |
LHO 4K LSC Auxiliary Controls Wiring |
Jay Heefner |
Document Migration
|
08 Mar 2001 |
D010061-x0 |
LHO 4K LSC Wiring Diagram |
Jay Heefner |
Document Migration
|
08 Mar 2001 |
D010035-x0 |
LHO 4K LOS Controls Wiring (LVEA) |
Jay Heefner |
Document Migration
|
07 Mar 2001 |
D010049-x0 |
LHO 4K ASC System Wiring |
Jay Heefner |
Document Migration
|
07 Mar 2001 |
D010034-x0 |
LHO 4K X End Station Controls Wiring |
Jay Heefner |
Document Migration
|
07 Mar 2001 |
D010046-x0 |
29.5" ID Adjustable Bellows |
Larry Jones |
Document Migration
|
07 Mar 2001 |
D010050-x0 |
LHO 4K ASC LVEA Rack Assembly |
Jay Heefner |
Document Migration
|
07 Mar 2001 |
D010055-x0 |
LLO 4K Temporary Optical Lever Damping of RM, BS, MMT3 Wiring |
Jay Heefner |
Document Migration
|
20 Feb 2001 |
D000364-x0 |
Reference Cavity Rigid Periscope, Base & Spacers |
Tom Mahood |
Document Migration
|
20 Feb 2001 |
D010032-x0 |
LIGO II Large Pathfinder Substrate |
GariLynn Billingsley |
Document Migration
|
20 Feb 2001 |
D010051-x0 |
Acoustic Skirt Cross Section and Layout |
Tom Mahood |
Document Migration
|
09 Feb 2001 |
D010048-x0 |
ETMY, BSC 10 LHO END STATION ETM TELESCOPE LOCATION VIEW |
Ken Mailand |
Document Migration
|
08 Feb 2001 |
D000462-x0 |
ETMY ETM TELESCOPE LOCATION LHO BSC10 |
Ken Mailand |
Document Migration
|
08 Feb 2001 |
D010047-x0 |
Universal Dewhitening Board RevA1 Upgrade Board |
Jay Heefner |
Document Migration
|
07 Feb 2001 |
D000418-x0 |
14.7 Hz MC Servo Notch Filter |
Flavio Nocera |
Document Migration
|
05 Feb 2001 |
D010037-x0 |
LHO 4K SUS/ASC/LSC End Station Rack Assembly |
Jay Heefner |
Document Migration
|
02 Feb 2001 |
D010045-x0 |
LHO 4K LVEA Optical Lever Wiring |
Jay Heefner |
Document Migration
|
02 Feb 2001 |
D010039-x0 |
Light Pipe Holder |
Tom Mahood |
Document Migration
|
29 Jan 2001 |
D000312-x0 |
Document Change Notice (DCN) |
GariLynn Billingsley |
Document Migration
|
24 Jan 2001 |
D010007-x0 |
Advanced LIGO SEI Conceptual Design Drawings - RP2 (exploded) 0 - with added detail, Assembly and Detail Drawing 2 |
Stanford University |
Document Migration
|
23 Jan 2001 |
D010028-x0 |
Advanced LIGO SEI Conceptual Design Drawings - The Inner Stage with Outer Stage Pods, Concept Design Drawing 2 |
Stanford University |
Document Migration
|
23 Jan 2001 |
D010016-x0 |
Advanced LIGO SEI Conceptual Design Drawings - Outer Stage Component B6, Assembly and Detail Drawing 10 |
Stanford University |
Document Migration
|
23 Jan 2001 |
D010012-x0 |
Advanced LIGO SEI Conceptual Design Drawings - Outer Stage Component B2, Assembly and Detail Drawing 6 |
Stanford University |
Document Migration
|
23 Jan 2001 |
D010031-x0 |
Advanced LIGO SEI Conceptual Design Drawings - Complete Except for Support Tubes, Crossbeams, and Piers, Conceptual Design Drawing 5 |
Stanford University |
Document Migration
|
23 Jan 2001 |
D010020-x0 |
Advanced LIGO SEI Conceptual Design Drawings - Inner Stage Component C1, Assembly and Detail Drawing 14 |
Stanford University |
Document Migration
|
23 Jan 2001 |
D010018-x0 |
Advanced LIGO SEI Conceptual Design Drawings - Outer Stage Component B8, Assembly and Detail Drawing 12 |
Stanford University |
Document Migration
|
23 Jan 2001 |
D010021-x0 |
Advanced LIGO SEI Conceptual Design Drawings - Inner Stage Component C2, Assembly and Drawing Detail 15 |
Stanford University |
Document Migration
|
23 Jan 2001 |
D010013-x0 |
Advanced LIGO SEI Conceptual Design Drawings - Outer Stage Component B3, Assembly and Detail Drawing 7 |
Stanford University |
Document Migration
|
23 Jan 2001 |
D010030-x0 |
Advanced LIGO SEI Conceptual Design Drawings - Inner Stage with Outer Stage Support, Conceptual Design Drawing 4 |
Stanford University |
Document Migration
|
23 Jan 2001 |
D010025-x0 |
Advanced LIGO SEI Conceptual Design Drawings - Inner Stage Component C6, Assembly and Detail Drawing 19 |
Stanford University |
Document Migration
|
23 Jan 2001 |
D010014-x0 |
Advanced LIGO SEI Conceptual Design Drawings - Outer Stage Component B4, Assembly and Detail Drawing 8 |
Stanford University |
Document Migration
|
23 Jan 2001 |
D010019-x0 |
Advanced LIGO SEI Conceptual Design Drawings - Inner Stage Ass`y (partially exploded) C0, Assembly and Detail Drawing 13 |
Stanford University |
Document Migration
|
23 Jan 2001 |
D010010-x0 |
Advanced LIGO SEI Conceptual Design Drawings - Outer Stage ass`y B0, Assembly and Detail Drawing 4 |
Stanford University |
Document Migration
|
23 Jan 2001 |
D010026-x0 |
Advanced LIGO SEI Conceptual Design Drawings - ETF Chamber, ETF Chamber Dimensions |
Stanford University |
Document Migration
|
23 Jan 2001 |
D010022-x0 |
Advanced LIGO SEI Conceptual Design Drawings - Inner Stage Component C3, Assembly and Detail Drawing 16 |
Stanford University |
Document Migration
|
23 Jan 2001 |
D010017-x0 |
Advanced LIGO SEI Conceptual Design Drawings - Outer Stage Component B7, Assembly and Detail Drawing 11 |
Stanford University |
Document Migration
|
23 Jan 2001 |
D010006-x0 |
Advanced LIGO SEI Conceptual Design Drawings - RP2 (exploded) 0, Assembly and Detail Drawing 1 |
Stanford University |
Document Migration
|
23 Jan 2001 |
D010024-x0 |
Advanced LIGO SEI Conceptual Design Drawings - Inner Stage Component C5, Assembly and Detail Drawing 18 |
Stanford University |
Document Migration
|
23 Jan 2001 |
D010015-x0 |
Advanced LIGO SEI Conceptual Design Drawings - Outer Stage Component B5, Assembly and Detail Drawing 9 |
Stanford University |
Document Migration
|
23 Jan 2001 |
D010027-x0 |
Advanced LIGO SEI Conceptual Design Drawings - The Inner Stage, Conceptual Design Drawing 1 |
Stanford University |
Document Migration
|
23 Jan 2001 |
D010029-x0 |
Advanced LIGO SEI Conceptual Design Drawings - Inner Stage with Outer Stage (partially exposed), Conceptual Design Drawing 3 |
Stanford University |
Document Migration
|
23 Jan 2001 |
D010008-x0 |
Advanced LIGO SEI Conceptual Design Drawings - Outer Stage (exploded) B0, Assembly and Detail Drawing 3 |
Stanford University |
Document Migration
|
23 Jan 2001 |
D010011-x0 |
Advanced LIGO SEI Conceptual Design Drawings - Outer Stage Component B1, Assembly and Detail Drawing 5 |
Stanford University |
Document Migration
|
23 Jan 2001 |
D010023-x0 |
Advanced LIGO SEI Conceptual Design Drawings - Inner Stage Component C4, Assembly and Detail Drawing 17 |
Stanford University |
Document Migration
|
23 Jan 2001 |
D000057-x0 |
LOS Controller Rev C Upgrade Board |
Jay Heefner |
Document Migration
|
17 Jan 2001 |
D000337-x0 |
Washington Existing 2K PSL Table Layout |
Tom Mahood |
Document Migration
|
04 Jan 2001 |
D000352-x0 |
U100A Mirror Mounting Block |
Tom Mahood |
Document Migration
|
04 Jan 2001 |
D000353-x0 |
PBS Cube Mounting Block |
Tom Mahood |
Document Migration
|
04 Jan 2001 |
D000336-x0 |
Washington 4K PSL Table Layout |
Tom Mahood |
Document Migration
|
04 Jan 2001 |
D000265-x0 |
Beam Splitter Blank, 40 Meter |
GariLynn Billingsley |
Document Migration
|
02 Jan 2001 |
D000267-x0 |
End Test Mass Blank, 40 Meter |
GariLynn Billingsley |
Document Migration
|
02 Jan 2001 |
D000268-x0 |
Recycling Mirror Blank, 40 Meter |
GariLynn Billingsley |
Document Migration
|
02 Jan 2001 |
D000266-x0 |
Input Test Mass Blank, 40 Meter |
GariLynn Billingsley |
Document Migration
|
02 Jan 2001 |
D000316-x0 |
SOS Dewhitening and Anti-Image Filter |
Jay Heefner |
Document Migration
|
21 Dec 2000 |
D000460-x0 |
Ported 29` Door: 40M Lab |
Larry Jones |
Document Migration
|
21 Dec 2000 |
D000459-x0 |
ETMX LHO TELESCOPE LOCATION BSC9 |
Ken Mailand |
Document Migration
|
20 Dec 2000 |
D000417-x0 |
LHO 4K LVEA Optical Lever Wiring |
Jay Heefner |
Document Migration
|
14 Dec 2000 |
D000385-x0 |
ROUND SAPPHIRE SUBSTRATE 1 INCH |
Ken Mailand |
Document Migration
|
14 Dec 2000 |
D000382-x0 |
ROUND FUSED SILICA SUBSTRATE 1 INCH |
Ken Mailand |
Document Migration
|
14 Dec 2000 |
D000394-x0 |
Stabilized Oscillator SUS Satellite Amplifier |
Jay Heefner |
Document Migration
|
14 Dec 2000 |
D000415-x0 |
LHO 4K IOO Alignment Controls Wiring |
Jay Heefner |
Document Migration
|
14 Dec 2000 |
D000383-x0 |
FUSED SILICA PRISM (EAR) |
Ken Mailand |
Document Migration
|
14 Dec 2000 |
D000420-x0 |
LHO 4K IO Length Controls Wiring |
Jay Heefner |
Document Migration
|
14 Dec 2000 |
D000416-x0 |
LHO 4K IOO Auxiliary Controls Wiring |
Jay Heefner |
Document Migration
|
14 Dec 2000 |
D000379-x0 |
ROUND FUSED SILICA SUBSTRATE .5 INCH |
Ken Mailand |
Document Migration
|
14 Dec 2000 |
D000384-x0 |
ROUND SAPPHIRE SUBSTRATE .5 INCH |
Ken Mailand |
Document Migration
|
14 Dec 2000 |
D000454-x0 |
Fiber Alignment Split Bushing |
Ken Mailand |
Document Migration
|
13 Dec 2000 |
D000449-x0 |
Staging Building for Livingston, Issued for Construction - Electrical |
John Desmond |
Document Migration
|
12 Dec 2000 |
D000436-x0 |
Staging Building for Livingston, Issued for Construction - Slab, Column Plan |
John Desmond |
Document Migration
|
12 Dec 2000 |
D000450-x0 |
Staging Building for Livingston, Issued for Construction - Lighting |
John Desmond |
Document Migration
|
12 Dec 2000 |
D000421-x0 |
Map Showing Partial Topographic Survey of Livingston Observatory |
John Desmond |
Document Migration
|
12 Dec 2000 |
D000422-x0 |
Staging Building for Livingston, Issued for Construction - Handicapped Standard Details |
John Desmond |
Document Migration
|
12 Dec 2000 |
D000434-x0 |
Staging Building for Livingston, Issued for Construction - Second Floor Reflected Ceiling Plan |
John Desmond |
Document Migration
|
12 Dec 2000 |
D000443-x0 |
Staging Building for Livingston, Issued for Construction - Schedules and Details |
John Desmond |
Document Migration
|
12 Dec 2000 |
D000431-x0 |
Staging Building for Livingston, Issued for Construction - Stair Plans, Sections |
John Desmond |
Document Migration
|
12 Dec 2000 |
D000445-x0 |
Staging Building for Livingston, Issued for Construction - Second Level Plumbing Plan |
John Desmond |
Document Migration
|
12 Dec 2000 |
D000441-x0 |
Staging Building for Livingston, Issued for Construction - First Floor Plan |
John Desmond |
Document Migration
|
12 Dec 2000 |
D000448-x0 |
Staging Building for Livingston, Issued for Construction - Lighting |
John Desmond |
Document Migration
|
12 Dec 2000 |
D000452-x0 |
Staging Building for Livingston, Issued for Construction - Details |
John Desmond |
Document Migration
|
12 Dec 2000 |
D000453-x0 |
Staging Building for Livingston, Issued for Construction - Panels |
John Desmond |
Document Migration
|
12 Dec 2000 |
D000438-x0 |
Staging Building for Livingston, Issued for Construction - Roof Framing Plan |
John Desmond |
Document Migration
|
12 Dec 2000 |
D000451-x0 |
Staging Building for Livingston, Issued for Construction - Electrical |
John Desmond |
Document Migration
|
12 Dec 2000 |
D000423-x0 |
Staging Building for Livingston, Issued for Construction - Wall Sections, Details |
John Desmond |
Document Migration
|
12 Dec 2000 |
D000435-x0 |
Staging Building for Livingston, Issued for Construction - Grade Beam, Shafts Plan |
John Desmond |
Document Migration
|
12 Dec 2000 |
D000432-x0 |
Staging Building for Livingston, Issued for Construction - Stair Sections, Details |
John Desmond |
Document Migration
|
12 Dec 2000 |
D000447-x0 |
Staging Building for Livingston, Issued for Construction - Site |
John Desmond |
Document Migration
|
12 Dec 2000 |
D000433-x0 |
Staging Building for Livingston, Issued for Construction - First Floor Reflected Ceiling Plan |
John Desmond |
Document Migration
|
12 Dec 2000 |
D000444-x0 |
Staging Building for Livingston, Issued for Construction - First Floor Plan |
John Desmond |
Document Migration
|
12 Dec 2000 |
D000429-x0 |
Staging Building for Livingston, Issued for Construction - Interior Elevations, Detail |
John Desmond |
Document Migration
|
12 Dec 2000 |
D000440-x0 |
Staging Building for Livingston, Issued for Construction - Details |
John Desmond |
Document Migration
|
12 Dec 2000 |
D000446-x0 |
Staging Building for Livingston, Issued for Construction - Plumbing Riser Diagram and Details |
John Desmond |
Document Migration
|
12 Dec 2000 |
D000439-x0 |
Staging Building for Livingston, Issued for Construction - Details |
John Desmond |
Document Migration
|
12 Dec 2000 |
D000424-x0 |
Staging Building for Livingston, Issued for Construction - Partial Floor Plans |
John Desmond |
Document Migration
|
12 Dec 2000 |
D000414-x0 |
Temporary Optical Lever Damping for ITM`s |
Jay Heefner |
Document Migration
|
05 Dec 2000 |
D000407-x0 |
Staging Building for Livingston, Issued for Construction - Exterior Elevations |
John Desmond |
Document Migration
|
04 Dec 2000 |
D000412-x0 |
Staging Building for Livingston, Issued for Construction - - Building Sections, Details |
John Desmond |
Document Migration
|
04 Dec 2000 |
D000409-x0 |
Staging Building for Livingston, Issued for Construction - Door Schedule |
John Desmond |
Document Migration
|
04 Dec 2000 |
D000404-x0 |
Staging Building for Livingston, Issued for Construction - Existing Site and Building Demolition Plans |
John Desmond |
Document Migration
|
04 Dec 2000 |
D000410-x0 |
Staging Building for Livingston, Issued for Construction - Building Section, Details |
John Desmond |
Document Migration
|
04 Dec 2000 |
D000403-x0 |
Staging Building for Livingston, Issued for Construction - Site Plan and Details |
John Desmond |
Document Migration
|
04 Dec 2000 |
D000402-x0 |
Staging Building for Livingston, Issued for Construction - Title Sheet |
John Desmond |
Document Migration
|
04 Dec 2000 |
D000411-x0 |
Staging Building for Livingston, Issued for Construction - - Building Section, Details |
John Desmond |
Document Migration
|
04 Dec 2000 |
D000408-x0 |
Staging Building for Livingston, Issued for Construction - Exterior Elevations, Finish Schedule |
John Desmond |
Document Migration
|
04 Dec 2000 |
D000388-x0 |
PLATE, TARGET SUPPORT, SHORT |
Ken Mailand |
Document Migration
|
01 Dec 2000 |
D000349-x0 |
Adjustable 8" ID Bellows |
Larry Jones |
Document Migration
|
01 Dec 2000 |
D000393-x0 |
APERTURE ALIGNMENT TOOL ITMY 2K |
Ken Mailand |
Document Migration
|
01 Dec 2000 |
D000391-x0 |
APERTURE ALIGNMENT TOOL BS 2K BSC7 |
Ken Mailand |
Document Migration
|
01 Dec 2000 |
D000389-x0 |
FRAME, TARGET, PO TELESCOPE |
Ken Mailand |
Document Migration
|
01 Dec 2000 |
D000374-x0 |
REF. ACAD ELIPTICAL BAFFLE |
Ken Mailand |
Document Migration
|
28 Nov 2000 |
D000377-x0 |
LAYOUTS MODE CLEANER BAFFLE |
Ken Mailand |
Document Migration
|
28 Nov 2000 |
D000373-x0 |
HAM 9 TABLE PLAN, VIEW VIEWPORT BEAM DUMP LOCATION |
Ken Mailand |
Document Migration
|
28 Nov 2000 |
D000372-x0 |
HAM 10 TABLE, PLAN VIEW |
Ken Mailand |
Document Migration
|
28 Nov 2000 |
D000375-x0 |
LAYOUT ETM TELESCOPE LENS FOCUS BARREL |
Ken Mailand |
Document Migration
|
28 Nov 2000 |
D000203-x0 |
Global Diagnostic System Signal Processor |
Sander Liu |
Document Migration
|
15 Nov 2000 |
D000255-x0 |
PAM Screw Assembly |
Janeen Romie |
Document Migration
|
08 Nov 2000 |
D000350-x0 |
Klinger Mount Base Block |
Richard Savage |
Document Migration
|
03 Nov 2000 |
D000360-x0 |
1, Modified CF Flange. 2, Support Beam Weldment, Stack Support, 18" Chamber |
Larry Jones |
Document Migration
|
03 Nov 2000 |
D000363-x0 |
Assembly, Stack Support, 18" Chamber |
Larry Jones |
Document Migration
|
03 Nov 2000 |
D000362-x0 |
Top Plate, Stack Support, 18" Chamber |
Larry Jones |
Document Migration
|
03 Nov 2000 |
D000361-x0 |
Bottom Plate, Stack Support, 18" Chamber |
Larry Jones |
Document Migration
|
03 Nov 2000 |
D000359-x0 |
Support Beam, Stack Support, 18" Chamber |
Larry Jones |
Document Migration
|
03 Nov 2000 |
D000193-x0 |
PO TELESCOPE MIRROR POSITION TARGET |
Ken Mailand |
Document Migration
|
31 Oct 2000 |
D000190-x0 |
TABLE CLAMP TELESCOPE HOLD DOWN |
Ken Mailand |
Document Migration
|
31 Oct 2000 |
D000099-x0 |
Tool, PO Telescope Periscope Alignment |
Ken Mailand |
Document Migration
|
27 Oct 2000 |
D000082-x0 |
FRONT APS BAFFLE FRAME, LEFT |
Ken Mailand |
Document Migration
|
27 Oct 2000 |
D000083-x0 |
FRONT APS BAFFLE FRAME, RIGHT |
Ken Mailand |
Document Migration
|
27 Oct 2000 |
D000250-x0 |
FRONT APS 4K BAFFLE FRAME, RIGHT |
Ken Mailand |
Document Migration
|
27 Oct 2000 |
D000254-x0 |
Cavity Beam Dump Housing Tube, BSC7, 4KITMXHR3, 4KITMXHR4, BSC8, 4KITMYHR3, 4KITMYHR4 |
Ken Mailand |
Document Migration
|
27 Oct 2000 |
D000081-x0 |
FRONT APS BAFFLE, GLASS BOTTOM |
Ken Mailand |
Document Migration
|
27 Oct 2000 |
D000056-x0 |
LLO ETMX Telescope BSC4 |
Ken Mailand |
Document Migration
|
27 Oct 2000 |
D000246-x0 |
ASSEMBLY 4K APS FRONT BAFFLE |
Ken Mailand |
Document Migration
|
27 Oct 2000 |
D000084-x0 |
ADAPTOR PLATE APS TELESCOPE FRONT BAFFLE |
Ken Mailand |
Document Migration
|
27 Oct 2000 |
D000080-x0 |
FRONT, APS BAFFLE, GLASS TOP |
Ken Mailand |
Document Migration
|
27 Oct 2000 |
D000058-x0 |
2K PO Mirror Assembly |
Ken Mailand |
Document Migration
|
27 Oct 2000 |
D000010-x0 |
Primary Mirror Centering Screw |
Ken Mailand |
Document Migration
|
27 Oct 2000 |
D000079-x0 |
PRECISION SPACER, WASHER |
Ken Mailand |
Document Migration
|
27 Oct 2000 |
D000189-x0 |
ASSEMBLY APS 2K FRONT BAFFLE |
Ken Mailand |
Document Migration
|
27 Oct 2000 |
D000344-x0 |
ASSEMBLY APS 4K FRONT BAFFLE |
Ken Mailand |
Document Migration
|
27 Oct 2000 |
D000098-x0 |
TARGET, PO Telescope Alignment |
Ken Mailand |
Document Migration
|
27 Oct 2000 |
D000009-x0 |
Secondary Mirror Flexure Adjusting Screw |
Ken Mailand |
Document Migration
|
27 Oct 2000 |
D000247-x0 |
FRONT APS 4K BAFFLE GLASS BOTTOM |
Ken Mailand |
Document Migration
|
27 Oct 2000 |
D000248-x0 |
FRONT APS 4K BAFFLE FRAME, LEFT |
Ken Mailand |
Document Migration
|
27 Oct 2000 |
D000188-x0 |
APS Baffle Frame Spreader Bar |
Ken Mailand |
Document Migration
|
20 Oct 2000 |
D000186-x0 |
8 Channel Anti-Image Filter Board |
Jay Heefner |
Document Migration
|
19 Oct 2000 |
D000168-x0 |
BOTTOM TABLE PLATE HAM3/9 TABLE BEAM DUMP |
Ken Mailand |
Document Migration
|
18 Oct 2000 |
D000171-x0 |
GLASS, BOTTOM HAM2 TABLE BEAM DUMP |
Ken Mailand |
Document Migration
|
18 Oct 2000 |
D000154-x0 |
ANGLE GUSSET HAM2/3/9 TABLE BEAM DUMP |
Ken Mailand |
Document Migration
|
18 Oct 2000 |
D000158-x0 |
RIGHT HAND BOTTOM ANGLE HAM2 TABLE BEAM DUMP |
Ken Mailand |
Document Migration
|
18 Oct 2000 |
D000155-x0 |
RIGHT HAND TOP ANGLE HAM2/3/9 TABLE BEAM DUMP |
Ken Mailand |
Document Migration
|
18 Oct 2000 |
D000173-x0 |
GLASS, BOTTOM HAM3/9 TABLE BEAM DUMP |
Ken Mailand |
Document Migration
|
18 Oct 2000 |
D000172-x0 |
GLASS, TOP HAM2/3 TABLE BEAM DUMP |
Ken Mailand |
Document Migration
|
18 Oct 2000 |
D000156-x0 |
LEFT HAND TOP ANGLE HAM2/3/9 TABLE BEAM DUMP |
Ken Mailand |
Document Migration
|
18 Oct 2000 |
D000169-x0 |
LEFT HAND BOTTOM ANGLE HAM3/9 TABLE BEAM DUMP |
Ken Mailand |
Document Migration
|
18 Oct 2000 |
D000170-x0 |
RIGHT HAND BOTTOM ANGLE HAM3/9 TABLE BEAM DUMP |
Ken Mailand |
Document Migration
|
18 Oct 2000 |
D000167-x0 |
BOTTOM TABLE PLATE HAM2 TABLE BEAM DUMP |
Ken Mailand |
Document Migration
|
18 Oct 2000 |
D000157-x0 |
TOP PLATE HAM2/3/9 TABLE BEAM DUMP |
Ken Mailand |
Document Migration
|
18 Oct 2000 |
D000174-x0 |
GLASS, TOP HAM9/2 TABLE BEAM DUMP |
Ken Mailand |
Document Migration
|
18 Oct 2000 |
D000399-x0 |
ASC Quad Photodiode Whitening Board |
Jay Heefner |
Document Migration
|
17 Oct 2000 |
D000198-x0 |
Frequency Distribution System Drawing |
Rich Abbott |
Document Migration
|
11 Oct 2000 |
D000323-x0 |
TNI Satellite Amplifier |
Jay Heefner |
Document Migration
|
11 Oct 2000 |
D000330-x0 |
Kinematic Mount for HAMS |
Jonathan Kern |
Document Migration
|
06 Oct 2000 |
D000078-x0 |
Ham and BSC (SEI) Table Level |
Jonathan Kern |
Document Migration
|
06 Oct 2000 |
D000328-x0 |
Wireframe Target Fixture for HAMs |
Jonathan Kern |
Document Migration
|
06 Oct 2000 |
D000329-x0 |
Caddy for Handling and Baking Large Optics |
Jonathan Kern |
Document Migration
|
06 Oct 2000 |
D000077-x0 |
Core Optic Caddy & Baking Fixture |
Jonathan Kern |
Document Migration
|
06 Oct 2000 |
D000322-x0 |
OSEM Aluminum Spacer |
Janeen Romie |
Document Migration
|
03 Oct 2000 |
D000191-x0 |
LSC Differential Driver/Receiver |
Mohana Mageswaran |
Document Migration
|
18 Sep 2000 |
D000087-x0 |
LSC Common Mode Servo, Board 2 (WA 2K), Rev. 01 |
Dale Ouimette |
Document Migration
|
18 Sep 2000 |
D000318-x0 |
Paving at Hanford Observatory |
None |
Document Migration
|
14 Sep 2000 |
D000310-x0 |
LLO LSC System Layout Drawing |
Dale Ouimette |
Document Migration
|
07 Sep 2000 |
D000309-x0 |
LSC Wiring Diagram, Rack 1X9 (LLO) |
Dale Ouimette |
Document Migration
|
07 Sep 2000 |
D000307-x0 |
LA 4K LSC Auxiliary Controls |
Jay Heefner |
Document Migration
|
07 Sep 2000 |
D000238-x0 |
LLO 4K One Arm Test LSC System Wiring |
Jay Heefner |
Document Migration
|
01 Sep 2000 |
D000264-x0 |
Special 10.00" CFF Flange 10.0" OD to 6.0" |
Ken Mailand |
Document Migration
|
22 Aug 2000 |
D000239-x0 |
LLO 4K One Arm Test Auxiliary Controls |
Jay Heefner |
Document Migration
|
08 Aug 2000 |
D000252-x0 |
Circuit Board Fixture, Bottom |
Janeen Romie |
Document Migration
|
08 Aug 2000 |
D000251-x0 |
Circuit Board Fixture |
Janeen Romie |
Document Migration
|
08 Aug 2000 |
D000234-x0 |
Reference Cavity Short Vacuum Chamber |
Peter King |
Document Migration
|
08 Aug 2000 |
D000177-x0 |
SCH LIGO Fast Diode Input |
Rich Abbott |
Document Migration
|
24 Jul 2000 |
D000232-x0 |
LLO VERTEX INSTALLATION ELEVATION VIEW |
Ken Mailand |
Document Migration
|
19 Jul 2000 |
D000231-x0 |
LLO VERTEX INSTALLATION PLAN VIEW |
Ken Mailand |
Document Migration
|
19 Jul 2000 |
D000216-x0 |
Optics Table Elevations (Livingston LVEA) |
Dennis Coyne |
Document Migration
|
13 Jul 2000 |
D000214-x0 |
PSL Block Diagram |
Rich Abbott |
Document Migration
|
13 Jul 2000 |
D000207-x0 |
WA 2K Y Arm LSC Controls Wiring |
Jay Heefner |
Document Migration
|
27 Jun 2000 |
D000200-x0 |
RM Clamp |
Janeen Romie |
Document Migration
|
20 Jun 2000 |
D000109-x0 |
Seismic System Antialiasing Filter Board 2 |
Sander Liu |
Document Migration
|
14 Jun 2000 |
D000108-x0 |
Seismic System Antialiasing Filter Board 1 |
Sander Liu |
Document Migration
|
14 Jun 2000 |
D000199-x0 |
WA 2K LSC Auxiliary Controls |
Jay Heefner |
Document Migration
|
13 Jun 2000 |
D000126-x0 |
COS Target Assembly - 2k Folding Mirror, X & Y |
Janeen Romie |
Document Migration
|
05 Jun 2000 |
D000137-x0 |
Universal Dewhitening Filter Prototype |
Jay Heefner |
Document Migration
|
02 Jun 2000 |
D000004-x0 |
Support Mount, ETM Camera, Rev. B |
Michael Smith et al. |
Document Migration
|
21 May 2000 |
D000005-x0 |
Support Bracket, ETM Camera, Rev. B |
Michael Smith et al. |
Document Migration
|
21 May 2000 |
D000102-x0 |
PZT Driver Extension, Rev. A |
Janeen Romie |
Document Migration
|
21 May 2000 |
D000093-x0 |
ETM Cover Plate, Bottom, Rev. A |
Michael Smith |
Document Migration
|
21 May 2000 |
D000111-x0 |
ARM CAVITY BAFFLE, HANFORD SITE, ITM-X INSTALLATION |
Paul Kabot |
Document Migration
|
19 May 2000 |
D000110-x0 |
ARM CAVITY BAFFLE, HANFORD SITE, ITM-Y INSTALLATION |
Paul Kabot |
Document Migration
|
19 May 2000 |
D000112-x0 |
ARM CAVITY BAFFLE, GLASS PLATE ASSEMBLIES |
Paul Kabot |
Document Migration
|
19 May 2000 |
D000091-x0 |
Back Plate, Viewport Beam Dump |
Ken Mailand |
Document Migration
|
18 May 2000 |
D000088-x0 |
Clamp, Viewport Beam Dump Glass |
Ken Mailand |
Document Migration
|
18 May 2000 |
D000090-x0 |
Glass, Viewport Beam Dump |
Ken Mailand |
Document Migration
|
18 May 2000 |
D000100-x0 |
ADAPTOR, VIEWPORT BEAM DUMP |
Ken Mailand |
Document Migration
|
18 May 2000 |
D000092-x0 |
Assembly, Viewport Beam Dump |
Ken Mailand |
Document Migration
|
18 May 2000 |
D000089-x0 |
Table Plate, Viewport Beam Dump |
Ken Mailand |
Document Migration
|
18 May 2000 |
D000122-x0 |
Base Plate Sliding |
Matt Smith |
Document Migration
|
27 Apr 2000 |
D000094-x0 |
BSC2, Optical Lever Assembly |
Michael Smith |
Document Migration
|
24 Mar 2000 |
D000053-x0 |
Four Channel Notch Module |
Jay Heefner |
Document Migration
|
01 Mar 2000 |
D000013-x0 |
Microscope OSEM Bushing |
Janeen Romie |
Document Migration
|
01 Mar 2000 |
D000074-x0 |
Pam Bracket (long) |
Jonathan Kern |
Document Migration
|
01 Mar 2000 |
D000068-x0 |
Access Pigtail |
Janeen Romie |
Document Migration
|
01 Mar 2000 |
D000001-x0 |
PAM Screw, SOS |
Janeen Romie |
Document Migration
|
01 Mar 2000 |
D000070-x0 |
LIGO II PATHFINDER SUBSTRATE |
Craig Conley |
Document Migration
|
01 Mar 2000 |
D000071-x0 |
COS Viewport, Reducer Flange 10.0" OD to 6.0" (Varian) |
Dennis Coyne |
Document Migration
|
24 Feb 2000 |
D000073-x0 |
COS Viewport Assembly |
Jonathan Kern |
Document Migration
|
24 Feb 2000 |
D000038-x0 |
Chamber Pier Configuration |
Larry Jones |
Document Migration
|
27 Jan 2000 |
D000041-x0 |
Teflon Screw Tip, Large |
Janeen Romie |
Document Migration
|
27 Jan 2000 |
D000040-x0 |
Teflon Screw Tip, Small |
Janeen Romie |
Document Migration
|
27 Jan 2000 |
D000039-x0 |
Z Pivot Assembly |
Larry Jones |
Document Migration
|
27 Jan 2000 |
D000011-x0 |
LDAS Software Version Numbering System |
Kent Blackburn |
Document Migration
|
17 Jan 2000 |
D000007-x0 |
LDAS Software Process Control Flowchart |
Kent Blackburn |
Document Migration
|
13 Jan 2000 |
D000003-x0 |
Differential to Single Ended Receiver |
Jay Heefner |
Document Migration
|
07 Jan 2000 |