v2: removed reference to AOSEMs in document ( there are no
AOSEMs in BSFM suspensions).
v3: some minor edits. Also addition of links in section 8
on how to access software.
v4: added more info on test results in section 7.1
v5 minor edits
v5: 3rd Feb 2014 - notes added by CiT with view to take this through to completion.
v6: updated the general document to include link to useful electronics wiki in section 2c.
v7: updated section 8 with more info on SVN (written by Stuart)
v8: added link to ops manual for testing procedures in section 7.
v9: added electronics requirements link to document (Norna 17 May 2014)
Ten headings for acceptance:
1. Requirements documentation
https://dcc.ligo.org/LIGO-T010007 Cavity Optics Suspension
Subsystem Design Requirements
Other supporting documentation is given in references
listed in the above main document.
REFERENCE. REVIEWED. DONE. CLOSED
2. Design overview and detailed design documentation
a) Final Design Document
https://dcc.ligo.org/LIGO-T080218 BS/FM Final Design Document
REFERENCE. REVIEWED. DONE. CLOSED
b) Review reports
https://dcc.ligo.org/LIGO-T1200463 Summary of Suspension
Final Design Reviews
REVIEWED. DONE. CLOSED
c) Supporting design documents
Supporting documentation is given in references listed in
the above main document.
REVIEWED. DONE. CLOSED
d) Drawings
https://dcc.ligo.org/LIGO-D1000392 aLIGO BS/FM MAIN ASSEMBLY
https://dcc.ligo.org/LIGO-T1000080 BS/FM Drawing Tree
D0901076 BS OPTIC ASSEMBLY - ADDED CIT 30/OCT/13.
OPEN - Janeen could you review and comment if this is ready for review / DCN?
e) Bills of Materials
https://dcc.ligo.org/LIGO-T1000003 Beamsplitter/Folding Mirror Materials List
REVIEWED. CLOSED
f) Interface control
RODAs are listed in section 2f of the above main document.
REVIEWED. CLOSED
g) Software
Software is documented on the SVN. Further details of how
to access can be found in Section 8 of the above main
document.
REVIEWED. CLOSED
h) Design source data
Mechanical CAD models are in PDM works and electronics CAD
models are available on LIGO Lab archives
REVIEWED. CLOSED
3. Materials and fabrication specification
https://dcc.ligo.org/LIGO-E0900023 PROCESS FOR
MANUFACTURING CANTILEVER SPRING BLADES FOR AdvLIGO .
REVIEWED. CLOSED
4. Parts and in-process spares inventoried
Assemblies are recorded in ICS. Individual spare mechanical parts which
have gone through clean and bake are in general recorded in ICS.
In some cases spare sub-assemblies have been put together but not yet recorded as such.
Electronics are recorded using the S-number scheme.
A separate document has been prepared which summarises storing of spare parts, see T1300908.
NOT PROJECT JOB TO DO. ORGANIZE SPARES IS OPS. THIS SHOULD BE ADDED TO PUNCH LIST TO REMIND TO ASK AGAIN.
CLOSED
5. Assembly procedures
https://dcc.ligo.org/LIGO-E1000686 BS Assembly and Alignment Procedure
https://dcc.ligo.org/LIGO-E1000753 Preparation of a
beamsplitter or folding mirror (BS/FM) (Gluing primary and
secondary wire break-off prisms)
https://dcc.ligo.org/LIGO-T1200105 Review of Design and Procedure for Use of BS/FM Prism Jig
- This document appears to just be a collection of
comments to the documentation under review, with little to
no resolution. The conclusion states that the resolution of
these items were tracked over SUS telecons, and that 'As
of 2nd October 2012 [to the best Mark Barton's knowledge]
everything that needed doing was done.' I went back to the
notes for Sept 2012,
and I find no reference to this material.
- Spot checking the action items from Section 3,
- (1) None of the DCC numbers cited in Dennis' response
table, which are actioned to be captured, exist in E1000753.
- (7) There is no mention of the word 'flipper' in
E1000753, and a novice's quick glance over the procedure
doesn't seem to mention anything that might be a procedure
for something being 'flipped.'
- (12) Is Janeen satisfied with the diagrams that are
presumably now included?
- Based on the spot check and SUS telecon notes, finding
a record of the resolution of all the mentioned action
items is difficult at best.
Note added by Norna. The above comments have been addressed in v3 of T1200105
REVIEWED. CLOSED
6. Installation procedures
https://dcc.ligo.org/LIGO-T1100489-v2 BS/FM installation
lock-down procedure
Chamber installation procedures are particular to each
suspension.
REVIEWED. CLOSED
7. Test documents
Suspension testing: https://dcc.ligo.org/LIGO-G1200070
Ideal Order/Contents of aLIGO Triple SUS Testing / Commissioning
Testing related documentation is kept on the SVN
repository, as are transfer functions, spectra and B&K
results. Further details are given in the main document
above, including DCC links to other test results such as
OSEMs, blades, vibration absorbers etc.
Electronics testing: The results of reports are posted
under the serial number of the chassis. Further details are
given in the above main document.
(added by Norna 24 March 2014) A useful link for key testing procedures
is the Checkout/Testing page in the Operation Manual at
https://awiki.ligo-wa.caltech.edu/aLIGO/Suspensions/OpsManual/Testing
REVIEWED. CLOSED
8. User interface software
This is found on the SVN. Useful links are
- the gui interface for the userapps svn:
https://redoubt.ligo-wa.caltech.edu/websvn/listing.php?repname=cds_user_apps
- or the simple html interface to userapps svn:
https://redoubt.ligo-wa.caltech.edu/svn/cds_user_apps/
- a direct link to the web interface of the latest simulink models:
LHO: https://lhocds.ligo-wa.caltech.edu/simlink/
LLO: https://llocds.ligo-la.caltech.edu/daq/simlink/
- Review Comments from Fabrice:
I reviewed the MEDM screens using H1 BS.
Everything is working well.
(except guardian and some details in ODC screens, but this
is not SUS responsibility).
All the models and screens are well under revision control
and up to date. (updated the last time on 10/29/2013)
Section 8 of document has been updated to include more info on SVN
REVIEWED. CLOSED
9. Operation Manual
https://dcc.ligo.org/LIGO-E1200633 aLIGO SUS Operation Manual
This covers quads and triple suspensions due to large
element of commonality
Comments from Jeff Lewis: Significant work has been done
on the SUS Operations wiki page, however the Operation
Instruction section is yet to be completed as of
10/30/2013. This could be added to a punch list.
REVIEWED. PUNCH LIST ITEM. SEE ABOVE.
10. Safety
E0900163 Beamsplitter/Folding Mirror Suspension Assembly Hazard Analysis
REVIEWED. SIGNED. CLOSED