LIGO-Number |
Title |
Author(s) |
Topic(s) |
Last Updated |
P2000113-v9 |
Fiducial displacements with improved accuracy for the global network of gravitational wave detectors |
Richard Savage et al. |
Calibration
|
16 Nov 2023 |
G2301988-v2 |
September 21, 2023 LVK - EM Telecon, LIGO site update |
Jenne Driggers et al. |
Detector
|
21 Sep 2023 |
G2201909-v3 |
A+ / O4 OMC DCPD Whitening Chassis Redesign Oct 2022 Update |
Jeffrey Kissel et al. |
Subsystem Test
Sensing and Control
Incoming Inspection
Commissioning
|
05 Sep 2023 |
G1500623-v6 |
aLIGO, CAL, Official Advanced LIGO Sensitivity Plots |
Jeffrey Kissel et al. |
Calibration
Commissioning
|
23 Jun 2023 |
P2100207-v3 |
Characterization of systematic error in Advanced LIGO calibration in the second half of O3 (O3B) |
Joseph Betzwieser et al. |
Calibration
|
09 Sep 2022 |
E1900133-x0 |
LIGO Calibration Pipeline Parameter Configurations: O3 |
Jeffrey Kissel et al. |
Calibration
Change Control
|
08 Dec 2021 |
T1900253-v6 |
Record of Real-Time Calibration Pipeline Parameter Configuration Changes: O3 (and ER14) -- L1 |
Joseph Betzwieser et al. |
Calibration
Change Control
|
08 Dec 2021 |
P1700236-v12 |
Reconstructing the calibrated strain signal in the Advanced LIGO detectors |
Aaron Viets et al. |
Calibration
|
18 Nov 2021 |
P1900245-v7 |
Characterization of systematic error in Advanced LIGO calibration |
Ling Sun et al. |
Calibration
|
11 Nov 2021 |
T2000584-v3 |
Characterization of systematic error in Advanced LIGO calibration in the second half of O3 (O3B) |
Jeffrey Kissel et al. |
Calibration
|
01 Jun 2021 |
G1401390-v8 |
Advanced LIGO Sensitivity Plots, L1 |
Joseph Betzwieser |
Calibration
|
23 Mar 2021 |
G2000497-v2 |
O3 LIGO-Virgo-KAGRA Update, April 2020 |
Keita Kawabe et al. |
Operations
Detector
Public Talk / Colloquium
Astrophysics / Multi-messenger
|
02 Apr 2020 |
P2000107-v6 |
advligorts: The Advanced LIGO Real-Time Digital Control and Data Acquisition System |
Jameson Graef Rollins et al. |
Data and Computing
Data Acquisition System
Sensing and Control
|
31 Mar 2020 |
P1600063-v11 |
Improving LIGO calibration accuracy by tracking and compensating for slow temporal variations |
Darkhan Tuyenbayev et al. |
Calibration
|
21 Nov 2019 |
P1500248-v15 |
Calibration of the Advanced LIGO detectors for the discovery of the binary black-hole merger GW150914 |
LIGO Scientific Collaboration et al. |
Calibration
|
13 Oct 2019 |
P1500249-v17 |
The Advanced LIGO Photon Calibrators |
Richard Savage et al. |
Calibration
Auxiliary Optics
|
23 Jul 2019 |
P1600139-v16 |
Calibration Uncertainty for Advanced LIGO’s First and Second Observing Runs |
Craig Cahillane et al. |
Calibration
|
23 Jul 2019 |
G1901349-v4 |
O3 LIGO-Virgo-KAGRA Update, July 18 2019 |
Joseph Betzwieser et al. |
Operations
Detector
Astrophysics / Multi-messenger
|
18 Jul 2019 |
T1400256-v17 |
Time Domain Calibration in Advanced LIGO (circa O1, Now Outdated) |
Xavier Siemens et al. |
Calibration
|
16 Mar 2019 |
T1800256-v1 |
Thermal State of the test masses of the LIGO interferometer |
Guadalupe Quirarte et al. |
Core Optics
Detector Characterization
|
16 Mar 2019 |
G1802165-v1 |
L1 Calibrated Sensitivity Spectra Oct 20 2018 (Representative for ER13) |
Jeffrey Kissel et al. |
Calibration
|
09 Nov 2018 |
G1802164-v1 |
H1 Calibrated Sensitivity Spectra Nov 08 2018 (Representative for ER13) |
Jeffrey Kissel et al. |
Calibration
|
09 Nov 2018 |
T1400268-v2 |
LLO camera status |
Joseph Betzwieser |
System Engineering
Auxiliary Optics
|
18 Apr 2018 |
T1300202-v3 |
aLIGO GigE camera layout and usage |
Joseph Betzwieser |
Auxiliary Optics
|
18 Apr 2018 |
T1700318-v1 |
Implementing Real-Time Calibration in Advanced LIGO Control Software |
Dane Stocks et al. |
Calibration
|
19 Feb 2018 |
P1600285-v21 |
Validating gravitational-wave detections: The Advanced LIGO hardware injection system |
Christopher Biwer et al. |
Detector
|
20 Feb 2017 |
T1600270-v1 |
Spectral Line Tracking at LLO |
Joseph Betzwieser et al. |
Calibration
|
01 Jan 2017 |
T1600388-v1 |
Imaging Optical Scatter in Advanced LIGO |
Adalyne Cummins et al. |
Auxiliary Optics
|
01 Jan 2017 |
T1400349-v13 |
Documentation of the Advanced LIGO Hardware Injection Infrastructure |
Eric Thrane et al. |
Data analysis software
Continuous Wave
GW Bursts
Data quality / vetoes
Compact Binaries
Computing/archiving
Stochastic
|
26 Oct 2016 |
T1300950-v8 |
Calibration Uncertainty Budget Requirements for early aLIGO |
Xavier Siemens et al. |
Calibration
|
23 Sep 2016 |
E1500291-x0 |
aLIGO, INJ |
Eric Thrane et al. |
Calibration
Continuous Wave
GW Bursts
Compact Binaries
Detector Characterization
Stochastic
|
27 Jul 2016 |
T1600284-x0 |
Spectral Line Tracking |
Bria Storr et al. |
Modelling
|
06 Jul 2016 |
G1600511-v1 |
Simulated Plant Approach |
Koji Arai et al. |
Modelling
Sensing and Control
Basic R&D
|
14 Mar 2016 |
G1501273-v1 |
L1 Calibrated Sensitivity Spectra Oct 10 2015 (Representative for early O1) |
Joseph Betzwieser |
Calibration
|
12 Oct 2015 |
G1500904-v1 |
L1 Calibrated Sensitivity Spectra June 6 2015 (Best for ER7) |
Joseph Betzwieser |
Calibration
|
08 Jul 2015 |
G1500479-v1 |
L1 Calibrated Sensitivity Spectra Mar 3 2015 |
Joseph Betzwieser |
Calibration
|
06 Apr 2015 |
G1401372-v1 |
L1 Calibrated Sensitivity Spectra June 1 2014 |
Joseph Betzwieser |
Calibration
|
02 Apr 2015 |
G1401373-v1 |
L1 Calibrated Sensitivity Spectra June 12 2014 |
Joseph Betzwieser |
Calibration
|
02 Apr 2015 |
G1401375-v1 |
L1 Calibrated Sensitivity Spectra July 24 2014 |
Joseph Betzwieser |
Calibration
|
02 Apr 2015 |
G1401374-v1 |
L1 Calibrated Sensitivity Spectra June 28 2014 |
Joseph Betzwieser |
Calibration
|
02 Apr 2015 |
G1401376-v1 |
L1 Calibrated Sensitivity Spectra July 30 2014 |
Joseph Betzwieser |
Calibration
|
02 Apr 2015 |
G1401377-v1 |
L1 Calibrated Sensitivity Spectra Nov 27 2014 |
Joseph Betzwieser |
Calibration
|
02 Apr 2015 |
P1400197-v1 |
Modeling of Optical Scattering in Advanced LIGO |
Hunter Rew et al. |
Modelling
Calibration
Detector Characterization
Auxiliary Optics
|
03 Nov 2014 |
T1200482-v2 |
aLIGO SEI / SUS Watchdog Design |
Jeffrey Kissel et al. |
Data Acquisition System
Installation
Final Design
Seismic Isolation
Integration
System Engineering
System Test
Suspensions
|
10 Jul 2014 |
T1300435-v1 |
Suspension Module Guardian Design |
Jeffrey Kissel et al. |
Preliminary Design
Commissioning
State Control and Monitoring
Suspensions
|
20 Jan 2014 |
T1300432-v2 |
The 2013-2014 data analysis, software and computing, detector characterization white paper |
Pia Astone et al. |
Data Analysis
|
18 Oct 2013 |
E1300481-v1 |
ECR for HEPI medm screen update |
Joseph Betzwieser |
Seismic Isolation
|
31 May 2013 |
G1100805-v1 |
Overview of the projects at Caltech 40-m prototype |
Koji Arai et al. |
Sensing and Control
Meeting
|
09 Jul 2011 |
T1100340-v1 |
Realtime Code Generator (RCG) post build script |
Joseph Betzwieser et al. |
Data Acquisition System
|
23 Jun 2011 |
G050111-v1 |
Summary of recent measurements of g factor changes induced by thermal loading in the H1 interferometer |
Joseph Betzwieser et al. |
Core Optics
Commissioning
Cleaning
Auxiliary Optics
|
07 Jun 2011 |
T050074-x0 |
Optical Absorption in Initial LIGO Interferometers |
Stefan Ballmer et al. |
Core Optics
Commissioning
Cleaning
Auxiliary Optics
|
05 Jun 2011 |
G1000546-v1 |
Simulated Plant Approach |
Peter Michael Kalmus et al. |
Modelling
Sensing and Control
Commissioning
Basic R&D
|
15 Jul 2010 |
P070123-x0 |
Searching for gravitational waves from Cassiopeia A with LIGO |
Alicia M Sintes et al. |
Document Migration
Public relations
|
16 Oct 2009 |
G0900520-v2 |
Testing Advanced LIGO length sensing and control scheme at the Caltech 40m interferometer |
David Yeaton-Massey et al. |
Upgrades
|
30 Jun 2009 |
T080242-x0 |
S5 V3 h(t) Review and Validation |
Joseph Betzwieser et al. |
Document Migration
|
22 Sep 2008 |
G080217-x0 |
Calibrators - The h(t) group - LSC/Virgo Collaborations Meeting @ Caltech, March 17-20, 2008 |
Joseph Betzwieser et al. |
Document Migration
|
04 Apr 2008 |
T070001-x0 |
Suspension Thermal Noise in Initial and Enhanced LIGO |
Joseph Betzwieser et al. |
Document Migration
|
16 Aug 2007 |
G070205-x0 |
Reaching for the Spindown Limit on the Crab Pulsar |
Joseph Betzwieser |
Document Migration
|
28 Mar 2007 |
G050085-x0 |
H1 arm cavity g factor changes resulting from 1064 nm heating |
Joseph Betzwieser et al. |
Document Migration
|
15 Mar 2005 |
T050030-x0 |
Summary of H1 g factor measurements |
Joseph Betzwieser et al. |
Document Migration
|
24 Feb 2005 |
T040158-x0 |
Excess Noise Mechanism in LIGO Output Mode Cleaner |
Joseph Betzwieser et al. |
Document Migration
|
26 Aug 2004 |
T040156-x0 |
Study of the Output Mode Cleaner Prototype using the Phasecamera |
Joseph Betzwieser et al. |
Document Migration
|
23 Aug 2004 |
G040415-x0 |
Study of the Output Mode Cleaner Prototype Using the Phasecmaera - LSC Meeting, August 16th-19th, 2004, Hanford WA |
Joseph Betzwieser et al. |
Document Migration
|
20 Aug 2004 |
G030047-x0 |
Predicting Thermal Noise in Initial LIGO Interferometers - LSC Meeting, March 17th - 20th, Livingston, LA |
Rana Adhikari et al. |
Document Migration
|
20 Mar 2003 |