LIGO Document E1000006-v24

Advanced LIGO Quad Suspension Metal-Build Assembly Procedure

Document #:
LIGO-E1000006-v24
Document type:
E - Engineering documents
Other Versions:
LIGO-E1000006-v20
05 Jul 2011, 14:46
LIGO-E1000006-v18
21 Jun 2011, 09:09
LIGO-E1000006-v16
31 May 2011, 15:59
LIGO-E1000006-v15
18 May 2011, 12:44
LIGO-E1000006-v14
12 May 2011, 09:13
LIGO-E1000006-v13
21 Apr 2011, 08:08
LIGO-E1000006-v10
23 Feb 2011, 09:14
LIGO-E1000006-v9
04 Jan 2011, 15:04
LIGO-E1000006-v6
13 Sep 2010, 09:45
LIGO-E1000006-v1
12 Apr 2010, 11:09
Abstract:
The assembly procedure for the production version of the quad suspension, from receiving of parts through to a balanced and aligned all-metal build in storage. Added wire safety procedure from T1000674.
Files in Document:
Other Files:
Keywords:
sus
Notes and Changes:
-v24: Sentence added to section 3.6 with reference to new drawing D1400167. Section 3.9 extensively revised to cover mitigation steps to deal with problems in early assemblies of the D060422 clamps.
v23: added information in Section 4.1, bullet 2 describing how the weldment orients to the test stand or SEI ISI optics table and how the cartridges orient to the weldment.

-v22, undated clamp-wire-clamp section for UIM clamp assembly D060422, to avoid wire slippage.
Added note about D1300233 on main chain wire clamp assembly for using wire loops from Penultimate mass to UIM.
Removed notes (by strikethrough) on top mass ECD magnets and added info on magnet spacer, D1200749, per RODA M1200147.
Added note to remove blade ECD magnets at UIM main and reaction chain, bug 21

-v21, Updated mass assembly sections with instructions on how to set weights of masses.


DCC Version 3.4.2, contact Document Database Administrators