LIGO-Number |
Title |
Author(s) |
Topic(s) |
Last Updated |
D0900520-v13 |
aLIGO Systems, LHAM3-L1 Top Level Chamber Assembly |
Ignacio Romero et al. |
Final Design
System Engineering
|
24 May 2016 |
D0900456-v13 |
aLIGO Systems, HAM5-L1 Top Level Chamber Assembly |
Ignacio Romero et al. |
Final Design
System Engineering
|
23 Jan 2014 |
D0901464-v6 |
aLIGO Systems Layout LLO Y-End Station |
Jose Eduardo Chavez et al. |
Final Design
System Engineering
|
11 Oct 2016 |
D0901085-v1 |
AdvLIGO SEI HAM2-H1, ISOLATION TABLE TOP LEVEL ASSY. |
Jose Eduardo Chavez et al. |
Final Design
System Engineering
|
26 Jun 2024 |
D0900506-v6 |
aLIGO Systems BSC5-L1, Top Level Chamber Assembly |
Ignacio Romero |
Final Design
System Engineering
|
11 Jun 2018 |
D0900365-v14 |
aLIGO Systems, LHAM2-L1 Top Level Chamber Assembly |
Ignacio Romero et al. |
Final Design
System Engineering
|
21 Apr 2016 |
D0901094-v7 |
aLIGO Systems, HAM3-H1 Top Level Chamber Assembly |
Jose Eduardo Chavez |
Final Design
System Engineering
|
26 Apr 2012 |
D0901812-v1 |
AdvLIGO VE HAM6-L1 Vacuum Equipment Assembly |
Jose Eduardo Chavez |
Final Design
System Engineering
|
10 Sep 2019 |
D0900492-v5 |
aLIGO Systems, BSC3-L1 Top Level Chamber Assembly |
Ignacio Romero |
Final Design
System Engineering
|
12 Jul 2012 |
D0900471-v5 |
aLIGO Systems, BSC4-L1 Top Level Chamber Assembly |
Ignacio Romero |
Final Design
System Engineering
|
23 Jan 2014 |
D0901822-v11 |
aLIGO Systems, HAM6-H1 Top Level Chamber Assembly |
Jose Eduardo Chavez et al. |
Final Design
System Engineering
|
07 Mar 2024 |
D0901811-v10 |
aLIGO Systems, HAM6-L1 Top Level Chamber Assembly |
Jose Eduardo Chavez et al. |
Final Design
System Engineering
|
27 Feb 2015 |
D0900428-v8 |
aLIGO Systems, LBSC2-L1 Top Level Chamber Assembly |
Eduardo Sanchez et al. |
Final Design
System Engineering
|
04 Dec 2023 |
D0901142-v5 |
aLIGO Systems, BSC2-H1 Top Level Chamber Assembly |
Jose Eduardo Chavez |
Final Design
System Engineering
|
04 Dec 2023 |
D0901083-v12 |
aLIGO Systems, HAM2-H1 Top Level Chamber Assembly |
Jose Eduardo Chavez et al. |
Final Design
System Engineering
|
22 Oct 2019 |
D0901821-v3 |
aLIGO Systems, HAM1-H1 Top Level Chamber Assembly |
Jose Eduardo Chavez |
Final Design
System Engineering
|
06 May 2022 |
D0901810-v2 |
AdvLIGO VE HAM1-L1 Vacuum Equipment Assembly |
Jose Eduardo Chavez |
Final Design
System Engineering
|
20 Jan 2023 |
D1201071-v2 |
AdvLIGO BSC5-L1 ISI Table, Payload & Suspended Mass Assembly |
Jose Eduardo Chavez et al. |
Final Design
System Engineering
|
14 Jun 2016 |
D0901129-v7 |
aLIGO Systems, HAM5-H1 Top Level Chamber Assembly |
Jose Eduardo Chavez |
Final Design
System Engineering
|
25 Oct 2017 |
D0901859-v2 |
AdvLIGO, Vacuum Equipment Layout, LLO Corner Station |
Jose Eduardo Chavez |
Final Design
System Engineering
|
14 Mar 2013 |
D1300077-v3 |
AdvLIGO SUS HAM6-L1, XYZ Local CS for Output Mode Cleaner Suspension (OMC) |
Jose Eduardo Chavez |
Final Design
System Engineering
|
24 Jul 2015 |
D0900421-v10 |
aLIGO Systems, HAM4-L1 Top Level Chamber Assembly |
Jose Eduardo Chavez et al. |
Final Design
System Engineering
|
01 Apr 2016 |
E1000337-v4 |
AdvLIGO Detailed Mass Properties-CG Report BSC Tables (LLO) |
Jose Eduardo Chavez |
Final Design
System Engineering
|
14 Jun 2016 |
D0901153-v2 |
AdvLIGO SUS BSC9-H1, XYZ Local CS for ETMX |
Jose Eduardo Chavez |
Final Design
System Engineering
|
27 Jan 2020 |
D0901465-v6 |
aLIGO Systems Layout LLO X-End Station |
Jose Eduardo Chavez et al. |
Final Design
System Engineering
|
05 Sep 2019 |
D0901154-v4 |
aLIGO Systems, WBSC10-H1 Top Level Chamber Assembly |
Jose Eduardo Chavez |
Final Design
System Engineering
|
11 Apr 2013 |
D0901125-v9 |
aLIGO Systems, HAM4-H1 Top Level Chamber Assembly |
Jose Eduardo Chavez et al. |
Final Design
System Engineering
|
31 Oct 2018 |
D0901150-v5 |
aLIGO Systems, WBSC9-H1 Top Level Chamber Assembly |
Jose Eduardo Chavez |
Final Design
System Engineering
|
23 Jan 2014 |
E1000202-v8 |
AdvLIGO Detailed Mass Properties-CG Report BSC Tables LHO |
Jose Eduardo Chavez |
Final Design
System Engineering
|
18 Jun 2014 |
D1100640-v2 |
AdvLIGO HAM Optics Table Dog Clamp SOS Suspensions |
Jose Eduardo Chavez et al. |
Final Design
Input Optics
Installation
System Engineering
|
06 Mar 2013 |
D0900445-v7 |
AdvLIGO SUS BSC1-L1, XYZ Local CS for ITMY |
Jose Eduardo Chavez et al. |
Final Design
System Engineering
|
11 May 2018 |
D0901157-v4 |
AdvLIGO SUS BSC10-H1, XYZ Local CS for ETMY |
Jose Eduardo Chavez |
Final Design
System Engineering
|
26 Mar 2018 |
E1200345-v3 |
Schnupp Effect: ETM /ITM MECHANICAL CLEARANCES & COOKIE CUTTER 'BLANK' FEASIBILITY |
Eduardo Sanchez et al. |
Preliminary Design
System Engineering
|
15 Mar 2018 |
D1200697-v5 |
AdvLIGO IO HAM2-H1, XYZ Local CS for IO PSL PD Assembly (ISS Second Loop PD Array) |
Jose Eduardo Chavez et al. |
Final Design
System Engineering
|
20 Oct 2017 |
D1001072-v1 |
AdvLIGO PSL Enclosure Area (H1 & H2), Corner Station Hanford (WA) |
Jose Eduardo Chavez |
Final Design
System Engineering
|
22 Sep 2017 |
D1002171-v2 |
AdvLIGO SEI HAM3-H1, XYZ Local CS for IO Optic Mounts Components |
Jose Eduardo Chavez et al. |
Final Design
System Engineering
|
22 Jun 2017 |
E1101160-v2 |
HAM6-L Top Level Chamber Assembly BOM |
Jose Eduardo Chavez |
Final Design
System Engineering
|
14 Jun 2016 |
E1101159-v2 |
HAM5-L Top Level Chamber Assembly BOM |
Jose Eduardo Chavez |
Final Design
System Engineering
|
14 Jun 2016 |
E1200296-v1 |
BSC4-H2 Top Level Chamber Assembly BOM |
Jose Eduardo Chavez |
System Engineering
|
14 Jun 2016 |
E1200569-v1 |
HAM1-L Top Level Chamber Assembly BOM |
Jose Eduardo Chavez |
Final Design
System Engineering
|
14 Jun 2016 |
E1201084-v1 |
BSC4 L Top Level Chamber Assembly BOM |
Jose Eduardo Chavez |
Final Design
System Engineering
|
14 Jun 2016 |
E1101165-v2 |
BSC3 L Top Level Chamber Assembly BOM |
Jose Eduardo Chavez |
Final Design
System Engineering
|
14 Jun 2016 |
E1101164-v3 |
BSC2-L Top Level Chamber Assembly BOM |
Jose Eduardo Chavez |
Final Design
System Engineering
|
14 Jun 2016 |
E1101163-v2 |
BSC1 L Top Level Chamber Assembly BOM |
Jose Eduardo Chavez |
Final Design
System Engineering
|
14 Jun 2016 |
E1200974-v1 |
BSC1-W Top Level Chamber Assembly BOM |
Jose Eduardo Chavez |
Final Design
System Engineering
|
14 Jun 2016 |
D0900516-v1 |
AdvLIGO SEI BSC5-L1, XYZ Local CS for ISI Table |
Jose Eduardo Chavez |
Final Design
System Engineering
|
14 Jun 2016 |
D0900436-v1 |
AdvLIGO SUS BSC5-L1, XYZ Local for ETM Tel Assy |
Jose Eduardo Chavez |
Final Design
System Engineering
|
14 Jun 2016 |
D0900517-v3 |
AdvLIGO SUS BSC5-L1, XYZ Local CS for ETMY |
Jose Eduardo Chavez |
Final Design
System Engineering
|
14 Jun 2016 |
D0900507-v3 |
AdvLIGO VE BSC5-L1, Vaccuum Equipment Assembly |
Jose Eduardo Chavez et al. |
Final Design
System Engineering
|
14 Jun 2016 |
E1300289-v1 |
BSC5 L Top Level Chamber Assembly BOM |
Jose Eduardo Chavez |
Final Design
System Engineering
|
14 Jun 2016 |
D0900502-v5 |
AdvLIGO Systems, BSC5-H2 Top Level Chamber Assembly |
Jose Eduardo Chavez |
Final Design
System Engineering
|
19 Oct 2009 |
D0900512-v11 |
aLIGO Systems, WBSC6-H2 Top Level Chamber Assembly |
Jose Eduardo Chavez et al. |
Final Design
System Engineering
|
03 Aug 2015 |
D0901315-v1 |
OBSOLETE COC ETM Optic Container, Cake Tin, Assembly |
Jose Eduardo Chavez |
Final Design
System Engineering
|
27 Jan 2015 |
D0901394-v1 |
OBSOLETE COC R Optic Container, Cake Tin Assembly |
Jose Eduardo Chavez |
Final Design
System Engineering
|
27 Jan 2015 |
D0901299-v1 |
OBSOLETE COC FM Optic Container, Cake Tin Assembly |
Jose Eduardo Chavez |
Final Design
System Engineering
|
27 Jan 2015 |
D0901332-v1 |
OBSOLETE COC CP Optic Container, Cake Tin Assembly |
Jose Eduardo Chavez |
Final Design
System Engineering
|
27 Jan 2015 |
D1002234-v3 |
AdvLIGO SEI HAM3-L1, XYZ Local CS for ISC Components |
Jose Eduardo Chavez et al. |
Final Design
System Engineering
|
22 Jan 2015 |
D0901820-v1 |
AdvLIGO VE HAM1-H1 Vacuum Equipment Assembly |
Jose Eduardo Chavez |
Final Design
System Engineering
|
19 Jan 2015 |
E1200808-v1 |
aLIGO, NAMING CONVENTION EXTERNAL OPTICS TABLES |
Jose Eduardo Chavez |
Final Design
System Engineering
|
14 Jan 2015 |
D0900442-v7 |
aLIGO Systems, BSC1-L1 Top Level Chamber Assembly |
Ignacio Romero et al. |
Final Design
System Engineering
|
10 Dec 2014 |
D0901468-v9 |
aLIGO Systems Layout LHO X-End Station |
Jose Eduardo Chavez et al. |
Final Design
System Engineering
|
31 Jul 2014 |
D0901467-v9 |
aLIGO Systems Layout LHO Y-End Station |
Jose Eduardo Chavez et al. |
Final Design
System Engineering
|
31 Jul 2014 |
D0901490-v5 |
aLIGO LIVINGSTON SYSTEM LAYOUT |
Jose Eduardo Chavez et al. |
System Engineering
|
19 Jun 2014 |
E1200562-v4 |
aLIGO Tree and Chamber Level DCC Drawing Numbers |
Calum Torrie et al. |
System Engineering
|
21 Apr 2014 |
D0900360-v13 |
aLIGO Systems, WBSC8-H2 Top Level Chamber Assembly |
Jose Eduardo Chavez |
Final Design
System Engineering
|
23 Jan 2014 |
D0901137-v5 |
aLIGO Systems, BSC1-H1 Top Level Chamber Assembly |
Jose Eduardo Chavez |
Final Design
System Engineering
|
23 Jan 2014 |
D1002235-v6 |
AdvLIGO SEI HAM3-L1, XYZ Local CS for IO Optic Mount Components |
Jose Eduardo Chavez et al. |
Final Design
System Engineering
|
09 Oct 2013 |
D0901146-v5 |
aLIGO Systems, BSC3-H1 Top Level Chamber Assembly |
Jose Eduardo Chavez |
Final Design
System Engineering
|
09 Oct 2013 |
D0901099-v2 |
AdvLIGO SUS HAM3-H1, XYZ Local CS for HSTS (MC2) Sub-Assy |
Jose Eduardo Chavez et al. |
Final Design
System Engineering
|
12 Feb 2013 |
D0901098-v2 |
AdvLIGO SUS HAM3-H1, XYZ Local CS for HSTS (PR2) Sub-Assy |
Jose Eduardo Chavez et al. |
Final Design
System Engineering
|
12 Feb 2013 |
D0901089-v3 |
aLIGO SUS HAM2-H1, XYZ Local CS for HSTS (MC3) Sub-Assy |
Jose Eduardo Chavez et al. |
Final Design
System Engineering
|
12 Feb 2013 |
D0901088-v3 |
AdvLIGO SUS HAM2-H1, XYZ Local CS for HSTS (MC1) Sub-Assy |
Jose Eduardo Chavez et al. |
Final Design
System Engineering
|
12 Feb 2013 |
D0900413-v6 |
aLIGO SUS HAM2-L1, XYZ Local CS for HSTS (MC1) Sub-Assy |
Jose Eduardo Chavez et al. |
Final Design
System Engineering
|
25 Jan 2013 |
D0900419-v2 |
AdvLIGO SUS BSC6-H2, XYZ Local CS for TMS ETM Tel Assy |
Jose Eduardo Chavez et al. |
Auxiliary Optics
|
14 Aug 2012 |
D0900515-v7 |
aLIGO SUS BSC6-H2, XYZ Local CS for ETMY |
Jose Eduardo Chavez et al. |
Final Design
System Engineering
|
29 Jun 2012 |
D1001122-v2 |
AdvLIGO SUS BSC8-H2, XYZ Local CS for SLC Arm Cavity Baffle |
Jose Eduardo Chavez |
Final Design
System Engineering
|
16 Dec 2011 |
D0900363-v4 |
aLIGO SUS BSC8-H2, XYZ Local CS for ITMY |
Jose Eduardo Chavez et al. |
Final Design
System Engineering
|
14 Dec 2011 |
E1000404-v2 |
ACB Interface BSC Chambers H1, H2 for Advanced LIGO |
Jose Eduardo Chavez |
Fabrication
System Engineering
|
18 Mar 2011 |
D0901266-v1 |
AdvLIGO COC FM BS Optic Container Cover, Top, |
Jose Eduardo Chavez |
Final Design
System Engineering
|
17 Jul 2009 |
D0901400-v1 |
Adv LIGO COC R Optic Container, Plastic, Insert, Base, Alum Box Rnd |
Jose Eduardo Chavez |
Final Design
System Engineering
|
17 Jul 2009 |
D0901352-v1 |
Adv LIGO COC R Optic Container, Cover, Lid, Alum Box Rnd |
Jose Eduardo Chavez |
Final Design
System Engineering
|
17 Jul 2009 |
D0901354-v1 |
Adv LIGO COC R Optic Container, Base, Lid, Alum Box Rnd |
Jose Eduardo Chavez |
Final Design
System Engineering
|
17 Jul 2009 |
D0901353-v1 |
Adv LIGO COC R Optic Container, Cover, Ring, Alum Box Rnd |
Jose Eduardo Chavez |
Installation
System Engineering
|
17 Jul 2009 |
D0901355-v1 |
Adv LIGO COC R Optic Container, Base, Ring, Alum Box Rnd |
Jose Eduardo Chavez |
Final Design
System Engineering
|
17 Jul 2009 |
D0901356-v1 |
Adv LIGO COC R Optic Container, Plate, Fitting, Mirror Wedge, Alum Box Rnd |
Jose Eduardo Chavez |
Final Design
System Engineering
|
17 Jul 2009 |
D0901399-v1 |
AdvLIGO COC CP Optic Container Plastic, Insert, Base, Alum Box Rnd, CP |
Jose Eduardo Chavez |
Final Design
System Engineering
|
17 Jul 2009 |
D0901330-v1 |
AdvLIGO COC CP Optic Container Base, Lid, Alum Box Rnd |
Jose Eduardo Chavez |
Final Design
System Engineering
|
17 Jul 2009 |
D0901331-v1 |
AdvLIGO COC CP Optic Container Base, Ring, Alum Box Rnd, CP |
Jose Eduardo Chavez |
Final Design
System Engineering
|
17 Jul 2009 |
D0901329-v1 |
AdvLIGO COC CP Optic Container Plate, Fitting, Mirror Wedge, Alum Box Rnd, CP |
Jose Eduardo Chavez |
Final Design
System Engineering
|
17 Jul 2009 |
D0901328-v1 |
AdvLIGO COC CP Optic Container Cover, Ring, Alum Box Rnd, CP |
Jose Eduardo Chavez |
Final Design
System Engineering
|
17 Jul 2009 |
D0901327-v1 |
AdvLIGO COC CP Optic Container Cover, Lid, Alum Box Rnd |
Jose Eduardo Chavez |
Final Design
System Engineering
|
17 Jul 2009 |
D0901270-v1 |
AdvLIGO COC FM BS Optic Container Plastic, Insert, Base |
Jose Eduardo Chavez |
Final Design
System Engineering
|
17 Jul 2009 |
D0901268-v1 |
AdvLIGO COC FM BS Optic Container Plate, Fitting, Mirror Wedge |
Jose Eduardo Chavez |
Final Design
System Engineering
|
17 Jul 2009 |
D0901267-v1 |
AdvLIGO COC FM BS Optic Container Base, Bottom, |
Jose Eduardo Chavez |
Final Design
System Engineering
|
17 Jul 2009 |
D0901212-v1 |
AdvLIGO COC ETM Optic Container Base, Lid, |
Jose Eduardo Chavez |
Final Design
System Engineering
|
17 Jul 2009 |
D0901211-v1 |
AdvLIGO COC ETM Optic Container Base, Ring, |
Jose Eduardo Chavez |
Fabrication
System Engineering
|
17 Jul 2009 |
D0901210-v1 |
AdvLIGO COC ETM Optic Container Cover, Lid, |
Jose Eduardo Chavez |
Final Design
System Engineering
|
17 Jul 2009 |
D0901317-v1 |
AdvLIGO COC ETM Optic Container Plastic, Insert, Base, Alum Box Rnd |
Jose Eduardo Chavez |
Final Design
System Engineering
|
17 Jul 2009 |
D0901316-v1 |
AdvLIGO COC ETM Optic Container Block, Spring Loaded, Adjustable/Alignment Stop Mirror |
Jose Eduardo Chavez |
Final Design
System Engineering
|
17 Jul 2009 |
D0901398-v1 |
AdvLIGO COC ETM Optic Container Plate, Adjustable/Alignment Stop Mirror, |
Jose Eduardo Chavez |
Final Design
System Engineering
|
17 Jul 2009 |
D0901209-v1 |
AdvLIGO COC ETM Optic Container Cover, Ring |
Jose Eduardo Chavez |
Final Design
System Engineering
|
17 Jul 2009 |
D0901208-v1 |
AdvLIGO COC ETM Optic Container Plate, Fitting, Mirror Wedge |
Jose Eduardo Chavez |
Final Design
System Engineering
|
17 Jul 2009 |
D0901064-v1 |
AdvLIGO COC Optic Container Handle, Cover Lid |
Jose Eduardo Chavez |
Final Design
System Engineering
|
17 Jul 2009 |
D0901063-v1 |
AdvLIGO COC Optic Container Plate, Retaining Screw, Fitting Plate, Mirror Wedge |
Jose Eduardo Chavez |
Final Design
System Engineering
|
17 Jul 2009 |
D0901311-v1 |
AdLIGO COC Optics Container Custom Viton Bellow for wedge plate adjuster |
Jose Eduardo Chavez |
Core Optics
|
17 Jul 2009 |
D0901321-v1 |
AdvLIGO COC Optic Container Rod, Guide, End Threaded, 1/4-20 |
Jose Eduardo Chavez |
Final Design
System Engineering
|
17 Jul 2009 |
D0901320-v1 |
AdvLIGO COC Optic Container Screw Retaining End Slot |
Jose Eduardo Chavez |
Final Design
System Engineering
|
17 Jul 2009 |
D0901322-v1 |
AdvLIGO COC Optic Container Block Cover Removal |
Jose Eduardo Chavez |
Final Design
System Engineering
|
17 Jul 2009 |