LIGO-Number |
Title |
Author(s) |
Topic(s) |
Last Updated |
G2301207-v1 |
Aerial photographs of LIGO Hanford Observatory, c. 2023 |
Michael Landry et al. |
Public relations
Observatory Facilities
|
27 Sep 2024 |
P2400364-v1 |
LIGO Spectra special edition comic |
Joey Key et al. |
Education, Outreach
|
21 Aug 2024 |
T2300318-v1 |
Analyzing LIGO Ring Heaters: Investigating Electrical Shorting, Troubleshooting Mechanical Failures, and Modeling Future Designs - Rachel McQueen |
Rachel McQueen et al. |
Assembly
Sensing and Control
Other data analysis
|
03 Apr 2024 |
T2300327-v1 |
Leveraging the stability of the Photon Calibrator X/Y comparison to reduce system uncertainty |
Julianna Lewis et al. |
Calibration
Education, Outreach
|
03 Apr 2024 |
T040164-v2 |
SFT Data Format Version 2--3 Specification |
Bruce Allen et al. |
Continuous Wave
|
12 Nov 2022 |
T1600014-v1 |
Report of the Detection Committee |
Frederique Marion et al. |
GW Bursts
Data quality / vetoes
Compact Binaries
Detector Characterization
|
10 Aug 2020 |
G1501317-v8 |
How we know GW150914 was NOT an injection |
Matthew Evans |
Data quality / vetoes
|
10 Aug 2020 |
G2000774-v1 |
LIGO Exploration Center Conceptual Design |
Amber Strunk et al. |
Education, Outreach
|
20 May 2020 |
L2000119-v3 |
COVID-19 plan for observatory sites |
Joe Giaime et al. |
Policies
Risk Management
Management
|
16 Mar 2020 |
G1800711-v2 |
LHO SEC |
Michael Landry et al. |
Education, Outreach
|
09 Oct 2019 |
P040057-x0 |
Making h(t) for LIGO (S3 Calibration Paper) |
Bruce Allen et al. |
Document Migration
|
16 Mar 2019 |
P080118-v3 |
Precise calibration of LIGO test mass actuators using photon radiation pressure |
Daniel Sigg et al. |
Calibration
|
16 Mar 2019 |
P0900155-v6 |
Accurate calibration of test mass displacement in the LIGO interferometers |
Jeffrey Kissel et al. |
Commissioning
Calibration
Observatory Facilities
|
16 Mar 2019 |
G1801697-v1 |
Summary of DAWN-4 sessions |
Jess McIver et al. |
Meeting
|
31 Aug 2018 |
E1400464-v5 |
aLIGO Installation Acceptance Document for WBSC10 (Y) |
Michael Landry et al. |
Installation
|
30 Jan 2015 |
E1400463-v5 |
aLIGO Installation Acceptance Document for WBSC9 (X) |
Michael Landry et al. |
Installation
|
30 Jan 2015 |
E1400462-v5 |
aLIGO Installation Acceptance Document for WBSC3 (X) |
Michael Landry |
Installation
|
12 Feb 2015 |
E1400461-v4 |
aLIGO Installation Acceptance Document for WBSC2 |
Michael Landry et al. |
Installation
|
12 Feb 2015 |
E1400460-v5 |
aLIGO Installation Acceptance Document for WBSC1 (Y) |
Michael Landry et al. |
Installation
|
12 Feb 2015 |
E1400439-v3 |
aLIGO Installation Acceptance Document for WHAM2 |
Michael Landry et al. |
Installation
|
20 Jan 2015 |
P1700294-v8 |
Multi-Messenger Observations of a Binary Neutron Star Merger |
LIGO Scientific Collaboration et al. |
Astrophysics / Multi-messenger
|
22 Dec 2017 |
P1600285-v21 |
Validating gravitational-wave detections: The Advanced LIGO hardware injection system |
Christopher Biwer et al. |
Detector
|
20 Feb 2017 |
E1500291-x0 |
aLIGO, INJ |
Eric Thrane et al. |
GW Bursts
Compact Binaries
Stochastic
Calibration
Continuous Wave
Detector Characterization
|
27 Jul 2016 |
P151226-v13 |
GW151226: Observation of Gravitational Waves from a 22-Solar-Mass Binary Black Hole Coalescence |
LIGO Scientific Collaboration et al. |
Compact Binaries
|
15 Jun 2016 |
G1600258-v1 |
GW150914: Observation of Gravitational Waves from a Black Hole Binary Merger |
Michael Landry et al. |
Detector
Public Talk / Colloquium
Compact Binaries
Education, Outreach
|
11 Feb 2016 |
L1500138-v6 |
LLO, LHO site status for GW150914 |
LIGO Scientific Collaboration et al. |
Detector
Data Analysis
|
11 Feb 2016 |
G1600256-v1 |
DCC test doc |
Michael Landry |
Detector
|
10 Feb 2016 |
T1500542-v2 |
Cavity Alignment Using Fringe Scanning: LIGO SURF Final Report |
Laura Sinkunaite et al. |
Sensing and Control
Data analysis software
|
23 Dec 2015 |
L1500019-v1 |
LHO Installation Acceptance Review Report |
Michael Landry et al. |
Reviews
|
06 May 2015 |
E1400438-v5 |
aLIGO Installation Acceptance Document for WHAM1 |
Michael Landry et al. |
Installation
|
26 Mar 2015 |
P1400105-v5 |
Achieving Resonance in the Advanced LIGO Gravitational-Wave Interferometer |
Alexa N Staley et al. |
Sensing and Control
Integration
Basic R&D
|
05 Mar 2015 |
E1400459-v11 |
aLIGO LHO Installation Acceptance "Punch List" |
Michael Landry et al. |
Detector
Installation
Reviews
|
12 Feb 2015 |
E1400466-v4 |
aLIGO Installation Acceptance Document for H1 PSL |
Michael Landry et al. |
Installation
|
11 Feb 2015 |
E1400467-v3 |
aLIGO Installation Acceptance Document for LHO Vacuum Equipment |
Michael Landry |
Installation
|
10 Feb 2015 |
E1400465-x0 |
aLIGO Installation Acceptance Document for H1 DAQ |
Michael Landry |
Installation
|
09 Feb 2015 |
E1400441-v7 |
aLIGO Installation Acceptance Document for WHAM4 |
Michael Landry |
Installation
|
09 Feb 2015 |
E1400440-v3 |
aLIGO Installation Acceptance Document for WHAM3 |
Michael Landry et al. |
Installation
|
02 Feb 2015 |
E1400443-v4 |
aLIGO Installation Acceptance Document for WHAM6 |
Michael Landry |
Installation
|
30 Jan 2015 |
E1400442-v4 |
aLIGO Installation Acceptance Document for WHAM5 |
Michael Landry |
Installation
|
27 Jan 2015 |
D1002834-v2 |
aLIGO Installation, LLO Y-End Station, Cartridge & Cleanroom, Layout |
Brian O'Reilly et al. |
Conceptual Design
Installation
Observatory Facilities
|
14 Jan 2015 |
L1400082-v2 |
LLO Installation Acceptance Review Report |
Michael Landry et al. |
Detector
Installation
Reviews
|
21 Jun 2014 |
T1400385-v2 |
Incursion/installation plan for WHAM6, June 2014 |
Keita Kawabe et al. |
Installation
|
10 Jun 2014 |
E1200483-x0 |
aLIGO, INS |
Michael Landry et al. |
Detector
Installation
|
03 Apr 2014 |
P1100166-v4 |
Controlling calibration errors in gravitational-wave detectors by precise location of calibration forces |
Hernan Daveloza et al. |
Modelling
Collaboration
Core Optics
Calibration
|
24 Dec 2012 |
D1002842-v1 |
aLIGO Installation, LLO X-End Station, Cartridge & Cleanroom, Layout |
Brian O'Reilly et al. |
Installation
Observatory Facilities
|
18 Dec 2012 |
E0900006-v1 |
Review of HAM-ISI "Watchdog" safety software |
Sam Waldman et al. |
Data Acquisition System
Seismic Isolation
Suspensions
Data and Computing
Safety
System Engineering
|
01 Apr 2012 |
T1100071-v9 |
Frequency Domain Calibration Error Budget of LIGO Instruments in S6 |
Keita Kawabe et al. |
Detector
Calibration
|
06 Jan 2012 |
G1100511-v5 |
Plenary 4 aLIGO Installation Status, April 2011 |
Brian O'Reilly et al. |
Reviews
|
05 May 2011 |
M1000142-v2 |
Advanced LIGO Review Committee Report: Test Mass Optical Lever PDR |
Hugh Radkins et al. |
Reviews
Auxiliary Optics
|
24 Sep 2010 |
T050089-v1 |
Snapshot of LIGO Mechanical Resonances HTML Pages, Circa S1-S4 |
Michael Landry |
Core Optics
Basic R&D
|
16 Jul 2010 |
G1000391-v1 |
LIGO : The Laser Interferometer Gravitational Wave Observatory |
Michael Landry et al. |
Detector
Public Talk / Colloquium
|
12 May 2010 |
T0900401-v2 |
Analyzing Elastic Deformation of Test Masses in Ligo |
Richard Savage et al. |
Modelling
Core Optics
Calibration
|
09 Nov 2009 |
P070136-x0 |
Searches for continuous gravitational waves with LIGO and GEO600 |
Michael Landry |
Document Migration
Public relations
|
19 Oct 2009 |
P070123-x0 |
Searching for gravitational waves from Cassiopeia A with LIGO |
Alicia M Sintes et al. |
Document Migration
Public relations
|
16 Oct 2009 |
E0900043-v1 |
LHO HAM6 Incursion procedure - Feb 09 |
Michael Landry |
Sensing and Control
|
01 Apr 2009 |
E0900097-v1 |
LHO HAM6 incursion procedure – Mar 09 |
Keita Kawabe et al. |
Sensing and Control
|
01 Apr 2009 |
E0900029-v1 |
H1 HAM4 97/3 BS Installation |
Michael Landry |
Auxiliary Optics
|
16 Mar 2009 |
M080034-v1 |
Magnet Swap Review for Enhanced LIGO |
Norna Robertson |
Upgrades
Suspensions
Reviews
|
13 Mar 2009 |
G080387-x0 |
Enhanced LIGO Status - PAC 24 Meeting @ LIGO Hanford Observatory, June 24-25, 2008 |
Michael Landry |
Document Migration
|
15 Jul 2008 |
G080190-x0 |
Beating the spin-down limit on gravitational wave emission from the Crab pulsar |
Michael Landry |
Document Migration
|
28 May 2008 |
G080216-x0 |
Investigation of Discrepancies Between Photon Calibrator, VCO and Official (Coil) Calibration Techniques - LSC/Virgo Collaborations Meeting @ Caltech, March 17-20, 2008 |
Justin Garofoli et al. |
Document Migration
|
04 Apr 2008 |
G070631-x0 |
Towards Gravitational Wave Astronomy |
Michael Landry |
Document Migration
|
29 Nov 2007 |
G070039-x0 |
LIGO Status |
Michael Landry |
Document Migration
|
28 Mar 2007 |
G060514-x0 |
Gravitational Wave Astronomy II |
Michael Landry |
Document Migration
|
01 Mar 2007 |
G060515-x0 |
Gravitational Wave Astronomy III |
Michael Landry |
Document Migration
|
01 Mar 2007 |
G060513-x0 |
Gravitational Wave Astronomy I |
Michael Landry |
Document Migration
|
01 Mar 2007 |
T050059-x0 |
Calibration of the LIGO detectors for the S3 |
Gabriela Gonzalez et al. |
Document Migration
|
11 Sep 2006 |
G060230-x0 |
Expanding Horizons: Yours. Mine. The Universe`s |
Michael Landry |
Document Migration
|
14 Jun 2006 |
G060117-x0 |
S5 calibration: time dependent coefficients - LSC Meeting, March 19-22, 2006, Hanford WA |
Gabriela Gonzalez et al. |
Document Migration
|
14 Apr 2006 |
T060062-x0 |
Outline: continuous-wave detection validation steps |
Michael Landry |
Document Migration
|
10 Apr 2006 |
T040175-x0 |
Specification for Storing Calibration Data for LIGO |
Duncan Brown et al. |
Document Migration
|
05 Jan 2006 |
T040211-x0 |
Design Note: LHO Microseism Mitigation |
Michael Landry et al. |
Document Migration
|
20 Sep 2005 |
G050387-x0 |
Spectral Line Catalogue Status - LSC Meeting, August 14th - 17th, Hanford WA |
Philip Charlton et al. |
Document Migration
|
18 Aug 2005 |
G050404-x0 |
h(t): Are You Experienced? - LSC Meeting, August 14th - 17th, Hanford WA |
Michael Landry |
Document Migration
|
17 Aug 2005 |
T040060-x0 |
Calibration of the LIGO Detectors for S2 |
Gabriela Gonzalez et al. |
Document Migration
|
21 Apr 2005 |
G050129-x0 |
Hardware Injections in S4 - LSC Meeting, March 20-23, 2005, Livingston LA |
Sukanta Bose et al. |
Document Migration
|
25 Mar 2005 |
T050003-x0 |
StackSlide And Hough Search SNR And Statistics |
Michael Landry et al. |
Document Migration
|
08 Feb 2005 |
G040423-x0 |
Improving LIGO`s Stability and Sensitivity: Commissioning Examples |
Michael Landry |
Document Migration
|
02 Sep 2004 |
G040250-x0 |
CW Search Group Efforts - Overview |
Michael Landry |
Document Migration
|
28 Jun 2004 |
G040251-x0 |
S2 and S3 calibration status - LSC Meeting @ Tufts University, June 5-6, 2004 |
Michael Landry |
Document Migration
|
28 Jun 2004 |
G040133-x0 |
Summary of E10 / S3 Hardware Signal Injections - LSC Meeting, March 15 - 18th, Livingston, LA |
Bruce Allen et al. |
Document Migration
|
24 May 2004 |
G040176-x0 |
Time Domain Calibration: Making h(t) for LIGO - LSC Meeting, March 15 - 18th, Livingston, LA |
Bruce Allen et al. |
Document Migration
|
19 Mar 2004 |
G040177-x0 |
Calculation of the phases of injected pulsars from the servo loop - LSC Meeting, March 15 - 18th, Livingston, LA |
Bruce Allen et al. |
Document Migration
|
19 Mar 2004 |
G040143-x0 |
S2/S3 Calibration - LSC Meeting, March 15 - 18th, Livingston, LA |
Rana Adhikari et al. |
Document Migration
|
18 Mar 2004 |
G040152-x0 |
Storing Time-Domain Calibration Information in Frame Files - LSC Meeting, March 15 - 18th, Livingston, LA |
Gabriela Gonzalez et al. |
Document Migration
|
18 Mar 2004 |
G030628-x0 |
Calibration of Data in the Time Domain - LSC Meeting, November 10th - 13th, Hanford WA |
Bruce Allen et al. |
Document Migration
|
14 Nov 2003 |
G030605-x0 |
Calibration: S2 update, S3 preliminaries - LSC Meeting, November 10th - 13th, Hanford WA |
Rana Adhikari et al. |
Document Migration
|
14 Nov 2003 |
G030629-x0 |
Calculation of Alpha(t) and Beta(t) - LSC Meeting, November 10th - 13th, Hanford WA |
Jolien Creighton et al. |
Document Migration
|
14 Nov 2003 |
G030426-x0 |
S2 Calibration |
Rana Adhikari et al. |
Document Migration
|
14 Oct 2003 |
G030397-x0 |
The Stack-Slide Search - LSC Meeting, August 18th - 21st, Hannover, Germany |
Michael Landry et al. |
Document Migration
|
27 Aug 2003 |
G030389-x0 |
LIGO Commissioning and Initial Science Runs: Current Status |
Michael Landry |
Document Migration
|
11 Aug 2003 |
G030307-x0 |
Monitoring LIGO Data During the S2 Science Run |
Michael Landry |
Document Migration
|
30 Jul 2003 |
G030310-x0 |
S3 Expectations, S2 Calibration |
Michael Landry |
Document Migration
|
24 Jun 2003 |
G030259-x0 |
LIGO Commissioning and Initial Science Runs: Current Status |
Michael Landry |
Document Migration
|
05 Jun 2003 |
T030097-x0 |
Calibration of the LIGO detectors for the First LIGO Scientific Run |
Rana Adhikari et al. |
Document Migration
|
28 May 2003 |
G030093-x0 |
Calibration Testing - LSC Meeting, March 17th - 20th, Livingston, LA |
Gabriela Gonzalez et al. |
Document Migration
|
23 Apr 2003 |
G030092-x0 |
Autocalibration - LSC Meeting, March 17th - 20th, Livingston, LA |
Michael Landry |
Document Migration
|
03 Apr 2003 |
T020166-x0 |
Detecting a Stochastic Background of Gravitational Radiation - Background Information |
Bruce Allen et al. |
Document Migration
|
29 Jan 2003 |
T020141-x0 |
Input Test Mass (ITM) Absolute Calibrations: Fringe Counting, Fringe Fitting, and Sign Toggling Methods |
Rana Adhikari et al. |
Document Migration
|
25 Sep 2002 |
G020376-x0 |
Stochastic Upper Limit Group E7 Report - LSC Meeting, August 19th - 22nd, Hanford WA |
Bruce Allen et al. |
Document Migration
|
21 Aug 2002 |
T020115-x0 |
Stochastic Sources Upper Limit Group E7 Report |
Bruce Allen et al. |
Document Migration
|
19 Aug 2002 |
G020253-x0 |
Intersite Environmental Transients, E5, E6 and E7 Investigations - LSC Meeting, March 20 - 23, Livingston LA |
Gabriela Gonzalez et al. |
Document Migration
|
06 Jun 2002 |
G020067-x0 |
The Mechanics of an Engineering Run Amplitude Calibration - LSC Meeting, March 20 - 23, Livingston LA |
Rana Adhikari et al. |
Document Migration
|
28 Mar 2002 |
G010396-x0 |
Intersite Environmental Correlations: E3 and E4 Investigations, Part 2: Bursts |
Nelson Christensen et al. |
Document Migration
|
13 Nov 2001 |
T010017-x0 |
Proposal to Set an Upper Limit on Stochastic Sources Using LIGO Engineering Data |
Bruce Allen et al. |
Document Migration
|
27 Aug 2001 |
G010286-x0 |
E3/E4 PEM Correlations, Part 1 - LSC Meeting August 13 - 16, Hanford WA |
Nelson Christensen et al. |
Document Migration
|
22 Aug 2001 |
G010285-x0 |
E3/E4 Displacement Sensitivity Calibration for the LLO 4km IFO - LSC Meeting August 13 -16, Hanford WA |
Warren Johnson et al. |
Document Migration
|
20 Aug 2001 |
G010252-x0 |
LIGO Sensing System Performance |
Michael Landry |
Document Migration
|
24 Jul 2001 |
T000072-x0 |
Proposal for Remote Control of Laser Power into 2km LHO Mode Cleaner |
Peter Fritschel et al. |
Document Migration
|
04 May 2001 |
G010109-x0 |
The Datacond API - LSC Meeting March 14 -17 2001 Livingston, LA |
Warren Anderson et al. |
Document Migration
|
20 Mar 2001 |
G010057-x0 |
E2 Amplitude Calibration of the Hanford Recombined 2km IFO - LSC Meeting March 14 -17 2001 Livingston, LA |
Michael Landry et al. |
Document Migration
|
13 Mar 2001 |
G000337-x0 |
E2 Calibration of the Hanford 2km IFO |
Michael Landry et al. |
Document Migration
|
20 Dec 2000 |
T000020-x0 |
Summary of Mechanical Resonances in the LIGO Hanford Interferometers |
Michael Landry et al. |
Document Migration
|
03 Mar 2000 |