LIGO Document E0900029-v1
- This procedure describes the swap of the H1 HAM4 DC/RF output beam splitter, currently 50/50, for the eLIGO final configuration one of 97/3.
- Installed OBS was measured to be 95/5, 3/8" and P-Pol.
DCC Version 3.4.3, contact
Document Database Administrators