LIGO Document E1201035-v26

aLIGO Chamber Entry & Exit Procedures

Document #:
LIGO-E1201035-v26
Document type:
E - Engineering documents
Other Versions:
LIGO-E1201035-v25
12 Nov 2025, 08:51
Abstract:
The scope of this document is to summarize the general steps associated with entering HAM and BSC chambers, cleaning in-chamber items (as required) and then exiting the chambers. In general, these steps should be followed for all incursions subsequent to initial installation e.g. commissioning, final alignment or venting for scheduled maintenance. All top level installation procedures are grouped at LIGO-E1200023: aLIGO Chamber (Top Level) Installation Procedures. For latest information on optic cleaning refer to the following COC DCN, E1300142. The marked up version of the main document or the check-list should be posted to the DCC as part of a chamber vent. For checklist go to page 4 of main pdf and print as required.

NOV 2025: For full details on which GV and FGV to close / open refer to T2500020.

Files in Document:
Other Files:
Notes and Changes:
Added step to check TCS CO2 alignment to CP on BSC1 and BSC3

DCC Version 3.5.4.3, contact DCC Help