E1201035-v25 |
aLIGO Chamber Entry & Exit Procedures |
Calum Torrie et al. |
Safety
System Engineering
|
27 Mar 2023 |
E1300017-v8 |
First Contact Spray Application & Removal Procedure |
Calum Torrie et al. |
System Engineering
|
12 Aug 2021 |
T1300493-v1 |
"Known" Particulate Sample Poster |
Kaitlin Gushwa et al. |
System Engineering
|
11 Feb 2021 |
T1100530-v7 |
Overall Work flow for in-vacuum cables. |
Calum Torrie et al. |
System Engineering
|
08 Dec 2020 |
E1400363-x0 |
Collection of Documents associated with cleaning optics for advanced LIGO |
Calum Torrie et al. |
Core Optics
System Engineering
|
01 Aug 2018 |
T1100605-v3 |
Inspection of In-Vacuum Cables at Livingston and Hanford |
Kaitlin Gushwa |
System Engineering
|
08 Mar 2017 |
G1501076-v1 |
C is For Charging - Update on aLIGO Test Mass Charging |
Kaitlin Gushwa et al. |
System Engineering
|
07 Mar 2017 |
E1500214-v6 |
Assembly procedure - OMC stray light baffle aka Black Glass Shroud |
Kaitlin Gushwa et al. |
System Engineering
|
07 Mar 2017 |
G1500539-v3 |
You can look but you can't touch - slides prepared for SYS meeting 22nd April 2015 |
Calum Torrie et al. |
System Engineering
|
06 Jun 2015 |
E1201096-v5 |
Contamination Sample Handling - How to receive, use, send, buy and store samples. |
Calum Torrie et al. |
System Engineering
|
06 May 2015 |
T1400492-v3 |
1" Witness Optic: Ionizer |
Kaitlin Gushwa et al. |
System Engineering
|
02 Dec 2014 |
P1400205-v8 |
Coming Clean: Understanding and Mitigating Optical Contamination and Laser Induced Damage in Advanced LIGO |
Kaitlin Gushwa et al. |
Core Optics
System Engineering
|
28 Oct 2014 |
G1400378-v2 |
Hanford Contamination Control Update - Back to Basics (March 2014) |
Kaitlin Gushwa et al. |
System Engineering
|
21 Oct 2014 |
G1400396-v5 |
Plenary Lecture for SPIE Laser Damage 2014 |
Calum Torrie et al. |
System Engineering
|
18 Sep 2014 |
G1400209-v2 |
Laser Induced Damage due to Particulate Contamination |
GariLynn Billingsley et al. |
Basic R&D
Core Optics
|
08 Sep 2014 |
E1400258-v3 |
Contamination Control Mitigation Processes and the resulting Cleanliness Levels |
Calum Torrie et al. |
Operations
Installation
System Engineering
Core Optics
|
19 Jun 2014 |
T1300665-v9 |
The LIGO Particulate Evaluation Tool (PET) |
Kaitlin Gushwa et al. |
System Engineering
|
03 Jun 2014 |
T1400386-x0 |
LIGO Contamination Control Processes and Mitigation Steps - Obsolete |
Calum Torrie et al. |
System Engineering
|
03 Jun 2014 |
P1300192-v2 |
Optical contamination control in the Advanced LIGO ultra-high vacuum system |
Margot Hennig et al. |
System Engineering
Core Optics
|
11 Mar 2014 |
G1301249-v3 |
Hanford and Livingston Contamination Control Update Dec 2013-Jan2014 |
Kaitlin Gushwa et al. |
System Engineering
|
11 Mar 2014 |
G1400142-v1 |
Summary of 4" Wafer Data |
Calum Torrie et al. |
System Engineering
|
11 Mar 2014 |
G1300995-v1 |
aLIGO Contamination Control and Analysis Fall 2013 LVC Meeting |
Kaitlin Gushwa |
System Engineering
Meeting
|
22 Jan 2014 |
D1301007-v6 |
Particle Evaluation Tool - Custom Microscope Templates |
Calum Torrie et al. |
System Engineering
|
08 Jan 2014 |
T1300093-v7 |
Prudential Body Box Results |
Kaitlin Gushwa et al. |
Basic R&D
System Engineering
|
01 Nov 2013 |
D0900413-v6 |
aLIGO SUS HAM2-L1, XYZ Local CS for HSTS (MC1) Sub-Assy |
Jose Eduardo Chavez et al. |
Final Design
System Engineering
|
25 Jan 2013 |
G1200915-v1 |
In-Vacuum Cables – Lessons From Advanced LIGO Assembly & Installation |
Kaitlin Gushwa |
Suspensions
System Engineering
|
17 Jan 2013 |
T1200266-v3 |
Ground Loop Hunting on HXTS Suspensions |
Kaitlin Gushwa et al. |
Suspensions
|
17 Jan 2013 |