Document List by Topic

These documents on Project Controls (subtopic of Detector) are available:
(List events on Project Controls)

LIGO-Number Title Author(s) Topic(s) Last Updated
C2500022-x0 Project Management Brian O'Reilly Project Controls
LIGO-India
Observatory Facilities
System Engineering
17 Jan 2025
T1900280-v1 Optimal non-linear control for LIGO interferometers Millind Vaddiraju et al. Project Controls
01 Mar 2020
M050303-v5 Advanced LIGO Project Execution Plan David Shoemaker et al. Project Controls
Management
25 Nov 2015
T1500091-v1 3IFO PSL ISS Photodetector Array Inventory Peter King Email Gary Davis et al. Project Controls
20 Mar 2015
T1500083-v1 3IFO PSL Table Contents Packing Lists/Inventory Gary Davis et al. System Engineering
Project Controls
04 Mar 2015
M1300468-v10 Acceptance Process for the Advanced LIGO Project Dennis Coyne et al. Policies
Project Controls
23 Feb 2015
M070102-v2 M070102 Advanced LIGO Change Control Procedure Carol Wilkinson et al. Project Controls
Change Control
22 Feb 2015
P1400189-v1 Correlated Noise in LIGO Detectors from Schumann Resonance Ryan Horton et al. Project Controls
Education, Outreach
Calibration
25 Sep 2014
T1300734-v1 Simulating the Advanced LIGO Interferometer Using the Real Control Code Juan Castillo Project Controls
31 Aug 2014
G1300850-v1 Simulating the Advanced LIGO Interferometer Using the Real Control Code Juan Castillo Project Controls
27 Nov 2013
M060056-v2 Advanced LIGO Reference Design David Shoemaker Detector
Conceptual Design
Reports
08 May 2011
M0810012-v2 Advanced LIGO UK Project Management Meeting Number 51, Telecon Dec 2008 Justin Greenhalgh Project Controls
18 Mar 2009

Number of documents found: 12


DCC Version 3.5.0, contact DCC Help