E1500229-v14 |
Third IFO Component Request Log |
Dennis Coyne |
System Engineering
Operations
LIGO-India
|
10 Feb 2017 |
C2500022-x0 |
Project Management |
Brian O'Reilly |
Project Controls
LIGO-India
System Engineering
Observatory Facilities
|
17 Jan 2025 |
G1902286-v1 |
The Real Dirt on LIGO |
Fred Raab |
LIGO-India
|
05 Dec 2019 |
E1300001-v11 |
Long Term Storage Plan for the Components of the Third Advanced LIGO Interferometer |
Carol Wilkinson et al. |
LIGO-India
System Engineering
|
18 Jun 2016 |
M1900059-v1 |
LIGO-India Electronics Deliverables |
Rich Abbott |
LIGO-India
|
26 Mar 2019 |
G1900481-v1 |
LIGO-India status and Calibration plans |
Shivaraj Kandhasamy et al. |
LIGO-India
Sensing and Control
Observatory Facilities
|
15 Mar 2019 |
G1900266-v3 |
Pragyan '19 Keynote: The Bright Future of Gravitational-Wave Astronomy |
Fred Raab |
Education, Outreach
LIGO-India
|
15 Mar 2019 |
T1800389-v1 |
Technical Description of Advanced LIGO Detector by Subsystem |
Fred Raab |
LIGO-India
Detector
|
26 Feb 2019 |
M1300164-v8 |
3rd IFO Long-Term Storage Acceptance and Punchlist |
Calum Torrie et al. |
Installation
LIGO-India
System Engineering
|
01 Apr 2015 |
E1800032-v1 |
LIGO Beam Tube Qualification Test Procedures |
Larry Jones et al. |
LIGO-India
Vacuum
Final Design
|
12 Feb 2018 |
G1602006-v4 |
Exploring the New Frontier of Gravitational-Wave Astronomy |
Fred Raab |
Public Talk / Colloquium
LIGO-India
|
14 Jan 2017 |
G1701210-x0 |
LIGO-India: A Status report |
Sanjit Mitra et al. |
LIGO-India
|
09 Jul 2017 |
E1600178-v9 |
WASP Database Spreadsheet for 3rd IFO (containers in storage) - obsolete |
Nichole Washington |
Operations
LIGO-India
|
12 Jun 2017 |
G1601623-v3 |
Gravitational-Wave Detectors in India |
Fred Raab |
Public Talk / Colloquium
Detector
LIGO-India
|
18 Aug 2016 |
G1300176-v1 |
The LIGO Vacuum Equipment and Beam Tubes: Retrospective and Prospective |
Michael Zucker |
LIGO-India
Public Talk / Colloquium
Vacuum
|
03 Nov 2015 |
D1300289-v2 |
Adapter Plate, HAM Storage Container Conversion, 3rd IFO |
Sam Barnum et al. |
Conceptual Design
LIGO-India
Suspensions
Auxiliary Optics
|
22 May 2013 |
D1300288-x0 |
Adapter Plate, HAM Storage Container Conversion, 3rd IFO |
Sam Barnum |
Seismic Isolation
LIGO-India
Conceptual Design
|
28 Mar 2013 |
T1200219-v1 |
Scientific benefits of moving one of LIGO Hanford detectors to India |
B Sathyaprakash et al. |
LIGO-India
|
17 May 2012 |
G1200204-v2 |
Network-enabled access to globally distributed data: LIGO-India |
Roy Williams |
LIGO-India
Public Talk / Colloquium
|
09 Apr 2012 |
M1100296-v2 |
LIGO-India, Proposal of the Consortium for Indian Initiative in Gravitational-wave Observations (IndIGO),[Public] |
Bala Iyer et al. |
LIGO-India
Proposals
|
09 Apr 2012 |