LIGO Document E1200329-v3

aLIGO Chamber (Top Level) Installation Procedure: LBSC2

Document #:
LIGO-E1200329-v3
Document type:
E - Engineering documents
Other Versions:
Abstract:
aLIGO Chamber (Top Level) Installation Procedure: LBSC2
Files in Document:
Other Files:
Topics:
Notes and Changes:
1) Updated - TCS in chamber (post cartridge insertion) now should go after installation of OptLev periscopes, and just before Optics Cleaning. This is to ensure TCS mirror faces can stay protected long as possible.
2) Updated - Links and applicable documents
3) Updated - Cartridge section referring this document to E1200344.
CIT
Referenced by:

DCC Version 3.4.2, contact Document Database Administrators