LIGO Document E1200956-v7

Initial Alignment Procedure - LBSC4 As Built

Document #:
LIGO-E1200956-v7
Document type:
E - Engineering documents
Other Versions:
Abstract:
This is the procedure for the initial alignment of the Livingston BSC4. This document describes the necessary equipment and procedures for setting the initial positions and the angular alignments of the principal optics both for the cartridge installation on the test stand and the later installation of the cartridge into the chamber.This is the procedure for the initial alignment of the Louisiana LBSC 4. This document describes the necessary equipment and procedures for setting the initial positions and the angular alignments of the principal optics both for the cartridge installation on the test stand and the later installation of the cartridge into the chamber.
Notes and Changes:
6/2/2014 J. Oberling: Various cross reference/format changes, updated figures.

12/20/2013 J. Oberling: Updated to As Built version

11/6/2013 J. Oberling: Added monument names for in-chamber alignment.

10/22/2013 J. Oberling: Added alignment solution for in-chamber alignment. Still need monument names, but numbers are good.

9/12/2013 J. Oberling: Updated ACB alignment procedure

8/12/2013 J. Oberling: Added End-X monument information, cartridge alignment solution, and section for P-Cal periscope alignment

Still to do:
-Change highlighted items/figures


DCC Version 3.4.3, contact Document Database Administrators