E1100187-v6 |
LIGO Music Wire Specification. |
Calum Torrie et al. |
System Engineering
Requirements
Suspensions
|
15 Feb 2024 |
G2101943-v1 |
September 2021 scattering mitigation and PEM update |
Robert Schofield et al. |
Auxiliary Optics
|
06 Sep 2021 |
T1800485-v6 |
U200 Mount Damping Study |
Craig Worley et al. |
Input Optics
Basic R&D
|
04 Sep 2020 |
P1800038-v4 |
Towards windproofing LIGO: Reducing the effect of wind-driven floor tilt by using rotation sensors in active seismic isolation. |
Krishna Venkateswara et al. |
Seismic Isolation
Basic R&D
|
12 Mar 2020 |
G1801687-v1 |
BRS integration to ISI |
Arnaud Pele et al. |
Seismic Isolation
|
25 Feb 2020 |
T1900768-v4 |
SEI Roadmap - Plans and Ideas for better isolation and control for Advanced LIGO |
Brian Lantz et al. |
Seismic Isolation
|
26 Dec 2019 |
T1900777-v1 |
Reducing differential motion using CPS sensors |
Chiara DiFronzo et al. |
Seismic Isolation
|
20 Nov 2019 |
G1901122-v3 |
Lockloss status at beginning of O3 (LLO) |
Arnaud Pele |
Commissioning
Detector Characterization
|
19 Nov 2019 |
E1200068-v18 |
aLIGO SEI STS and T240 Ground Seismometer Inventory |
Celine Ramet et al. |
Seismic Isolation
Installation
|
01 Aug 2016 |
T1900321-v1 |
Benefits of the trees around the LIGO Livingston Buildings |
Brian Lantz et al. |
Seismic Isolation
Observatory Facilities
|
30 May 2019 |
T1800066-v2 |
typical motion of HAM Suspension points in O2 |
Brian Lantz et al. |
Installation
Seismic Isolation
|
17 Dec 2018 |
G1800399-v1 |
Seismic Control during Earthquakes: Review of new technique |
Brian Lantz et al. |
Seismic Isolation
Integration
|
14 Dec 2018 |
G1802012-v3 |
Status of Beam Rotation Sensors at LLO |
Krishna Venkateswara et al. |
Seismic Isolation
Basic R&D
|
19 Nov 2018 |
T1700343-v1 |
Non-Linear Angular Noise Coupling into Differential Arm Length |
Brian Seymour et al. |
Sensing and Control
|
19 Feb 2018 |
T1600586-v4 |
O1 LLO Wind Study |
Arnaud Pele et al. |
Seismic Isolation
Commissioning
|
21 Dec 2016 |
E1600169-x0 |
HAM Auxiliary suspensions design and testing documentation |
Giacomo Ciani et al. |
Input Optics
|
03 Jun 2016 |
E1200343-v96 |
OSEM Chart |
Stuart Aston et al. |
Suspensions
Subsystem Test
Assembly
|
22 Oct 2015 |
G1401207-v4 |
Advanced LIGO Seismic Isolation and Control |
Brett Shapiro et al. |
Suspensions
Sensing and Control
Seismic Isolation
|
03 Apr 2015 |
E1400151-x0 |
3rd IFO SUS ETMY Acceptance Document |
Norna Robertson et al. |
Suspensions
|
11 Feb 2015 |
E1400150-x0 |
3rd IFO SUS ETMX Acceptance Document |
Norna Robertson et al. |
Suspensions
|
11 Feb 2015 |
E1400149-x0 |
3rd IFO SUS ITMY Acceptance Document |
Norna Robertson et al. |
Suspensions
|
11 Feb 2015 |
E1400148-x0 |
3rd IFO SUS ITMX Acceptance Document |
Norna Robertson et al. |
Suspensions
|
11 Feb 2015 |
E1400146-x0 |
H1 SUS ITMX Acceptance Document |
Norna Robertson et al. |
Suspensions
|
11 Feb 2015 |
E1400147-x0 |
H1 SUS ITMY Acceptance Document |
Norna Robertson et al. |
Suspensions
|
11 Feb 2015 |
E1400161-v1 |
H1 SUS HLTS SR3 Acceptance Document |
Norna Robertson et al. |
Suspensions
|
06 Nov 2014 |
T1400672-x0 |
Report from the Commissioning Workshop on Suspensions at Virgo |
Jeffrey Kissel et al. |
Basic R&D
Integration
Seismic Isolation
Commissioning
Installation
Modelling
Suspensions
Meeting
|
21 Oct 2014 |
E1400124-v1 |
H1 SUS HSTS SR2 Acceptance Document |
Norna Robertson et al. |
Suspensions
|
05 Sep 2014 |
E1400123-v1 |
H1 SUS HSTS SRM Acceptance Document |
Norna Robertson et al. |
Suspensions
|
05 Sep 2014 |
E1400122-v2 |
H1 SUS HSTS PR2 Acceptance Document |
Norna Robertson et al. |
Suspensions
|
05 Sep 2014 |
E1400121-v4 |
H1 SUS HSTS PRM Acceptance Document |
Norna Robertson et al. |
Suspensions
|
05 Sep 2014 |
E1400120-v3 |
H1 SUS HSTS MC3 Acceptance Document |
Norna Robertson et al. |
Suspensions
|
05 Sep 2014 |
E1400118-v2 |
H1 SUS HSTS MC1 Acceptance Document |
Norna Robertson et al. |
Suspensions
|
05 Sep 2014 |
E1400119-v1 |
H1 SUS HSTS MC2 Acceptance Document |
Norna Robertson et al. |
Suspensions
|
05 Sep 2014 |
E1400129-x0 |
3rd IFO SUS HSTS SR2 Acceptance Document |
Norna Robertson et al. |
Suspensions
|
05 Sep 2014 |
E1400128-x0 |
3rd IFO SUS HSTS SRM Acceptance Document |
Norna Robertson et al. |
Suspensions
|
05 Sep 2014 |
E1400127-x0 |
3rd IFO SUS HSTS PR2 Acceptance Document |
Norna Robertson et al. |
Suspensions
|
05 Sep 2014 |
E1400126-x0 |
3rd IFO SUS HSTS MC3 Acceptance Document |
Norna Robertson et al. |
Suspensions
|
05 Sep 2014 |
E1400125-x0 |
3rd IFO SUS HSTS MC2 Acceptance Document |
Norna Robertson et al. |
Suspensions
|
05 Sep 2014 |
E1400157-x0 |
3rd IFO SUS BS Acceptance Document |
Norna Robertson et al. |
Suspensions
|
04 Sep 2014 |
E1400159-x0 |
3rd IFO SUS HLTS PR3 Acceptance Document |
Norna Robertson et al. |
Suspensions
|
04 Sep 2014 |
E1400160-x0 |
3rd IFO SUS HLTS SR3 Acceptance Document |
Norna Robertson et al. |
Suspensions
|
30 Apr 2014 |
E1400158-x0 |
3rd IFO SUS OMC Acceptance Document |
Norna Robertson et al. |
Suspensions
|
30 Apr 2014 |
T1400293-x0 |
Suspension Alignment Offsets and Gains |
Mark Barton et al. |
Suspensions
Modelling
|
21 Apr 2014 |
T1300435-v1 |
Suspension Module Guardian Design |
Jeffrey Kissel et al. |
Preliminary Design
Suspensions
State Control and Monitoring
Commissioning
|
20 Jan 2014 |
E1300502-x0 |
H1 SUS MC1 Acceptance Document |
Arnaud Pele et al. |
Suspensions
|
30 May 2013 |
E1300505-x0 |
H1 SUS MC2 Acceptance Document |
Mark Barton et al. |
Suspensions
|
30 May 2013 |
E1300504-x0 |
H1 SUS MC3 Acceptance document |
Mark Barton et al. |
Suspensions
|
30 May 2013 |