Document List by Author

Giacomo Ciani of Virgo Collaboration is listed as an author on the following documents:

LIGO-Number Title Author(s) Topic(s) Last Updated
T1300463-v26 TCS Ring Heaters: Summary of Location, Type & Predicted Performance Aidan Brooks et al. Assembly
Installation
Vacuum
Auxiliary Optics
26 Mar 2014
D1001895-v7 aLIGO TCS Ring Heater Assembly, Lower Segment Giacomo Ciani et al. Fabrication
Vacuum
Auxiliary Optics
19 Jun 2013
D1100048-v1 aLIGO TCS Ring Heater Vacuum Test Fixture - UFl Version of fixture/test Guido Mueller et al. Final Design
Fabrication
Vacuum
Auxiliary Optics
18 Dec 2019
T1300756-v2 Status of UF Ring Heater Prototype development and testing Giacomo Ciani et al. Basic R&D
Upgrades
Auxiliary Optics
28 Jun 2018
E1300308-x0 Input Mode Cleaner Testing Documentation Guido Mueller et al. Input Optics
Reviews
11 Dec 2017
E1200215-v2 (HAUX) HAM Auxiliary Suspensions Controls Arrangement Poster Giacomo Ciani Assembly
Input Optics
Subsystem Test
Suspensions
13 Nov 2017
E1300588-v2 HAUX H1-IM4 test report Guido Mueller et al. Input Optics
Subsystem Test
03 Oct 2016
E1300587-v2 HAUX H1-IM3 test report Guido Mueller et al. Input Optics
Subsystem Test
03 Oct 2016
E1300586-v2 HAUX H1-IM2 test report Guido Mueller et al. Input Optics
Subsystem Test
03 Oct 2016
E1300585-v2 HAUX H1-IM1 test report Guido Mueller et al. Input Optics
Subsystem Test
03 Oct 2016
E1300591-v3 HAUX L1-IM3 test report Guido Mueller et al. Input Optics
Subsystem Test
03 Oct 2016
E1300592-v2 HAUX L1-IM4 test report Guido Mueller et al. Input Optics
Subsystem Test
03 Oct 2016
E1300590-v2 HAUX L1-IM2 test report Guido Mueller et al. Input Optics
Subsystem Test
03 Oct 2016
E1300589-v2 HAUX L1-IM1 test report Guido Mueller et al. Input Optics
Subsystem Test
03 Oct 2016
D1001167-v1 ALIGO IO HAM AUX SUS ASSEMBLY FIXTURES ASSEMBLY Guido Mueller et al. Input Optics
Final Design
03 Jun 2016
E1600169-x0 HAM Auxiliary suspensions design and testing documentation Giacomo Ciani et al. Input Optics
03 Jun 2016
T1000339-v3 HAM Auxiliary Suspensions modeling and test results Giacomo Ciani et al. Input Optics
Subsystem Test
Suspensions
03 Jun 2016
E1000344-v7 HAM Auxiliary Suspension Assembly Specification Guido Mueller et al. Input Optics
Final Design
03 Jun 2016
T1000526-v3 HAM Auxiliary Suspensions Design Requirements Giacomo Ciani et al. Input Optics
Requirements
Suspensions
19 Jan 2016
T1000338-v4 HAM Auxiliary Suspensions Final Design Giacomo Ciani et al. Input Optics
Final Design
Suspensions
19 Jan 2016
P1500069-v4 Advanced LIGO Input Optics Giacomo Ciani Input Optics
15 May 2015
T1300091-v11 IO Faraday Isolator Rodica Martin et al. Input Optics
Reviews
20 Mar 2015
T0900495-v4 HAM Auxiliary Suspensions Electronics Requirements Giacomo Ciani et al. Input Optics
Requirements
Suspensions
03 Dec 2014
T1300084-v5 IO EOM Guido Mueller et al. Input Optics
Final Design
20 Jun 2014
E1201013-v2 aLIGO Input Optics Acceptance Documentation Giacomo Ciani et al. Input Optics
Reviews
22 Apr 2014
D1001517-v6 TCS Ring Heater In-Vac Cable Assembly Christopher Guido et al. Final Design
Fabrication
Vacuum
Auxiliary Optics
12 Feb 2014
T1300466-x0 IO Faraday Isolator Assembly Procedures Guido Mueller et al. Input Optics
Reviews
25 Dec 2013
T1300086-x0 IO Faraday Isolator Material and Assembly Documents Guido Mueller et al. Input Optics
Final Design
25 Dec 2013
T1300123-x0 IO Faraday Isolator Requirements and Design Guido Mueller et al. Input Optics
Reviews
25 Dec 2013
E1200637-v1 aLIGO, AOS, TCS, Acceptance of Ring Heaters Mindy Jacobson et al. Assembly
Subsystem Test
Installation
System Engineering
Auxiliary Optics
22 Nov 2013
E1000295-v8 aLIGO TCS Ring Heater Assembies, Formal Drawing Tree & BOM Reference Guido Mueller et al. Incoming Inspection
Fabrication
Vacuum
Auxiliary Optics
25 Oct 2013
F1100002-v4 Winding Template, aLIGO TCS Ring Heater Elements Mindy Jacobson et al. Incoming Inspection
Fabrication
Vacuum
Auxiliary Optics
07 Mar 2013
E1200589-x0 aLIGO, IOO, Baffles Guido Mueller et al. Input Optics
26 Feb 2013
D1200560-v1 Base of Copper Clamp, aLIGO TCS Ring Heater Assembly Mindy Jacobson et al. Fabrication
Vacuum
Auxiliary Optics
30 Oct 2012
D1200561-v1 Copper Clamp, aLIGO TCS Ring Heater Assembly Mindy Jacobson et al. Fabrication
Vacuum
Auxiliary Optics
30 Oct 2012
E1200716-x0 DCN, aLIGO TCS Glass Former for Production Lot #2 Ring Heater Assemblies Mindy Jacobson et al. Assembly
Fabrication
Vacuum
Auxiliary Optics
25 Jul 2012
T0900486-v5 IO Stray Light Analysis and Baffle Design Guido Mueller et al. Input Optics
Final Design
15 Feb 2011
D1000969-v2 aLIGO TCS Monolithic Ring Heater Shield Guido Mueller et al. Final Design
Preliminary Design
Fabrication
Auxiliary Optics
04 Aug 2010

Number of documents found: 38


DCC Version 3.4.3, contact Document Database Administrators