LIGO-Number |
Title |
Author(s) |
Topic(s) |
Last Updated |
D1201210-v16 |
aLIGO SQZ: SQZT0 optical layout |
Lisa Barsotti et al. |
Final Design
Squeezer
|
19 Mar 2024 |
D1001895-v7 |
aLIGO TCS Ring Heater Assembly, Lower Segment |
Giacomo Ciani et al. |
Fabrication
Vacuum
Auxiliary Optics
|
19 Jun 2013 |
E0900325-v10 |
Inventory List for IO PSL table |
David Reitze et al. |
Input Optics
Final Design
|
05 Mar 2015 |
T1300651-v1 |
Evaluation of three as-builtaLigo optical levers at LHO:PR3, HAM2, ITMY |
Cheryl Vorvick |
Commissioning
Installation
Auxiliary Optics
|
10 May 2017 |
T1500022-v2 |
CO2 RIN coupling to DARM for aLIGO TCS |
Aidan Brooks et al. |
Sensing and Control
Installation
Final Design
Auxiliary Optics
|
14 Aug 2016 |
M1400285-v3 |
Anti-Harassment Guidelines of the LIGO Scientific Collaboration |
Alicia M Sintes et al. |
Diversity
Policies
|
27 Apr 2015 |
T1100570-v5 |
Thermal Compensation System (TCS): CO2 Laser Projection System (CO2P) Final Design Document |
Aidan Brooks et al. |
Requirements
Final Design
Vacuum
Auxiliary Optics
|
12 Feb 2015 |
M1300501-v2 |
Best Practices for the LIGO Scientific Collaboration |
Neil Gehrels et al. |
Diversity
|
05 Dec 2013 |
E0900301-v3 |
IOO Faraday Isolator Assembly and Certification Procedures |
David Tanner et al. |
Input Optics
Fabrication
Detector
|
13 Dec 2011 |
D1003196-v3 |
aLIGO TCS 10-in Custom Viewport Flange |
Cheryl Vorvick et al. |
Fabrication
Final Design
Vacuum
Preliminary Design
Auxiliary Optics
|
01 Feb 2013 |
D1201033-v3 |
In-vacuum witnes plate fixture for a 4" silicon wafer - lower |
Cheryl Vorvick |
Vacuum
Basic R&D
|
11 Jan 2013 |
D1201032-v1 |
In-vacuum witnes plate fixture for a 4" silicon wafer - upper |
Cheryl Vorvick |
Vacuum
Basic R&D
|
11 Jan 2013 |
T1100517-v7 |
Thermal Compensation System (TCS): Hartmann Wavefront Sensor (HWS) Final Design Document |
Aidan Brooks et al. |
Final Design
Auxiliary Optics
|
09 Dec 2012 |
G080078-x0 |
Imaged Scattered light from LIGO Resonant Cavities: Micro-roughness vs Point Scatter Loss |
William Kells et al. |
Document Migration
|
11 Apr 2012 |
D1100453-v2 |
aLIGO TCS 1/10 Lamda Flat 4'' Dia. Mirror, CO2 Laser Projection |
Austin Langley et al. |
Final Design
Vacuum
Preliminary Design
Auxiliary Optics
|
28 Feb 2012 |
D1100449-x0 |
aLigo TCS Mirror Mount, CO2 Laser Projection |
Austin Langley et al. |
Final Design
Vacuum
Preliminary Design
Auxiliary Optics
|
23 Feb 2012 |
T1000705-v2 |
Hartmann Wavefront Sensor (HWS) delta-preliminary design review (PDR) documentation |
Jesper Munch et al. |
Preliminary Design
Auxiliary Optics
|
15 Feb 2012 |
D1100285-v3 |
aLIGO TCS Fixture Retainer, H2 UHV Steering Mirror Assembly |
Mindy Jacobson et al. |
Fabrication
Final Design
Vacuum
Auxiliary Optics
|
01 Feb 2012 |
D1200122-v1 |
Handle for Cleaning the H2 UHV 12" Steering Mirror |
Mindy Jacobson et al. |
Cleaning
Vacuum
Auxiliary Optics
|
24 Jan 2012 |
D1100053-x0 |
aLIGO TCS HWS Viewport Enclosure Assembly, Y-arm |
Cheryl Vorvick et al. |
Fabrication
Final Design
Vacuum
Preliminary Design
Auxiliary Optics
|
01 Nov 2011 |
D1003193-v3 |
aLIGO TCS Viewport Enclosure Assembly, H2 CO2 Laser Projection |
Cheryl Vorvick et al. |
Final Design
Vacuum
Preliminary Design
Auxiliary Optics
|
22 Aug 2011 |
T0900239-v1 |
AOS: Optical Lever and Viewport Conceptual Design |
Robert Schofield et al. |
Auxiliary Optics
|
19 May 2009 |
D1003195-x0 |
aLIGO TCS External Clamping Flange Assembly, CO2 Laser Projection |
Cheryl Vorvick et al. |
Final Design
Vacuum
Preliminary Design
Auxiliary Optics
|
03 Dec 2010 |
|
|
|
None
|
|
D1002952-v2 |
aLIGO TCS RH Winding Guide |
Cheryl Vorvick et al. |
Final Design
Vacuum
Auxiliary Optics
|
15 Nov 2010 |
|
|
|
None
|
|
T1000096-v1 |
Test on Super Luminescent LED as a Light Source for Optical Lever System |
Cheryl Vorvick et al. |
Auxiliary Optics
|
22 Apr 2010 |
G1000286-v1 |
Line-related commissioning and some upconversion observations |
Robert Schofield et al. |
Detector Characterization
|
14 Mar 2010 |
P080016-x0 |
The LSC glitch group: monitoring noise transients during the fifth LIGO science run |
Robert Schofield et al. |
Document Migration
Public relations
|
22 Oct 2009 |
T0900204-v2 |
Analysis of iLigo Witness Plate by Battelle, PNNL |
GariLynn Billingsley et al. |
Core Optics
Basic R&D
|
09 Jun 2009 |
T0900026-v1 |
Initial Results from PNNL Scanning Electron microscope ITM witness sample |
Cheryl Vorvick |
Core Optics
Basic R&D
|
24 Feb 2009 |
G080246-x0 |
Activities of the LSC glitch group during S5 |
Lindy Blackburn et al. |
Document Migration
|
11 Apr 2008 |
E040496-x0 |
TCS Chiller Standard Operating Procedure |
Ken Mailand et al. |
Document Migration
|
16 Aug 2007 |
T050064-x0 |
Thermal Compensation System Description |
Stefan Ballmer et al. |
Document Migration
|
10 May 2005 |
T040057-x0 |
Heating Beam Pattern Optical Design CO2 Laser Thermal Compensation Bench |
Gerardo Moreno et al. |
Document Migration
|
30 Nov 2004 |
G040172-x0 |
Thermal Compensation Installation at LHO - GR17, July 18-23, 2004, Dublin Ireland |
Stefan Ballmer et al. |
Document Migration
|
30 Nov 2004 |