LIGO-Number |
Title |
Author(s) |
Topic(s) |
Last Updated |
T1300463-v26 |
TCS Ring Heaters: Summary of Location, Type & Predicted Performance |
Aidan Brooks et al. |
Assembly
Vacuum
Installation
Auxiliary Optics
|
26 Mar 2014 |
E1200507-v5 |
aLIGO HAM-ISI, Pre-Installation Test Report, Phase II, LHO HAM 3 (Unit #5) |
Hugo Paris et al. |
Subsystem Test
|
17 Feb 2015 |
E1000324-v1 |
aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #7 (HAM4) |
Hugo Paris et al. |
Subsystem Test
Seismic Isolation
|
18 Jun 2014 |
F0900070-v6 |
GS-13 Inspection Checklist |
Joe Hanson et al. |
Subsystem Test
Incoming Inspection
Installation
Seismic Isolation
|
18 Jun 2014 |
E1000323-v3 |
aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #6 (HAM5) |
Hugo Paris et al. |
Subsystem Test
Seismic Isolation
|
05 Nov 2013 |
E1000311-v9 |
aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #2 |
Hugo Paris et al. |
Final Design
Seismic Isolation
|
26 Jun 2013 |
E1200002-v3 |
DCN, aLIGO TCS CO2P Steering Mirror 2 Assembly, H1/L1 |
Mindy Jacobson et al. |
Vacuum
Preliminary Design
Auxiliary Optics
Final Design
|
14 Feb 2013 |
D1200763-v2 |
Handle Gusset, aLIGO TCS Steering Mirror 2, H1-L1 |
Mindy Jacobson et al. |
Assembly
Vacuum
Installation
Cleaning
Auxiliary Optics
|
14 Feb 2013 |
D1201407-v1 |
Short Damping Spacer, aLIGO TCS CO2P Steering Mirror Assembly 1 H1-L1 |
Greg Grabeel et al. |
Assembly
Vacuum
Auxiliary Optics
|
31 Jan 2013 |
E1200830-x0 |
DCN, Custom Part Modifications Allowing Slip-Fit, aLIGO TCS SM1 Assembly |
Mindy Jacobson et al. |
Assembly
Vacuum
Auxiliary Optics
Fabrication
|
08 Nov 2012 |
D1201406-v1 |
Long Damping Spacer, aLIGO TCS CO2P Steering Mirror 1 Assembly H1-L1 |
Greg Grabeel et al. |
Assembly
Vacuum
Auxiliary Optics
|
08 Nov 2012 |
E1000314-v3 |
aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #5 (HAM3) |
Hugo Paris et al. |
Subsystem Test
Seismic Isolation
|
28 Jun 2012 |
E1000313-v2 |
aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #4 (HAM2) |
Hugo Paris et al. |
Subsystem Test
Seismic Isolation
|
28 Jun 2012 |
E1000312-v5 |
aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #3 |
Hugo Paris et al. |
Subsystem Test
Seismic Isolation
|
24 May 2012 |
E1000310-v7 |
aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #1 |
Hugo Paris et al. |
Subsystem Test
Seismic Isolation
|
26 Apr 2012 |