Event Listing

Events for Detector
(Documents on Detector)

DateTimeTitle LocationTopic(s)
11 Sep 202309:30 – 18:00LVK Meeting - September 2023:Optics sessionToyama International Conference Center - Room 202 (2F)
Basic R&D
Core Optics
 09:30 – 17:30LVK Meeting - September 2023:Suspension and Isolation Working GroupToyama International Conference Center - Room 205 (2F)
Seismic Isolation
Suspensions
24 Aug 2023All day/no time201 East Bridge, and zoom
https://caltech.zoom.us/j/2121413085
Astrophysics / Multi-messenger
Basic R&D
Compact Binaries
Data Analysis
Data analysis software
Detector
Detector Characterization
Education, Outreach
GW source predictions
Laser Systems
Machine Learning
Other data analysis
Project Controls
Public Talk / Colloquium
Sensing and Control
Stochastic
System Engineering
17 Jul 202300:00 – Amaldi15online
Data Analysis
Detector
23 Mar 2023All day/no timeMIT - NW22
https://mit.zoom.us/j/94598361377?pwd=SUlQdnh6a2pMa21aVmtEbWdmNFI5QT09
A#
Suspensions
 09:00 – 11:40BHQS "Heavy SUS" Workshop:Session 1 - Setting the stage, things we knowMIT
Suspensions
15 Mar 202309:00 – 10:50LVK Meeting - March 2023:Plenary Session I
Observatory Facilities
14 Mar 202309:00 – 16:40LVK Meeting - March 2023:Instrument Science & CommissioningMCormick Auditorium
Basic R&D
Commissioning
Detector
Upgrades
01 Nov 2022All day/no time
A+
Core Optics
 09:00 – 11:30Bigger Beamsplitter Fabrication for A+:Requirements Documents
A+
Core Optics
12 Sep 202209:00 – 17:30LVK Meeting - September 2022:Optics (OWG)
Core Optics
 09:00 – 15:00LVK Meeting - September 2022:Suspensions (SWG)
Suspensions
06 Jun 202209:00 – GRASS2022Padova, Italy
Core Optics
Data Analysis
Sensing and Control
14 Mar 202210:00 – 11:55 G2200522">LVK March 2022:OWG - Monday - IRecording at G2200522
A+
Basic R&D
Core Optics
 16:00 – 18:15 G2200523 ">LVK March 2022:OWG - Monday - IIRecording at G2200523
A+
Basic R&D
Core Optics
07 Sep 202116:00 – LVK September 2021:Control Systems
Basic R&D
Commissioning
Sensing and Control
06 Sep 202116:30 – 18:10LVK September 2021:SWG Monday (times are CEST)Zoom Meeting ID 99828773208 Passcode 35863095
Suspensions
15 Mar 202110:00 – 14:45Zoom Room B">LVK March 2021:SWG breakout - MondayZoom Room B
PW is TBD
Suspensions
14 Sep 202013:00 – 17:00LVK September 2020:Suspension Working Group breakout sessionZoom Room B: https://uofglasgow.zoom.us/j/96617926994
recordings, https://dcc.ligo.org/G2000xxx-x0
Suspensions
21 Aug 202010:00 – 14:25SURF 2020 Final Presentations:SURF 2020 Final Presentations - Day 2https://caltech.zoom.us/j/99418291972?pwd=eVpqcFlCWEpXSWh3M0ozeGVCeERzdz09
Data Analysis
Detector
Education, Outreach
Public Talk / Colloquium
20 Aug 2020All day/no timezoom
Data Analysis
Detector
Education, Outreach
Public Talk / Colloquium
 10:00 – 13:40SURF 2020 Final Presentations:SURF 2020 Final Presentations - Day 1https://caltech.zoom.us/j/95797177267?pwd=eWRZcEFERGxrV2xVRnZ4cE5HUFU3Zz09
Basic R&D
Data Analysis
Detector
Education, Outreach
Public Talk / Colloquium
29 Jun 2020All day/no timeGWANW 2020Zoom: https://washington.zoom.us/j/4056700799
Public Version of Event Link: https://dcc.ligo.org/cgi-bin//DocDB/DisplayMeeting?conferenceid=1075
Astrophysics / Multi-messenger
Data Analysis
Detector
Meeting
28 Apr 202009:00 – 09:40FEA User Group Meetingshttps://lists.caltech.edu/listinfo/fea-ligo-usergroup
Basic R&D
Conceptual Design
System Engineering
16 Mar 202010:00 – 11:45LVK March 2020:SWG breakout - Monday
Suspensions
28 Nov 2019All day/no time
Core Optics
Procurements
 09:00 – 14:30Test Mass Rework in the A+ era:Polish Procurement - Zygo
Core Optics
Procurements
03 Sep 201909:00 – LVK Sept 2019:Day 2: Computing sessionRoom F
Computing/archiving
Data analysis software
Data and Computing
02 Sep 201914:00 – LVK Sept 2019:Day 1: Computing sessionRoom E
Computing/archiving
Data analysis software
Data and Computing
22 Aug 2019All day/no timeCaltech SCR, West Bridge 351, TeamSpeak
https://caltech.zoom.us/j/982160842
Data Analysis
Detector
Education, Outreach
Public Talk / Colloquium
08 Aug 201909:00 – 13:30CIT Engineering Summer Student TalksDowns 314
System Engineering
24 Jun 2019All day/no timeLHO
Astrophysics / Multi-messenger
Data Analysis
Detector
Meeting
28 Aug 2018All day/no timeUniversity of Birmingham
Modelling
Seismic Isolation
Sensing and Control
Suspensions
23 Aug 2018All day/no timeCaltech SCR, West Bridge 351, TeamSpeak
TeamSpeak, LIGO Seminar channel
Astrophysics / Multi-messenger
Auxiliary Optics
Basic R&D
Commissioning
Compact Binaries
Data Analysis
Data analysis software
Data and Computing
Data quality / vetoes
Detector
Detector Characterization
Education, Outreach
GW source predictions
Machine Learning
Seismic Isolation
Sensing and Control
 09:00 – 10:40SURF 2018 Final Presentations:SURF 2018 Final Presentations 1Caltech SCR, West Bridge 351, TeamSpeak
Basic R&D
Data Analysis
Detector
Education, Outreach
20 Mar 201808:30 – 12:10LVC March 2018:SWG sessionSalazar 2014
Seismic Isolation
Suspensions
 08:30 – 12:00LVC March 2018:QNWG parallel sessionSalazar 2019
Basic R&D
Squeezer
 14:00 – 16:00LVC March 2018:LAWG SessionSalazar 2016
Input Optics
Laser Systems
 14:00 – 16:30LVC March 2018:CSWG SessionSalazar 2014
Sensing and Control
State Control and Monitoring
22 Feb 201809:00 – Core Optics Download
Core Optics
28 Sep 201709:00 – UWash BRS - additional units
Fabrication
Installation
Integration
Operations Business
Proposals
Seismic Isolation
29 Aug 201708:45 – 11:55LVC CERN August 2017:Day 2: LAWG Session (Tuesday morning)CERN R-030
https://maps.cern.ch/mapsearch/mapsearch.htm?n=[%272/R-030%27]
Auxiliary Optics
Laser Systems
 08:45 – 12:20LVC CERN August 2017:Day 2: SWG Session (Tuesday morning)60-6-015 - Room Georges Charpak (Room F)
Seismic Isolation
Suspensions
 14:00 – 17:40LVC CERN August 2017:Day 2: Optics and Coatings session
Basic R&D
Core Optics
28 Aug 201714:00 – 16:15LVC CERN August 2017:Day 1: Joint IS/ControlsMain Auditorium, 500-1-001
Sensing and Control
24 Aug 2017All day/no timeSCR, LHO, LLO, TEAMSPEAK: We will use "LIGO Seminar",
Data Analysis
Detector
06 Jun 201709:00 – 13:252017 Jun 06-09 CDS F2FLHO
Data Acquisition System
11 May 201709:00 – 10:30GWADW 2017:Day 4 - Workshop 2 - Controls 1Endeavour Room - Resort Side
Sensing and Control
Suspensions
 11:00 – 12:30GWADW 2017:Day 4 - Workshop 3 - Controls 2Endeavour Room - Resort Side
Sensing and Control
State Control and Monitoring
Suspensions
30 Aug 201608:45 – 12:30August 2016 LSC-Virgo Collaboration Meeting:SWG session
Seismic Isolation
Suspensions
19 Aug 201609:00 – 10:40SURF 2016 Final Presentations:SURF 2016 Final Presentations Session 4351 W. Bridge
Data Analysis
Detector
18 Aug 201609:00 – 12:20SURF 2016 Final Presentations:SURF 2016 Final Presentations Session 2351 W. Bridge
Data Analysis
Detector
 14:00 – 16:20SURF 2016 Final Presentations:SURF 2016 Final Presentations Session 3351 W. Bridge
Data Analysis
Detector
17 Aug 2016All day/no time351 W. Bridge
Data Analysis
Detector
 15:00 – 17:00SURF 2016 Final Presentations:SURF 2016 Final Presentations Session 1351 W. Bridge
Data Analysis
Detector
22 Jun 201613:00 – 14:50NSF Review of LIGO - June 2016:Parallel Breakout Session III: LIGO Computing
Computing/archiving
Data and Computing
NSF
Reviews
 13:00 – 15:00NSF Review of LIGO - June 2016:Parallel Breakout Session IV: LIGO Vacuum Systems
NSF
Reviews
Vacuum
22 May 201609:00 – GWADW 2016
Detector
15 Mar 201608:45 – 12:30March 2016 LSC-Virgo Collaboration Meeting:Day 2 - LAWG SessionSan Marino
Auxiliary Optics
Basic R&D
Input Optics
Laser Systems
25 Sep 201509:00 – DetEnchance: Compensation Plates
Core Optics
18 Sep 201509:00 – 09:30DetEnchance: AERM
Core Optics
Procurements
01 Sep 201509:30 – 12:30September 2015 LSC-VIRGO Collaboration Meeting:SWG / Optics
Basic R&D
Seismic Isolation
Suspensions
 14:00 – 17:10September 2015 LSC-VIRGO Collaboration Meeting:AIC/QNWG
Sensing and Control
Squeezer
 14:00 – 17:00September 2015 LSC-VIRGO Collaboration Meeting:Optics / SWG
Core Optics
20 Aug 201508:30 – 17:50SURF15 PresentationsSCR
LHO, LLO
Data Analysis
Detector
03 Jun 201521:00 – 07:30ER7
Commissioning
Data Analysis
Detector
Integration
11 Dec 201408:30 – 10:30November 2014 StatusTeam Speak
Project Controls
08 Dec 201409:00 – Zygo: Polishing of Two Compensation Plates
Core Optics
13 Nov 201408:30 – 09:00Oct 2014 Status -v2:Oct 2014 Performance and Status
Project Controls
 08:45 – 09:15Oct 2014 Status -v2:Sub-System Schedules and Critical Path
Collaboration
Fabrication
Project Controls
 09:30 – 10:30Oct 2014 Status -v2:Staffing Profiles
Personnel
Project Controls
 09:45 – 09:50Oct 2014 Status -v2:Procurement Status
Personnel
Project Controls
13 Oct 2014All day/no timeVIRGO
Cascina, Italy
Basic R&D
Commissioning
Integration
Meeting
Modelling
Seismic Isolation
Sensing and Control
State Control and Monitoring
Suspensions
System Engineering
26 Aug 201409:00 – 12:20Fall 2014 LSC-Virgo Collaboration Meeting:Day 2 - SWG SessionFisher, C+M+B
Seismic Isolation
Suspensions
21 Aug 201409:30 – 12:20SURF 2014 Presentations:SURF 2014 Presentations IVCaltech SCR
Data Analysis
Detector
Education, Outreach
 14:00 – 17:50SURF 2014 Presentations:SURF 2014 Presentations VCaltech SCR
Data Analysis
Detector
Education, Outreach
 18:00 – 19:00SURF 2014 Presentations:SURF 2014 Presentations 0
Detector
20 Aug 201410:30 – 11:50SURF 2014 Presentations:SURF 2014 Presentations IILLO
Data Analysis
Detector
Education, Outreach
 13:15 – 14:55SURF 2014 Presentations:SURF 2014 Presentations IIILLO
Data Analysis
Detector
Education, Outreach
19 Aug 2014All day/no timeLLO and Caltech
Data Analysis
Detector
Education, Outreach
 13:00 – 17:00SURF 2014 Presentations:SURF 2014 Presentations ILLO
Data Analysis
Detector
Education, Outreach
 20:00 – 20:40SURF 2014 Presentations:SURF 2014 Presentations VI
Data Analysis
Detector
24 Jun 201408:30 – 19:152014 June NSF Review of LIGOHanford Observatory
Commissioning
Detector
NSF
Operations
25 May 201409:00 – GWADW 2014Takayama, Japan
Detector
08 May 201408:45 – 11:20DCS NSF Review PreparationsNSF HQ
Data and Computing
NSF
Reviews
10 Apr 201408:30 – 10:00Mar14 Status
Management
Meeting
Project Controls
 08:30 – 10:30Mar14 Status
Management
Meeting
Project Controls
18 Mar 201414:00 – 15:45March 2014 LSC-Virgo Collaboration Meeting:Day 2 - SWG SessionGallieni 7
Seismic Isolation
Suspensions
16 Jan 201408:30 – 09:15GV7 recovery team meetingworldwide
Observatory Facilities
Technical Review Board
Vacuum
01 Jan 2014All day/no timeZYGO 75-S191358
Core Optics
Procurements
23 Sep 2013All day/no timeHannover, Germany
Data Analysis
Detector
Meeting
 08:45 – 13:45LVC meeting September 2013:SWG Morning Session
Basic R&D
Installation
Seismic Isolation
Suspensions
 14:00 – 17:20LVC meeting September 2013:Optics Afternoon Session
Basic R&D
Core Optics
Input Optics
Public Talk / Colloquium
01 Aug 201309:00 – Les Rencontres du VietnamQuy Nohn, Vietnam
Data Analysis
Detector
30 Apr 201309:00 – aLIGO Annual Review 2013LLO
Detector
NSF
Reviews
09 Apr 201309:00 – H2 Storage ReviewLHO
Detector
NSF
Reviews
22 Mar 201313:30 – 18:00LVC meeting March 2013:Coating Workshop - FridayAmerican University
Basic R&D
Core Optics
19 Mar 201309:00 – 13:35LVC meeting March 2013:Joint Interferometer Session - AMCabinet+Judiciary
Basic R&D
Detector
Installation
Integration
 14:00 – 17:30LVC meeting March 2013:Joint Interferometer Session - PMCabinet+Judiciary
Basic R&D
Commissioning
Detector
Installation
Integration
18 Mar 2013All day/no timeHyatt Regency Hotel, Bethesda, Maryland
Data Analysis
Detector
Meeting
 08:45 – 15:40LVC meeting March 2013:Suspensions working groupWaterford Ballroom
Seismic Isolation
Suspensions
 09:15 – 17:35LVC meeting March 2013:Optics Working GroupOld Georgetown
Core Optics
 14:00 – 17:00LVC meeting March 2013:LAUX (Lasers and auxiliary optics)Cabinet+Judiciary
Auxiliary Optics
Laser Systems
27 Feb 2013All day/no time75-S161559
Seismic Isolation
 09:00 – 09:30SI-101: HEPI position sensors
Seismic Isolation
26 Feb 201309:00 – 09:30LIGO India Facility and Vacuum BriefingLHO
System Engineering
Vacuum
09 Oct 201209:00 – aLIGO PAPSLAC
Advisory Boards (e.g., PAC, PAP, ...)
Detector
17 Sep 201209:00 – H2 OATLIGO Hanford Observatory
Auxiliary Optics
Commissioning
Seismic Isolation
Sensing and Control
Suspensions
System Engineering
23 Aug 201209:00 – SURF 2012
Basic R&D
Data Analysis
Detector
Education, Outreach
15 Aug 201209:00 – Electrical Maintenance Contract - LLOLLO
Caltech
Observatory Facilities
28 Jun 2012All day/no time75ADV
Seismic Isolation
14 Jun 2012All day/no time75ADV-S144828
System Engineering
14 May 201209:00 – GWADWWaikoloa Marriott Resort, Hawaii
Detector
27 Apr 2012All day/no time75ADV
Auxiliary Optics
Procurements
 All day/no time75ADV
Auxiliary Optics
Procurements
23 Apr 2012All day/no time75ADV
Auxiliary Optics
Procurements
18 Apr 2012All day/no time75ADV
Auxiliary Optics
Procurements
11 Apr 201208:00 – aLIGO April 2012 NSF ReviewLHO
Detector
Reviews
02 Apr 2012All day/no time75ADV
Auxiliary Optics
Procurements
29 Mar 2012All day/no time75ADV
Auxiliary Optics
Procurements
12 Mar 2012All day/no time75ADV-S138971
Auxiliary Optics
Procurements
01 Mar 201209:00 – 12-03-01 ITMY Fiber BreakThe Ether
Commissioning
Seismic Isolation
Suspensions
24 Feb 2012All day/no time75ADV-S135253
Auxiliary Optics
Procurements
05 Jan 2012All day/no time75ADV-S133633
Auxiliary Optics
Procurements
03 Jan 2012All day/no time75ADV-S131765
Personnel
Procurements
Suspensions
05 Dec 2011All day/no time75ADV-S130872
Personnel
Procurements
Suspensions
21 Nov 2011All day/no time75ADV-S130079
Observatory Facilities
Personnel
Procurements
08 Nov 2011All day/no time75ADV-S133263
Auxiliary Optics
Procurements
25 Oct 201109:00 – CDS F2F MeetingPasadena, CA
Commissioning
Data Acquisition System
Data and Computing
Meeting
19 Sep 201109:00 – aLIGO PAP ReviewSLAC/Breidenbach
Advisory Boards (e.g., PAC, PAP, ...)
Detector
11 Jul 2011All day/no time75ADV-S120159
Auxiliary Optics
Procurements
22 Jun 2011All day/no time
Laser Systems
Procurements
15 Jun 2011All day/no time
Auxiliary Optics
Laser Systems
Procurements
06 Jun 2011All day/no time75ADV-S120151
Procurements
System Engineering
06 May 2011All day/no time
System Engineering
 09:00 – 00:30Chamber Cleaning:LHO Chamber Cleaning Sample Documentation and Results
System Engineering
04 May 2011All day/no time75ADV-S116842
Procurements
System Engineering
25 Apr 201107:30 – aLIGO April 2011 NSF ReviewLLO
Detector
NSF
Reviews
15 Apr 2011All day/no time75ADV-S117646
Core Optics
Procurements
06 Apr 2011All day/no time75ADV-S114048
Procurements
System Engineering
04 Apr 2011All day/no time75ADV-S113059
Procurements
Project Controls
09 Mar 2011All day/no time
Procurements
Seismic Isolation
07 Mar 2011All day/no time75ADV-S112320
Procurements
Project Controls
14 Feb 2011All day/no time75ADV-S111125
System Engineering
07 Feb 2011All day/no time75ADV-S117943
Sensing and Control
Subsystem Test
31 Jan 2011All day/no time75ADV-S110084
Auxiliary Optics
System Engineering
 All day/no time75ADV-S109956
System Engineering
 All day/no time
Auxiliary Optics
Operations
System Engineering
11 Jan 2011All day/no time75ADV-S108192
System Engineering
03 Jan 2011All day/no time75ADV-S107767
Core Optics
Procurements
20 Dec 2010All day/no time75ADV-S107166
Core Optics
Procurements
13 Dec 2010All day/no time75ADV-S107280
Procurements
System Engineering
 All day/no time75ADV-S107181
Procurements
System Engineering
 All day/no time75ADV-S107182
Procurements
System Engineering
29 Nov 2010All day/no time75ADV-S106853
Procurements
System Engineering
18 Nov 2010All day/no time
Observatory Facilities
Procurements
11 Nov 2010All day/no time75ADV-S105169
Procurements
System Engineering
28 Oct 201009:00 – Chamber CleaningOSB
Installation
Vacuum
27 Oct 2010All day/no time75ADV-S104664
Procurements
System Engineering
11 Oct 2010All day/no time75ADV-S103224
Laser Systems
22 Sep 201009:00 – FMP Install Cleanroom
Installation
Observatory Facilities
03 Sep 2010All day/no time
Procurements
Sensing and Control
17 Aug 201009:00 – GNB FDRGNB
Final Design
Observatory Facilities
Vacuum
05 Aug 2010All day/no time75ADV-S107342
Laser Systems
 All day/no time75ADV-S107341
Laser Systems
Procurements
 All day/no time75ADV-S107885
Laser Systems
Procurements
27 Jul 2010All day/no time75ADV-1087576
Core Optics
19 Jul 2010All day/no time
Procurements
Seismic Isolation
 All day/no time75ADV-S096652
System Engineering
13 Jul 2010All day/no time75ADV-S096725
LIGO Livingston, LA
Fabrication
Observatory Facilities
07 Jul 2010All day/no time75ADV-S096128
System Engineering
 All day/no time75ADV-S096112
System Engineering
 09:00 – 10:30Think Resources Labor Contract - Michael Miller:Change Order 1
System Engineering
 09:00 – Think Resources Labor Contract - Michael Miller:Correspondence
System Engineering
 09:00 – Aerotek Labor Contract - Ayodele Cole:Correspondence
System Engineering
 09:00 – 10:30Think Resources Labor Contract - Michael Miller:Contract/Purchase Order
System Engineering
 09:00 – 10:00Aerotek Labor Contract - Ayodele Cole:Proposal
System Engineering
 09:00 – 10:00Think Resources Labor Contract - Michael Miller:Proposal
System Engineering
 09:00 – 10:30Think Resources Labor Contract - Michael Miller:Change Order 2
System Engineering
 09:00 – 10:30Aerotek Labor Contract - Ayodele Cole:Contract
System Engineering
 09:00 – 11:00Aerotek Labor Contract - Ayodele Cole:Change Order 1
System Engineering
22 Jun 201009:00 – GNB PDRLHO
Vacuum
16 Jun 201009:00 – NSF Review of LIGO-AustraliaNSF Headquarters
Data Analysis
Detector
Reviews
01 Jun 2010All day/no time
Fabrication
Procurements
Seismic Isolation
21 May 2010All day/no time75ADV-S093274
System Engineering
 09:00 – 09:30Think Resources Labor Contract - Norris Kilpatrick:Proposal
System Engineering
 09:00 – 10:30Think Resources Labor Contract - Norris Kilpatrick:Change Order 1
System Engineering
 09:00 – Think Resources Labor Contract - Norris Kilpatrick:Correspondence
System Engineering
 09:00 – 11:30Think Resources Labor Contract - Norris Kilpatrick:Contract
System Engineering
 09:00 – 10:30Think Resources Labor Contract - Norris Kilpatrick:Change Order 2
System Engineering
18 May 2010All day/no time75ADV-S093244
System Engineering
 All day/no time75ADV-S093262
System Engineering
 09:00 – 09:30Randstad Contract - Tim Nguyen:Proposal
System Engineering
 09:00 – 10:00Randstad Contract - Tim Nguyen:Correspondence
System Engineering
 09:00 – 11:30Think Resources Labor Contract - Leo Olmos:Contract
System Engineering
 09:00 – 09:30Think Resources Labor Contract - Leo Olmos:Proposal
System Engineering
 09:00 – 10:30Randstad Contract - Tim Nguyen:Change Order 1
System Engineering
 09:00 – 12:00Randstad Contract - Tim Nguyen:Contract
System Engineering
 09:00 – Think Resources Labor Contract - Leo Olmos:Correspondence
System Engineering
 09:00 – Think Resources Labor Contract - Leo Olmos:Modifications
System Engineering
10 May 2010All day/no time75ADV-S092593
System Engineering
 All day/no time75ADV-S092517
System Engineering
 09:00 – 11:30Aerotek Labor Contract - Daphen Pino:Contract/Purchase Order
System Engineering
 09:00 – Aerotek Labor Contract - Jack Davis:Modifications
System Engineering
 09:00 – 11:30Aerotek Labor Contract - Jack Davis:Contract/Purchase Order
System Engineering
 09:00 – 10:00Aerotek Labor Contract - Jack Davis:Proposal
System Engineering
 09:00 – Aerotek Labor Contract - Daphen Pino:Correspondence
System Engineering
 09:00 – Aerotek Labor Contract - Jack Davis:Correspondence
System Engineering
 09:00 – 10:00Aerotek Labor Contract - Daphen Pino:Proposal
System Engineering
 09:00 – Aerotek Labor Contract - Daphen Pino:Modifications
System Engineering
07 May 2010All day/no time75ADV-S097499
Fabrication
Procurements
Seismic Isolation
16 Apr 201009:00 – aLIGO Team MeetingEVO/LLO
Detector
14 Apr 201008:00 – aLIGO 2010 April NSF ReviewLLO
Detector
Reviews
Upgrades
01 Apr 2010All day/no time75ADV-S097101
Fabrication
Procurements
Seismic Isolation
 All day/no timeLIGO
Caltech
Core Optics
 09:00 – 09:30ATFilms:Proposal/QuotesLIGO
Caltech
Core Optics
26 Mar 2010All day/no time
Fabrication
Vacuum
 09:00 – 12:00FTIR Testing:General
Fabrication
Vacuum
15 Mar 2010All day/no time75ADV-S092509
Auxiliary Optics
Laser Systems
Procurements
 11:00 – 12:00AO-213 TCS - CO2 Laser:Technical Documentation
Auxiliary Optics
Laser Systems
Procurements
 11:15 – 15:15AO-213 TCS - CO2 Laser:RFP
Auxiliary Optics
Laser Systems
Procurements
 11:30 – 16:30AO-213 TCS - CO2 Laser:Bid Evaluation
Auxiliary Optics
Laser Systems
Procurements
Proposals
 11:45 – 13:45AO-213 TCS - CO2 Laser:PO LTG Lasertech Group Inc 75ADV-S092509
Auxiliary Optics
Laser Systems
Procurements
 12:00 – 15:30AO-213 TCS - CO2 Laser:Contract Modifications
Auxiliary Optics
Laser Systems
Procurements
 12:00 – 12:30AO-213 TCS - CO2 Laser:Invoices & Packing Slips
Auxiliary Optics
Laser Systems
 12:00 – AO-213 TCS - CO2 Laser:Reports / Corrospondence
Auxiliary Optics
Laser Systems
 12:15 – AO-213 TCS - CO2 Laser:Closeout
Auxiliary Optics
Laser Systems
02 Mar 2010All day/no time75ADV-S093198
Fabrication
Procurements
Seismic Isolation
19 Feb 2010All day/no time
Fabrication
Procurements
Seismic Isolation
 09:00 – 12:30SI-195i BSC Catalog Internal Pod Parts:RFQ
Fabrication
Procurements
Seismic Isolation
 09:00 – 09:30SI-195i BSC Catalog Internal Pod Parts:Technical Documentation
Fabrication
Procurements
Seismic Isolation
18 Feb 2010All day/no time75ADV-S096429
Procurements
Seismic Isolation
 09:00 – 10:30SI-187 BSC Large Plates UHV Chemical Cleaning:RFQ
Procurements
Seismic Isolation
 09:00 – 14:30SI-187 BSC Large Plates UHV Chemical Cleaning:Technical Documentation
Procurements
Seismic Isolation
08 Feb 2010All day/no time75ADV-S092885
Fabrication
Procurements
Seismic Isolation
 All day/no time75ADV-S092142
Fabrication
Procurements
Seismic Isolation
16 Sep 2009All day/no time75ADV-1087510
Core Optics
Procurements
15 Sep 2009All day/no time75ADV-1087507
Core Optics
Procurements
04 Sep 2009All day/no time
Procurements
Seismic Isolation
 All day/no time
Procurements
Seismic Isolation
 09:00 – HAM ISI Counter Balance:Technical Documents
Procurements
Seismic Isolation
23 Jul 2009All day/no time
Core Optics
Suspensions
10 Jul 2009All day/no time75ADV-S081828
Core Optics
Procurements
13 Apr 2009All day/no time75ADV-1086781
Core Optics
Procurements
23 Feb 2009All day/no time
Core Optics
Operations
 All day/no time75ADV-S066420
Core Optics
 09:00 – 09:30LIGO Ops - Think Resources, Rand Dannenberg:Proposal
Core Optics
Operations
08 Jan 2000All day/no time
Fabrication
Seismic Isolation
 09:00 – Test Procurement:Technical Documentation
Fabrication
Seismic Isolation
19 Nov 199209:00 – 10:30NSF Review of LIGO:NSF Review of LIGO-Day 1
Basic R&D
Conceptual Design
Detector
NSF
Reviews
18 Nov 1992All day/no timeCaltech
Basic R&D
Conceptual Design
Detector
NSF
Reviews
 08:00 – 16:45NSF Review of LIGO:NSF Review of LIGO-Day 1Caltech
Basic R&D
Conceptual Design
Detector
NSF
Reviews

Modelling
Modelling
Modelling
Modelling
Seismic Isolation
Seismic Isolation
Seismic Isolation
Seismic Isolation
Sensing and Control
Sensing and Control
Sensing and Control
Sensing and Control
Suspensions
Suspensions
Suspensions
Suspensions
  – 00:00
Data Analysis
Data Analysis
Detector
Detector
Education, Outreach
Education, Outreach
 All day/no time
Data Analysis
Data Analysis
Detector
Detector
Education, Outreach
Education, Outreach
 All day/no time
Modelling
Modelling
Modelling
Modelling
Seismic Isolation
Seismic Isolation
Seismic Isolation
Seismic Isolation
Sensing and Control
Sensing and Control
Sensing and Control
Sensing and Control
Suspensions
Suspensions
Suspensions
Suspensions
 All day/no time
Detector
Detector
 All day/no time
Core Optics
Core Optics
 All day/no time
Data Analysis
Data Analysis
Detector
Detector
Meeting
Meeting

DCC Version 3.4.2, contact Document Database Administrators