LIGO Document T1300645-v5
- With the addition of HEPI, as well as a few extra control paths which are possible from the addition of Stage 0 L4Cs, it is necessary to re-calculate the performance of the platform for noise-budgeting techniques originally developed in eLIGO. This document describes the details of this recalculation.
- Removed errant line in aLIGO equation for Z which still included a tilt term.
DCC Version 3.4.3, contact
Document Database Administrators