D2100635-v1 |
A+ SUS HAM6-L1 OMC REFL SLED (WFS36) Baseplate |
Russell Jones et al. |
Suspensions
A+
|
31 Mar 2025 |
D2400028-v1 |
A+ SUS HAM6-H1 LOPO SLED Baseplate |
Russell Jones et al. |
Suspensions
A+
|
31 Mar 2025 |
D2100636-v1 |
A+ SUS HAM6-H1 WFS45 SLED Baseplate |
Russell Jones et al. |
System Engineering
A+
|
31 Mar 2025 |
D2100634-v1 |
A+ SUS HAM6-H1 WFS36 SLED Baseplate |
Russell Jones et al. |
Suspensions
A+
|
19 Mar 2025 |
D070560-v2 |
ALIGO SUS CO2 Laser Machine_Overall Assembly_[CO2_GLA_ASM_OVERALL] |
Russell Jones et al. |
Suspensions
Assembly
Fabrication
|
06 Dec 2024 |
E2300136-v1 |
DCN Revised Disc Insert (welding puck) |
GariLynn Billingsley et al. |
Fabrication
Suspensions
|
15 May 2023 |
T1000337-v4 |
Quadruple Suspension Monolithic Stage Final Design |
Angus Bell |
Final Design
Suspensions
|
22 Sep 2022 |
E1400021-v7 |
Fiber Profile Data Summary Table |
Angus Bell et al. |
Suspensions
|
07 Apr 2014 |
T1100404-v4 |
Note to support corrected jig settings-calculations for off-set fiducial lines of ETM04 |
Marielle van Veggel et al. |
Suspensions
Installation
|
01 Jul 2020 |
G1601163-v1 |
Characterisation of the aLIGO monolithic suspensions |
Borja Sorazu et al. |
Public Talk / Colloquium
Suspensions
|
27 Mar 2018 |
G1700998-v2 |
Optical properties of silicon for cryogenic interferferometric gravitational wave detectors |
Zeno Tornasi et al. |
Basic R&D
Core Optics
|
12 Jul 2017 |
T1000017-v1 |
Monolithic Test Hang Procedure Notes |
Matthew Maxwell et al. |
Subsystem Test
Suspensions
|
12 Apr 2017 |
D1000759-v3 |
Advanced LIGO SUS ETM Production Monolithic Assembly |
Russell Jones et al. |
Final Design
Assembly
Suspensions
|
12 Jul 2016 |
G1601144-v1 |
Factors pertaining to the strength of four-fiber monolithic silica test mass suspensions |
Kirill Tokmakov et al. |
Suspensions
|
19 May 2016 |
G1601114-x0 |
GW150914 a quadruple whammy |
Angus Bell et al. |
Public Talk / Colloquium
|
16 May 2016 |
T1600008-v1 |
Summary of silica suspension fibre breaks during the aLIGO project |
Angus Bell et al. |
Suspensions
Installation
|
11 Jan 2016 |
G1400837-v1 |
Pictures from March 2014 ITM welding |
Angus Bell |
Installation
Suspensions
|
06 Aug 2014 |
E1300915-v5 |
Silica Fibre Profile Template |
Travis Sadecki et al. |
Suspensions
Fabrication
|
16 Jan 2014 |
E1400006-v2 |
Fiber Profile Data - Doug/Travis Pull Dec 19, 2013 Fiber 1 |
Angus Bell et al. |
Suspensions
|
07 Jan 2014 |
T1300948-v3 |
LLO ETMY post-welding pitch value: actions and lessons |
Norna Robertson et al. |
Installation
Suspensions
|
13 Dec 2013 |
D1000128-v3 |
Penultimate mass prism holder for D0901592 bonding jig |
Marielle van Veggel et al. |
Suspensions
Preliminary Design
|
18 Jul 2013 |
D1001623-v2 |
aLIGO ETM/ITM penultimate mass prism holder assembly |
Marielle van Veggel et al. |
Suspensions
Installation
|
18 Jul 2013 |
T1200328-v1 |
CO2 weld repair tests on aLIGO fused silica horns |
Angus Bell |
Suspensions
Installation
|
22 Apr 2013 |
E1000829-v6 |
BS/FM Prism Gluing Jig Settings Calculation Spreadsheet |
Marielle van Veggel et al. |
Installation
Suspensions
|
16 Jan 2013 |
D1102247-v1 |
ALIGO SUS CO2 Laser Machine_Spinning Mirror Assembly_Stage to Clamp Coupling Piece |
Russell Jones et al. |
Fabrication
Assembly
Suspensions
|
20 Dec 2012 |
E1200409-x0 |
aLIGO fused silica ears dimensional test reports |
Angus Bell |
Fabrication
Suspensions
|
24 Apr 2012 |
E1200410-x0 |
aLIGO fused silica ears dimensional test reports |
Angus Bell |
Suspensions
Fabrication
|
24 Apr 2012 |
T1200046-v1 |
LIGO 3 Strawman Design, Team Red (public version) |
Stefan Hild et al. |
Basic R&D
Detector
|
31 Jan 2012 |
D1102245-v1 |
ALIGO SUS CO2 Laser Machine_Spinning Mirror Assembly_Stage to Mirror Assembly Coupling |
Russell Jones et al. |
Fabrication
Assembly
Suspensions
|
28 Nov 2011 |
T1000345-v2 |
The Design of the IGR MKII Strength Testing Machine |
Russell Jones et al. |
Basic R&D
Suspensions
|
11 Oct 2011 |
D0900373-v2 |
ALIGO SUS ETM/ITM Monolithic Assembly_Advanced Welding Hub |
Giles Hammond et al. |
Suspensions
Installation
Basic R&D
|
08 Mar 2011 |
E1000273-v1 |
Design document for PM wire break-off prisms |
Ken Strain et al. |
Final Design
Suspensions
|
02 Sep 2010 |
T1000472-v1 |
Technical Design Document of the fibre guard in the aLIGO ETM/ITM quad suspension |
Marielle van Veggel et al. |
Installation
Suspensions
|
26 Aug 2010 |
D1000008-v3 |
Fibre storage rack |
Giles Hammond et al. |
Preliminary Design
Suspensions
|
18 May 2010 |
T1000114-v1 |
ALIGO NP-type: - Ear Bonding at LASTI - February 2010 |
Gerardo Moreno et al. |
Installation
Suspensions
|
15 Mar 2010 |
T0900629-v2 |
Response to questions from the review panel on the Final Design Review of the ETM/ITM ears |
Giles Hammond et al. |
Suspensions
Final Design
|
17 Dec 2009 |
E980061-x0 |
Core Optics Components (COC) Final Design Document |
Helena Armandula et al. |
Document Migration
|
27 Apr 1998 |