D1001518-v6 |
Cable Assy, Upper Ring Heater Segment to Lower Quad Terminal Block |
Mindy Jacobson et al. |
Final Design
Auxiliary Optics
Fabrication
Vacuum
|
15 Nov 2010 |
D1001519-v7 |
Cable Assy, Lower Ring Heater Segment |
Mindy Jacobson et al. |
Final Design
Auxiliary Optics
Fabrication
Assembly
Cleaning
Vacuum
|
30 Aug 2012 |
D1001520-v4 |
Cable Assy, Lower Quad Terminal Block to Upper Quad Terminal Block |
Mindy Jacobson et al. |
Fabrication
Vacuum
Final Design
Auxiliary Optics
|
03 Dec 2010 |
D1001521-v5 |
Cable Assy, Terminal Block to Upper Quad |
Mindy Jacobson et al. |
Auxiliary Optics
Final Design
Vacuum
Fabrication
|
07 Dec 2010 |
D1201065-v2 |
aLIGO CO2P HgCdTe photodetector mount/preamp assembly |
Benjamin Abbott et al. |
Final Design
Auxiliary Optics
|
09 Dec 2024 |
E1100892-v25 |
TCS Block diagram: H1/L1 Corner Station |
Stephen O'Connor et al. |
Preliminary Design
Auxiliary Optics
|
11 Aug 2014 |
D1002529-v5 |
Ring Heater Driver |
Stephen O'Connor |
Auxiliary Optics
Fabrication
|
18 Sep 2012 |
D1102207-v5 |
TCS: EtherCAT Corner Station Chassis |
Aidan Brooks et al. |
Auxiliary Optics
Laser Systems
Final Design
|
13 Feb 2014 |
D1101835-v7 |
Flow Meter/Laser Interlock Control Board |
Zhenhua Shao et al. |
Fabrication
Auxiliary Optics
|
24 Aug 2015 |
D1101930-x0 |
empty |
Aidan Brooks et al. |
Final Design
Auxiliary Optics
|
10 Mar 2015 |
D1002851-v4 |
ETM: Hartmann Sensor Power Supply |
Stephen O'Connor |
Preliminary Design
Auxiliary Optics
|
10 Mar 2015 |
D1102385-v2 |
ETM: Hartmann Sensor Power Supply - PCB |
Stephen O'Connor |
Fabrication
Conceptual Design
Auxiliary Optics
|
10 Mar 2015 |
T1100034-v5 |
aLIGO Final Design of Ring Heaters and Electronics |
Mindy Jacobson et al. |
Vacuum
Fabrication
Auxiliary Optics
Final Design
|
12 Feb 2015 |
T1100570-v5 |
Thermal Compensation System (TCS): CO2 Laser Projection System (CO2P) Final Design Document |
Aidan Brooks et al. |
Requirements
Auxiliary Optics
Final Design
Vacuum
|
12 Feb 2015 |
D1102205-v1 |
TCS: ITM HWS EtherCAT cable splitter |
Stephen O'Connor et al. |
Auxiliary Optics
Final Design
Laser Systems
|
07 Aug 2014 |
D1101941-v2 |
ETM HWS EtherCAT breakout box |
Aidan Brooks et al. |
Incoming Inspection
Auxiliary Optics
|
25 Jun 2014 |
E1100071-v11 |
Obsolete |
Stephen O'Connor et al. |
Conceptual Design
|
10 Jun 2014 |
E1200637-v1 |
aLIGO, AOS, TCS, Acceptance of Ring Heaters |
Mindy Jacobson et al. |
Auxiliary Optics
Subsystem Test
System Engineering
Installation
Assembly
|
22 Nov 2013 |
T1100517-v7 |
Thermal Compensation System (TCS): Hartmann Wavefront Sensor (HWS) Final Design Document |
Aidan Brooks et al. |
Final Design
Auxiliary Optics
|
09 Dec 2012 |
E1000699-v6 |
aLIGO TCS Ring Heater Parent UHV Cable Assembly Formal Drawing Tree & BOM |
Mindy Jacobson et al. |
Final Design
Auxiliary Optics
Fabrication
Vacuum
|
10 Oct 2012 |
D1003312-v8 |
aLIGO TCS Ring Heater End-to-End Wiring Diagram |
Stephen O'Connor |
Vacuum
Fabrication
Auxiliary Optics
Final Design
|
24 Jul 2012 |
E1000065-v6 |
aLIGO TCS CO2 Laser Specification |
Mindy Jacobson et al. |
Preliminary Design
Auxiliary Optics
Final Design
|
20 Jun 2012 |
D1100711-v2 |
Micrel Regulator |
Stephen O'Connor |
Auxiliary Optics
Preliminary Design
|
19 Mar 2012 |
D1200402-x0 |
Ring Heater Driver Enclosure Chassis |
Emery Brown et al. |
Fabrication
Auxiliary Optics
|
06 Mar 2012 |
T1200082-v1 |
Beckhoff Breakout Box |
Stephen O'Connor |
Fabrication
Auxiliary Optics
Requirements
|
23 Feb 2012 |
T1000705-v2 |
Hartmann Wavefront Sensor (HWS) delta-preliminary design review (PDR) documentation |
Jesper Munch et al. |
Auxiliary Optics
Preliminary Design
|
15 Feb 2012 |
T1200076-x0 |
ETM HWS EtherCAT breakout box |
Stephen O'Connor |
Auxiliary Optics
Requirements
Fabrication
|
09 Feb 2012 |
T1200072-v1 |
Test Proceedure ETM: Hartman Sensor Power Supply |
Stephen O'Connor |
Fabrication
Auxiliary Optics
Requirements
|
08 Feb 2012 |
T1200006-v2 |
Linear High Current Regulator Thermal Evaluation |
Rich Abbott et al. |
Basic R&D
System Engineering
|
06 Jan 2012 |
T1100290-v2 |
Ring Heater Driver Chassis Test Procedure |
Stephen O'Connor |
Fabrication
Auxiliary Optics
|
09 Sep 2011 |
E1100490-v1 |
aLIGO TCS Hartmann Sensor Camera Assembly DCN |
Aidan Brooks et al. |
Auxiliary Optics
Final Design
|
31 May 2011 |
E1000700-v4 |
DCN, aLIGO TCS Ring Heater Parent UHV Cable Assembly |
Mindy Jacobson et al. |
Fabrication
Vacuum
Final Design
Auxiliary Optics
|
07 Dec 2010 |
D1003031-x0 |
aLIGO TCS In-Air Cable for ETM Ring Heater Driver |
Mindy Jacobson et al. |
Fabrication
Final Design
Auxiliary Optics
|
15 Nov 2010 |
D1003030-x0 |
aLIGO TCS In-Air Cable for ITM Ring Heaters |
Mindy Jacobson et al. |
Fabrication
Final Design
Auxiliary Optics
|
15 Nov 2010 |