LIGO Document T1200385-v1
- When the LLO BS was hung, it had a large pitch offset, possibly due to prisms glued in the wrong position. This document describes the efforts to understand the problem and the eventual decision to correct it using trim mass at the IM.
- -v1: preliminary draft for discussion - needs more data and a conclusion.
DCC Version 3.4.3, contact
Document Database Administrators