LIGO Document E1400166-v3
- Procedure for installing and commissioning containment vessel to neutralize LGV7 stem leak.
- - Incorporated outcome of fit check/dry run performed week of 9/23/2014
- Revised assembly & test sequence
- Detailed housing shim/alignment procedure included
- SS500 locations revised
- PID schematic and equipment list included
- Top level assembly drawings included