M1100040-v7 |
SOP for Arm Length Stabilization Setup in LVEA and VEA at LHO |
Bram Slagmolen et al. |
Sensing and Control
Safety
|
26 Aug 2015 |
E1100530-v10 |
PSL/IO/TCS Beckhoff (Slow Controls) Chassis Cabling/Wiring Diagram |
Jose Puente et al. |
State Control and Monitoring
Laser Systems
Installation
|
16 Aug 2024 |
P1500249-v17 |
The Advanced LIGO Photon Calibrators |
Richard Savage et al. |
Calibration
Auxiliary Optics
|
23 Jul 2019 |
T1200259-v3 |
PSL Startup and Shutdown Procedures |
Michael Rodruck |
Laser Systems
|
21 Sep 2016 |
D1003076-v6 |
L1 and H1 PSL/IO optical table and Laser Area Enclosure layout drawing |
Michael Rodruck et al. |
Installation
Laser Systems
|
21 Sep 2016 |
D1300179-v1 |
PSL Environmental Monitoring System Concentrator Box Top/Bottom Panel |
Michael Rodruck |
Fabrication
|
02 Mar 2015 |
D1300177-v1 |
PSL Environmental Monitoring System Concentrator Box Side Panels |
Michael Rodruck |
Fabrication
|
02 Mar 2015 |
T1300585-v2 |
Setup and Alignment of Pcal Periscope Pre-Alignment Support Cradles |
Richard Savage et al. |
Fabrication
Auxiliary Optics
|
10 Jan 2014 |
M1200320-v1 |
Standard Operating Procedure for Prometheus Dual Wave Length Laser in the OSB Optics Lab at LHO |
Keita Kawabe et al. |
Safety
|
24 Sep 2012 |
M1200295-v1 |
Standard Operating Procedure for OzOptics IR laser in the OSB Optics Lab at LHO |
Keita Kawabe et al. |
Safety
|
07 Sep 2012 |
M1200283-v1 |
Standard Operating Procedure (SOP) for End Station Optics Labs at LHO |
Keita Kawabe et al. |
Safety
|
24 Aug 2012 |
T1200172-v2 |
Installation and testing of L1 PSL table legs |
Riccardo DeSalvo et al. |
Laser Systems
Commissioning
|
15 Apr 2012 |
D1101098-v1 |
H2 Laser Diode Room and Chiller Room Architectural Drawings |
Richard Savage et al. |
Final Design
Laser Systems
|
13 Jun 2011 |
T1000416-v3 |
LSC Instrument Science White Paper 2010 |
Gregg Harry et al. |
Detector
Reports
|
20 Apr 2011 |
D1002388-v3 |
Mechanical Sections and Details - H1 Laser Area Enclosure Acoustic Shell |
Derek Anderson et al. |
Laser Systems
Procurements
Final Design
|
05 Nov 2010 |