LIGO Document E1100810-v3
- This document covers installation of the Arm Cavity Baffle onto an overhead mechanical interface for testing and onto the Stage 0 structure inside a BSC chamber. This procedure must be read before beginning the installation of an Arm Cavity Baffle.
DCC Version 3.4.3, contact
Document Database Administrators