C960739-x0 |
Missing Page for ICD-BTT and Interface Control Document for the Beam Tube and the Beam Tube Slab |
Lance Buboltz |
Document Migration
|
29 Sep 2020 |
C960366-v1 |
Design Document Revisions - Design Calculations for CDRL`s 10 & 24 - CDRL 10 & 24, DRD 03 |
Lance Buboltz |
Document Migration
|
29 Sep 2020 |
C951392-x0 |
Foundation Loads and Valve Support at the Terminations |
Lance Buboltz |
Document Migration
|
29 Sep 2020 |
P990007-v1 |
LIGO Beam Tube Module Design, Fabrication & Installation |
Lance Buboltz et al. |
Document Migration
Vacuum
|
02 Feb 2019 |
E950117-x0 |
Spiral Weld Pipe Mill Specification |
Lance Buboltz |
Document Migration
|
12 Jun 2012 |
T950127-x0 |
Termination Support Foundation Loads |
Lance Buboltz |
Document Migration
|
18 Dec 1995 |
T950125-x0 |
Termination Support Sketch and Summary of Loads per Anchor Bolt |
Lance Buboltz |
Document Migration
|
15 Dec 1995 |