USEFUL LINKS
1) For aid with orientation of chamber and location of flanges on chamber, refer to AdvLIGO VE HAM4-H1, Vacuum Equipment Assembly, LIGO-D0901126
2) For a Summary of electrical feedthrough types and typical sub-flanges refer to LIGO-D1101775: aLIGO, ELECTRICAL FEEDTHROUGH TYPES, TYPICAL SUBFLANGES, AND PORT CONFIGURATIONS
3) Refer to LIGO-D1002892 (linked below) for the Flange Master Listing Summary
LHAM1 flange layout pictures as of June 2023 (O4 configuration or -v7 of this document) : https://photos.app.goo.gl/Akqx4zY2EzM2Ytq17
08 June 2023: SK uploaded v1 .PDF drawing. Changes include:
- Converting sub-flange D4-3 into D4-3C1 and D4-3C2 for 2 x DB25 connectors.
- Converting sub-flange D1-3C1 and D1-3C2 into D1-3 for a vacuum purge port.
- Removing flanges C1 and D8 since they have vacuum equipment only and therefore should be in HAM1-L1's VE drawing ('D0901810') instead.
- Removing Notes 2 and 4 on D1002884-v6.
- Updating note under Detail B.
- Reorienting detail circles of flanges D5 and D6.
- Adding Detail D for flange D1.
DCC Version 3.5.0, contact
DCC Help