LIGO Document D0901137-v2
- AdvLIGO Systems, BSC1-H1 Top Level Chamber Assembly
- Punch (Snag) List: -
1. Need to add image of layout with BSC1 highlighted (sheet 1 of 4).
2. Need to add bill of materials and balloons (sheet 2 of 4).
3. Need to add transparent laser beam of appropriate diameter.
4. Once laser beam added, need to add cross-section-vertical through laser beam.
5. missing CO2 ITM steering mirror and its support
DCC Version 3.4.3, contact
Document Database Administrators