LIGO-Number | Title | Author(s) | Topic(s) | Last Updated |
---|---|---|---|---|
D1500295-v4 | OPO Suspension (OPOS, VOPO, VIP) Overall Assembly Drawing | Fabrice Matichard et al. | Basic R&D Squeezer |
12 Sep 2022 |
E1500359-v1 | aLIGO, SQZ | Lisa Barsotti et al. | Squeezer |
17 Mar 2022 |
E1600168-x0 | aLIGO, SQZ, OPOS Suspension (VOPO, VIP) | Fabrice Matichard et al. | Final Design Squeezer |
29 Mar 2021 |
E1600171-x0 | aLIGO, SQZ, VOPO Cavity | Fabrice Matichard et al. | Final Design Squeezer |
23 Nov 2020 |
E1500358-v2 | aLIGO, SQZ, Preliminary Design Documents | Lisa Barsotti et al. | Squeezer Preliminary Design |
03 Nov 2020 |
E1600165-v1 | VOPO Suspension - Conceptual Design Study | Alvaro Fernandez-Galiana et al. | Thesis/Dissertation Squeezer |
24 Oct 2018 |
E1500361-x0 | aLIGO, SQZ, VOPO | Lisa Barsotti et al. | Squeezer Preliminary Design |
17 Apr 2017 |
Number of documents found: 7