L1 installed a 90/10 beam splitter in front of the POP QPD sled in order to allow operation at input power higher than 10W.
A picture of the ISC path in HAM3 is here:
https://alog.ligo-la.caltech.edu/aLOG/uploads/9787_20131119142329_IMG_0099.jpg
DCC Version 3.5.0, contact
DCC Help