LIGO Document E1500454-x0
- We propose to extend the RF distribution infrastructure to the PSL room. Currently, the lines terminate at the PSL field racks, and the runs into the PSL are using cables strung on the floor.
DCC Version 3.5.0, contact
DCC Help