LIGO Document D060348-v2
- Advanced LIGO, SUS, Penre MASS Quad N-Ptype, OSEM TRANSLATION PLATE, ETM PEN RE MASS CAN
- Final UK Quad production drawing - rev F
5/14/2011 note from Dennis Coyne: Jodi Fauver and Jeff Bartlett report that 36 revision B units and 4 revision F units were delivered to LHO.
5/14/2011 note from Joe O'Dell (RAL):
The differences between previous revisions and the final uploaded ones are just clerical changes to the drawings.... e.g. the removal of the “n-p type” in the titles, the change to “aLIGO” for the system, of the addition of dimensions in drawings, to aid manufacture. Before the handover of the final drawings, I went through and made many of these clerical changes, and since the drawings were released, I had to increment the revision.
DCC Version 3.4.3, contact
Document Database Administrators